CN107313316A - A kind of AGV paths implementation method - Google Patents

A kind of AGV paths implementation method Download PDF

Info

Publication number
CN107313316A
CN107313316A CN201710653675.XA CN201710653675A CN107313316A CN 107313316 A CN107313316 A CN 107313316A CN 201710653675 A CN201710653675 A CN 201710653675A CN 107313316 A CN107313316 A CN 107313316A
Authority
CN
China
Prior art keywords
track
cycle operation
bank bridge
area
handling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710653675.XA
Other languages
Chinese (zh)
Inventor
郑松
林东东
吴晓林
郭昇彦
柯伟林
念榕
孙云
郑蓉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sap (fujian) Technology Co Ltd
Original Assignee
Sap (fujian) Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sap (fujian) Technology Co Ltd filed Critical Sap (fujian) Technology Co Ltd
Priority to CN201710653675.XA priority Critical patent/CN107313316A/en
Publication of CN107313316A publication Critical patent/CN107313316A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C1/00Design or layout of roads, e.g. for noise abatement, for gas absorption
    • E01C1/002Design or lay-out of roads, e.g. street systems, cross-sections ; Design for noise abatement, e.g. sunken road

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention provides a kind of AGV paths implementation method, traffic zone is divided into traveling area and loading place, the track in the traveling area and the track of the loading place are one-way road;The track in the traveling area includes going to the track of bank bridge, goes to stockyard and be back to the track of maintenance area, wherein going to stockyard and to be back to the track of maintenance area opposite with the track direction for going to bank bridge;The loading place includes handling track and passes through track, and track is passed through in a side in any handling track to be described, and another side is another handling track being disposed adjacent.The inventive method substantially reduces the complexity of AGV road networks so that the haulage vehicle AGV in turnover stockyard is not easy collision, congestion and obstruction occur, so as to improve operating efficiency by being provided with going out trade, returning trade, work road, pass through for single file.

Description

A kind of AGV paths implementation method
Technical field
The present invention relates to AGV (Automated Guided Vehicle, automatical pilot transportation vehicle) path implementation method, fit For places such as stockyard, harbours.
Background technology
Traditional traffic jam is primarily due to stockyard intersection road conditions complexity, traffic flow and concentrated.
Stockyard is the place for depositing container, is responsible for importing and exporting the handing-over and keeping of container.Imported and exported as container The buffer strip of link, stockyard ensure that the continuity and high efficiency of container handling operation.According to current domestic container code Head operating type, after certain incoming vessel rests in berth, disc despatch is unloaded in order to shorten, unused bank bridge by track all Move together, only need to ensure to leave certain safe distance between bank bridge.Although so improving the efficiency of loading and unloading, When bank bridge quantity increase to a certain extent after, the average efficiency of loading and unloading of bank bridge does not improve significantly, on the contrary than unit make Industry efficiency has declined, and this is primarily due to excessive dolly, and movement occurs in that jam situation between stockyard ahead of the curve.According to right The actual investigational data of certain domestic container terminal shows, when using 6 with debark bridge one ship of operation simultaneously when, ship is made Industry efficiency when only using 4 compared with do not improve significantly.
Stockyard is area maximum, the region of container logisticses concentration in container terminal, and the complexity of road network to pass in and out heap Easily there is collision, congestion and obstruction in haulage vehicle AGV in.This is all directly connected to the operating efficiency of bank bridge, easily goes out Existing bank bridge waits AGV phenomenon, and then influences the overall operation efficiency of harbour.Although the arrangement form in case area, road width, heap The traffic that production plan can be all had influence on inside stockyard, but some in these factors when harbour is initially built Decide, it is impossible to change easily.Thus stockyard AGV traffic control into whole harbour traffic control emphasis.
Stockyard intersection is the wagon flow steering of different directions, the place for intersecting and converging, and easily occurs crowded, collision, order Sequence is chaotic.Based on safety and operating efficiency problem, suitable traffic control must be carried out to it.Intersection in stockyard is unlike general Have on accessible by road provided with traffic lights, belong to unsignalized intersection.The quality of unsignalized intersection running situation, may influence whole The operation of individual road grid traffic system.Similar to traffic counting situation at the parting of the ways, stockyard intersection wagon flow primary cross, Three kinds of fundamemtal phenomenas of shunting and interflow.The conflict formed when the wagon flow of different directions intersects mainly has intersection conflict Horizontal cross and square crossing;The conflict that the wagon flow in one direction is formed when the wagon flow of two different directions is punished into separation It is shunting conflict;The wagon flow of different directions is dissolved into meet and together form interflow conflict, and basic condition such as Fig. 1 is represented.
The particular problem of stockyard intersection collision can mainly be described as following three kinds:
1) on equidirectional, because collision caused by AGV speed different (unloaded and heavy duties) may;
2) in a certain track in stockyard, a certain AGV found in traveling before there is an AGV serving a bridge operation;
3) there are many AGV at certain moment while reaching intersection.
The content of the invention
The technical problem to be solved in the present invention, is to provide a kind of AGV paths implementation method, by being provided with going out for single file Trade, return trade, work road, pass through, substantially reducing the complexity of AGV road networks so that the haulage vehicle in turnover stockyard AGV is not easy collision, congestion and obstruction occur, so as to improve operating efficiency.
What the present invention was realized in:A kind of AGV paths implementation method, traveling area and handling are divided into by traffic zone Area, the track in the traveling area and the track of the loading place are one-way road;
The track in the traveling area includes going to the track of bank bridge, goes to stockyard and be back to the track of maintenance area, wherein Go to stockyard and to be back to the track of maintenance area opposite with the track direction for going to bank bridge;
The loading place includes handling track and passes through track, and car is passed through in a side in any handling track to be described Road, another side is another handling track being disposed adjacent.
In addition, present invention additionally comprises cycle operation area, for current between bank bridge and stockyard;
The cycle operation area is made up of several cycle operation lines, and each cycle operation line includes the car by going to bank bridge The remittance section in road connection handling track, by loading and unloading the remittance abroad section that the track of bank bridge is gone in track connection, the remittance section and remittance abroad One end of section is closed to the handling track setting of bank bridge, and the other end is closed to described go to stockyard and be back to the car of maintenance area Road.
Cycle operation area generting machanism is:Locate to set centered on bank bridge group;The bank bridge group refers to as same ship All bank bridges of oceangoing ship operation.With the movement of bank bridge group, the cycle operation area also follows bank bridge to move together.
A cycle operation line is used alone in each handling track close to handling district center;Close to the 2- of handling area edge 3 handling tracks share a cycle operation line.
The process in cycle operation area is described in vehicle remittance remittance abroad:
(1) vehicle is entered the remittance of the corresponding cycle operation line in the cycle operation area by a track for going to bank bridge Section;
(2) vehicle enters corresponding handling track by correspondence cycle operation line, and the handling track setting for reaching bank bridge enters Luggage is unloaded;
(3) after vehicle completed loading, entered by the corresponding handling track by the remittance abroad section of correspondence cycle operation line and gone Toward the track in stockyard, if now meeting other vehicles, go to stockyard via the track of passing through for the track side for going to stockyard or return It is back to maintenance area.
The invention has the advantages that:By being provided with going out trade, returning trade, work road, pass through, significantly for single file Reduce the complexity of AGV road networks so that the haulage vehicle AGV in turnover stockyard is not easy collision, congestion and obstruction occur, so that Improve operating efficiency;The present invention also utilizes the create-rule in cycle operation area in addition, and every vehicle line is strictly distinguished, Ensure that the vehicle flowrate of each circuit is balanced, further the frequency of interaction of reduction vehicle, so that it is crowded, clogging to reduce vehicle Occur.
Brief description of the drawings
The present invention is further illustrated in conjunction with the embodiments with reference to the accompanying drawings.
Fig. 1 is the situation that existing stockyard intersection vehicles collide.
Fig. 2 is the schematic diagram of AGV of the present invention driving path.
Fig. 3 travels the structural representation of the specific embodiment of area one for the present invention.
Fig. 4 is the structural representation of the specific embodiment of loading place one of the present invention.
Fig. 5 is the structural representation of the specific embodiment of cycle operation area one of the present invention.
Fig. 6 is the structural representation of cycle operation area of the present invention another specific embodiment.
Fig. 7 generates the structural representation of example for the work route in cycle operation area of the present invention.
Embodiment
The inventive method is that whole harbour is automated into the traffic zone that regional processing is controlled into a no signal lamp, is passed through The travel direction of vehicle is limited the classifying rationally of traffic zone, the no signal lamp commander of vehicle is realized.As shown in Figure 2, AGV Travel route can be subdivided into 3 stage of route.By taking AGV ship-discharging operations as an example, AVG unloading route can be divided into:AGV is arrived An Qiao, bank bridge to stockyard and stockyard to maintenance area, and each stage AGV travel routes by traffic rules control.
The AGV paths implementation method of the present invention, traveling area and loading place, the car in the traveling area are divided into by traffic zone The track of road and the loading place is one-way road;
The track in the traveling area includes going to the track of bank bridge, goes to stockyard and be back to the track of maintenance area, wherein Go to stockyard and to be back to the track of maintenance area opposite with the track direction for going to bank bridge;
The loading place includes handling track and passes through track, and car is passed through in a side in any handling track to be described Road, another side is another handling track being disposed adjacent.
In addition, present invention additionally comprises cycle operation area, for current between bank bridge and stockyard;
The cycle operation area is made up of several cycle operation lines, and each cycle operation line includes the car by going to bank bridge The remittance section in road connection handling track, by loading and unloading the remittance abroad section that the track of bank bridge is gone in track connection, the remittance section and remittance abroad One end of section is closed to the handling track setting of bank bridge, and the other end is closed to described go to stockyard and be back to the car of maintenance area Road.
Cycle operation area generting machanism is:Locate to set centered on bank bridge group;The bank bridge group refers to as same ship All bank bridges of oceangoing ship operation.With the movement of bank bridge group, the cycle operation area also follows bank bridge to move together.
A cycle operation line is used alone in each handling track close to handling district center;Close to the 2- of handling area edge 3 handling tracks share a cycle operation line.
The process in cycle operation area is described in vehicle remittance remittance abroad:
(1) vehicle is entered the remittance of the corresponding cycle operation line in the cycle operation area by a track for going to bank bridge Section;
(2) vehicle enters corresponding handling track by correspondence cycle operation line, and the handling track setting for reaching bank bridge enters Luggage is unloaded;
(3) after vehicle completed loading, entered by the corresponding handling track by the remittance abroad section of correspondence cycle operation line and gone Toward the track in stockyard, if now meeting other vehicles, go to stockyard via the track of passing through for the track side for going to stockyard or return It is back to maintenance area.
As shown in Fig. 3 to Fig. 7, in order to which the present invention is better described, below by taking automatic dock as an example:
Such as the area distribution schematic diagram that Fig. 3 to Fig. 7 is an automatic dock in a specific embodiment of the invention, it includes 6 The track of bar traveling and the track of 7 loading places.
As Fig. 3 shows, by the inventive method, it travels area and goes to the direction in bank bridge and stockyard by 6 traveling lanes according to AGV Sorted out, wherein ①②③ roads AGV travel directions are unidirectionally turned left, thus three road cars enter An Qiao operation areas to AGV;④⑤⑥ Road AGV travel directions are unidirectionally turned right, and thus three tracks enter storage yard operation area or are back to maintenance area AGV.
As shown in figure 4, AGV loading place driveway travel directions be it is unidirectional to the left.Because considering that same ship may There are many bank bridges to be serviced for it, in order to avoid previous bank bridge operation track occupies latter service bank bridge AGV current car Road, therefore by the inventive method, by loading place lane design is handling track and passes through track.Wherein 1. 4. 7. it is to pass through car 6. 5. 3. road, be 2. handling track.When AGV goes to 6. track operation, discovery can be led to by other AGV road occupyings, now AGV Cross 7. track walk to 6. track, then converge into the 6. track job position;Similarly AGV can pass through the 4. car Road is walked to the 5. track and the 3. track, AGV can by 1. track walk to the 2. track.
As shown in figure 5, according to the present invention, the traffic rules in the current use cycle operation area between bank bridge and stockyard, root According to the track one-way trip characteristic in traveling area and loading place, it can be followed in one cycle operation area of place's design centered on bank bridge Ring operation area is constituted by several cycle operation lines and (is depended on traveling area's dextrad one way road number), each cycle operation line closure In the handling track setting of bank bridge.With the movement of bank bridge, also follower's bank bridge is moved together in cycle operation area.
As shown in fig. 6, the cycle operation area generating principle of the harbour:It is 4 in view of handling track, travels area's dextrad list Runway is 3, therefore 2. 3. handling track shares one bar of cycle operation line 1 by the, and 5. the load and unload track Special circulation production line 2,6. the load and unload track Special circulation production line 3, take by the 2. 3. handling track shares one bar of cycle operation line the reason for be Because production line 1 is in the outer most edge in cycle operation area, the big road conditions to inner side cycle operation line of this circuit vehicle flowrate are disturbed It is smaller.
If as shown in fig. 7, when many bank bridges are same shipping work, these bank bridges can be processed as to a list Position, forms cycle operation area one big, that is, place is set centered on bank bridge group, and the bank bridge group refers to as same ship All bank bridges of operation.
Although the foregoing describing the embodiment of the present invention, those familiar with the art should manage Solution, the specific embodiment described by us is merely exemplary, rather than for the restriction to the scope of the present invention, is familiar with this The equivalent modification and change that the technical staff in field is made in the spirit according to the present invention, should all cover the present invention's In scope of the claimed protection.

Claims (6)

1. a kind of AGV paths implementation method, it is characterised in that:Traffic zone is divided into traveling area and loading place, the traveling The track of the track in area and the loading place is one-way road;
The track in the traveling area includes going to the track of bank bridge, goes to stockyard and be back to the track of maintenance area, wherein going to Stockyard and to be back to the track of maintenance area opposite with the track direction for going to bank bridge;
The loading place includes handling track and passes through track, and track is passed through in a side in any handling track to be described, Another side is another handling track being disposed adjacent.
2. a kind of AGV paths implementation method according to claim 1, it is characterised in that:Also include cycle operation area, be used for It is current between bank bridge and stockyard;
The cycle operation area is made up of several cycle operation lines, and each cycle operation line includes being connected by the track for going to bank bridge Tipping unload track remittance section, by load and unload track connection go to bank bridge track remittance abroad section, it is described import section and remittance abroad section One end is closed to the handling track setting of bank bridge, and the other end is closed to described go to stockyard and be back to the track of maintenance area.
3. a kind of AGV paths implementation method according to claim 2, it is characterised in that:The cycle operation area generates machine System is:Locate to set centered on bank bridge group;The bank bridge group refers to as all bank bridges of same shipping work.
4. a kind of AGV paths implementation method according to claim 3, it is characterised in that:It is described with the movement of bank bridge group Cycle operation area also follows bank bridge to move together.
5. a kind of AGV paths implementation method according to claim 3, it is characterised in that:Close to each of handling district center Load and unload track and a cycle operation line is used alone;The 2-3 handling track close to handling area edge shares a cycle operation Line.
6. a kind of AGV paths implementation method according to claim 3, it is characterised in that:Vehicle is imported and circulated described in remittance abroad The process of operation area is:
(1) vehicle is entered the remittance section of the corresponding cycle operation line in the cycle operation area by a track for going to bank bridge;
(2) vehicle enters corresponding handling track by correspondence cycle operation line, and the handling track setting for reaching bank bridge enters luggage Unload;
(3) after vehicle completed loading, entered by the corresponding handling track by the remittance abroad section of correspondence cycle operation line and go to heap Track, if now meeting other vehicles, go to stockyard via the track of passing through for the track side for going to stockyard or be back to Maintenance area.
CN201710653675.XA 2017-08-03 2017-08-03 A kind of AGV paths implementation method Pending CN107313316A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710653675.XA CN107313316A (en) 2017-08-03 2017-08-03 A kind of AGV paths implementation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710653675.XA CN107313316A (en) 2017-08-03 2017-08-03 A kind of AGV paths implementation method

Publications (1)

Publication Number Publication Date
CN107313316A true CN107313316A (en) 2017-11-03

Family

ID=60170010

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710653675.XA Pending CN107313316A (en) 2017-08-03 2017-08-03 A kind of AGV paths implementation method

Country Status (1)

Country Link
CN (1) CN107313316A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108109435A (en) * 2018-01-23 2018-06-01 唐山港集团股份有限公司 A kind of road transition
CN108382870A (en) * 2018-02-05 2018-08-10 青岛港国际股份有限公司 AGV passes in and out the optimization method and system in operation track under gantry crane
CN109213163A (en) * 2018-09-06 2019-01-15 青岛港国际股份有限公司 AGV method for optimizing route and system in automatic dock QCTP operation
CN110009919A (en) * 2019-03-30 2019-07-12 共享智能铸造产业创新中心有限公司 It is mixed with automatic control system and its working method of the vehicle in intersection of AGV
CN110347156A (en) * 2019-06-28 2019-10-18 青岛港国际股份有限公司 A kind of AGV passes in and out the method for optimizing route and system in operation lane under gantry crane
CN111815161A (en) * 2020-07-07 2020-10-23 中船重工信息科技有限公司 Traffic control rule application method of horizontal transportation scheduling system
CN114194872A (en) * 2021-12-20 2022-03-18 中国海洋大学 Automatic wharf shore bridge operation method based on double buffer models

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1030203A (en) * 1996-07-18 1998-02-03 Tokyu Car Corp Passage device for traveling vehicle
CN204569208U (en) * 2015-02-13 2015-08-19 中交第三航务工程勘察设计院有限公司 Full-automatic container depot double-deck overhead purlin, harbour car delivery system
CN206188034U (en) * 2016-09-08 2017-05-24 程子谦 Arrangement structure in full automated container pier place ahead operation area
CN106743014A (en) * 2016-12-29 2017-05-31 云南卓沛科技有限公司 The warehousing system and storage, warehouse-out method of loading small handcart are transported based on AGV

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1030203A (en) * 1996-07-18 1998-02-03 Tokyu Car Corp Passage device for traveling vehicle
CN204569208U (en) * 2015-02-13 2015-08-19 中交第三航务工程勘察设计院有限公司 Full-automatic container depot double-deck overhead purlin, harbour car delivery system
CN206188034U (en) * 2016-09-08 2017-05-24 程子谦 Arrangement structure in full automated container pier place ahead operation area
CN106743014A (en) * 2016-12-29 2017-05-31 云南卓沛科技有限公司 The warehousing system and storage, warehouse-out method of loading small handcart are transported based on AGV

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108109435A (en) * 2018-01-23 2018-06-01 唐山港集团股份有限公司 A kind of road transition
CN108382870A (en) * 2018-02-05 2018-08-10 青岛港国际股份有限公司 AGV passes in and out the optimization method and system in operation track under gantry crane
CN109213163A (en) * 2018-09-06 2019-01-15 青岛港国际股份有限公司 AGV method for optimizing route and system in automatic dock QCTP operation
CN110009919A (en) * 2019-03-30 2019-07-12 共享智能铸造产业创新中心有限公司 It is mixed with automatic control system and its working method of the vehicle in intersection of AGV
CN110009919B (en) * 2019-03-30 2021-12-21 共享智能铸造产业创新中心有限公司 Automatic control system for vehicle mixed with AGV at intersection and working method thereof
CN110347156A (en) * 2019-06-28 2019-10-18 青岛港国际股份有限公司 A kind of AGV passes in and out the method for optimizing route and system in operation lane under gantry crane
CN110347156B (en) * 2019-06-28 2022-07-19 青岛港国际股份有限公司 Method and system for optimizing path of AGV entering and exiting from working lane under shore bridge
CN111815161A (en) * 2020-07-07 2020-10-23 中船重工信息科技有限公司 Traffic control rule application method of horizontal transportation scheduling system
CN114194872A (en) * 2021-12-20 2022-03-18 中国海洋大学 Automatic wharf shore bridge operation method based on double buffer models

Similar Documents

Publication Publication Date Title
CN107313316A (en) A kind of AGV paths implementation method
CN206188034U (en) Arrangement structure in full automated container pier place ahead operation area
CN107765692A (en) A kind of control method for realizing no signal lamp AGV paths
CN107045343B (en) AGV traffic control method and system
CN109242379B (en) Container unloading and loading transportation system and method for molten iron combined transport railway bay station
CN108217220A (en) A kind of container automatic yard movement system method for arranging
US3754669A (en) Arrangement for continuously transferring loads units
CN101198532A (en) Method and reloading system for reloading or loading at least one loading unit
CN105417190B (en) Container terminal, container handling method and container set dredge method
US3091188A (en) Transfer system
CN109143997B (en) Automatic control system and method for container yard of bay station of molten iron combined transport railway
CN108016889A (en) A kind of container transshipment system method for arranging
CN110065826A (en) A kind of harbour AGV and truck coordinate transport system and working method
WO2019237737A1 (en) Operation system and method for unloading from railway and waterway combined transportation railway harbor station to harbor district stacking yard
CN109249962B (en) Railway container freight yard access control method and system
US20060027133A1 (en) Super railway for USA
CN114348059A (en) Route segmentation unlocking and logic processing method and system based on ad hoc network
CN207451120U (en) A kind of container automatic yard movement system
CN109249963B (en) Interlocking route control method and system for rail power flat car cluster
CN105314408A (en) Automatic rail transport system of container wharf and operation method
CN116477386A (en) Efficient operation container port land area system and operation method thereof
CN108363398A (en) A kind of automatic driving vehicle traffic control system
Nader et al. Technological conditions of intermodal transhipment terminals in Poland
Belošević et al. Rail-road trans-shipment yards: layouts and rail operation
CN105644590A (en) Anti-locking control method for turn-back region running of rail intersecting train

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination