CN107292068A - A kind of assembled architecture BIM model treatments method and processing system - Google Patents

A kind of assembled architecture BIM model treatments method and processing system Download PDF

Info

Publication number
CN107292068A
CN107292068A CN201710719938.2A CN201710719938A CN107292068A CN 107292068 A CN107292068 A CN 107292068A CN 201710719938 A CN201710719938 A CN 201710719938A CN 107292068 A CN107292068 A CN 107292068A
Authority
CN
China
Prior art keywords
bim
prefabricated components
elements
model
bim model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710719938.2A
Other languages
Chinese (zh)
Inventor
韩文东
朱小琴
梁铭
冯华晟
吴伟
王海峰
彭杰
徐新华
王承
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Upper Marine Jian Dongfu Investment And Development Co Ltd
Original Assignee
Upper Marine Jian Dongfu Investment And Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Upper Marine Jian Dongfu Investment And Development Co Ltd filed Critical Upper Marine Jian Dongfu Investment And Development Co Ltd
Priority to CN201710719938.2A priority Critical patent/CN107292068A/en
Publication of CN107292068A publication Critical patent/CN107292068A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Geometry (AREA)
  • Marketing (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Tourism & Hospitality (AREA)
  • Computer Hardware Design (AREA)
  • General Business, Economics & Management (AREA)
  • Economics (AREA)
  • Structural Engineering (AREA)
  • Mathematical Analysis (AREA)
  • Civil Engineering (AREA)
  • Operations Research (AREA)
  • Data Mining & Analysis (AREA)
  • Quality & Reliability (AREA)
  • Computational Mathematics (AREA)
  • Architecture (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides a kind of assembled architecture BIM model treatments method and processing system, method includes:BIM model of elements are set up according to prefabricated components information, and exclusive coding is carried out to the BIM model of elements of foundation, BIM model of elements is matched one by one with corresponding prefabricated components information;The Holistic modeling of assembled architecture is carried out using the BIM model of elements through exclusive coding, overall BIM models are obtained;Obtain the prefabricated components information corresponding to the exclusive coding of BIM model of elements in the overall BIM models.The present invention keys in exclusive coding when setting up model in conventional BIM models, when being applied using BIM models, it is corresponding with the progress of true prefabricated components by exclusive coding, ensure to read prefabricated components real information during BIM practical applications, realize lightweight BIM block molds, prefabricated components platform burden is reduced, accelerates the loading velocity to model in platform.

Description

A kind of assembled architecture BIM model treatments method and processing system
Technical field
The present invention relates to assembled architecture field, more particularly to a kind of assembled architecture BIM model treatments method and processing System.
Background technology
BIM technology, in the new development of building field, with the propulsion of building industrialization, gradually exists as informationization technology Building Trade in China application.Industry generally believes that BIM can realize the informatization of engineering project, promotes owner, design Side, construction party and O&M side preferably cooperate, in terms of progress, cost, quality, strengthen project predictability and can Control property, realizes the whole-life cycle fee of project.
Assembly concrete building core is " integrated ", and BIM provides strong carrier for assembly concrete building. It can be said that the BIM development for being extended to assembly concrete provides strong support.
The features such as industrialized house has simple house type, modularization, mould can be relatively easily realized using BIM technology The parts library of block design and component, this causes the difficulty of BIM modeling works to substantially reduce.The house mode of production of industrialization It is required that realize full industrial chain, Life cycle management, and that this production and way to manage and BIM technology are good at is complete Life cycle management theory is perfectly in harmony.
The content of the invention
In view of above-mentioned exist or potential weak point in the prior art, a kind of assembling is provided in embodiments of the invention Formula builds BIM model treatments method and processing system, can lightweight BIM block molds, reduce prefabricated components platform burden, plus To the loading velocity of model in fast platform.
To achieve the above object, the first aspect of the present invention provides a kind of assembled architecture BIM model treatment methods, its Including step:
BIM model of elements are set up according to prefabricated components information, and exclusive coding is carried out to the BIM model of elements of foundation, are made BIM model of elements are matched one by one with corresponding prefabricated components information;
The Holistic modeling of assembled architecture is carried out using the BIM model of elements through exclusive coding, overall BIM moulds are obtained Type;And
Obtain the prefabricated components information corresponding to the exclusive coding of BIM model of elements in the overall BIM models.
In certain embodiments, in addition to step:Arrangement of reinforcement modeling is carried out to prefabricated components according to prefabricated components information, obtained Prefabricated components arrangement of reinforcement model;
And wherein, the BIM model of elements of described pair of foundation carry out exclusive coding, make BIM model of elements with it is corresponding pre- The step of component information processed is matched one by one includes:
BIM model of elements described in prefabricated components information identical and the prefabricated components arrangement of reinforcement model are carried out unified exclusive Coding, makes the BIM model of elements be matched one by one with the prefabricated components arrangement of reinforcement model.
In certain embodiments, corresponding to the exclusive coding for obtaining the BIM model of elements in the overall BIM models Prefabricated components information the step of include:
Obtain the exclusive coding of the BIM model of elements in the overall BIM models;
According to the prefabricated components arrangement of reinforcement of the identical exclusive coding of the exclusive codes match of the BIM model of elements of acquisition correspondence Model.
In certain embodiments, after according to the exclusive codes match to corresponding prefabricated components arrangement of reinforcement model, also wrap Include step:Make the information inventory of the simultaneously prefabricated components information for the prefabricated components arrangement of reinforcement model that induced matching is arrived.
In certain embodiments, it is described to carry out the whole of assembled architecture using the BIM model of elements through exclusive coding Volume modeling, the step of obtaining overall BIM models includes:
The BIM model of elements through exclusive coding are imported into prefabricated components management platform;
The Holistic modeling of assembled architecture is carried out to the BIM model of elements in the prefabricated components management platform, is obtained To overall BIM models.
The second aspect of the present invention provides a kind of assembled architecture BIM model treatment systems, and it includes:
First modeling unit, for setting up BIM model of elements according to prefabricated components information;
Coding unit, for carrying out exclusive coding to the BIM model of elements of foundation, make BIM model of elements with it is corresponding pre- Component information processed is matched one by one;
Second modeling unit, the entirety for carrying out assembled architecture using the BIM model of elements through exclusive coding Modeling, obtains overall BIM models;And
Information acquisition unit, for obtaining corresponding to the exclusive coding of the BIM model of elements in the overall BIM models Prefabricated components information.
In certain embodiments, in addition to the 3rd modeling unit, for being carried out according to prefabricated components information to prefabricated components Arrangement of reinforcement is modeled, and obtains prefabricated components arrangement of reinforcement model;
And wherein, the coding unit be used for by BIM model of elements described in prefabricated components information identical with it is described pre- Reinforced component model processed carries out unified exclusive coding, makes the BIM model of elements and the prefabricated components arrangement of reinforcement model one by one Match somebody with somebody.
In certain embodiments, a codes match unit is provided with described information acquiring unit;
Described information acquiring unit is used for the exclusive coding for obtaining the BIM model of elements in the overall BIM models;
The codes match unit is identical specially for the exclusive codes match correspondence of the BIM model of elements according to acquisition Belong to the prefabricated components arrangement of reinforcement model of coding.
In certain embodiments, in addition to inventory production unit, for making and exporting the codes match units match The information inventory of the prefabricated components information of the prefabricated components arrangement of reinforcement model arrived.
In certain embodiments, in addition to a prefabricated components management platform, for by the BIM units through exclusive coding Model imported into prefabricated components management platform, and enters luggage to the BIM model of elements in the prefabricated components management platform The Holistic modeling built with formula, obtains overall BIM models.
The present invention is due to using above-mentioned technical proposal, and what is made it have has the beneficial effect that:Mould is set up in conventional BIM models Exclusive coding is keyed in during type, it is corresponding with the progress of true prefabricated components by exclusive coding when being applied using BIM models, Ensure to read prefabricated components real information during BIM practical applications, realize lightweight BIM block molds, reduce prefabricated components platform Burden, accelerates the loading velocity to model in platform.
Brief description of the drawings
Technical scheme in order to illustrate the embodiments of the present invention more clearly, makes required in being described below to embodiment Accompanying drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the present invention, for For those of ordinary skill in the art, on the premise of not paying creative work, other can also be obtained according to these accompanying drawings Accompanying drawing.
Fig. 1 be embodiments of the invention in a kind of assembled architecture BIM model treatment systems high-level schematic functional block diagram.
Fig. 2 be embodiments of the invention in a kind of assembled architecture BIM model treatment methods flow chart.
Fig. 3 be the embodiment of the present invention in a kind of prefabricated components management platform high-level schematic functional block diagram.
Fig. 4 be the embodiment of the present invention in a kind of prefabricated components management method flow chart.
Embodiment
Illustrate embodiments of the present invention below by way of specific instantiation, those skilled in the art can be by this specification Disclosed content understands other advantages and effect of the present invention easily.The present invention can also pass through specific realities different in addition The mode of applying is embodied or practiced, the various details in this specification can also based on different viewpoints with application, without departing from Various modifications or alterations are carried out under the spirit of the present invention.
First, as shown in fig.1, providing a kind of assembled architecture BIM model treatment systems in the embodiment of the present invention, its Including:
One first modeling unit 11, for setting up BIM model of elements according to prefabricated components information;
One coding unit 12, for carrying out exclusive coding to the BIM model of elements of foundation, make BIM model of elements with it is corresponding Prefabricated components information match one by one;
One second modeling unit 13, the entirety for carrying out assembled architecture using the BIM model of elements through exclusive coding Modeling, obtains overall BIM models;And
One information acquisition unit 14, for obtaining corresponding to the exclusive coding of the BIM model of elements in overall BIM models Prefabricated components information.
It is preferred that the assembled architecture BIM model treatments system in the embodiment of the present invention also includes one the 3rd modeling unit, For carrying out arrangement of reinforcement modeling to prefabricated components according to prefabricated components information, prefabricated components arrangement of reinforcement model is obtained;
And wherein, coding unit 12 is used for prefabricated components information identical BIM model of elements and prefabricated components arrangement of reinforcement Model carries out unified exclusive coding, BIM model of elements is matched one by one with prefabricated components arrangement of reinforcement model.
It is preferred that being provided with a codes match unit in information acquisition unit 14 in the embodiment of the present invention;Wherein, information is obtained Unit 14 is taken to be used for the exclusive coding for obtaining the BIM model of elements in overall BIM models;Codes match unit is used for according to acquisition The identical exclusive coding of the exclusive codes match for stating BIM model of elements correspondence prefabricated components arrangement of reinforcement model.
It is preferred that the assembled architecture BIM model treatments system in the embodiment of the present invention also includes inventory production unit, use In the information inventory for the prefabricated components information for making and exporting the prefabricated components arrangement of reinforcement model that codes match units match is arrived.
Managed it is preferred that the assembled architecture BIM model treatments system in the embodiment of the present invention also includes a prefabricated components Platform, for the BIM model of elements through exclusive coding to be imported into prefabricated components management platform, and in prefabricated components management The Holistic modeling of assembled architecture is carried out in platform to BIM model of elements, overall BIM models are obtained.
Coordinate again shown in Fig. 2, a kind of assembled architecture BIM model treatment methods additionally provided in embodiments of the invention, It includes step:
Step 101:BIM model of elements are set up according to prefabricated components information, and it is exclusive to the BIM model of elements progress of foundation Coding, makes BIM model of elements be matched one by one with corresponding prefabricated components information;
Step 102:The Holistic modeling of assembled architecture is carried out using the BIM model of elements through exclusive coding, entirety is obtained BIM models;And
Step 103:Prefabricated components information corresponding to the exclusive coding of BIM model of elements in acquisition entirety BIM models.
It is preferred that the assembled architecture BIM model treatments method in the embodiment of the present invention also includes step:According to prefabricated structure Part information carries out arrangement of reinforcement modeling to prefabricated components, obtains prefabricated components arrangement of reinforcement model;
And exclusive coding wherein, is carried out to the BIM model of elements of foundation in step 101, make BIM model of elements with it is right The step of prefabricated components information answered is matched one by one includes:
Prefabricated components information identical BIM model of elements and prefabricated components arrangement of reinforcement model are subjected to unified exclusive coding, made BIM model of elements are matched one by one with prefabricated components arrangement of reinforcement model.
It is preferred that in step 103 obtain entirety BIM models in BIM model of elements exclusive coding corresponding to it is pre- The step of component information processed, includes:
Obtain the exclusive coding of the BIM model of elements in entirety BIM models;
According to the prefabricated components arrangement of reinforcement mould of the identical exclusive coding of the exclusive codes match of the BIM model of elements of acquisition correspondence Type.
It is preferred that in above-mentioned steps, after according to exclusive codes match to corresponding prefabricated components arrangement of reinforcement model, also wrapping Include step:Make the information inventory of the simultaneously prefabricated components information for the prefabricated components arrangement of reinforcement model that induced matching is arrived.
It is preferred that in above-mentioned steps, the whole of assembled architecture is carried out using the BIM model of elements through exclusive coding Volume modeling, the step of obtaining overall BIM models further comprises:
BIM model of elements through exclusive coding are imported into prefabricated components management platform;
The Holistic modeling of assembled architecture is carried out to BIM model of elements in prefabricated components management platform, overall BIM is obtained Model.
The assembled architecture BIM model treatments method and assembled architecture BIM model treatment systems of the present invention passes through normal Exclusive coding is keyed in when setting up model in rule BIM models, when being applied using BIM models, by exclusive coding and truly Prefabricated components are corresponded to, it is ensured that prefabricated components real information is read during BIM practical applications, lightweight BIM block molds are realized, Prefabricated components management platform burden is reduced, accelerates the loading velocity to model in platform.
Coordinate shown in Fig. 3, a kind of prefabricated components management platform is provided in the embodiment of the present invention, it includes project information and connect Module 21, project is received to set up and display module 22, modeling module 23, component information receiving module 24 and tabulation management module 25. Wherein:
Project information receiving module 21, for obtaining project essential information;
Project is set up and display module 22, is set up operation item for the project essential information according to acquisition, is generated and show Show the item page of operation item;
Modeling module 23, for being leading using the Life cycle of operation item, sets up each using BIM technology and implements rank The BIM point of applications of section;
Component information receiving module 24, for being set and priority assignation according to role, obtains the PC structures of each implementation phase Part information, the information entered to the BIM point of applications of each implementation phase in edlin and management, BIM point of applications therein is come Come from the information of the assembled architecture BIM model treatment systems of the present invention;And
Tabulation management module 25, makes and exports the information report of the PC components in each BIM point of application.
It is preferred that PC components processing platform also includes authority management module, identity information and behaviour for setting participant Make authority;
And wherein, component information receiving module 24 is used for:According to the identity information of the participant of setting, judge whether to obtain The PC component informations from participant are fetched, and basis for estimation is only to obtain the PC components from the participant for being provided with identity information Information;And the operating right of the participant according to setting, obtain PC component informations in the scope of respective operations authority.
It is preferred that PC component informations therein include the initial information of PC components;
And wherein, component information receiving module 24 is used for the initial information for obtaining the PC components of each implementation phase;
The BIM models of the BIM point of applications of correspondence implementation phase are set up according to the initial information of the PC components of acquisition;And
Hierarchical is carried out to BIM models to check and manage.
It is preferred that the PC components processing platform in the embodiment of the present invention also includes condition setting module, for setting PC structures The component condition of part;
Also, management module 25 of tabulating is used for the component condition according to setting, filters out the PC components for meeting component condition, And make the information report of the PC components of correspondence BIM point of applications.
It is preferred that PC components processing platform in the embodiment of the present invention also includes Quick Response Code module, for according to making simultaneously The information report of PC components in each derived BIM point of application, generates the component Quick Response Code of PC components.
Coordinate shown in Fig. 4, a kind of prefabricated components management method is provided in the embodiment of the present invention, using above-mentioned prefabricated components Management platform realizes that it mainly comprises the following steps:
Step 201:Acquisition project essential information;
Step 202:Operation item is set up according to the project essential information of acquisition, the project page of operation item is generated and show Face;
Step 203:Life cycle using operation item is leading, and the BIM of each implementation phase is set up using BIM technology Point of application;
Step 204:Set according to role and priority assignation, the PC component informations of each implementation phase are obtained, to each reality The BIM point of applications for applying the stage enter edlin and management;And
Step 205:Make and export the information report of the PC components in each BIM point of application.
Using above-mentioned technical proposal, PC component informations are integrated in PC member tubes by embodiments of the invention by BIM technology In platform, each participant can fill in component relevant information and state by platform, and platform can be recorded and analysis project shape automatically State, then can be by the state of each component of platform management and control as manager.
It is preferred that in step 201, operation item is set up according to the project essential information of acquisition, generate and show operation The item page of project, can further comprise:
Grassroot project:Can grassroot project and entry item essential information, including project name, upload project front cover etc.;
Project editor:Enter edlin to the project essential information set up the project, including project name, upload project front cover again Deng;
Deletion of items:Delete the project set up the project;
Opening project:Each noncontinuous item platform is directly entered by Enterprise project management platform and carries out fine-grained management;
Project Introduction:Basic condition, participation unit and project BIM applications to project are summarized and described, and make project Each participant is very clear to project basic condition.
Project basic condition:In item page to item destination locations, the scale of construction, assembly rate, plot ratio, periphery is supporting, build If the information such as cycle, project characteristic and project basic effect figure carry out typing and editor.
It is preferred that the PC components processing method in the embodiment of the present invention also includes step:The identity information of participant is set And operating right;
Also, in step 204, set according to role and priority assignation, obtain the PC component informations of each implementation phase Step, further comprises:
According to the identity information of the participant of setting, judge whether to obtain the PC component informations from participant, and judge According to only to obtain the PC component informations from the participant for being provided with identity information, in this way, owner can main ginseng each to project It is described with the information such as side and its responsibility and working range, specifies the responsibility of each participant, promote it to cooperate and link up.
According to the operating right of the participant of setting, PC component informations are obtained in the scope of respective operations authority.
It is preferred that in step 103, relate to BIM and apply and component management two parts, be specially
BIM is applied:Using BIM technology, the main BIM point of applications of each implementation phase of operation item are enumerated, and to application The information such as process, application achievements are summarized description.
Component management:Life cycle using PC projects is leading, designed by component, component processing, component conveying and The links such as lifting component, which are realized, to be managed the dynamic of assembled project.Each participates in the component information of unit respectively to different phase Enter edlin and management, by being set and priority assignation to the role for participating in unit, control each PC component can be specified not With the responsible department in stage, it specify that responsibility is clear and definite with the division of labor, auxiliary improves the quality of component.
Further it may include it is preferred that at step 104, the step of the PC component informations for obtaining each implementation phase:Obtain Take the initial information of the PC components of each implementation phase;
And edlin wherein, is entered to the BIM point of applications of each implementation phase and be may include the step of management:According to acquisition PC components initial information set up correspondence implementation phase BIM point of applications BIM models;And BIM models are layered Level is checked and managed.
In the different phase of PC components, each relevant unit can be added by platform, edit different component informations, and can on Pass, browse and delete PC component models.After component information editor, related director can carry out self-inspection and test in platform Receive.
In addition, each participant can voluntarily upload the component quality inspection file of current generation to platform, owner and quality inspection personnel Can online browse quality inspection file, facilitate responsibility tracing, ensured the quality of PC components.As component information editor and completion is checked and accepted, Unified verification is carried out to stage PC component informations by quality examination director, the quality of component has been ensured, it is ensured that in lower single order Section component availability of data.
For the engineering information of operation item, independent order, member status, construction waiting can be generated to each PC components Can enter edlin and renewal to it by each participation unit Deng related engineering information, auxiliary owner the duration is carried out overall control with Unified management.
For model management, the synthesis management and control of project level is carried out for BIM models and data.Facilitate construction unit quick Understand whole project implementation situation, make development of projects, project data, project quality, project problem etc. very clear.
For PC component data managements, user can carry out browsing, checking with correcting, while this module for PC component informations The relevant information in all operating process of preamble will be shown, centralized management is carried out for construction unit.
It is preferred that in step 105, the information report of the PC components in each BIM point of application is made and exports, including: Hierarchical is carried out to BIM models to check and manage, and the loading of arbitrary region model can be achieved, checks and hides etc., and to appointing The examination and form export of meaning floor.Derived form is mainly comprising information such as quality, progress, costs.Derived form can be according to According to customer demand, other related engineering informations are customized.
Can be by being highlighted problematic component in different colors in a model come intuitively in PC component processing platforms Represent component quality state.User can in platform pre-set different quality problem option, gone wrong with facilitating When different problems are carried out to click examinations, while also allowing for that inspector is unified to quality problems to be sorted out and exporting quality form Shi Jinhang aggregation of data.
It is preferred that the PC components processing method in the embodiment of the present invention also includes step:Component condition is set;
Also, in step 105, make and enter one the step of exporting the information report of the PC components in each BIM point of application Step may include:
According to the component condition of setting, the PC components for meeting component condition are filtered out, and make correspondence BIM point of applications PC components information report.
After the completion of the responsible department quality inspection in each stage, undertaking of construction or related quality inspection unit can be carried out to component quality one by one Audit once again, corresponding conditionses (type, numbering, Lou Hao, floor, weight, concrete label etc.) are met by the screening of component filter Component, can accomplish similar member batch examination & verification.Both project efficiency is improved, PC component qualities have been ensured again, the pipe that becomes more meticulous is realized Reason.
It is preferred that the PC components processing method in the embodiment of the present invention also includes step:According to make and derived from each The information report of PC components in BIM point of applications, generates the component Quick Response Code of PC components.
Wherein, the operation of component planar bar code technology is:Selected PC components can generate component Quick Response Code, be scanned by mobile terminal Quick Response Code can display member essential information in real time.By given authority, component shape directly can be carried out in mobile terminal landing platform The editor of state and information, realizes PC ends, iPad ends, the collaboration of the screen of iPhone ends three.
User can set different phase in component lifecycle process according to project duration in PC component processing platforms Plan node, in implementation process, user can be edited by computer client operation.Participant positioned at job site can lead to Cross mobile phone scanning Quick Response Code to read and update PC member status (design, processing, transport, lifting etc.), platform can record structure automatically The beginning and ending time information that part state updates, by the way that platform is by data summarization and a key exports progress report.It is easy to participate in unit pair The progress of implementation of PC components carries out control, aids in reasonable arrangement project duration.
In addition, the design of PC components and plan in process and actual material use information, can be remembered by platform Record and statistics.Incorporation engineering amount is counted and computation rule, and the statement of costs can be directly exported in platform.If component, which goes wrong, to be needed Do over again and produce extra quantities, the automatically updated material of platform is used and real time contrast's intended use and actual amount, It is easy to user to grasp project cost in real time, realizes 5D dynamically management.
In model browser interface basic operation can be carried out to BIM models:Including rotation translation, scaling, roaming, cutting, survey Amount, decomposition etc..User directly can carry out three dimensional navigation to project model in this module to the BIM models of upload, utilize BIM skills The visual advantage of art intuitively checks project.The engineering information of PC components can record in model on platform and be in project It is existing.Visual model manipulation interface not only can also show different component by different colours representation component quality Progress of implementation (design complete, machine, transporting completion, installation etc.), user can customizing model and structure according to demand The expression way of part, is realized very clear to quality, the progress situation of project.
Client can by component filter set condition (component numbering, element type, Lou Hao, floor, weight, concrete label, Member status etc.) the satisfactory component of screening, to be operated to same type member batch, one-touch component management is realized, The operation difficulty of client is alleviated, the time of project management is greatlyd save.
On data analysis, the basic engineering information to PC projects carries out statistics and analysis.Including in project component sum, The information such as component species, assembly rate, prefabricated rate and member status, manufacturing schedule, component cost.All data and PC structures in project The information direct correlation of part, and counted and calculated automatically by platform.Client can check in platform and export all kinds of of project Engineering information data, the convenient critical index to project intuitively carries out control.In addition, can be according to the demand of client existing On the basis of be customized and expand, fully meet demand of the client for Engineering.
Include user management, Role Management, four parts of rights management and model management on system administration.
User management:The platform user related in PC components processing platform of the present invention is managed concentratedly.It can add Plus, check and edit name on account, the information such as the pet name, role and password are set.
Role Management:Unit can be participated in for project to be added, edit and delete, and be easy to owner to each participation of project The basic condition of side is understood.
Rights management:Owner can respectively be configured to the authority of each participant.Make each participation unit can only be according to setting The authority pair the put PC component information relevant with our unit is operated.Prevent from have changed other category of component because of maloperation Property, is easy to responsibility to track, it is ensured that project data it is safe and reliable.
Model management:BIM models and component model that this project is related to, user can carry out the upload of model in this module With download.Change of the platform to model can be recorded in real time, and owner can grasp the source of each component model, version, download The information such as record.It is easy to each participant to be based on BIM models and carries out data interaction and Project cooperation, improves operating efficiency.
State on PC components is configured.Owner can carry out personalized customization to base model of the model component in platform With editor.The information such as the color including different conditions and different phase component.By defining the Show Styles per first grade member, respectively Individual participant can intuitively be browsed in BIM models to project with PC components, the state of each PC components be grasped in time, just In control and adjusted iterm embodiment.
The PC components processing platform and its processing method of assembled architecture in the embodiment of the present invention have following beneficial effect Really:
Prefabricated components processing platform is to realize that Enterprise project management is complete for core, based on BIM technology, with PC components Life cycle management is leading, and deployment implementation is carried out by internet cloud platform.Auxiliary realizes construction unit, designing unit, life The collaborative work of the relevant departments such as process unit, traffic unit, lifting unit is produced, enterprise-level, project level and component level is improved Integrated management efficiency.
It should be noted that structure, ratio, size depicted in this specification institute accompanying drawings etc., only to coordinate Content disclosed in bright book, so that those skilled in the art understands and reads, is not limited to the enforceable limit of the present invention Fixed condition, therefore do not have technical essential meaning, the modification of any structure, the change of proportionate relationship or the adjustment of size, not Under influence effect of the invention that can be generated and the purpose that can reach, it all should still fall and be obtained in disclosed technology contents In the range of covering.Meanwhile, it is cited such as " on ", " under ", "left", "right", " centre " and " one " etc. in this specification Term, is merely convenient to understanding for narration, and is not used to limit enforceable scope of the invention, the change of its relativeness or tune It is whole, under without essence change technology contents, when being also considered as enforceable category of the invention.
Described above is only presently preferred embodiments of the present invention, not does any formal limitation to the present invention, though So the present invention is disclosed above with preferred embodiment, but is not limited to the present invention, any to be familiar with this professional technology people Member, in the range of technical solution of the present invention is not departed from, when the technology contents using the disclosure above make a little change or repair The equivalent embodiment for equivalent variations is adornd, as long as being the content without departing from technical solution of the present invention, the technology according to the present invention is real Any simple modification, equivalent variations and modification that confrontation above example is made, still fall within the scope of technical solution of the present invention It is interior.

Claims (10)

1. a kind of assembled architecture BIM model treatment methods, it is characterised in that including step:
BIM model of elements are set up according to prefabricated components information, and exclusive coding is carried out to the BIM model of elements of foundation, make BIM mono- Meta-model is matched one by one with corresponding prefabricated components information;
The Holistic modeling of assembled architecture is carried out using the BIM model of elements through exclusive coding, overall BIM models are obtained; And
Obtain the prefabricated components information corresponding to the exclusive coding of BIM model of elements in the overall BIM models.
2. assembled architecture BIM model treatment methods as claimed in claim 1, it is characterised in that also including step:According to pre- Component information processed carries out arrangement of reinforcement modeling to prefabricated components, obtains prefabricated components arrangement of reinforcement model;
And wherein, the BIM model of elements of described pair of foundation carry out exclusive coding, make BIM model of elements and corresponding prefabricated structure The step of part information is matched one by one includes:
BIM model of elements described in prefabricated components information identical and the prefabricated components arrangement of reinforcement model are subjected to unified exclusive volume Code, makes the BIM model of elements be matched one by one with the prefabricated components arrangement of reinforcement model.
3. assembled architecture BIM model treatment methods as claimed in claim 2, it is characterised in that the acquisition entirety The step of prefabricated components information corresponding to the exclusive coding of BIM model of elements in BIM models, includes:
Obtain the exclusive coding of the BIM model of elements in the overall BIM models;
According to the prefabricated components arrangement of reinforcement mould of the identical exclusive coding of the exclusive codes match of the BIM model of elements of acquisition correspondence Type.
4. assembled architecture BIM model treatment methods as claimed in claim 3, it is characterised in that according to the exclusive volume Code is matched after corresponding prefabricated components arrangement of reinforcement model, in addition to step:Make the prefabricated components arrangement of reinforcement mould that simultaneously induced matching is arrived The information inventory of the prefabricated components information of type.
5. such as assembled architecture BIM model treatment methods according to any one of claims 1 to 4, it is characterised in that the profit The Holistic modeling of assembled architecture is carried out with the BIM model of elements through exclusive coding, the step of obtaining overall BIM models is wrapped Include:
The BIM model of elements through exclusive coding are imported into prefabricated components management platform;
The Holistic modeling of assembled architecture is carried out to the BIM model of elements in the prefabricated components management platform, obtains whole Body BIM models.
6. a kind of assembled architecture BIM model treatment systems, it is characterised in that including:
First modeling unit, for setting up BIM model of elements according to prefabricated components information;
Coding unit, carries out exclusive coding for the BIM model of elements to foundation, makes BIM model of elements and corresponding prefabricated structure Part information is matched one by one;
Second modeling unit, the Holistic modeling for carrying out assembled architecture using the BIM model of elements through exclusive coding, Obtain overall BIM models;And
Information acquisition unit, it is prefabricated corresponding to the exclusive coding of the BIM model of elements in the overall BIM models for obtaining Component information.
7. assembled architecture BIM model treatment systems as claimed in claim 6, it is characterised in that also single including the 3rd modeling Member, for carrying out arrangement of reinforcement modeling to prefabricated components according to prefabricated components information, obtains prefabricated components arrangement of reinforcement model;
And wherein, the coding unit is used for BIM model of elements described in prefabricated components information identical and the prefabricated structure Part arrangement of reinforcement model carries out unified exclusive coding, the BIM model of elements is matched one by one with the prefabricated components arrangement of reinforcement model.
8. assembled architecture BIM model treatment systems as claimed in claim 7, it is characterised in that described information acquiring unit In be provided with a codes match unit;
Described information acquiring unit is used for the exclusive coding for obtaining the BIM model of elements in the overall BIM models;
The codes match unit is used for the identical exclusive volume of exclusive codes match correspondence according to the BIM model of elements of acquisition The prefabricated components arrangement of reinforcement model of code.
9. assembled architecture BIM model treatment systems as claimed in claim 8, it is characterised in that also make single including inventory Member, the information of the prefabricated components information for making and exporting the prefabricated components arrangement of reinforcement model that the codes match units match is arrived Inventory.
10. the assembled architecture BIM model treatment systems as any one of claim 6~9, it is characterised in that also wrap A prefabricated components management platform is included, for the BIM model of elements through exclusive coding to be imported into prefabricated components management platform, And the Holistic modeling of assembled architecture is carried out to the BIM model of elements in the prefabricated components management platform, obtain entirety BIM models.
CN201710719938.2A 2017-08-21 2017-08-21 A kind of assembled architecture BIM model treatments method and processing system Pending CN107292068A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710719938.2A CN107292068A (en) 2017-08-21 2017-08-21 A kind of assembled architecture BIM model treatments method and processing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710719938.2A CN107292068A (en) 2017-08-21 2017-08-21 A kind of assembled architecture BIM model treatments method and processing system

Publications (1)

Publication Number Publication Date
CN107292068A true CN107292068A (en) 2017-10-24

Family

ID=60107006

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710719938.2A Pending CN107292068A (en) 2017-08-21 2017-08-21 A kind of assembled architecture BIM model treatments method and processing system

Country Status (1)

Country Link
CN (1) CN107292068A (en)

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107977487A (en) * 2017-11-07 2018-05-01 山东住工装配建筑有限公司 A kind of assembly concrete architectural design method based on BIM technology
CN108376376A (en) * 2018-02-02 2018-08-07 北京筑业志远软件开发有限公司 Construction engineering quality management standardized method based on BIM models
CN108416076A (en) * 2017-12-19 2018-08-17 江苏镇江建筑科学研究院集团股份有限公司 A kind of assembled architecture design method based on BIM technology
CN108453884A (en) * 2017-12-15 2018-08-28 上海建工五建集团有限公司 Prefabricated components information updating method and system
CN109034736A (en) * 2018-07-10 2018-12-18 李磊 Project management system and operating platform based on BIM
CN109190296A (en) * 2018-09-29 2019-01-11 中民筑友科技投资有限公司 A kind of prefabrication and assembly construction information statistical method, device and equipment based on BIM
CN110084720A (en) * 2019-04-29 2019-08-02 南京筑新建筑工程有限公司 A kind of light weight assembling-type metal building system
CN110287351A (en) * 2019-06-27 2019-09-27 哈工大(张家口)工业技术研究院 A kind of threedimensional model lightweight displaying optimization method
CN110598260A (en) * 2019-08-16 2019-12-20 南京紫城工程设计有限公司 Municipal engineering design system based on BIM technology
CN110795786A (en) * 2019-10-21 2020-02-14 上海嘉实(集团)有限公司 Component encoding method, device, equipment and storage medium
CN112182724A (en) * 2020-10-20 2021-01-05 深圳供电局有限公司 BIM model parameter processing method and three-dimensional model management platform
WO2021042585A1 (en) * 2019-09-06 2021-03-11 民航机场建设工程有限公司 Cdm establishment method for building component
CN112731892A (en) * 2021-01-27 2021-04-30 山东海龙建筑科技有限公司 BIM-based construction method for assembly type building management and control and material tracing production line
CN113204284A (en) * 2021-05-25 2021-08-03 中建八局第三建设有限公司 Virtual construction comprehensive pipeline installation and acceptance method based on BIM and MR technology
CN113420062A (en) * 2021-06-16 2021-09-21 上海建工集团股份有限公司 BIM model information rapid retrieval method for building electromechanical system
CN114647886A (en) * 2022-05-20 2022-06-21 广州市创博机电设备安装有限公司 Construction method and system based on BIM and identification code
CN114648014A (en) * 2022-05-20 2022-06-21 安徽数智建造研究院有限公司 Engineering data correlation method based on improved Gaussian mixture model
CN116629504A (en) * 2023-03-07 2023-08-22 北京城建集团有限责任公司 Intelligent construction-based precast tubular pile full life cycle management system and application method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106600239A (en) * 2016-12-28 2017-04-26 中建科技有限公司 Assembly type building construction full process data cooperation management system based on BIM
CN106971028A (en) * 2017-03-10 2017-07-21 福州众衡时代信息科技有限公司 It is a kind of that virtual reality technology is used for the method for assembled architecture industry

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106600239A (en) * 2016-12-28 2017-04-26 中建科技有限公司 Assembly type building construction full process data cooperation management system based on BIM
CN106971028A (en) * 2017-03-10 2017-07-21 福州众衡时代信息科技有限公司 It is a kind of that virtual reality technology is used for the method for assembled architecture industry

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
吴伟, 等: "《装配式建筑中的BIM技术研究及应用——以中建彩虹湾项目为例》", 《土木建筑工程信息技术》 *
张超: "《基于BIM的装配式结构设计与建造关键技术研究》", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 *

Cited By (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107977487A (en) * 2017-11-07 2018-05-01 山东住工装配建筑有限公司 A kind of assembly concrete architectural design method based on BIM technology
CN108453884A (en) * 2017-12-15 2018-08-28 上海建工五建集团有限公司 Prefabricated components information updating method and system
CN108416076A (en) * 2017-12-19 2018-08-17 江苏镇江建筑科学研究院集团股份有限公司 A kind of assembled architecture design method based on BIM technology
CN108376376A (en) * 2018-02-02 2018-08-07 北京筑业志远软件开发有限公司 Construction engineering quality management standardized method based on BIM models
CN108376376B (en) * 2018-02-02 2021-11-09 北京筑业志远软件开发有限公司 BIM model-based construction engineering quality management standardization method
CN109034736A (en) * 2018-07-10 2018-12-18 李磊 Project management system and operating platform based on BIM
CN109190296A (en) * 2018-09-29 2019-01-11 中民筑友科技投资有限公司 A kind of prefabrication and assembly construction information statistical method, device and equipment based on BIM
CN109190296B (en) * 2018-09-29 2022-11-15 中民筑友科技投资有限公司 BIM-based prefabricated assembly information statistical method, device and equipment
CN110084720A (en) * 2019-04-29 2019-08-02 南京筑新建筑工程有限公司 A kind of light weight assembling-type metal building system
CN110287351A (en) * 2019-06-27 2019-09-27 哈工大(张家口)工业技术研究院 A kind of threedimensional model lightweight displaying optimization method
CN110287351B (en) * 2019-06-27 2021-11-02 哈工大(张家口)工业技术研究院 Three-dimensional model lightweight display optimization method
CN110598260A (en) * 2019-08-16 2019-12-20 南京紫城工程设计有限公司 Municipal engineering design system based on BIM technology
WO2021042585A1 (en) * 2019-09-06 2021-03-11 民航机场建设工程有限公司 Cdm establishment method for building component
CN110795786A (en) * 2019-10-21 2020-02-14 上海嘉实(集团)有限公司 Component encoding method, device, equipment and storage medium
CN110795786B (en) * 2019-10-21 2023-10-20 上海嘉实(集团)有限公司 Component encoding method, device, apparatus, and storage medium
CN112182724A (en) * 2020-10-20 2021-01-05 深圳供电局有限公司 BIM model parameter processing method and three-dimensional model management platform
CN112731892A (en) * 2021-01-27 2021-04-30 山东海龙建筑科技有限公司 BIM-based construction method for assembly type building management and control and material tracing production line
CN113204284A (en) * 2021-05-25 2021-08-03 中建八局第三建设有限公司 Virtual construction comprehensive pipeline installation and acceptance method based on BIM and MR technology
CN113420062A (en) * 2021-06-16 2021-09-21 上海建工集团股份有限公司 BIM model information rapid retrieval method for building electromechanical system
CN113420062B (en) * 2021-06-16 2024-02-09 上海建工集团股份有限公司 Building electromechanical system BIM model information quick retrieval method
CN114647886A (en) * 2022-05-20 2022-06-21 广州市创博机电设备安装有限公司 Construction method and system based on BIM and identification code
CN114648014A (en) * 2022-05-20 2022-06-21 安徽数智建造研究院有限公司 Engineering data correlation method based on improved Gaussian mixture model
CN114648014B (en) * 2022-05-20 2022-08-23 安徽数智建造研究院有限公司 Engineering data correlation method based on improved Gaussian mixture model
CN116629504A (en) * 2023-03-07 2023-08-22 北京城建集团有限责任公司 Intelligent construction-based precast tubular pile full life cycle management system and application method

Similar Documents

Publication Publication Date Title
CN107292068A (en) A kind of assembled architecture BIM model treatments method and processing system
CN105700888B (en) A kind of visualization quick development platform based on jbpm workflow engine
CN102982396B (en) Universal process modeling framework
US20160148157A1 (en) Managing activities in an organization
CN106484393B (en) Visual view design method
CN105302532B (en) A kind of visual modeling editing machine for constructing system model
CN105320504B (en) A kind of visual software modeling method constructing software view based on software member view
KR102038092B1 (en) Apparatus and Method for automatic generation of Electric Design Drawings
CN107480898A (en) The PC components processing platform and its processing method of a kind of assembled architecture
US6819965B2 (en) Electronic work instruction object oriented system and method
US7512451B2 (en) System and method for interactive process management
CN112488654A (en) Integrated intelligent cooperation method and device for electric power material design
US10613522B2 (en) Templates in a multidisciplinary engineering system
CN110083336A (en) A kind of method that high efficiency creation customizes website
KR100441660B1 (en) Knowledge service system through ordered workflow, service method thereof, service method for developing products through network and system thereof
Fang et al. Towards model-based derivation of systems in the industrial automation domain
Ni et al. A collaborative engine for enterprise application integration
CN105955718B (en) A kind of software customized method and system
Ma et al. Application of BP neural networks in garment pattern design system
Le Wan et al. Research of the Technology and Application of 3D Model Based Assembly Structural Process Design for Spacecraft
KR100712685B1 (en) Construction process information management system
CN109242550B (en) Steel process cost prediction system
KR100994829B1 (en) A method of Generating a work-process system using a technique which a general user can design and revise
KR100743150B1 (en) Customized and Automated Technology Roadmapping System
CN107667385A (en) For the method and system that can dynamically extend subject in multidisciplinary engineering system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20171024

RJ01 Rejection of invention patent application after publication