CN107282700A - Integrated multifunctional correct-by-construction equipment - Google Patents
Integrated multifunctional correct-by-construction equipment Download PDFInfo
- Publication number
- CN107282700A CN107282700A CN201710720989.7A CN201710720989A CN107282700A CN 107282700 A CN107282700 A CN 107282700A CN 201710720989 A CN201710720989 A CN 201710720989A CN 107282700 A CN107282700 A CN 107282700A
- Authority
- CN
- China
- Prior art keywords
- fixed
- walking
- correct
- hanging beam
- construction equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 30
- 230000007246 mechanism Effects 0.000 claims abstract description 67
- 229910000831 Steel Inorganic materials 0.000 claims description 9
- 239000010959 steel Substances 0.000 claims description 9
- 230000005540 biological transmission Effects 0.000 claims description 5
- 238000006073 displacement reaction Methods 0.000 claims description 5
- 230000035515 penetration Effects 0.000 claims description 3
- 230000015572 biosynthetic process Effects 0.000 claims description 2
- 239000000203 mixture Substances 0.000 claims 1
- 230000000007 visual effect Effects 0.000 description 6
- 239000007787 solid Substances 0.000 description 5
- 230000036244 malformation Effects 0.000 description 4
- 238000000034 method Methods 0.000 description 4
- 239000000463 material Substances 0.000 description 3
- 238000009434 installation Methods 0.000 description 2
- 238000005096 rolling process Methods 0.000 description 2
- 239000000729 antidote Substances 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D—WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D1/00—Straightening, restoring form or removing local distortions of sheet metal or specific articles made therefrom; Stretching sheet metal combined with rolling
- B21D1/14—Straightening frame structures
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention discloses integrated multifunctional correct-by-construction equipment.It is related to mechanical checkout equipment technical field.Including base;The surface of base one is fixed with some groups of columns;One end of column is fixed with a top frame;Auxiliary frame is further fixed between base and top frame;A fixed cross beam and a moving beam are respectively fixed between every group of column;Walking hanging beam is provided with adjacent two fixed cross beam, walking hanging beam is slidably matched with fixed cross beam;A longitudinal extension mechanism is provided with walking hanging beam;Transversal stretching mechanism is combined with moving beam;Moving beam one end is connected with a Diao Sheng mechanisms;Walking hanging beam is connected with a walking mechanism.The present invention, for the fixation and correction to large scale equipment structural vertical direction structure, the fixation and correction to large scale equipment structure level direction structure is realized by longitudinal extension mechanism and hydraulic cylinder by four groups of transversal stretching mechanisms.
Description
Technical field
The invention belongs to mechanical checkout equipment technical field, more particularly to integrated multifunctional correct-by-construction equipment.
Background technology
The construction of structural steelwork typically may be divided into two main construction procedures:It is the pre- of each base part of structure first
System processing, followed by the scene splicing installation of steel member.The prefabricated processing work of steel member is important in Pre-tensioned Steel Structures
Foundation, the quality that this work is completed plays conclusive influence to the construction of the in-site installation of next step.But steel knot
The deformation of component often occurs in structure process, and its cause mainly includes steel structure material deformation in itself, welded
Deformation that the deformation produced in journey and component movement are stacked collision and produced etc..For different deformations, can have different
Antidote:Such as artificial correction, machinery correction, flame straightening and mixing correction method.If reasonably in practice of construction
Using these methods, will play the role of to raising operating efficiency, guarantee steel construction crudy important.
In existing heavy mechanical equipment malformation, the heavy construction equipment such as excavator, crane, forklift makes
The malformation produced during, it is general using by the way of changing parts, but generally require it is tailor-made, the cost time compared with
Long, influence is normally used.
The content of the invention
It is an object of the invention to provide integrated multifunctional correct-by-construction equipment, by four groups of transversal stretching mechanisms, it is used for
Fixation and correction to large scale equipment structural vertical direction structure, are realized to large scale equipment by longitudinal extension mechanism and hydraulic cylinder
The fixation and correction of structure level direction structure, by set location Diao Sheng mechanisms, walking mechanism carries out the control of position, solves
The problem of existing large scale equipment malformation is difficult correction.
In order to solve the above technical problems, the present invention is achieved by the following technical solutions:
The present invention is integrated multifunctional correct-by-construction equipment, including base;The surface of base one is fixed with some groups and stood
Post;One end of the column is fixed with a top frame;Auxiliary frame is further fixed between the base and top frame;Wherein, every group
A fixed cross beam and a moving beam are respectively fixed between column;Wherein, walking hanging beam is provided with adjacent two fixed cross beam,
The walking hanging beam is slidably matched with fixed cross beam;A longitudinal extension mechanism is provided with the walking hanging beam;Wherein, it is described to move
Transversal stretching mechanism is combined with dynamic crossbeam;Wherein, described moving beam one end is connected with a Diao Sheng mechanisms;Wherein, the row
Hanging beam is walked to be connected with a walking mechanism.
Further, the column is " work " word girder construction;One apparent surface of " work " the word girder construction is along column
Axial direction is uniformly fixed with cross bar side by side;One end of " work " the word beam is additionally provided with pulley.
Further, the base includes the first I-shaped plate and the second I-shaped plate;The surface of first I-shaped plate one is provided with
One group of ladder conduit hole;Interval panel seat has been uniformly arranged between the first I-shaped plate and the second I-shaped plate;Adjacent two space bar
Seat forms penetration hole.Ladder conduit hole coordinates with one group of hydraulic cylinder;Slided by wheel seat and ladder conduit hole described hydraulic cylinder one end
It is dynamic to coordinate.
Further, the top frame is made up of a rectangle frame and some crossbeams;The crossbeam is fixed on rectangle frame side by side
It is interior.
Further, the auxiliary frame includes a connecting rod;The surface of connecting rod one is provided with this to be connected with base
The first fix bar, the second fix bar being connected with fixed cross beam, the 3rd fix bar that is connected with top frame.
Further, the moving beam two ends are slided on a column respectively;Move horizontal stroke in the transversal stretching mechanism edge
Liang Sicheng;
The transversal stretching mechanism includes a telescopic hydraulic cylinder and one and slides limit base;The telescopic hydraulic cylinder passes through a shield
Set coordinates with sliding limit base;The slip limit base includes the first slider bar and the second slider bar;The one of the sheath is relative
Two surfaces be respectively fixed with a guide pillar;
First slider bar and the second slider bar include the first side plate and the second side plate;First side plate and second
Side plate to being fixed with some spacing horizontal stripes between opposite;The spacing horizontal stripe of adjacent two couple in outside is fixed with fixed plate;It is described solid
The first roller is fixed with fixed board;The second side plate end face is fixed with a pair of support plates;
Wherein, the second side plate of first slider bar is fixed with a free bearing;
Wherein, the first side plate of second slider bar is fixed with another free bearing.
Further, the walking hanging beam includes a hanging beam and walking mechanism;The two ends on the surface of hanging beam one are solid respectively
Surely there is a walking mechanism;The walking mechanism includes wheel seat and fixed plate;The both ends of the surface of the hanging beam are respectively fixed with a tooth
Wheel;Wheel seat described in a pair is relatively fixed between two fixed plates;The wheel seat includes U row frids;The one of the U rows frid
Opposite face is relative respectively to be provided with through hole;The surface of U rows frid one is uniformly provided with four notches;Another table of U rows frid
The notch position in face is fixed with bearing;The second roller is fixed with the bearing;The longitudinal extension mechanism includes hydraulic cylinder;Institute
State hydraulic cylinder one end and be fixed with a fixed base plate;A wheel seat is fixed with the fixed base plate;The both sides of the wheel seat are solid respectively
Surely there is a connecting plate;Another wheel seat is additionally provided between two connecting plates;Two wheel seats are oppositely arranged;The hydraulic cylinder
Hanging beam displacement by wheel seat along walking hanging beam.
Further, the walking mechanism is fixed on fixed cross beam;The walking mechanism includes roller bearing and motor;It is described
The two ends of fixed cross beam are respectively fixed with a roller bearing;The roller bearing and a motor are passed by gear drive or belt wheel transmission or sprocket wheel
It is dynamic;Linked between two roller bearings by chain;The gear of the chain and walking hanging beam coordinates.
Further, the Diao Sheng mechanisms include a telescoping mechanism and assembly pulley;The telescoping mechanism passes through two groups of steel wires
Rope is connected with moving beam one end and the moving beam other end respectively;The assembly pulley includes the first pulley that column one end is set
With the second pulley set on telescoping mechanism.
Further, the telescoping mechanism uses telescopic hydraulic cylinder;The telescoping mechanism is fixed on column.
The invention has the advantages that:
1st, the present invention is by designing a kind of big machinery calibration equipment, for the correction to large scale equipment malformation, tool
Body, for the fixation and correction to large scale equipment structural vertical direction structure, is stretched by four groups of transversal stretching mechanisms by longitudinal direction
Contracting mechanism and hydraulic cylinder realize the fixation and correction to large scale equipment structure level direction structure.
2nd, structure of the invention can carry out the correction of distressed structure to all kinds of large scale equipments, should with having a wide range of application
With flexible, structural adjustment flexibly, can three-dimensional coordinate formula position locations of structures to be corrected.
Certainly, any product for implementing the present invention it is not absolutely required to while reaching all the above advantage.
Brief description of the drawings
In order to illustrate the technical solution of the embodiments of the present invention more clearly, used required for being described below to embodiment
Accompanying drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the present invention, for ability
For the those of ordinary skill of domain, on the premise of not paying creative work, it can also be obtained according to these accompanying drawings other attached
Figure.
Fig. 1 is the structural representation of the integrated multifunctional correct-by-construction equipment of the present invention;
Fig. 2 is the structural representation at the left view visual angle of base;
Fig. 3 regards the structural representation at visual angle for the right side of base;
Fig. 4 is the structural representation of walking hanging beam;
Fig. 5 is the structural representation of hanging beam;
Fig. 6 is the structural representation of moving beam;
Fig. 7 is the structural representation of the first slider bar;
Fig. 8 is Fig. 7 structural front view;
Fig. 9 is the structural representation that the second slider bar right side regards visual angle;
Figure 10 is the structural representation at the second slider bar left view visual angle;
Figure 11 is Figure 10 structural front view;
Figure 12 is the structural representation of longitudinal extension mechanism;
Figure 13 is Figure 12 structural front view;
Figure 14 is the structural representation for looking up visual angle of wheel seat;
Figure 15 is the structural representation at the vertical view visual angle of wheel seat;
Figure 16 is Figure 15 structural front view;
Figure 17 is the structural representation of transversal stretching mechanism;
Figure 18 is the structural representation of telescopic hydraulic cylinder;
Figure 19 is Figure 17 structural front view.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete
Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.It is based on
Embodiment in the present invention, it is all other that those of ordinary skill in the art are obtained under the premise of creative work is not made
Embodiment, belongs to the scope of protection of the invention.
In the description of the invention, it is to be understood that term " perforate ", " on ", " under ", " thickness ", " top ", " in ",
Indicating position or the position relationship such as " length ", " interior ", " surrounding ", are for only for ease of the description present invention and simplify description, without
It is that instruction or the signified component of hint or element must have specific orientation, with specific azimuth configuration and operation, therefore not
It is understood that as limitation of the present invention.
Refer to shown in Fig. 1-19, it is of the invention for integrated multifunctional correct-by-construction equipment, including base 1;The surface of base 1 one
It is fixed with two groups of columns 3;One end of column 3 is fixed with a top frame 4;Auxiliary frame 2 is further fixed between base 1 and top frame 4;
Wherein, column 3 is " work " word girder construction;Axial direction of one apparent surface of " work " word girder construction along column 3 is uniformly solid side by side
Surely there is cross bar 301;One end of " work " word beam is additionally provided with pulley 302.
Wherein, a fixed cross beam 6 and a moving beam 5 are respectively fixed between every group of column 3;Adjacent two fixed cross beam 6
On be provided with walking hanging beam 7, walking hanging beam 7 be slidably matched with fixed cross beam 6;A longitudinal extension machine is provided with walking hanging beam 7
Structure 13;Transversal stretching mechanism 11 is combined with moving beam 5;The one end of moving beam 5 is connected with a Diao Sheng mechanisms;Walking hanging beam 7
It is connected with a walking mechanism.
Wherein, base 1 includes the first I-shaped plate and the second I-shaped plate;The surface of first I-shaped plate one is provided with one group of ladder conduit
Hole 102;Interval panel seat has been uniformly arranged between first I-shaped plate and the second I-shaped plate;Adjacent two intervals panel seat formation penetration hole
101。
Wherein, top frame 4 is made up of a rectangle frame and some crossbeams;Crossbeam is fixed in rectangle frame side by side.
Wherein, auxiliary frame 2 includes a connecting rod;The surface of connecting rod one is provided with first be connected with base 1 with this and fixed
Bar 201, the second fix bar 202 being connected with fixed cross beam 6, the 3rd fix bar 203 being connected with top frame 4.
Wherein, the two ends of moving beam 5 are slided on a column 3 respectively;Transversal stretching mechanism 11 is along the displacement of moving beam 5;
Transversal stretching mechanism 11 includes a telescopic hydraulic cylinder 1101 and one and slides limit base;Telescopic hydraulic cylinder 1101 passes through one
Sheath 1102 coordinates with sliding limit base;Sliding limit base includes the first slider bar 1103 and the second slider bar 1104;Sheath
A 1102 two relative surfaces are respectively fixed with a guide pillar 1103;
First slider bar 1103 and the second slider bar 1104 include the first side plate 100 and the second side plate 200;First side plate
100 and second side plate 200 to being fixed with some spacing horizontal stripes 400 between opposite;The spacing horizontal stripe 400 of adjacent two couple in outside is consolidated
Surely there is fixed plate 500;The first roller 600 is fixed with fixed plate 500;The end face of second side plate 200 is fixed with a pair of support plates
300;
Wherein, the second side plate 200 of the first slider bar 1103 is fixed with a free bearing 700;
Wherein, the first side plate 100 of the second slider bar 1104 is fixed with another free bearing 700.
Wherein, walking hanging beam 7 includes a hanging beam and walking mechanism;The two ends on the surface of hanging beam one are respectively fixed with a vehicle with walking machine
Structure;Walking mechanism includes wheel seat 12 and fixed plate 701;The both ends of the surface of hanging beam are respectively fixed with a gear;A pair of phases of wheel seat 12
To being fixed between two fixed plates 701;Wheel seat 12 includes U row frids;One opposite face of U row frids respectively pass through by relative be provided with
Through hole 1201;The surface of U rows frid one is uniformly provided with four notches 1202;The position of notch 1202 on another surface of U row frids is fixed
There is bearing 1204;The second roller 1204 is fixed with bearing 1204;Longitudinal extension mechanism 13 includes hydraulic cylinder 1301;Hydraulic cylinder
1301 one end are fixed with a fixed base plate 1302;A wheel seat 12 is fixed with fixed base plate 1302;The both sides of wheel seat 12 are solid respectively
Surely there is a connecting plate 1303;Another wheel seat 12 is additionally provided between two connecting plates 1303;Two wheel seats 12 are oppositely arranged;Hydraulic cylinder
The 1301 hanging beam displacement by wheel seat 12 along walking hanging beam 7.
Wherein, walking mechanism is fixed on fixed cross beam 6;Walking mechanism includes roller bearing 9 and motor 10;Fixed cross beam 6
Two ends are respectively fixed with a roller bearing 9;The motor 10 of roller bearing 9 and one passes through gear drive or belt wheel transmission or chain gear transmission;Two rollings
Linked between axle 9 by chain;The gear of chain and walking hanging beam 7 coordinates.Drive roller bearing 9 to roll by motor 10, drive rolling
The chain at the two ends of axle 9, and then drive walking hanging beam 7 to move, the position for adjusting the longitudinal extension mechanism 13 on walking hanging beam 7
Put.
Wherein, Diao Sheng mechanisms include a telescoping mechanism and assembly pulley;Telescoping mechanism by two groups of steel wire ropes respectively with movement
The one end of crossbeam 5 and the connection of the other end of moving beam 5;Assembly pulley includes first pulley 302 and the telescoping mechanism that the one end of column 3 is set
The second pulley 303 of upper setting.First pulley 302 and second pulley 303 use into the setting of sister block, the pulley of half number
Connection for the one end of moving beam 5;The pulley of second half number is used for the connection of the other end of moving beam 5.
Wherein, telescoping mechanism uses telescopic hydraulic cylinder;Telescoping mechanism is fixed on column 3;Telescopic hydraulic cylinder one end passes through
The mode being hinged is fixed on column 3, and the other end of telescopic hydraulic cylinder is provided with the fixed seat of fixed second pulley 303.
In the description of this specification, the description of reference term " one embodiment ", " example ", " specific example " etc. means
At least one implementation of the present invention is contained in reference to specific features, structure, material or the feature that the embodiment or example are described
In example or example.In this manual, identical embodiment or example are not necessarily referring to the schematic representation of above-mentioned term.
Moreover, specific features, structure, material or the feature of description can be closed in any one or more embodiments or example
Suitable mode is combined.
Present invention disclosed above preferred embodiment is only intended to help and illustrates the present invention.Preferred embodiment is not detailed
All details of narration, it is only described embodiment that the invention is not limited yet.Obviously, according to the content of this specification,
It can make many modifications and variations.This specification is chosen and specifically describes these embodiments, is to preferably explain the present invention
Principle and practical application so that skilled artisan can be best understood by and utilize the present invention.The present invention is only
Limited by claims and its four corner and equivalent.
Claims (10)
1. integrated multifunctional correct-by-construction equipment, it is characterised in that:Including base (1);
The surface of base (1) one is fixed with some groups of columns (3);One end of the column (3) is fixed with a top frame (4);
Auxiliary frame (2) is further fixed between the base (1) and top frame (4);
Wherein, a fixed cross beam (6) and a moving beam (5) are respectively fixed between every group of column (3);
Wherein, walking hanging beam (7) is provided with adjacent two fixed cross beam (6), the walking hanging beam (7) and fixed cross beam (6) are sliding
It is dynamic to coordinate;A longitudinal extension mechanism (13) is provided with the walking hanging beam (7);
Wherein, it is combined with transversal stretching mechanism (11) on the moving beam (5);
Wherein, described moving beam (5) one end is connected with a Diao Sheng mechanisms;
Wherein, the walking hanging beam (7) is connected with a walking mechanism.
2. integrated multifunctional correct-by-construction equipment according to claim 1, it is characterised in that the column (3) is " work "
Word girder construction;Axial direction of one apparent surface of " work " the word girder construction along column (3) is uniformly fixed with cross bar side by side
(301);One end of " work " the word beam is additionally provided with pulley (302).
3. integrated multifunctional correct-by-construction equipment according to claim 1, it is characterised in that the base (1) includes the
One I-shaped plate and the second I-shaped plate;The surface of first I-shaped plate one is provided with one group of ladder conduit hole (102);First I-shaped
Interval panel seat has been uniformly arranged between plate and the second I-shaped plate;Adjacent two interval panel seat formation penetration hole (101).
4. integrated multifunctional correct-by-construction equipment according to claim 1, it is characterised in that the top frame (4) is by one
Rectangle frame and some crossbeams composition;The crossbeam is fixed in rectangle frame side by side.
5. integrated multifunctional correct-by-construction equipment according to claim 1, it is characterised in that the auxiliary frame (2) includes
One connecting rod;The surface of connecting rod one is provided with the first fix bar (201) being connected with base (1) and fixed cross beam with this
(6) the second fix bar (202) of connection, the 3rd fix bar (203) being connected with top frame (4).
6. integrated multifunctional correct-by-construction equipment according to claim 1, it is characterised in that the moving beam (5) two
Slided respectively on a column (3) at end;The transversal stretching mechanism (11) is along moving beam (5) displacement;
The transversal stretching mechanism (11) includes a telescopic hydraulic cylinder (1101) and one and slides limit base;The telescopic hydraulic cylinder
(1101) coordinated by a sheath (1102) with sliding limit base;The slip limit base includes the first slider bar (1103) and the
Two slider bars (1104);One two relative surfaces of the sheath (1102) are respectively fixed with a guide pillar (1103);
First slider bar (1103) and the second slider bar (1104) include the first side plate (100) and the second side plate (200);
First side plate (100) and the second side plate (200) to being fixed with some spacing horizontal stripes (400) between opposite;Outside is adjacent
The spacing horizontal stripe of two couples (400) be fixed with fixed plate (500);The first roller (600) is fixed with the fixed plate (500);Institute
State the second side plate (200) end face and be fixed with a pair of support plates (300);
Wherein, the second side plate (200) of first slider bar (1103) is fixed with a free bearing (700);
Wherein, the first side plate (100) of second slider bar (1104) is fixed with another free bearing (700).
7. integrated multifunctional correct-by-construction equipment according to claim 1, it is characterised in that walking hanging beam (7) bag
Include a hanging beam and walking mechanism;The two ends on the surface of hanging beam one are respectively fixed with a walking mechanism;The walking mechanism includes
Wheel seat (12) and fixed plate (701);The both ends of the surface of the hanging beam are respectively fixed with a gear;Wheel seat described in a pair (12) is relative
It is fixed between two fixed plates (701);The wheel seat (12) includes U row frids;The opposite face difference of the U rows frid
It is relative to be provided with through hole (1201);The surface of U rows frid one is uniformly provided with four notches (1202);The U rows frid is another
Notch (1202) position on surface is fixed with bearing (1204);The second roller (1204) is fixed with the bearing (1204);Institute
Stating longitudinal extension mechanism (13) includes hydraulic cylinder (1301);Described hydraulic cylinder (1301) one end is fixed with a fixed base plate
(1302);A wheel seat (12) is fixed with the fixed base plate (1302);The both sides of the wheel seat (12) are respectively fixed with a company
Fishplate bar (1303);Another wheel seat (12) is additionally provided between two connecting plates (1303);Two wheel seats (12) are relative to be set
Put;Hanging beam displacement of the hydraulic cylinder (1301) by wheel seat (12) along walking hanging beam (7).
8. integrated multifunctional correct-by-construction equipment according to claim 1, it is characterised in that the walking mechanism is fixed on
On fixed cross beam (6);The walking mechanism includes roller bearing (9) and motor (10);The two ends of the fixed cross beam (6) are fixed respectively
There is a roller bearing (9);The roller bearing (9) passes through gear drive or belt wheel transmission or chain gear transmission with a motor (10);Two roller bearings
(9) linked between by chain;The gear of the chain and walking hanging beam (7) coordinates.
9. integrated multifunctional correct-by-construction equipment according to claim 1, it is characterised in that the Diao Sheng mechanisms include one
Telescoping mechanism and assembly pulley;The telescoping mechanism by two groups of steel wire ropes respectively with moving beam (5) one end and moving beam (5)
The other end is connected;The assembly pulley includes second set in the first pulley (302) and telescoping mechanism of column (3) one end setting
Pulley (303).
10. integrated multifunctional correct-by-construction equipment according to claim 1, it is characterised in that the telescoping mechanism is used
Telescopic hydraulic cylinder;The telescoping mechanism is fixed on column (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710720989.7A CN107282700A (en) | 2017-08-22 | 2017-08-22 | Integrated multifunctional correct-by-construction equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710720989.7A CN107282700A (en) | 2017-08-22 | 2017-08-22 | Integrated multifunctional correct-by-construction equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107282700A true CN107282700A (en) | 2017-10-24 |
Family
ID=60107063
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710720989.7A Pending CN107282700A (en) | 2017-08-22 | 2017-08-22 | Integrated multifunctional correct-by-construction equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107282700A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110369554A (en) * | 2019-08-02 | 2019-10-25 | 深圳南方中集集装箱服务有限公司 | Container front end corrects machine |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1456447A1 (en) * | 1964-08-26 | 1970-02-26 | Drott Mfg Corp | Self-propelled gantry crane |
ES2013894A6 (en) * | 1989-04-21 | 1990-06-01 | Mora Agudo Manuel | Cold hydraulic straightener for platforms, etc. |
CN2853217Y (en) * | 2005-12-20 | 2007-01-03 | 傅景宽 | Gantry hydraulic corrector |
CN204074827U (en) * | 2014-10-09 | 2015-01-07 | 苏州晓炎自动化设备有限公司 | The removable plate straightening machine of a kind of gate-type |
CN204470322U (en) * | 2015-03-18 | 2015-07-15 | 张�林 | A kind of portal-type hydraulic calibration equipment for large-scale steel structure |
CN106115569A (en) * | 2016-08-31 | 2016-11-16 | 中车青岛四方机车车辆股份有限公司 | Three-dimensional transfer loading equipment |
CN207343491U (en) * | 2017-08-22 | 2018-05-11 | 合肥向上工程机械有限公司 | Integrated multifunctional correct-by-construction equipment |
-
2017
- 2017-08-22 CN CN201710720989.7A patent/CN107282700A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1456447A1 (en) * | 1964-08-26 | 1970-02-26 | Drott Mfg Corp | Self-propelled gantry crane |
ES2013894A6 (en) * | 1989-04-21 | 1990-06-01 | Mora Agudo Manuel | Cold hydraulic straightener for platforms, etc. |
CN2853217Y (en) * | 2005-12-20 | 2007-01-03 | 傅景宽 | Gantry hydraulic corrector |
CN204074827U (en) * | 2014-10-09 | 2015-01-07 | 苏州晓炎自动化设备有限公司 | The removable plate straightening machine of a kind of gate-type |
CN204470322U (en) * | 2015-03-18 | 2015-07-15 | 张�林 | A kind of portal-type hydraulic calibration equipment for large-scale steel structure |
CN106115569A (en) * | 2016-08-31 | 2016-11-16 | 中车青岛四方机车车辆股份有限公司 | Three-dimensional transfer loading equipment |
CN207343491U (en) * | 2017-08-22 | 2018-05-11 | 合肥向上工程机械有限公司 | Integrated multifunctional correct-by-construction equipment |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110369554A (en) * | 2019-08-02 | 2019-10-25 | 深圳南方中集集装箱服务有限公司 | Container front end corrects machine |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207343491U (en) | Integrated multifunctional correct-by-construction equipment | |
DE102016205956A1 (en) | Self-climbing system, self-climbing unit and method for implementing such a self-climbing unit on a concrete structure | |
EP3441523A1 (en) | Support rail for a translative robotic platform | |
CN104988994A (en) | Combined component | |
CN107282700A (en) | Integrated multifunctional correct-by-construction equipment | |
WO2013017171A1 (en) | Co-ordinate measuring device for measuring a workpiece | |
EP2485856B1 (en) | Process and device for manufacturing welded concrete reinforcement mats | |
LU501348A1 (en) | METHOD FOR CONSTRUCTING LARGE-SPAN THIN-WALLED CONCRETE SOUND BARRIER WITH POURING TROLLEY | |
DE60314454T2 (en) | VERTICAL ALIGNMENT AND LEVELING OF MODULE BUILDING UNITS | |
CN205330202U (en) | Take out post span wire reinforced structure | |
CN210316477U (en) | Inserted lifting scaffold perpendicularity adjusting device | |
CN107587885A (en) | Two lining trolley structures and assembling method in a kind of standard cross-section of tunnel | |
JP2018162567A (en) | Movable work scaffold | |
EP1502999B1 (en) | Support for devices and signs for spanning roads | |
AT509734B1 (en) | PROCESS FOR ESTABLISHING AN ELECTRIC SUPPLY | |
JP6124444B2 (en) | Structure dismantling system | |
EP3495309B1 (en) | Bridge crane installation | |
CN204781987U (en) | Z of building profile make -up machine is to removing structure | |
JP7306628B2 (en) | Carriage with rail feeder | |
CN114775609A (en) | Integrated guide frame of steel trestle steel pipe pile construction positioning operation platform and construction method | |
DE2306401C3 (en) | Lining for an open-cut tunnel | |
DE2208911C3 (en) | Device for distributing concrete in the course of erecting buildings | |
DE60315714T2 (en) | MODULAR COMPONENT AND METHOD FOR ASSEMBLING THEREOF | |
CN204777674U (en) | Material conveying system of building profile make -up machine | |
EP2511223B1 (en) | Method for producing a lifting device in the ground and use of same |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
AD01 | Patent right deemed abandoned |
Effective date of abandoning: 20240319 |
|
AD01 | Patent right deemed abandoned |