CN107309365A - Waste silk wire paying-off stretches mechanism - Google Patents

Waste silk wire paying-off stretches mechanism Download PDF

Info

Publication number
CN107309365A
CN107309365A CN201710534933.2A CN201710534933A CN107309365A CN 107309365 A CN107309365 A CN 107309365A CN 201710534933 A CN201710534933 A CN 201710534933A CN 107309365 A CN107309365 A CN 107309365A
Authority
CN
China
Prior art keywords
wire
pulley
waste silk
support
lifting slider
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710534933.2A
Other languages
Chinese (zh)
Other versions
CN107309365B (en
Inventor
费洪福
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fuyang Hangzhou Flying Hardware Co Ltd
Original Assignee
Fuyang Hangzhou Flying Hardware Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuyang Hangzhou Flying Hardware Co Ltd filed Critical Fuyang Hangzhou Flying Hardware Co Ltd
Priority to CN201710534933.2A priority Critical patent/CN107309365B/en
Publication of CN107309365A publication Critical patent/CN107309365A/en
Application granted granted Critical
Publication of CN107309365B publication Critical patent/CN107309365B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21FWORKING OR PROCESSING OF METAL WIRE
    • B21F1/00Bending wire other than coiling; Straightening wire
    • B21F1/02Straightening
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21FWORKING OR PROCESSING OF METAL WIRE
    • B21F23/00Feeding wire in wire-working machines or apparatus

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Metal Extraction Processes (AREA)
  • Guides For Winding Or Rewinding, Or Guides For Filamentary Materials (AREA)

Abstract

Mechanism is stretched the invention discloses a kind of waste silk wire paying-off, it is intended to is solved waste silk and is carried out easily card silk phenomenon occur during wire drawing, causes to forget about it draw drum, the phenomenon for the waste silk that fractures, the big deficiency of potential safety hazard.The invention includes support, draw drum, pedestal upper end is provided with pulley of reaching the standard grade, offline pulley, vertically arranged slide bar is connected with support, slide bar, which is arranged on, reaches the standard grade between pulley and offline pulley, liftable is provided with lifting slider on slide bar, lifting slider lower end mounts balancing weight, lifting pulley is installed on lifting slider, the travel switch for being available for lifting slider to touch is installed on support above lifting slider, on support track frame is connected with close to pulley position of reaching the standard grade, adjustable shelf has been slidably mounted in track frame, buffer spring is installed between track frame upper end and adjustable shelf, adjustable shelf is provided with conductor loop, upper position is provided with shell-rinding wheel on support, wire seat.

Description

Waste silk wire paying-off stretches mechanism
Technical field
The present invention relates to a kind of wire-drawing frame, more specifically, it relates to which a kind of waste silk wire paying-off stretches mechanism.
Background technology
At present, reconstruction is typically directly melted down in waste silk recycling, or is justified by butt welding, pressure, and wire drawing machine shaping becomes again Utilized, yielded poorly for building silk, energy consumption is big, and product quality is not good.Now many techniques be the waste silk that will press circle it is direct on Wire drawing machine further draws circle, and take-up is then wound to waste silk by take-up reel, then coiled waste silk is carried out into annealing softening, Eventually pass water tank drawbench further to draw and attenuate, make technique filament, substantially increase the quality and value of product, but it is this Drawing process is higher to technological requirement, and it is always a problem to want to produce in enormous quantities, main bottleneck be after draw drum unwrapping wire directly Into water tank drawbench, easily there is card silk phenomenon, cause to forget about it draw drum, the phenomenon for the waste silk that fractures, potential safety hazard is big.
Chinese patent notification number CN204074798U, discloses a kind of wire releasing device of wire drawing machine, including wire drawing machine load-bearing is put down Platform, wire drawing machine bearing platform is arranged on load-bearing bases, and wire drawing machine bearing platform is provided with wrapping wire close to the end of load-bearing bases Axle, cops top is provided with wrapping wire support arm, and wire drawing bearing platform is provided with transfer guide plate at cops, and wire drawing machine load-bearing is put down Platform is disposed with multiple guiding trestles on the line of cops one, and wire drawing comb is additionally provided with the evagination end of wire drawing machine bearing platform Frame is managed, wire drawing carding frame is fixed on wire drawing bearing platform by locking device.Set wire drawing carding frame can on bearing platform With metal pretreated wire drawing, sideslip is prevented and sagging, metal wire-drawing can also be further ensured that by coordinating with multiple guiding trestles Direct of travel.But this wire releasing device of wire drawing machine is used for easily card silk phenomenon occur during waste silk unwrapping wire, cause to forget about it draw drum, Fracture the phenomenon of waste silk, and potential safety hazard is big.
The content of the invention
Easily there is card silk phenomenon during carrying out wire drawing instant invention overcomes waste silk, cause to forget about it draw drum, fracture The phenomenon of waste silk, the big deficiency of potential safety hazard stretches mechanism there is provided a kind of waste silk wire paying-off, and waste silk carries out the process of wire drawing In be less prone to card silk phenomenon, it is to avoid forget about it the phenomenon of draw drum because of Ka Si, and be difficult out during waste silk unwrapping wire Existing breakage phenomenon, it is to avoid potential safety hazard.
In order to solve the above-mentioned technical problem, the present invention uses following technical scheme:A kind of waste silk wire paying-off stretches mechanism, Including support, draw drum, pedestal upper end is provided with pulley of reaching the standard grade, offline pulley, support and is connected with vertically arranged slide bar, sliding Bar, which is arranged on, reaches the standard grade between pulley and offline pulley, and liftable is provided with lifting slider on slide bar, and lifting slider lower end, which is mounted, matches somebody with somebody The stroke for being provided with lifting pulley, support above lifting slider and being available for lifting slider to touch is installed on pouring weight, lifting slider It is connected with switch, support close to pulley position of reaching the standard grade in track frame, track frame and has been slidably mounted adjustable shelf, track frame upper end Buffer spring is installed between adjustable shelf, adjustable shelf is provided with upper position on conductor loop, support and is provided with shell-rinding wheel, wire Waste silk is wound on seat, draw drum, waste silk sequentially passes through conductor loop, pulley of reaching the standard grade, lifting pulley, offline pulley, shell-rinding wheel, wire Seat.
When waste silk wire paying-off stretches mechanism work, waste silk is pulled from left to right from draw drum, first passes around conductor loop Guiding smooth out with the fingers directly, then pass around and shell-rinding wheel reached after pulley of reaching the standard grade, lifting pulley, offline pulley, shell-rinding wheel removes waste silk surface Oxide layer, be sent to water tank drawbench eventually through wire seat and carry out further wire-drawing operation.When waste silk is pulled, in balancing weight In the presence of the waste silk of the lifting pulley left and right sides be in nature straight condition, it is this to stretch not hard draw, but flexible drawing Directly, be not in breakage phenomenon.When card silk phenomenon occurs in any position, lifting slider is pulled upward, and lifting slider, which rises, to be touched When encountering travel switch, whole system for drawing is closed, waste silk stops unwrapping wire action, it is to avoid occur fracture of wire phenomenon after wire drawing hard draw, Even forget about it draw drum, potential safety hazard occur.When waste silk catching phenomenon occurs in wire ring position, adjustable shelf has been pulled upwardly, Buffer spring in track frame has the effect of buffering to adjustable shelf, on the one hand can eject conductor loop downwards, so that leading Wire loop departs from clamping stagnation position, waste silk is can continue to smooth pulling, on the other hand enters row buffering to waste silk, it is to avoid occur after hard draw Fracture of wire phenomenon.This waste silk wire paying-off stretches mechanism and is less prone to card silk phenomenon during waste silk carries out wire drawing, it is to avoid Forget about it because of Ka Si and be less prone to breakage phenomenon during the phenomenon of draw drum, waste silk unwrapping wire, it is to avoid potential safety hazard, and And waste silk straightening effect is good, advantageously in the follow-up wire drawing of waste silk.
Preferably, pedestal lower end is provided with support baseboard, pedestal upper end is provided with crossbeam, pulley of reaching the standard grade, offline pulley, slide bar It is both connected on crossbeam.Supporting structure is steadily reliable, it is ensured that the safety and steady operation of whole mechanism.
Slided preferably, being provided with support close to pulley lower left position of reaching the standard grade on wire sleeve, lifting slider close to lifting Wheel top-left position is provided with wire sleeve, support and is provided with wire sleeve on the left of shell-rinding wheel, and waste silk both passes through wire sleeve.Wire sleeve pair Waste silk carries out guide effect, waste silk is swimmingly sent to pulley of reaching the standard grade, lifting pulley, on shell-rinding wheel, unwrapping wire was stretched Journey is relatively reliable, is conducive to reducing the risk of card silk.
Preferably, wire sleeve or so inwall is in the arcuate structure of protrusion, it is mounted on wire sleeve or so inwall some Two-wheeled roller is installed between individual ball, wire sleeve or so inwall, waste silk is arranged between two-wheeled roller.The arc inner wall of protrusion is favourable Being provided with beneficial to friction is reduced for penetrating and passing in waste silk, wheel roller and ball, reduces the risk of card silk.
Preferably, slide bar lower end is connected with limited block, branch is set between slide bar upper limit position block and lifting slider lower end Support spring.Support spring has certain cushioning supportive effect, be easy to lifting pulley both sides the adaptive lifting slider of waste silk and The Action of Gravity Field of balancing weight, it is to avoid fracture of wire phenomenon occur because the Action of Gravity Field that waste silk is received is excessive.
It is provided with plus powder chamber on the left of wire drawing ring preferably, being provided with wire seat in wire drawing ring, guide holder, plus powder chamber is close The inwall of wire drawing ring is in cone structure left large and right small, plus powder intracavitary is equipped with wire drawing powder.Waste silk passes through wire seat post-tensioning silk powder pair Waste silk is lubricated, and is conducive to the wire-drawing operation of waste silk, is carried out prestretching to waste silk by wire drawing ring, is easy to the drawing of water tank drawbench Silk operation.Cone structure plus powder chamber set be easy to wire drawing powder to be taken away by waste silk, improve lubricant effect.
Preferably, track frame includes two round bars be arrangeding in parallel, adjustable shelf two ends are slidably sleeved on two circles respectively On bar, two buffer springs are set on two round bars.The track frame being made up of two round bars is easy to the smooth sliding of adjustable shelf.
Pacify preferably, being slidably set with movable block top position on movable block, support in track frame below adjustable shelf Equipped with the driving rotating disk rotated is driven by motor, it is hinged between driving rotating disk edge and movable block on promotion connecting rod, movable block Reasonable line set is connected, waste silk passes through reason line set.Motor work drives driving rotating disk to rotate, and promotes and moves in the presence of connecting rod is promoted Motion block is slided up and down in track frame, so that waste silk is through before conductor loop, is pumped progress by managing line set Shake, makes waste silk in order, is prevented effectively from waste silk and occurs card silk phenomenon before wire carrier on being transported to.
Preferably, being set with prefastening force spring above lifting slider on slide bar, prefastening force spring lower end is connected to lifting On sliding block.When catching phenomenon occurs in waste silk, prefastening force spring provides certain pretightning force during lifting slider rises, Waste silk is eliminated catching phenomenon automatically to a certain extent, and certain protective effect is served to travel switch, prevent The power that lifting slider is acted on travel switch is excessive and damages travel switch.
Compared with prior art, the beneficial effects of the invention are as follows:Waste silk wire paying-off stretches mechanism and carries out wire drawing in waste silk During be less prone to card silk phenomenon, it is to avoid forget about it because of Ka Si and be difficult during the phenomenon of draw drum, waste silk unwrapping wire There is breakage phenomenon, it is to avoid potential safety hazard, and waste silk straightening effect is good, advantageously in the follow-up wire drawing of waste silk.
Brief description of the drawings
Fig. 1 is a kind of structural representation of the present invention;
Fig. 2 is the sectional view of the wire sleeve of the present invention;
Fig. 3 is the sectional view of the wire sleeve other direction of the present invention;
Fig. 4 is the sectional view of the wire seat of the present invention;
In figure:1st, support, 2, draw drum, 3, pulley of reaching the standard grade, 4, offline pulley, 5, slide bar, 6, lifting slider, 7, balancing weight, 8, Lifting pulley, 9, travel switch, 10, track frame, 11, adjustable shelf, 12, buffer spring, 13, conductor loop, 14, shell-rinding wheel, 15, lead Line seat, 16, waste silk, 17, support baseboard, 18, crossbeam, 19, wire sleeve, 20, ball, 21, wheel roller, 22, wire drawing ring, 23 plus powder Chamber, 24, movable block, 25, driving rotating disk, 26, promote connecting rod, 27, reason line set, 28, limited block, 29, support spring, 30, pretension Power spring.
Embodiment
Below by specific embodiment, and with reference to accompanying drawing, technical scheme is further described specifically:
Embodiment:A kind of waste silk wire paying-off stretches mechanism(Referring to accompanying drawing 1 to 4), including support 1, draw drum 2, pedestal upper end It is provided with pulley 3 of reaching the standard grade, offline pulley 4, support and is connected with vertically arranged slide bar 5, slide bar, which is arranged on, reaches the standard grade pulley with Between line pulley, liftable is provided with lifting slider 6 on slide bar, and lifting slider lower end mounts and installed on balancing weight 7, lifting slider Have on the travel switch 9 for being provided with lifting pulley 8, support above lifting slider and being available for lifting slider to touch, support close to upper Line pulley position is connected with track frame 10, and track frame is inclined upwardly setting from left to right, and activity has been slidably mounted in track frame Frame 11, is provided with buffer spring 12 between track frame upper end and adjustable shelf, adjustable shelf is provided with conductor loop 13, support position on the lower Put and winding waste silk 16 on shell-rinding wheel 14, wire seat 15, draw drum is installed, waste silk sequentially passes through conductor loop, pulley of reaching the standard grade, lifting Pulley, offline pulley, shell-rinding wheel, wire seat.Pedestal lower end is provided with support baseboard 17, and pedestal upper end is provided with crossbeam 18, cunning of reaching the standard grade Wheel, offline pulley, slide bar are both connected on crossbeam.Wire sleeve 19 is installed close to pulley lower left position of reaching the standard grade on support, lifted It is provided with sliding block close to lifting pulley top-left position on wire sleeve, support on the left of shell-rinding wheel and wire sleeve is installed, waste silk is worn Cross wire sleeve.Wire sleeve or so inwall is mounted on several balls 20 on wire sleeve or so inwall in the arcuate structure of protrusion, Two-wheeled roller 21 is installed, waste silk is arranged between two-wheeled roller between wire sleeve or so inwall.Slide bar lower end is connected with limited block 28, Support spring 29 is set between slide bar upper limit position block and lifting slider lower end.On slide bar pretightning force is set with above lifting slider Spring 30, prefastening force spring lower end is connected on lifting slider.Wire drawing ring in wire drawing ring 22, guide holder is installed left in wire seat Side is provided with plus powder chamber 23, plus powder chamber is in cone structure left large and right small close to the inwall of wire drawing ring, plus powder intracavitary is equipped with wire drawing powder. Track frame includes two round bars be arrangeding in parallel, and adjustable shelf two ends are slidably sleeved on two round bars respectively, adjustable shelf on round bar Lower section is threadedly coupled stop collar, and stop collar is used for spacing adjustable shelf.Two buffer springs are set on two round bars.In track frame Movable block top position on movable block 24, support is slidably set with below adjustable shelf the driving that rotation is driven by motor is installed Rotating disk 25, is hinged with promotion connecting rod 26, movable block between driving rotating disk edge and movable block and connects reasonable line set 27, waste silk is worn Cross reason line set.
When waste silk wire paying-off stretches mechanism work, waste silk is pulled from left to right from draw drum, first passes around conductor loop Guiding smooth out with the fingers directly, then pass around and shell-rinding wheel reached after pulley of reaching the standard grade, lifting pulley, offline pulley, shell-rinding wheel removes waste silk surface Oxide layer, be sent to water tank drawbench eventually through wire seat and carry out further wire-drawing operation.When waste silk is pulled, in balancing weight In the presence of the waste silk of the lifting pulley left and right sides be in nature straight condition, it is this to stretch not hard draw, but flexible drawing Directly, be not in breakage phenomenon.When card silk phenomenon occurs in any position, lifting slider is pulled upward, and lifting slider, which rises, to be touched When encountering travel switch, whole system for drawing is closed, waste silk stops unwrapping wire action, it is to avoid occur fracture of wire phenomenon after wire drawing hard draw, Even forget about it draw drum, potential safety hazard occur.When waste silk catching phenomenon occurs in wire ring position, adjustable shelf has been pulled upwardly, Buffer spring in track frame has the effect of buffering to adjustable shelf, on the one hand can eject conductor loop downwards, so that leading Wire loop departs from clamping stagnation position, waste silk is can continue to smooth pulling, on the other hand enters row buffering to waste silk, it is to avoid occur after hard draw Fracture of wire phenomenon.This waste silk wire paying-off stretches mechanism and is less prone to card silk phenomenon during waste silk carries out wire drawing, it is to avoid Forget about it because of Ka Si and be less prone to breakage phenomenon during the phenomenon of draw drum, waste silk unwrapping wire, it is to avoid potential safety hazard, and And waste silk straightening effect is good, advantageously in the follow-up wire drawing of waste silk.
Embodiment described above is a kind of preferably scheme of the present invention, not makees any formal to the present invention Limitation, also has other variants and remodeling on the premise of without departing from the technical scheme described in claim.

Claims (9)

1. a kind of waste silk wire paying-off stretches mechanism, it is characterized in that, including support, draw drum, pedestal upper end are provided with cunning of reaching the standard grade Vertically arranged slide bar is connected with wheel, offline pulley, support, slide bar, which is arranged on, reaches the standard grade between pulley and offline pulley, slide bar Upper liftable is provided with lifting slider, and lifting slider lower end, which is mounted, to be provided with balancing weight, lifting slider on lifting pulley, support It is provided with above lifting slider on the travel switch for being available for lifting slider to touch, support and is connected with track close to pulley position of reaching the standard grade Adjustable shelf has been slidably mounted in frame, track frame, has been provided with buffer spring, adjustable shelf and sets between track frame upper end and adjustable shelf There is on conductor loop, support upper position be provided with shell-rinding wheel, wire seat, draw drum and wind waste silk, waste silk sequentially passes through wire Ring, pulley of reaching the standard grade, lifting pulley, offline pulley, shell-rinding wheel, wire seat.
2. waste silk wire paying-off according to claim 1 stretches mechanism, it is characterized in that, pedestal lower end is provided with support baseboard, Pedestal upper end is provided with crossbeam, and pulley of reaching the standard grade, offline pulley, slide bar are both connected on crossbeam.
3. waste silk wire paying-off according to claim 1 stretches mechanism, it is characterized in that, close to pulley lower-left of reaching the standard grade on support Position is provided with wire sleeve, lifting slider to be provided with wire sleeve, support on the left of shell-rinding wheel close to lifting pulley top-left position Wire sleeve is installed, waste silk both passes through wire sleeve.
4. waste silk wire paying-off according to claim 3 stretches mechanism, it is characterized in that, wire sleeve or so inwall is in protrusion It is mounted on several balls on arcuate structure, wire sleeve or so inwall, two-wheeled roller is installed between wire sleeve or so inwall, given up Silk is arranged between two-wheeled roller.
5. waste silk wire paying-off according to claim 1 stretches mechanism, it is characterized in that, slide bar lower end is connected with limited block, Support spring is set between slide bar upper limit position block and lifting slider lower end.
6. the waste silk wire paying-off according to claim 1 to 5 any one stretches mechanism, it is characterized in that, pacify in wire seat Equipped with wire drawing ring, it is provided with plus powder chamber on the left of wire drawing ring in guide holder, plus powder chamber is in cone left large and right small close to the inwall of wire drawing ring Shape structure, plus powder intracavitary are equipped with wire drawing powder.
7. the waste silk wire paying-off according to claim 1 to 5 any one stretches mechanism, it is characterized in that, track frame includes Two round bars for be arrangeding in parallel, adjustable shelf two ends are slidably sleeved on two round bars respectively, and two buffer springs are set in two On round bar.
8. the waste silk wire paying-off according to claim 1 to 5 any one stretches mechanism, it is characterized in that, it is living in track frame Movable block top position on movable block, support is slidably set with below moving frame the driving turn that rotation is driven by motor is installed Disk, is hinged with promotion connecting rod, movable block between driving rotating disk edge and movable block and connects reasonable line set, and waste silk passes through reason line Set.
9. the waste silk wire paying-off according to claim 1 to 5 any one stretches mechanism, it is characterized in that, lifted on slide bar Prefastening force spring is set with above sliding block, prefastening force spring lower end is connected on lifting slider.
CN201710534933.2A 2017-07-03 2017-07-03 Mechanism is straightened in waste silk wire paying-off Active CN107309365B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710534933.2A CN107309365B (en) 2017-07-03 2017-07-03 Mechanism is straightened in waste silk wire paying-off

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710534933.2A CN107309365B (en) 2017-07-03 2017-07-03 Mechanism is straightened in waste silk wire paying-off

Publications (2)

Publication Number Publication Date
CN107309365A true CN107309365A (en) 2017-11-03
CN107309365B CN107309365B (en) 2018-12-25

Family

ID=60180582

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710534933.2A Active CN107309365B (en) 2017-07-03 2017-07-03 Mechanism is straightened in waste silk wire paying-off

Country Status (1)

Country Link
CN (1) CN107309365B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107855437A (en) * 2017-11-22 2018-03-30 安徽天瑞电子科技有限公司 Wire harness stably walks straight structure after unreeling
CN109127776A (en) * 2018-10-25 2019-01-04 无锡通用钢绳有限公司 A kind of wire releasing device of wire drawing machine
CN110000451A (en) * 2019-01-22 2019-07-12 中车长春轨道客车股份有限公司 The anti-sticking silk method of barreled wire welding
CN110479792A (en) * 2019-07-31 2019-11-22 德州恒远焊材有限公司 A kind of pull-type pay off rack
CN113579121A (en) * 2021-06-23 2021-11-02 苏州斯尔特微电子有限公司 High-power LED chip wire bonding machine
CN114314157A (en) * 2021-12-17 2022-04-12 国网河南省电力公司温县供电公司 Cable unwrapping wire tractive device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5249472A (en) * 1991-12-23 1993-10-05 Brown Maurice H Wire tension meter
JP2008138389A (en) * 2006-11-30 2008-06-19 Ihi Corp Accumulator of wire reeling equipment
CN201799484U (en) * 2010-10-13 2011-04-20 广东精达里亚特种漆包线有限公司 Protecting device used for automatic unwinding of large drawing mill
CN202438557U (en) * 2012-03-07 2012-09-19 上海亿浩环保设备有限公司 Pickling-free rust removal wire-drawing device
CN202438570U (en) * 2012-03-07 2012-09-19 上海亿浩环保设备有限公司 Acid-pickling-free derusting wire drawing machine
CN106216435A (en) * 2016-07-27 2016-12-14 山东德林钢绳有限公司 Wire drawing machine continuous paying out device and line-putting method thereof

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5249472A (en) * 1991-12-23 1993-10-05 Brown Maurice H Wire tension meter
JP2008138389A (en) * 2006-11-30 2008-06-19 Ihi Corp Accumulator of wire reeling equipment
CN201799484U (en) * 2010-10-13 2011-04-20 广东精达里亚特种漆包线有限公司 Protecting device used for automatic unwinding of large drawing mill
CN202438557U (en) * 2012-03-07 2012-09-19 上海亿浩环保设备有限公司 Pickling-free rust removal wire-drawing device
CN202438570U (en) * 2012-03-07 2012-09-19 上海亿浩环保设备有限公司 Acid-pickling-free derusting wire drawing machine
CN106216435A (en) * 2016-07-27 2016-12-14 山东德林钢绳有限公司 Wire drawing machine continuous paying out device and line-putting method thereof

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107855437A (en) * 2017-11-22 2018-03-30 安徽天瑞电子科技有限公司 Wire harness stably walks straight structure after unreeling
CN109127776A (en) * 2018-10-25 2019-01-04 无锡通用钢绳有限公司 A kind of wire releasing device of wire drawing machine
CN109127776B (en) * 2018-10-25 2024-04-19 无锡通用钢绳有限公司 Paying-off device of wire drawing machine
CN110000451A (en) * 2019-01-22 2019-07-12 中车长春轨道客车股份有限公司 The anti-sticking silk method of barreled wire welding
CN110479792A (en) * 2019-07-31 2019-11-22 德州恒远焊材有限公司 A kind of pull-type pay off rack
CN113579121A (en) * 2021-06-23 2021-11-02 苏州斯尔特微电子有限公司 High-power LED chip wire bonding machine
CN114314157A (en) * 2021-12-17 2022-04-12 国网河南省电力公司温县供电公司 Cable unwrapping wire tractive device
CN114314157B (en) * 2021-12-17 2023-08-18 国网河南省电力公司温县供电公司 Cable paying-off traction device

Also Published As

Publication number Publication date
CN107309365B (en) 2018-12-25

Similar Documents

Publication Publication Date Title
CN107309365A (en) Waste silk wire paying-off stretches mechanism
CN204151387U (en) Cable copper wire wire drawing and annealing device
CN105253699A (en) Cable continuous curing storage device
CN204713144U (en) Weaving winding up roller transport trolley
CN104788015A (en) Novel high-speed glass fiber indexing cake winder
CN201791773U (en) High-level pay-off stand
CN202638948U (en) Vertical take-up machine
CN108394577B (en) High-speed wire automatic packing machine paying-off system
CN202183275U (en) Pay-off device of copper clad aluminum wires
CN104324959A (en) Wire pressing roller of inverted wire drawing machine
CN105057513A (en) Material feeding rack of spring coiling machine
CN210253592U (en) Loop type wire drawing machine tension adjusting rack
CN205324382U (en) A extrusion production line for processing copper wire
CN204416777U (en) Residual silk regenerative apparatus
CN209081142U (en) A kind of solder stick Automated winding equipment
CN106276398A (en) Cable up-coiler wire-sending device
CN216175435U (en) Rotary pay-off mechanism
CN206911964U (en) A kind of waste silk actinobacillus device
CN202343599U (en) Inverted take-up device
CN103817532A (en) Automatic uncoiling and blanking line
CN204237356U (en) A kind of thin machine drawing takeup tension mechanism
CN204148260U (en) The Wirewinding roller of inverted wire-drawing machine
CN203748654U (en) Automatic cigarette supporting device
CN208182057U (en) A kind of chain transfer having vertical lift and horizontally moving functions concurrently
CN206446889U (en) A kind of horizontal wire rod baling press reshaping device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Waste wire laying and straightening mechanism

Granted publication date: 20181225

Pledgee: Bank of Jiangsu Limited by Share Ltd. Hangzhou branch

Pledgor: HANGZHOU FUYANG FEIRUN HARDWARE CO.,LTD.

Registration number: Y2024330000142