CN107292578A - The online estimating and examining system of high voltage distribution network project feasibility study and method - Google Patents
The online estimating and examining system of high voltage distribution network project feasibility study and method Download PDFInfo
- Publication number
- CN107292578A CN107292578A CN201610219091.7A CN201610219091A CN107292578A CN 107292578 A CN107292578 A CN 107292578A CN 201610219091 A CN201610219091 A CN 201610219091A CN 107292578 A CN107292578 A CN 107292578A
- Authority
- CN
- China
- Prior art keywords
- department
- feasibility study
- project
- subordinate
- data
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 12
- 238000012552 review Methods 0.000 claims abstract description 26
- 238000011156 evaluation Methods 0.000 claims abstract description 13
- 239000000463 material Substances 0.000 claims abstract description 9
- 238000012550 audit Methods 0.000 claims abstract description 4
- 230000006870 function Effects 0.000 claims description 3
- 230000008676 import Effects 0.000 claims description 3
- 238000007619 statistical method Methods 0.000 claims description 3
- 238000011157 data evaluation Methods 0.000 abstract 1
- 239000012141 concentrate Substances 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000009467 reduction Effects 0.000 description 2
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Human Resources & Organizations (AREA)
- Tourism & Hospitality (AREA)
- Health & Medical Sciences (AREA)
- Marketing (AREA)
- Entrepreneurship & Innovation (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Data Mining & Analysis (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention relates to Electric Power Network Planning technical field, specifically related to a kind of online estimating and examining system of high voltage distribution network project feasibility study, review comment module, department of subordinate, which are checked and accepted, including core services module, pioneering program release module, department of subordinate reception reminder announced module, department of subordinate upload feasibility study material module, the automatic audit function of feasibility study data, higher level department reception feasibility study data prompting module, feasibility study data evaluation module, department of subordinate uploads situation statistical module etc., the flow of work of the whole feasibility study flow of completion;A kind of online reviewing method of project feasibility study is also provided, by the notice occurred under line, make a report on, review information into system, make pioneering program and to make a report on work in good order, reduce substantial amounts of repeated work, whole evaluation period is shortened, the operating efficiency of evaluation is improved.
Description
Technical field
The present invention relates to Electric Power Network Planning technical field, and in particular to a kind of online estimating and examining system of high voltage distribution network project feasibility study and the online reviewing method of feasibility study.
Background technology
Existing high voltage distribution network project feasibility study Review Workflow is related to the high voltage distribution network project that all cities inside the province have jurisdiction over service area, because the number of entry is more, material needed for each high voltage distribution network project is relatively more, every year need to be in batches to being designed evaluation in administrative service area, cause link up it is not smooth, evaluation period is longer.
Current evaluation mode is that the power distribution network high pressure feasibility study project's earlier stage plan in the current year is sent to department of subordinate by higher level department by Email, in addition it is also necessary to makes a report on unit by Advise By Wire or notice of meeting subordinate and makes a report on.The related data of all power distribution network high pressure projects in pioneering program is collected by subordinate unit, then is sent to by way of Email or paper document higher level department.
Because the assessment material required for each power distribution network high pressure project is more, report in batches sometimes, and evaluate underproof material and to be also retired and make a report on again, this will occur assessment material report not in time, a kind of assessment material situation about repeatedly sending occur, cause that evaluation period length, repeated workload is more, inefficiency.
The content of the invention
In order to solve the above technical problems, it is an object of the invention to:A kind of online estimating and examining system of high voltage distribution network project feasibility study is provided, there is information-based, automation, intelligence, improve the operating efficiency made a report on and evaluated, shorten the work period of Review Workflow, there is provided a kind of feasibility study online reviewing method, reduction power network is linked up and evaluation cost.
The technical scheme that the present invention is used by solution its technical problem for:
The core services module, mainly includes application server and database server, and both carry out information exchange by LAN or internet with client;
Pioneering program release module, for preserving pioneering program high voltage distribution network project data, whether the automatic decision high voltage distribution network project in project warehouse and distributes data to corresponding subordinate's department user;
Department of subordinate receives reminder announced module, and for obtaining pioneering program high voltage distribution network project data, notice is made a report in ejection;
Department of subordinate uploads feasibility study material module, the feasibility study data of each high voltage distribution network project for collecting and preserving the upload of department of subordinate;
The automatic audit function of feasibility study data, for obtaining high voltage distribution network project feasibility study data and being contrasted with java standard library, points out the information such as its data, file, map that high voltage distribution network project feasibility study data currently obtained lacks;
Higher level department receives feasibility study data prompting module, reminds higher level reviewer to evaluate the data of making a report on;
Feasibility study data evaluates module, and the feasibility study data of high voltage distribution network project is shown for collecting, and each professional reviewer of higher level department can evaluate to the data of each high voltage distribution network project, and fills in the review comment of correlation;
Review comment module is checked and accepted by department of subordinate, and review comment of the higher level department to this department's high pressure feasibility study project is checked for department of subordinate, and project data is modified adjustment according to review comment.
Wherein, preferred scheme is:
The online estimating and examining system of high voltage distribution network project feasibility study, in addition to department of subordinate upload situation statistical module, upload situation for collecting department of subordinate, and carry out statistical analysis;Department of subordinate uploads each department of subordinate of situation statistical module principal statistical and reports quantity and report ratio, and is shown with diagrammatic form, and exhibition method has line chart, block diagram, trend graph etc.;The system uses J2EE frameworks, and J2EE permission companies give middleware supplier some general, troublesome service end tasks and go completion.So developer can concentrate one's energy how to create on business logic, have correspondingly the development time.
The present invention also provides a kind of online reviewing method of project feasibility study of the online estimating and examining system of high voltage distribution network project feasibility study based on described in claim 1, comprises the following steps:
(1) higher level department imports pioneering program high voltage distribution network project data, and is distributed to department of subordinate, and department of subordinate receives and makes a report on prompting;
(2) department of subordinate makes a report on according to prompting for each high voltage distribution network project needs data;
(3) after project data examination is errorless, department of subordinate carries out preliminary hearing to project, fills in preliminary hearing opinion, and be sent to higher level department;
(4) higher level department receives high voltage distribution network project feasibility study data, and feasibility study data is evaluated with reference to preliminary hearing opinion, fills in and collects each professional review comment, feeds back to corresponding subordinate's department user;
(5) review comment of each project is checked and accepted by department of subordinate, and project feasibility study data is modified according to review comment, and modification is filed after finishing.
Being made a report in the step (2) needs data mainly to include project data, project application for developing and project drawing.
Compared with prior art, the invention has the advantages that:
(1) present invention by the notice occurred under line, make a report on, review information into system, make pioneering program and to make a report on work in good order, reduce substantial amounts of repeated work, shorten whole evaluation period, improve the operating efficiency of evaluation.
(2) various aspects such as present invention offer is automatically reminded to from the high pressure feasibility study data task of making a report on, feasibility study item file is examined, feasibility study project data is made a report on, the online evaluation of each specialty of higher level department, total solution is provided for user, can greatly improve make a report on, the operating efficiency and work quality of reviewer, reduction power network link up and evaluation cost.
Embodiment
The embodiment of the present invention is described further below:
Embodiment 1:
The online estimating and examining system of high voltage distribution network project feasibility study of the present invention, has the advantages that information-based, automation, intelligence, improves the operating efficiency made a report on and evaluated, shorten the work period of Review Workflow there is provided a kind of online reviewing method of feasibility study,.
The technical scheme that the present invention is used by solution its technical problem for:
The core services module, mainly includes application server and database server, and both carry out information exchange by LAN or internet with client;
Pioneering program release module, for preserving pioneering program high voltage distribution network project data, whether the automatic decision high voltage distribution network project in project warehouse and distributes data to corresponding subordinate's department user;
Department of subordinate receives reminder announced module, and for obtaining pioneering program high voltage distribution network project data, notice is made a report in ejection;
Department of subordinate uploads feasibility study material module, the feasibility study data of each high voltage distribution network project for collecting and preserving the upload of department of subordinate;
The automatic audit function of feasibility study data, for obtaining high voltage distribution network project feasibility study data and being contrasted with java standard library, points out the information such as its data, file, map that high voltage distribution network project feasibility study data currently obtained lacks;
Higher level department receives feasibility study data prompting module, reminds higher level reviewer to evaluate the data of making a report on;
Feasibility study data evaluates module, and the feasibility study data of high voltage distribution network project is shown for collecting, and each professional reviewer of higher level department can evaluate to the data of each high voltage distribution network project, and fills in the review comment of correlation;
Review comment module is checked and accepted by department of subordinate, and review comment of the higher level department to this department's high pressure feasibility study project is checked for department of subordinate, and project data is modified adjustment according to review comment.
Wherein, the online estimating and examining system of high voltage distribution network project feasibility study, in addition to department of subordinate upload situation statistical module, upload situation for collecting department of subordinate, and carry out statistical analysis;Department of subordinate uploads each department of subordinate of situation statistical module principal statistical and reports quantity and report ratio, and is shown with diagrammatic form, and exhibition method has line chart, block diagram, trend graph etc.;The system uses J2EE frameworks, and J2EE permission companies give middleware supplier some general, troublesome service end tasks and go completion.So developer can concentrate one's energy how to create on business logic, have correspondingly the development time.
Embodiment 2:
The present embodiment provides a kind of online reviewing method of project feasibility study based on embodiment 1, comprises the following steps:
(1) higher level department imports pioneering program high voltage distribution network project data, and is distributed to department of subordinate, and department of subordinate receives and makes a report on prompting;
(2) department of subordinate makes a report on according to prompting for each high voltage distribution network project needs data;
(3) after project data examination is errorless, department of subordinate carries out preliminary hearing to project, fills in preliminary hearing opinion, and be sent to higher level department;
(4) higher level department receives high voltage distribution network project feasibility study data, and feasibility study data is evaluated with reference to preliminary hearing opinion, fills in and collects each professional review comment, feeds back to corresponding subordinate's department user;
(5) review comment of each project is checked and accepted by department of subordinate, and project feasibility study data is modified according to review comment, and modification is filed after finishing.
Being made a report in the step (2) needs data mainly to include project data, project application for developing and project drawing.
Claims (6)
1. a kind of online estimating and examining system of high voltage distribution network project feasibility study, it is characterised in that including:
Core services module, mainly includes application server and database server, both pass through LAN or internet and client
End carries out information exchange;
Pioneering program release module, for preserving pioneering program high voltage distribution network project data, automatic decision high voltage distribution network
Whether mesh in project warehouse and distributes data to corresponding subordinate's department user;
Department of subordinate receives reminder announced module, and for obtaining pioneering program high voltage distribution network project data, notice is made a report in ejection;
Department of subordinate upload feasibility study material module, for collect and preserve department of subordinate upload each high voltage distribution network project can
Grind data;
The automatic audit function of feasibility study data, for obtaining high voltage distribution network project feasibility study data and being contrasted with java standard library, points out it to work as
The information such as data, file, the map that the high voltage distribution network project feasibility study data of preceding acquisition lacks;
Higher level department receives feasibility study data prompting module, reminds higher level reviewer to evaluate the data of making a report on;
Feasibility study data evaluates module, and the feasibility study data of high voltage distribution network project, each professional reviewer of higher level department are shown for collecting
Member can evaluate to the data of each high voltage distribution network project, and fill in the review comment of correlation;
Review comment module is checked and accepted by department of subordinate, and evaluation of the higher level department to this department's high pressure feasibility study project is checked for department of subordinate
Opinion, and project data is modified adjustment according to review comment.
2. according to the online estimating and examining system of claim 1 high voltage distribution network project feasibility study, it is characterised in that also including in department of subordinate
The condition that conveys feelings statistical module, uploads situation, and carry out statistical analysis for collecting department of subordinate.
3. the online estimating and examining system of high voltage distribution network project feasibility study according to claim 2, it is characterised in that in department of subordinate
Each department of subordinate of the condition that conveys feelings statistical module principal statistical reports quantity and reports ratio, and is shown with diagrammatic form.
4. the online estimating and examining system of high voltage distribution network project feasibility study according to claim 1, it is characterised in that the system is used
J2EE frameworks.
5. a kind of project feasibility study of the online estimating and examining system of high voltage distribution network project feasibility study based on described in claim 1 side of evaluation online
Method, it is characterised in that comprise the following steps:
(1) higher level department imports pioneering program high voltage distribution network project data, and is distributed to department of subordinate, and department of subordinate receives and filled out
Report is reminded;
(2) department of subordinate makes a report on according to prompting for each high voltage distribution network project needs data;
(3) after project data examination is errorless, department of subordinate carries out preliminary hearing to project, fills in preliminary hearing opinion, and be sent to higher level portion
Door;
(4) higher level department receives high voltage distribution network project feasibility study data, and feasibility study data is evaluated with reference to preliminary hearing opinion, fills out
Write and collect each professional review comment, feed back to corresponding subordinate's department user;
(5) review comment of each project is checked and accepted by department of subordinate, and project feasibility study data is modified according to review comment, repaiies
Change and file after finishing.
6. the online reviewing method of project feasibility study according to claim 4, it is characterised in that made a report in the step (2)
Data is needed mainly to include project data, project application for developing and project drawing.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610219091.7A CN107292578A (en) | 2016-04-10 | 2016-04-10 | The online estimating and examining system of high voltage distribution network project feasibility study and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610219091.7A CN107292578A (en) | 2016-04-10 | 2016-04-10 | The online estimating and examining system of high voltage distribution network project feasibility study and method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107292578A true CN107292578A (en) | 2017-10-24 |
Family
ID=60095809
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610219091.7A Pending CN107292578A (en) | 2016-04-10 | 2016-04-10 | The online estimating and examining system of high voltage distribution network project feasibility study and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107292578A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108345991A (en) * | 2018-01-31 | 2018-07-31 | 国网山东省电力公司经济技术研究院 | A kind of the feasibility study review system and reviewing method of fusion power grid multi-source information |
CN109961232A (en) * | 2019-03-28 | 2019-07-02 | 国网河南省电力公司经济技术研究院 | A kind of distribution network planning reviewing method, apparatus and system based on GIS |
CN110335018A (en) * | 2019-06-19 | 2019-10-15 | 国网山东省电力公司济宁市任城区供电公司 | Low-voltage network project feasibility study review system and method |
CN112348488A (en) * | 2020-12-03 | 2021-02-09 | 深圳供电局有限公司 | Auxiliary examination method for transformer power-transformation grindable automatic rules based on building information |
CN112598397A (en) * | 2020-12-30 | 2021-04-02 | 北京迪浩永辉技术有限公司 | Circuit design online evaluation method, system, medium, equipment, terminal and application |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101017538A (en) * | 2006-02-11 | 2007-08-15 | 鸿富锦精密工业(深圳)有限公司 | Proposal evaluation system and method therefor |
US20150073874A1 (en) * | 2013-09-10 | 2015-03-12 | EnergySavvy Inc. | Real time provisional evaluation of utility program performance |
US20150121332A1 (en) * | 2013-10-25 | 2015-04-30 | Tata Consultancy Services Limited | Software project estimation |
CN105117850A (en) * | 2015-08-31 | 2015-12-02 | 国家电网公司 | Auxiliary intelligent reviewing system for power transmission and transformation project design |
CN105373885A (en) * | 2015-11-10 | 2016-03-02 | 国网福建省电力有限公司 | Electric power engineering design review and technical economic evaluation information system |
CN105447627A (en) * | 2015-11-13 | 2016-03-30 | 国网宁夏电力公司经济技术研究院 | Design review process management and control mode research method |
-
2016
- 2016-04-10 CN CN201610219091.7A patent/CN107292578A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101017538A (en) * | 2006-02-11 | 2007-08-15 | 鸿富锦精密工业(深圳)有限公司 | Proposal evaluation system and method therefor |
US20150073874A1 (en) * | 2013-09-10 | 2015-03-12 | EnergySavvy Inc. | Real time provisional evaluation of utility program performance |
US20150121332A1 (en) * | 2013-10-25 | 2015-04-30 | Tata Consultancy Services Limited | Software project estimation |
CN105117850A (en) * | 2015-08-31 | 2015-12-02 | 国家电网公司 | Auxiliary intelligent reviewing system for power transmission and transformation project design |
CN105373885A (en) * | 2015-11-10 | 2016-03-02 | 国网福建省电力有限公司 | Electric power engineering design review and technical economic evaluation information system |
CN105447627A (en) * | 2015-11-13 | 2016-03-30 | 国网宁夏电力公司经济技术研究院 | Design review process management and control mode research method |
Non-Patent Citations (1)
Title |
---|
袁源等: "构建电网基建项目评审信息化平台的探讨", 《云南电业》 * |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108345991A (en) * | 2018-01-31 | 2018-07-31 | 国网山东省电力公司经济技术研究院 | A kind of the feasibility study review system and reviewing method of fusion power grid multi-source information |
CN109961232A (en) * | 2019-03-28 | 2019-07-02 | 国网河南省电力公司经济技术研究院 | A kind of distribution network planning reviewing method, apparatus and system based on GIS |
CN110335018A (en) * | 2019-06-19 | 2019-10-15 | 国网山东省电力公司济宁市任城区供电公司 | Low-voltage network project feasibility study review system and method |
CN112348488A (en) * | 2020-12-03 | 2021-02-09 | 深圳供电局有限公司 | Auxiliary examination method for transformer power-transformation grindable automatic rules based on building information |
CN112598397A (en) * | 2020-12-30 | 2021-04-02 | 北京迪浩永辉技术有限公司 | Circuit design online evaluation method, system, medium, equipment, terminal and application |
CN112598397B (en) * | 2020-12-30 | 2024-01-05 | 北京迪浩永辉技术有限公司 | Circuit design on-line review method, system, medium, equipment, terminal and application |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107292578A (en) | The online estimating and examining system of high voltage distribution network project feasibility study and method | |
CN105447627A (en) | Design review process management and control mode research method | |
CN104574002B (en) | Asset management information processing method and processing device based on big data analysis | |
US20200117151A1 (en) | Outage and switch management for a power grid system | |
EP2997491A1 (en) | System and method for integrated mission critical ecosystem management | |
CN112446649A (en) | Method and device for examining material purchasing plan | |
Mishra | Implementation status of value management in project management Practice in Nepal | |
US20070192175A1 (en) | System and method for deliberating a proposal | |
CN114399192A (en) | Online inspection automation RPA system | |
CN113409029A (en) | Material supply chain management platform | |
Sürücü et al. | Establishing key performance indicators for measuring software-development processes at a large organization | |
CN109146410A (en) | A kind of multimedia advertising design platform | |
Kitchenham et al. | Lessons learnt from the analysis of large-scale corporate databases | |
CN107194529B (en) | Power distribution network reliability economic benefit analysis method and device based on mining technology | |
JP2009140417A (en) | Data tabulating method and data tabulating device | |
Nienke et al. | Introducing an Information Logistics Approach to Support the Development of Future Energy Grid Management. | |
Elliott et al. | A Preliminary Assessment of Handprint Methodologies for Information and Communications Technology Grid Management Solutions | |
Akadiadis et al. | Analyzing statistically the energy consumption and production patterns of European REScoop members: results from the H2020 project REScoop Plus | |
Ullrich et al. | Co-operating with Municipal Partners on Indicator Identification and Data Acquisition. | |
Page et al. | Benchmark Stock Assessments for the Bottomfish Management Unit Species of American Samoa, the Commonwealth of the Northern Mariana Islands, and Guam in 2019 | |
Gerlach et al. | Navigating the energy transition: Identifying critical success factors for ancillary services provision and sustainable energy solutions in Germany | |
Kim et al. | Factors Influencing Impact of Smart Factory Adoption | |
CN114298591A (en) | Enterprise project application method and system | |
DE102010044724A1 (en) | Method for improved loss energy forecasting in a transmission network | |
Pudjiastuti et al. | Case Study of Application of Iso Methodology To Assess Economic Benefits Of Standards On Pt. Wika Beton (Bogor Factory) |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20171024 |