CN107276122A - Adapt to the grid-connected peak regulation resource transfer decision-making technique of extensive regenerative resource - Google Patents

Adapt to the grid-connected peak regulation resource transfer decision-making technique of extensive regenerative resource Download PDF

Info

Publication number
CN107276122A
CN107276122A CN201710495182.8A CN201710495182A CN107276122A CN 107276122 A CN107276122 A CN 107276122A CN 201710495182 A CN201710495182 A CN 201710495182A CN 107276122 A CN107276122 A CN 107276122A
Authority
CN
China
Prior art keywords
msub
mrow
peak regulation
peak
cost
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710495182.8A
Other languages
Chinese (zh)
Other versions
CN107276122B (en
Inventor
元博
张晋芳
***
王晓晨
栗楠
张富强
冯君淑
郑宽
焦冰琦
闫晓卿
伍声宇
王刚
张涛
王江波
刘军会
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Energy Research Institute Co Ltd
Electric Power Research Institute of State Grid Liaoning Electric Power Co Ltd
Economic and Technological Research Institute of State Grid Henan Electric Power Co Ltd
Original Assignee
State Grid Energy Research Institute Co Ltd
Electric Power Research Institute of State Grid Liaoning Electric Power Co Ltd
Economic and Technological Research Institute of State Grid Henan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Energy Research Institute Co Ltd, Electric Power Research Institute of State Grid Liaoning Electric Power Co Ltd, Economic and Technological Research Institute of State Grid Henan Electric Power Co Ltd filed Critical State Grid Energy Research Institute Co Ltd
Priority to CN201710495182.8A priority Critical patent/CN107276122B/en
Publication of CN107276122A publication Critical patent/CN107276122A/en
Application granted granted Critical
Publication of CN107276122B publication Critical patent/CN107276122B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/381Dispersed generators
    • H02J3/382
    • H02J3/383
    • H02J3/386
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/46Controlling of the sharing of output between the generators, converters, or transformers
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy
    • Y02E10/56Power conversion systems, e.g. maximum power point trackers
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/76Power conversion electric or electronic aspects

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Wind Motors (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The grid-connected peak regulation resource transfer decision-making technique of extensive regenerative resource, including step are adapted to the invention discloses a kind of:Obtain sequential workload demand P in the specific time period of given areaL, determine the peak regulation demand A of power dispatching stationt;Determine that Wind turbines time series forecasting is exerted oneself PWExerted oneself P with solar power generation unit time series forecastingS;Determine that peak regulation resource M can be used in systemi, determine all kinds of peak regulation resource MiAdjustable metrics range, peak capacity DMiWith corresponding peak regulation cost CMi, build mixed integer optimization model;Obtain the peak regulation resource transfer order of optimization in specific time period.The present invention is by setting up every kind of peak regulation means technical/economical models and cost model, build the mixed integer optimization model using economy as target, the optimal peak regulation resource transfer amount of cost benefit is obtained by solving model and order is called, regenerative resource is adapted to power system efficiently to dissolve, improving peak load regulation network ability has preferable actual directive significance and application value.

Description

Adapt to the grid-connected peak regulation resource transfer decision-making technique of extensive regenerative resource
Technical field
The present invention relates to the technical field of electric power sunykatuib analysis, and in particular to adapts to the grid-connected tune of extensive regenerative resource Peak resource transfer decision-making technique.
Background technology
With the large-scale development of the regenerative resources such as wind-powered electricity generation, solar energy, its randomness and intermittence are pacified to power system The influence of full stable operation is increasingly highlighted.The access of extensive new energy causes the peak regulation pressure of systems face increasingly to increase, especially It is that the anti-peak-shaving capability of wind-powered electricity generation becomes apparent from adding the difficulty of peak load regulation network.
Limited by endowment of resources, China's power supply architecture is based on the poor coal electricity of flexible modulation ability, peak-load regulating ability It is weaker, cause the regenerative resources such as honourable water to be dissolved limited.The factor of influence wind electricity digestion can be classified as two aspects, and one is to disappear Receive in terms of ability, include system fading margin ability, transmitting capacity of the electric wire netting etc. as long as determining the factor of a regional wind electricity digestion capability; In terms of two are level of dissolving, refer mainly to whether take full advantage of the peak regulation resource of system, can the limited peak regulation resource of science decision The amount of calling and call order, can determine realize that the maximization of regenerative resource is dissolved under existing objective condition.
There is randomness in calling for current China peak regulation resource, the discretion of scheduling is very big, cause all kinds of peak regulations to provide Source is called has gap with actual demand situation, is largely because the rational peak regulation resource transfer decision process of missing. The scheduling of science decision peak-load regulating resource is, it is necessary to solve the problems, such as following several respects:
(1) how available peak regulation resource in accurate and scientific definition system;
(2) how Technical Economy modeling and peak regulation Cost Modeling are carried out to all types of peak regulation resources;
(3) scientific and reasonable dispatching decision-making model how is built, helps scheduling institution accurately to realize the optimal feelings of economy Dissolved to greatest extent under condition regenerative resource.
But do not propose that related suitable model and method can be under Unified frames to all kinds of peak regulation resources still at present Technical and economic peculiarities are described and quantify its peak regulation cost, can also be realized to peak regulation resource transfer amount without specific method With the decision-making for calling order.
The content of the invention
The present invention proposes a kind of grid-connected peak regulation resource transfer decision system of extensive regenerative resource of adaptation, based on mixing Integer optimization method obtains the optimal peak regulation resource transfer capacity of economy and calls order, improves extensive regenerative resource and connects The reasonability and science of peak regulation scheduling of resource in the case of entering, improve the regenerative resource digestion capability of system.On solving Technical problem is stated, the technical solution adopted in the present invention there is provided a kind of grid-connected peak regulation of extensive regenerative resource that adapts to and provide Decision-making technique is called in source, is comprised the following steps:
Obtain sequential workload demand P in the specific time period of given areaL, determine the specific region power dispatching station specific Period peak regulation demand At;Determine that the time series forecasting of Wind turbines is exerted oneself PWExerted oneself P with the time series forecasting of solar power generation unitS;Really Determine that peak regulation resource M can be used in systemiAnd its operation characteristic, according to correspondence peak regulation resource MiSafety and stability and economy constraint bar Part, determines all kinds of peak regulation resource MiAdjustable metrics range and peak capacity DMi, and every kind of peak regulation resource MiCorresponding peak regulation into This CMi, and build mixed integer optimization model;Obtain the peak regulation resource transfer order of optimization in specific time period;Wherein i=1,2, 3...n。
In the above-mentioned methods, the peak regulation demand AtFormula specific as follows:
If the initial time of specific time period is t0, the sequential workload demand of initial time isFinish time is t, is terminated The sequential workload demand at moment isAnd power dispatching station is in moment t0Predict moment t peak capacity demand AtFor:
In formula, work as AtFor timing, peak regulation demand in representative works as AtDuring to bear, lower peak regulation demand is represented.
In the above-mentioned methods, the time series forecasting of the Wind turbines is exerted oneself PWFormula specific as follows:
In formula, a represents this area's wind power plant number;B represents the number of blower fan in g-th of wind power plant;Represent this area H in g-th of wind power plantgTheory of the Fans under the moment prediction of wind speed is exerted oneself;
The time series forecasting of solar power generation unit is exerted oneself PSFormula specific as follows:
In formula, c represents this area's solar power station number;D represents of photovoltaic electrification component in g-th of solar power station Number;Represent h in g-th of this area solar power stationgReason of the individual photovoltaic electrification component under moment prediction intensity of illumination By exerting oneself.
In the above-mentioned methods, the peak regulation resource MiIncluding:Coal group of motors, Gas Generator Set, conventional hydropower unit, draw water storage Can unit, nuclear power generating sets, abandon wind and abandon light, Demand Side Response and exerted oneself with interconnection.
In the above-mentioned methods, all kinds of peak regulation resource MiAdjustable metrics range, peak capacity DMiAnd corresponding cost mould Type CMiFormula specific as follows:
It regard coal group of motors as peak regulation means M1, the available upper peak modulation capacity N of coal group of motorsupSpecially following formula:
In formula,Maximum can use of coal group of motors is represented to exert oneself,Coal group of motors is represented currently to exert oneself;
The available lower peak modulation capacity N of coal group of motorsdownSpecially following formula:
In formula,Minimum can use of coal group of motors is represented to exert oneself;
The upper peak regulation cost C of coal group of motorsM1upIt is fuel consumption cost, formula specific as follows:
In formula, β represents coal group of motors coal consumption function,Represent that unit existsWhen the unit exerted oneself Coal consumption, wherein PM1,t0For initial time unit output,That is initial time is exerted oneself+gone up peak capacity, that is, currently Moment exerts oneself;Represent peak capacity in the coal group of motors that t is called;
The lower peak regulation cost C of coal group of motorsM1downIt is due to the unit coal consumption increase cost for forcing down and exerting oneself and bringing, uses following formula Represent:
In formula,Represent the unit coal consumption that unit is exerted oneself in initial time;Represent that unit existsWhen the unit coal consumption exerted oneself,Represent that current coal group of motors is exerted oneself,Represent the coal group of motors that t is called Lower peak capacity;
It regard Gas Generator Set as peak regulation means M2, the available upper peak modulation capacity N of Gas Generator SetupSpecially following formula:
In formula,Maximum can use of coal group of motors is represented to exert oneself,Coal group of motors is represented currently to exert oneself;
The available lower peak modulation capacity N of coal group of motorsdownSpecially following formula:
According to actual schedule demand, Gas Generator Set considers the different peak modulation capacities of liquefied natural gas and general gas, liquefaction Natural gas is provided mainly to start and stop peak regulation form, therefore the upper peak regulation cost of Gas Generator Set is fuel consumption cost, lower peak regulation into This is 0;
It regard conventional hydropower unit as peak regulation means M3, it is divided into radial-flow type water power and adjustable water power, wherein radial-flow type water Electricity is not involved in peak regulation, can adjust water power dry season participation peak regulation, it calls peak capacityReservoir level constraint, tool need to be met Body is as follows:
In formula, WtoRepresent the initial water level of reservoir, WminRepresent reservoir lowest water level, WmaxReservoir peak level is represented, η is Water amount of power generating conversion coefficient;
Conventional adjustable water power up-regulation peak cost is 0, when water occurs abandoning in lower peak regulation, lower peak regulation cost formula specific as follows:
In formula,Represent that unit abandons water cost, PcurWater is abandoned in expression;
It regard pump-storage generator as peak regulation means M4, it is necessary to upper and lower reservoir level constraint is met, it is specific as follows:
In formula, WtoRepresent the initial water level of reservoir, WminRepresent reservoir lowest water level, WmaxReservoir peak level is represented, DM4,tTo call the peak capacity that pumped storage unit is participated in;
Pump-storage generator peak regulation cost with take out hair loss represent, lower peak regulation cost CM4Formula specific as follows:
CM4=(1- α) β DM4,t
In formula, α is that pumped storage unit takes out hair conversion efficiency, and β is the specified unit coal consumption of coal group of motors;
It regard nuclear power generating sets as peak regulation means M5, peak regulation cost is consumption fuel cost, lower peak regulation cost on nuclear power generating sets For 0;The upper specific formula of peak regulation cost is as follows:
In formula, ω represents nuclear power unit of fuel cost, DM5,tRepresent peak capacity on nuclear power;
Wind will be abandoned and abandon light as peak regulation means M6, when peak regulation can not be met, wind is abandoned, light is abandoned and is exerted oneself fortune by equal proportion drop OK, and peak regulation cost formula specific as follows:
In formula,Light peak regulation power is abandoned for the wind of abandoning that calls, and λ abandons light unit cost to abandon wind;
It regard Demand Side Response as peak regulation means M7, and peak regulation cost formula specific as follows:
In formula,The peak capacity participated in for dispatching requirement side resource response, μ is that Demand Side Response unit is called into This;
Interconnection is exerted oneself and is used as peak regulation means M8, it is set to this grade of schedulable circuit with interconnection outside area and higher level dispatches Two kinds of circuit, higher level's scheduling circuit is set to non-scheduling or low priority is called, it is considered at a time got in touch with by adjusting After line plan is exerted oneself, proper timing it will need to be returned after with plan deviation electricity.
In the above-mentioned methods, all kinds of peak regulation resource MiPeak-load regulating equilibrium constraint need to be met, the system is adjusted Peak equilibrium constraint formula specific as follows:
Wherein,For all kinds of peak regulation resource transfer capacity,For wind, light renewable energy power generation prediction output deviation.
In the above-mentioned methods, the mixed integer optimization model contains decision variable, constraints and object function three Part, wherein decision variable are all kinds of peak regulation resource MiThe peak capacity provided in the feature period;Constraints is peak-load regulating Equilibrium constraint and safety and stability and economy constraints;Object function is peak-load regulating totle drilling cost.
In the above-mentioned methods, the object function includes object function when object function is with lower peak regulation during upper peak regulation;
Object function takes out hair for the electric peak regulation fuel consumption cost of coal, fuel gas generation fuel consumption cost, pumped storage during upper peak regulation Cost depletions, nuclear power fuel consuming cost and Demand Side Response cost sum, formula specific as follows:
During lower peak regulation object function be coal electricity drop when unit of force coal consumption increase cost, conventional motor group abandon water peak regulation into This, pumped storage takes out hair cost depletions, abandons wind and abandon peak regulation resources costs under light cost and Demand Side Response cost sum, other types and be 0, represented with following formula:
The present invention is built using economy as mesh by setting up every kind of peak regulation means technical/economical models and cost model Target mixed integer optimization model, obtains the optimal peak regulation resource transfer amount of cost benefit by solving model and calls order, Regenerative resource is adapted to power system efficiently to dissolve, improving peak load regulation network ability has preferable actual directive significance and application Value.
Brief description of the drawings
The method flow diagram that Fig. 1 provides for the present invention;
Flow chart is embodied for the method that the present invention is provided in Fig. 2.
Embodiment
The present invention is described in detail with reference to embodiment and Figure of description.
As shown in figure 1, adapting to the grid-connected peak regulation resource transfer decision-making of extensive regenerative resource the invention provides a kind of Method, comprises the following steps:
Sequential workload demand P in S1, acquisition given area specific time periodL, determine that the specific region power dispatching station exists Specific time period peak regulation demand At
Assuming that the initial time of specific time period is t0, the sequential workload demand of initial time isFinish time is t, knot The sequential workload demand at beam moment isAnd power dispatching station is in moment t0Predict moment t peak capacity demand At For:
In formula, work as AtFor timing, peak regulation demand in representative works as AtDuring to bear, lower peak regulation demand is represented.
S2, determine that the time series forecasting of Wind turbines is exerted oneself PWExerted oneself P with the time series forecasting of solar power generation unitS
The time series forecasting of Wind turbines is exerted oneself PWFormula specific as follows:
In formula, a represents this area's wind power plant number;B represents the number of blower fan in g-th of wind power plant;Represent this area H in g-th of wind power plantgTheory of the Fans under the moment prediction of wind speed is exerted oneself.
The time series forecasting of solar power generation unit is exerted oneself PSFormula specific as follows:
In formula, c represents this area's solar power station number;D represents of photovoltaic electrification component in g-th of solar power station Number;Represent h in g-th of this area solar power stationgReason of the individual photovoltaic electrification component under moment prediction intensity of illumination By exerting oneself.
S3, determine that peak regulation resource M can be used in systemiAnd its operation characteristic, according to correspondence peak regulation resource MiSafety and stability and Economy constraints, determines all kinds of peak regulation resource MiAdjustable metrics range and peak capacity DMi, and every kind of peak regulation resource Mi Corresponding peak regulation cost CMi(wherein i=1,2,3...n), and build mixed integer optimization model.Solution is waken up with a start to Optimized model Obtain peak regulation resource calls order and the amount of calling.
The peak regulation resource that peak regulation is participated in the present embodiment includes but is not limited to coal group of motors, Gas Generator Set, conventional hydropower machine Group, pump-storage generator, nuclear power generating sets, abandon wind and abandon light, Demand Side Response and exerted oneself with interconnection, and corresponding safety and stability and Economy constraints be respectively peak regulation Constraints of Equilibrium, units limits, reservoir dynamic capacity constraint, abandon wind abandon light constraint, unit Power constraint, the continuous start and stop constraint of unit and the actual schedule of climbing, which are run, to be constrained.
First determine that the sequencing theory for obtaining Wind turbines in the special time of given area is exerted oneself P firstF, normal power supplies machine The operation characteristic and sequential workload demand P of groupL, wherein,
The sequencing theory of Wind turbines is exerted oneself PFFormula specific as follows:
In formula, a represents this area's wind power plant number;B represents the number of blower fan in g-th of wind power plant;Represent this area H in g-th of wind power plantgTheory of the Fans under the moment wind friction velocity is exerted oneself.
Sequential workload demand PLIt is the history sequential load curve and search time of the corresponding period based on this area The load peak of the prediction of section, which is calculated, to be obtained, formula specific as follows:
In formula,It is historical load, KfIt is the load peak for the prediction for studying the period, KhIt is historical load peak value.
The characteristic that is operated together of above-mentioned all kinds of peak regulation resources mainly includes the available P that exerts oneself of unit maximum in systemC,max, it is minimum The P that exerts oneself can be usedC,min, the parameter such as unit climbing rate;The wherein available sum of exerting oneself of normal power supplies unit maximum should be greater than load and connection The maximum of winding thread plan electricity sent outside sum, and leave the maximum of certain positive spare capacity, then this area's normal power supplies unit The P that exerts oneself can be usedC,maxIt is shown below:
In formula, I represents the number of units of this area's normal power supplies unit, PCi,maxSkill can be used by representing the maximum of i-th conventional power unit Art is exerted oneself, PL(t)Represent the load power of t this area, Pt,plan(t) represent that t tie line plan sends power, R outside+Table Show positive spare capacity.It should be noted that normal power supplies refer to the power supply in addition to wind-powered electricity generation and solar power generation, it that is to say that peak regulation is provided All resources in source in addition to wind, light and load side are responded.
First, it regard coal group of motors as peak regulation means M1, the available upper peak modulation capacity N of coal group of motorsupSpecially following formula:
In formula,Maximum can use of coal group of motors is represented to exert oneself,Coal group of motors is represented currently to exert oneself.
The available lower peak modulation capacity N of coal group of motorsdownSpecially following formula:
In formula, PM1,minMinimum can use of coal group of motors is represented to exert oneself.Above-mentioned upper peak modulation capacity represents adjustable with lower peak modulation capacity Metrics range.
Required according to actual schedule, coal group of motors is divided into this grade of scheduling unit dispatches unit, this level scheduling unit with higher level It is set to high priority to call, higher level's scheduling unit is set to non-scheduling or low priority is called.Coal group of motors considers denitration Load rationally sets peak regulation cost with throwing the steady combustion load difference of oil, shows that lower peak regulation calls the preferential coal group of motors that allows in order Denitration load is down to, and throws the steady combustion load of oil and is used as unconventional regulating measure, therefore, the upper peak regulation cost C of coal group of motorsM1upIt is Fuel consumption cost, formula specific as follows:
In formula, β represents coal group of motors coal consumption function,Represent that unit existsWhen the list exerted oneself Position coal consumption, wherein PM1,t0For initial time unit output,That is initial time is exerted oneself+gone up peak capacity, that is, Current time exerts oneself;Represent peak capacity in the coal group of motors that t is called.
The lower peak regulation cost C of coal group of motorsM1downIt is due to the unit coal consumption increase cost for forcing down and exerting oneself and bringing, uses following formula Represent:
In formula,Represent the unit coal consumption that unit is exerted oneself in initial time;Represent that unit existsWhen the unit coal consumption exerted oneself,Represent that current coal group of motors is exerted oneself,Represent the coal group of motors that t is called Lower peak capacity.
2nd, it regard Gas Generator Set as peak regulation means M2, the available upper peak modulation capacity N of Gas Generator SetupSpecially following formula:
In formula,Maximum can use of coal group of motors is represented to exert oneself,Coal group of motors is represented currently to exert oneself.
The available lower peak modulation capacity N of coal group of motorsdownSpecially following formula:
According to actual schedule demand, Gas Generator Set considers LNG (Liquefied Nature Gas, liquefied natural gas) and general The different peak modulation capacities of logical combustion gas, LNG is provided mainly to start and stop peak regulation form, and general gas is set to continuously adjust.
The upper peak regulation cost of Gas Generator Set is fuel consumption cost, and lower peak regulation cost is 0.
3rd, it regard conventional hydropower unit as peak regulation means M3, it is divided into radial-flow type water power and adjustable water power, wherein radial-flow type Water power is not involved in peak regulation, can adjust water power dry season participation peak regulation, it calls peak capacity DM3,tReservoir level constraint need to be met, It is specific as follows:
In formula, WtoRepresent the initial water level of reservoir, WminRepresent reservoir lowest water level, WmaxReservoir peak level is represented, η is Water amount of power generating conversion coefficient.
Conventional adjustable water power up-regulation peak cost is 0, and lower peak regulation occurs abandoning water peak regulation cost formula specific as follows at present:
In formula,Represent that unit abandons water cost, PcurWater is abandoned in expression.
4th, it regard pump-storage generator as peak regulation means M4, it is similar with conventional hydropower, it is necessary to meet upper and lower reservoir level Constraint, it is specific as follows:
In formula, WtoRepresent the initial water level of reservoir, WminRepresent reservoir lowest water level, WmaxReservoir peak level is represented, DM4,tTo call the peak capacity that pumped storage unit is participated in.
Pump-storage generator possesses two kinds of operating modes of drawing water and generate electricity, and adjustable extent is completely sent out from full hair-like state of drawing water to generating electricity State, pump-storage generator peak regulation cost is specially to take out hair cost depletions, is mainly embodied in pumping operation mode, therefore upper peak regulation cost For 0, lower peak regulation cost CM4Formula specific as follows:
CM4=(1- α) β DM4,t
In formula, α is that pumped storage unit takes out hair conversion efficiency, and β is the specified unit coal consumption of coal group of motors.
5th, nuclear power generating sets are regard as peak regulation means M5, peak regulation cost is consumption fuel cost, lower peak regulation generation on nuclear power generating sets The reduction of table nuclear power is exerted oneself, and lower peak regulation cost is 0, but nuclear power generating sets peak regulation considers that need to shift to an earlier date the long period is prepared;Upper peak regulation The specific formula of cost is as follows:
In formula, ω represents nuclear power unit of fuel cost, DM5,tRepresent peak capacity on nuclear power.
6th, wind will be abandoned and abandon light as peak regulation means M6, when peak regulation can not be met, abandon wind, abandon light by equal proportion drop exert oneself Operation, and peak regulation cost formula specific as follows:
In formula,Light peak regulation power is abandoned for the wind of abandoning that calls, and λ abandons light unit cost to abandon wind.
7th, it regard Demand Side Response as peak regulation means M7, and call Demand Side Response resources costs formula specific as follows:
In formula,The peak capacity participated in for dispatching requirement side resource response, μ is that Demand Side Response unit is called into This.
8th, interconnection is exerted oneself and is used as peak regulation means M8, this grade of schedulable circuit and higher level are set to interconnection outside area Two kinds of circuit is dispatched, higher level's scheduling circuit is set to non-scheduling or low priority is called, it is considered to after connection line load is supported Continuous " going back electricity " effect, i.e., need to proper timing will be with plan afterwards after at a time being exerted oneself by adjusting tie line plan Deviation electricity is returned.
Above-mentioned all kinds of peak regulation resource Mi need to be considered outside safety and stability and economy constraints, are also needed to meet peak-load regulating and are put down Weigh constraints, to ensure the systematic electricity equilibrium of supply and demand, peak-load regulating equilibrium constraint formula specific as follows:
Wherein,For all kinds of peak regulation resource transfer capacity,Output deviation is predicted for wind, light renewable energy power generation, AtFor peak regulation demand.
Mixed integer optimization model contains decision variable, wherein three parts of constraints and object function, decision variable For all kinds of peak regulation resource MiThe peak capacity provided in the feature period;Constraints be said system peak regulation equilibrium constraint with Safety and stability and economy constraints.Object function is peak-load regulating totle drilling cost, and object function includes target during upper peak regulation Object function when function is with lower peak regulation, object function disappears for the electric peak regulation fuel consumption cost of coal, fuel gas generation fuel during upper peak regulation Consume cost, nuclear power fuel consuming cost and Demand Side Response cost sum, formula specific as follows:
During lower peak regulation object function be coal electricity drop when unit of force coal consumption increase cost, conventional motor group abandon water peak regulation into This, pumped storage takes out hair cost depletions, abandons wind and abandon peak regulation resources costs under light cost and Demand Side Response cost sum, other types and be 0, represented with following formula:
S4, all kinds of peak regulation resource M will be callediPeak regulation cost CMiExport, obtain by sequence from small to large with peak capacity The peak regulation resource transfer order of optimization in specific time period, wherein call cost minimization is optimal peak regulation resource.
Illustrate the specific implementation step of the present embodiment below, as shown in Fig. 2 comprising the following steps:
S11, determine specific region power dispatching station in specific time period peak regulation demand At
S12, the sequencing theory for obtaining Wind turbines are exerted oneself PW, solar power generation unit time series forecasting exert oneself PS, conventional electricity The operation characteristic and sequential workload demand P of source unitL
S13, determine that peak regulation resource M can be used in systemi
S14, determine each peak regulation resource MiOperation characteristic, each peak regulation resource M is determined according to dispatching requirementiAdjustable metrics range And build corresponding cost model.
S15, determine each peak regulation resource MiThe safety and stability and economy constraints that need to be met when calling.
S16, determine all kinds of peak regulation resource MiPeak regulation cost CMi, target letter when when determining upper peak regulation respectively with lower peak regulation Number.
S17, structure mixed integer optimization model.
S18, solving model, all kinds of peak regulation resource M are called by sequence output from small to largeiPeak regulation cost CMiHold with peak regulation Amount.
S19, end
The method that the present invention is provided implements simple clear, sets up every kind of peak regulation means technical/economical models and cost model, And then mixed integer optimization model of the structure using economy as target, the optimal peak regulation of cost benefit is obtained by solving model and provided The source amount of calling and call order, adapting to regenerative resource to power system efficiently dissolves, improve peak load regulation network ability have it is preferable Actual directive significance and application value.
The present invention is not limited to above-mentioned preferred forms, and anyone should learn that the knot made under the enlightenment of the present invention Structure changes, and the technical schemes that are same or similar to the present invention are each fallen within protection scope of the present invention.

Claims (8)

1. adapt to the grid-connected peak regulation resource transfer decision-making technique of extensive regenerative resource, it is characterised in that comprise the following steps:
Obtain sequential workload demand P in the specific time period of given areaL, determine the specific region power dispatching station in specific time period Peak regulation demand At;Determine that the time series forecasting of Wind turbines is exerted oneself PWExerted oneself P with the time series forecasting of solar power generation unitS;It is determined that being Peak regulation resource M can be used in systemiAnd its operation characteristic, according to correspondence peak regulation resource MiSafety and stability and economy constraints, really Fixed all kinds of peak regulation resource MiAdjustable metrics range and peak capacity DMi, and every kind of peak regulation resource MiCorresponding peak regulation cost CMi, And build mixed integer optimization model;Obtain the peak regulation resource transfer order of optimization in specific time period;Wherein i=1,2,3...n.
2. the method as described in claim 1, it is characterised in that the peak regulation demand AtFormula specific as follows:
If the initial time of specific time period is t0, the sequential workload demand of initial time isFinish time is t, finish time Sequential workload demand beAnd power dispatching station is in moment t0Predict moment t peak capacity demand AtFor:
<mrow> <msub> <mi>A</mi> <mi>t</mi> </msub> <mo>=</mo> <msub> <mi>P</mi> <msub> <mi>L</mi> <mrow> <mi>t</mi> <mn>0</mn> </mrow> </msub> </msub> <mo>-</mo> <msub> <mi>P</mi> <msub> <mi>L</mi> <mi>t</mi> </msub> </msub> </mrow>
In formula, work as AtFor timing, peak regulation demand in representative works as AtDuring to bear, lower peak regulation demand is represented.
3. the method as described in claim 1, it is characterised in that the time series forecasting of the Wind turbines is exerted oneself PWFormula specific as follows:
<mrow> <msub> <mi>P</mi> <mi>W</mi> </msub> <mo>=</mo> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>g</mi> <mo>=</mo> <mn>1</mn> </mrow> <mi>a</mi> </munderover> <munderover> <mo>&amp;Sigma;</mo> <mrow> <msub> <mi>h</mi> <mi>g</mi> </msub> <mo>=</mo> <mn>1</mn> </mrow> <mi>b</mi> </munderover> <msub> <mi>P</mi> <msub> <mi>h</mi> <mi>g</mi> </msub> </msub> </mrow>
In formula, a represents this area's wind power plant number;B represents the number of blower fan in g-th of wind power plant;Represent this area g H in individual wind power plantgTheory of the Fans under the moment prediction of wind speed is exerted oneself;
The time series forecasting of solar power generation unit is exerted oneself PSFormula specific as follows:
<mrow> <msub> <mi>P</mi> <mi>S</mi> </msub> <mo>=</mo> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>g</mi> <mo>=</mo> <mn>1</mn> </mrow> <mi>c</mi> </munderover> <munderover> <mo>&amp;Sigma;</mo> <mrow> <msub> <mi>h</mi> <mi>g</mi> </msub> <mo>=</mo> <mn>1</mn> </mrow> <mi>d</mi> </munderover> <msub> <mi>P</mi> <msub> <mi>h</mi> <mi>g</mi> </msub> </msub> </mrow>
In formula, c represents this area's solar power station number;D represents the number of photovoltaic electrification component in g-th of solar power station;Represent h in g-th of this area solar power stationgTheory of the individual photovoltaic electrification component under moment prediction intensity of illumination Exert oneself.
4. the method as described in claim 1, it is characterised in that the peak regulation resource MiIncluding:Coal group of motors, Gas Generator Set, often Rule Hydropower Unit, pump-storage generator, nuclear power generating sets, abandon wind and abandon light, Demand Side Response and exerted oneself with interconnection.
5. method as claimed in claim 4, it is characterised in that all kinds of peak regulation resource MiAdjustable metrics range, peak capacity DMiAnd corresponding cost model CMiFormula specific as follows:
It regard coal group of motors as peak regulation means M1, the available upper peak modulation capacity N of coal group of motorsupSpecially following formula:
<mrow> <msub> <mi>N</mi> <mrow> <mi>u</mi> <mi>p</mi> </mrow> </msub> <mo>=</mo> <msub> <mi>P</mi> <mrow> <msub> <mi>M</mi> <mn>1</mn> </msub> <mo>,</mo> <mi>m</mi> <mi>a</mi> <mi>x</mi> </mrow> </msub> <mo>-</mo> <msub> <mi>P</mi> <mrow> <msub> <mi>M</mi> <mn>1</mn> </msub> <mo>,</mo> <msub> <mi>t</mi> <mn>0</mn> </msub> </mrow> </msub> </mrow>
In formula,Maximum can use of coal group of motors is represented to exert oneself,Coal group of motors is represented currently to exert oneself;
The available lower peak modulation capacity N of coal group of motorsdownSpecially following formula:
<mrow> <msub> <mi>N</mi> <mrow> <mi>d</mi> <mi>o</mi> <mi>w</mi> <mi>n</mi> </mrow> </msub> <mo>=</mo> <msub> <mi>P</mi> <mrow> <msub> <mi>M</mi> <mn>1</mn> </msub> <mo>,</mo> <msub> <mi>t</mi> <mn>0</mn> </msub> </mrow> </msub> <mo>-</mo> <msub> <mi>P</mi> <mrow> <msub> <mi>M</mi> <mn>1</mn> </msub> <mo>,</mo> <mi>min</mi> </mrow> </msub> </mrow>
In formula,Minimum can use of coal group of motors is represented to exert oneself;
The upper peak regulation cost C of coal group of motorsM1upIt is fuel consumption cost, formula specific as follows:
<mrow> <msub> <mi>C</mi> <mrow> <mi>M</mi> <mn>1</mn> <mi>U</mi> <mi>P</mi> </mrow> </msub> <mo>=</mo> <msub> <mi>&amp;beta;</mi> <msub> <mi>P</mi> <mrow> <mi>M</mi> <mn>1</mn> <mo>,</mo> <mi>t</mi> <mn>0</mn> </mrow> </msub> </msub> <mo>+</mo> <msubsup> <mi>D</mi> <mrow> <mi>M</mi> <mn>1</mn> <mo>,</mo> <mi>t</mi> </mrow> <mo>+</mo> </msubsup> <mo>&amp;CenterDot;</mo> <msubsup> <mi>D</mi> <mrow> <mi>M</mi> <mn>1</mn> <mo>,</mo> <mi>t</mi> </mrow> <mo>+</mo> </msubsup> </mrow> 1
In formula, β represents coal group of motors coal consumption function,Represent that unit existsWhen the unit coal consumption exerted oneself, Wherein PM1,t0For initial time unit output,I.e. initial time is exerted oneself+gone up peak capacity, that is, current time Exert oneself;Represent peak capacity in the coal group of motors that t is called;
The lower peak regulation cost C of coal group of motorsM1downIt is due to the unit coal consumption increase cost for forcing down and exerting oneself and bringing, is represented with following formula:
<mrow> <msub> <mi>C</mi> <mrow> <mi>M</mi> <mn>1</mn> <mi>d</mi> <mi>o</mi> <mi>w</mi> <mi>n</mi> </mrow> </msub> <mo>=</mo> <mrow> <mo>(</mo> <msub> <mi>&amp;beta;</mi> <msub> <mi>P</mi> <mrow> <mi>M</mi> <mn>1</mn> <mo>,</mo> <mi>t</mi> <mn>0</mn> </mrow> </msub> </msub> <mo>+</mo> <msubsup> <mi>D</mi> <mrow> <mi>M</mi> <mn>1</mn> <mo>,</mo> <mi>t</mi> </mrow> <mo>-</mo> </msubsup> <mo>-</mo> <msub> <mi>&amp;beta;</mi> <msub> <mi>P</mi> <mrow> <mi>M</mi> <mn>1</mn> <mo>,</mo> <mi>t</mi> <mn>0</mn> </mrow> </msub> </msub> <mo>)</mo> </mrow> <mrow> <mo>(</mo> <msub> <mi>P</mi> <mrow> <mi>M</mi> <mn>1</mn> </mrow> </msub> <mo>+</mo> <msubsup> <mi>D</mi> <mrow> <mi>M</mi> <mn>1</mn> <mo>,</mo> <mi>t</mi> </mrow> <mo>-</mo> </msubsup> <mo>)</mo> </mrow> </mrow>
In formula,Represent the unit coal consumption that unit is exerted oneself in initial time;Represent that unit exists When the unit coal consumption exerted oneself,Represent that current coal group of motors is exerted oneself,Represent that peak regulation holds under the coal group of motors that t is called Amount;
It regard Gas Generator Set as peak regulation means M2, the available upper peak modulation capacity N of Gas Generator SetupSpecially following formula:
<mrow> <msub> <mi>N</mi> <mrow> <mi>u</mi> <mi>p</mi> </mrow> </msub> <mo>=</mo> <msub> <mi>P</mi> <mrow> <msub> <mi>M</mi> <mn>2</mn> </msub> <mo>,</mo> <mi>m</mi> <mi>a</mi> <mi>x</mi> </mrow> </msub> <mo>-</mo> <msub> <mi>P</mi> <mrow> <msub> <mi>M</mi> <mn>2</mn> </msub> <mo>,</mo> <msub> <mi>t</mi> <mn>0</mn> </msub> </mrow> </msub> </mrow>
In formula,Maximum can use of coal group of motors is represented to exert oneself,Coal group of motors is represented currently to exert oneself;
The available lower peak modulation capacity N of coal group of motorsdownSpecially following formula:
<mrow> <msub> <mi>N</mi> <mrow> <mi>d</mi> <mi>o</mi> <mi>w</mi> <mi>n</mi> </mrow> </msub> <mo>=</mo> <msub> <mi>P</mi> <mrow> <msub> <mi>M</mi> <mn>2</mn> </msub> <mo>,</mo> <msub> <mi>t</mi> <mn>0</mn> </msub> </mrow> </msub> <mo>-</mo> <msub> <mi>P</mi> <mrow> <msub> <mi>M</mi> <mn>2</mn> </msub> <mo>,</mo> <mi>min</mi> </mrow> </msub> </mrow>
According to actual schedule demand, Gas Generator Set considers the different peak modulation capacities of liquefied natural gas and general gas, and liquefaction is natural Gas is provided mainly to start and stop peak regulation form, therefore the upper peak regulation cost of Gas Generator Set is fuel consumption cost, and lower peak regulation cost is 0;
It regard conventional hydropower unit as peak regulation means M3, it is divided into radial-flow type water power and adjustable water power, wherein radial-flow type water power is not joined With peak regulation, water power dry season participation peak regulation is can adjust, it calls peak capacityReservoir level constraint need to be met, specifically such as Under:
<mrow> <msub> <mi>W</mi> <mrow> <mi>m</mi> <mi>i</mi> <mi>n</mi> </mrow> </msub> <mo>&amp;le;</mo> <msub> <mi>W</mi> <msub> <mi>t</mi> <mn>0</mn> </msub> </msub> <mo>+</mo> <msub> <mi>&amp;eta;D</mi> <mrow> <msub> <mi>M</mi> <mn>3</mn> </msub> <mo>,</mo> <mi>t</mi> </mrow> </msub> <mo>&amp;le;</mo> <msub> <mi>W</mi> <mrow> <mi>m</mi> <mi>a</mi> <mi>x</mi> </mrow> </msub> </mrow>
In formula, WtoRepresent the initial water level of reservoir, WminRepresent reservoir lowest water level, WmaxReservoir peak level is represented, η is generating Water interaction coefficient;
Conventional adjustable water power up-regulation peak cost is 0, when water occurs abandoning in lower peak regulation, lower peak regulation cost formula specific as follows:
In formula,Represent that unit abandons water cost, PcurWater is abandoned in expression;
It regard pump-storage generator as peak regulation means M4, it is necessary to upper and lower reservoir level constraint is met, it is specific as follows:
<mrow> <msub> <mi>W</mi> <mrow> <mi>m</mi> <mi>i</mi> <mi>n</mi> </mrow> </msub> <mo>&amp;le;</mo> <msub> <mi>W</mi> <msub> <mi>t</mi> <mn>0</mn> </msub> </msub> <mo>+</mo> <msub> <mi>&amp;eta;D</mi> <mrow> <msub> <mi>M</mi> <mn>3</mn> </msub> <mo>,</mo> <mi>t</mi> </mrow> </msub> <mo>&amp;le;</mo> <msub> <mi>W</mi> <mrow> <mi>m</mi> <mi>a</mi> <mi>x</mi> </mrow> </msub> </mrow>
In formula, WtoRepresent the initial water level of reservoir, WminRepresent reservoir lowest water level, WmaxRepresent reservoir peak level, DM4,tFor The peak capacity for calling pumped storage unit to participate in;
Pump-storage generator peak regulation cost with take out hair loss represent, lower peak regulation cost CM4Formula specific as follows:
CM4=(1- α) β DM4,t
In formula, α is that pumped storage unit takes out hair conversion efficiency, and β is the specified unit coal consumption of coal group of motors;
It regard nuclear power generating sets as peak regulation means M5, peak regulation cost is consumption fuel cost on nuclear power generating sets, and lower peak regulation cost is 0;On The specific formula of peak regulation cost is as follows:
<mrow> <msub> <mi>C</mi> <mrow> <msub> <mi>M</mi> <mn>5</mn> </msub> <mo>,</mo> <mi>t</mi> </mrow> </msub> <mo>=</mo> <msub> <mi>&amp;omega;D</mi> <mrow> <mi>M</mi> <mn>5</mn> <mo>,</mo> <mi>t</mi> </mrow> </msub> </mrow>
In formula, ω represents nuclear power unit of fuel cost, DM5,tRepresent peak capacity on nuclear power;
Wind will be abandoned and abandon light as peak regulation means M6, when peak regulation can not be met, wind is abandoned, light is abandoned and is exerted oneself operation by equal proportion drop, and tune Peak cost formula specific as follows:
<mrow> <msub> <mi>C</mi> <mrow> <msub> <mi>M</mi> <mn>6</mn> </msub> <mo>,</mo> <mi>t</mi> </mrow> </msub> <mo>=</mo> <msub> <mi>&amp;lambda;D</mi> <mrow> <msub> <mi>M</mi> <mn>6</mn> </msub> <mo>,</mo> <mi>t</mi> </mrow> </msub> </mrow>
In formula,Light peak regulation power is abandoned for the wind of abandoning that calls, and λ abandons light unit cost to abandon wind;
It regard Demand Side Response as peak regulation means M7, and peak regulation cost formula specific as follows:
<mrow> <msub> <mi>C</mi> <mrow> <msub> <mi>M</mi> <mn>7</mn> </msub> <mo>,</mo> <mi>t</mi> </mrow> </msub> <mo>=</mo> <msub> <mi>&amp;mu;D</mi> <mrow> <msub> <mi>M</mi> <mn>7</mn> </msub> <mo>,</mo> <mi>t</mi> </mrow> </msub> </mrow>
In formula,The peak capacity participated in for dispatching requirement side resource response, μ is that Demand Side Response unit calls cost;
Interconnection is exerted oneself and is used as peak regulation means M8, this grade of schedulable circuit and higher level's scheduling circuit are set to interconnection outside area Two kinds, higher level's scheduling circuit is set to non-scheduling or low priority is called, it is considered at a time by adjusting interconnection meter Mark after power, proper timing will need to be returned after with plan deviation electricity.
6. method as claimed in claim 4, it is characterised in that all kinds of peak regulation resource MiPeak-load regulating balance need to be met about Beam condition, the peak-load regulating equilibrium constraint formula specific as follows:
<mrow> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>i</mi> <mo>=</mo> <mn>1</mn> </mrow> <mn>8</mn> </munderover> <msub> <mi>D</mi> <mrow> <msub> <mi>M</mi> <mi>i</mi> </msub> <mo>,</mo> <mi>t</mi> </mrow> </msub> <mo>+</mo> <msubsup> <mi>E</mi> <mrow> <mi>r</mi> <mi>e</mi> <mi>n</mi> </mrow> <mi>t</mi> </msubsup> <mo>=</mo> <msub> <mi>A</mi> <mi>t</mi> </msub> </mrow>
Wherein,For all kinds of peak regulation resource transfer capacity,For wind, light renewable energy power generation prediction output deviation.
7. the method as described in claim 1, it is characterised in that the mixed integer optimization model contains decision variable, constraint Condition and three parts of object function, wherein decision variable are all kinds of peak regulation resource MiThe peak capacity provided in the feature period; Constraints is peak-load regulating equilibrium constraint and safety and stability and economy constraints;Object function is that peak-load regulating is total Cost.
8. method as claimed in claim 7, it is characterised in that the object function includes object function and downward during upper peak regulation Object function during peak;
Object function takes out hair loss for the electric peak regulation fuel consumption cost of coal, fuel gas generation fuel consumption cost, pumped storage during upper peak regulation Cost, nuclear power fuel consuming cost and Demand Side Response cost sum, formula specific as follows:
<mfenced open = "" close = ""> <mtable> <mtr> <mtd> <mrow> <mi>min</mi> <mi> </mi> <msub> <mi>Z</mi> <mrow> <mi>u</mi> <mi>p</mi> </mrow> </msub> </mrow> </mtd> <mtd> <mrow> <msub> <mi>Z</mi> <mrow> <mi>u</mi> <mi>p</mi> </mrow> </msub> <mo>=</mo> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>i</mi> <mo>=</mo> <mn>1</mn> </mrow> <mn>8</mn> </munderover> <msub> <mi>C</mi> <mrow> <msub> <mi>M</mi> <mi>i</mi> </msub> <mo>,</mo> <mi>t</mi> </mrow> </msub> </mrow> </mtd> </mtr> </mtable> </mfenced>
Object function is that coal electricity drops peak regulation cost when unit of force coal consumption increase cost, conventional motor group abandon water, taken out during lower peak regulation It is 0 that storage, which takes out hair cost depletions, abandons wind to abandon peak regulation resources costs under light cost and Demand Side Response cost sum, other types, is used Following formula is represented:
<mfenced open = "" close = ""> <mtable> <mtr> <mtd> <mrow> <mi>min</mi> <mi> </mi> <msub> <mi>Z</mi> <mrow> <mi>d</mi> <mi>o</mi> <mi>w</mi> <mi>n</mi> </mrow> </msub> </mrow> </mtd> <mtd> <mrow> <msub> <mi>Z</mi> <mrow> <mi>d</mi> <mi>o</mi> <mi>w</mi> <mi>n</mi> </mrow> </msub> <mo>=</mo> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>i</mi> <mo>=</mo> <mn>1</mn> </mrow> <mn>8</mn> </munderover> <msub> <mi>C</mi> <mrow> <msub> <mi>M</mi> <mi>i</mi> </msub> <mo>,</mo> <mi>t</mi> </mrow> </msub> </mrow> </mtd> </mtr> </mtable> </mfenced> 3
CN201710495182.8A 2017-06-26 2017-06-26 Peak-shaving resource calling decision method suitable for large-scale renewable energy grid connection Active CN107276122B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710495182.8A CN107276122B (en) 2017-06-26 2017-06-26 Peak-shaving resource calling decision method suitable for large-scale renewable energy grid connection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710495182.8A CN107276122B (en) 2017-06-26 2017-06-26 Peak-shaving resource calling decision method suitable for large-scale renewable energy grid connection

Publications (2)

Publication Number Publication Date
CN107276122A true CN107276122A (en) 2017-10-20
CN107276122B CN107276122B (en) 2020-02-21

Family

ID=60069668

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710495182.8A Active CN107276122B (en) 2017-06-26 2017-06-26 Peak-shaving resource calling decision method suitable for large-scale renewable energy grid connection

Country Status (1)

Country Link
CN (1) CN107276122B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108206539A (en) * 2018-01-10 2018-06-26 云南电网有限责任公司电力科学研究院 A kind of renewable energy power generation distribution network planning method
CN109038689A (en) * 2018-09-13 2018-12-18 中国南方电网有限责任公司电网技术研究中心 A kind of ultra-short term Optimization Scheduling of electric system
CN109755970A (en) * 2019-03-29 2019-05-14 广东电网有限责任公司 A kind of energy-saving scheduling method, system, equipment and computer readable storage medium
CN110112767A (en) * 2019-03-19 2019-08-09 华北电力大学 The polymorphic Demand-side load of wide area participates in the lotus source optimization control method of peak-load regulating
CN110417004A (en) * 2019-07-12 2019-11-05 国网甘肃省电力公司经济技术研究院 A kind of extra-high voltage alternating current-direct current sending end power grid multi-source coordination peak regulation potentiality computation model
CN110443509A (en) * 2019-08-08 2019-11-12 华中科技大学 A method of all kinds of flexibility resources are assessed to electric system flexibility contribution degree
CN114039347A (en) * 2021-11-16 2022-02-11 国网河南省电力公司经济技术研究院 Wind power pumped storage dispatching method considering condition risk and uncertainty
CN114421469A (en) * 2022-01-26 2022-04-29 中国大唐集团科学技术研究院有限公司中南电力试验研究院 Method for identifying and counting peak shaving frequency of turbonator under deep peak shaving working condition
CN114818095A (en) * 2022-06-30 2022-07-29 武昌理工学院 Green building elastic constraint energy-saving optimization method
CN117638874A (en) * 2023-11-07 2024-03-01 国网四川省电力公司经济技术研究院 New energy system cost determination method based on source network charge storage collaborative optimization

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102479350A (en) * 2010-11-25 2012-05-30 国网能源研究院 New-energy large-scale grid connection based electric power analysis system and method thereof
CN103762619A (en) * 2014-02-12 2014-04-30 国家电网公司 Nuclear power involvement grid peak shaving judging method based on grid peak shaving capacity balancing
CN106684928A (en) * 2016-11-26 2017-05-17 国网河南省电力公司电力科学研究院 Calculation method of power grid peak regulation margin based on peak regulation cost
KR20170059726A (en) * 2015-11-23 2017-05-31 한국전기연구원 System for Testing Function of Distributed Resources and Method using thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102479350A (en) * 2010-11-25 2012-05-30 国网能源研究院 New-energy large-scale grid connection based electric power analysis system and method thereof
CN103762619A (en) * 2014-02-12 2014-04-30 国家电网公司 Nuclear power involvement grid peak shaving judging method based on grid peak shaving capacity balancing
KR20170059726A (en) * 2015-11-23 2017-05-31 한국전기연구원 System for Testing Function of Distributed Resources and Method using thereof
CN106684928A (en) * 2016-11-26 2017-05-17 国网河南省电力公司电力科学研究院 Calculation method of power grid peak regulation margin based on peak regulation cost

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108206539A (en) * 2018-01-10 2018-06-26 云南电网有限责任公司电力科学研究院 A kind of renewable energy power generation distribution network planning method
CN109038689A (en) * 2018-09-13 2018-12-18 中国南方电网有限责任公司电网技术研究中心 A kind of ultra-short term Optimization Scheduling of electric system
CN109038689B (en) * 2018-09-13 2021-11-05 南方电网科学研究院有限责任公司 Ultra-short-term optimal scheduling method for power system
CN110112767A (en) * 2019-03-19 2019-08-09 华北电力大学 The polymorphic Demand-side load of wide area participates in the lotus source optimization control method of peak-load regulating
CN110112767B (en) * 2019-03-19 2023-05-30 华北电力大学 Load source optimization control method for peak regulation of wide-area polymorphic demand side load participation system
CN109755970A (en) * 2019-03-29 2019-05-14 广东电网有限责任公司 A kind of energy-saving scheduling method, system, equipment and computer readable storage medium
CN109755970B (en) * 2019-03-29 2022-01-25 广东电网有限责任公司 Energy-saving scheduling method, system, equipment and computer readable storage medium
CN110417004B (en) * 2019-07-12 2022-08-05 国网甘肃省电力公司经济技术研究院 Extra-high voltage alternating current-direct current sending end power grid multi-source coordination peak shaving potential calculation model
CN110417004A (en) * 2019-07-12 2019-11-05 国网甘肃省电力公司经济技术研究院 A kind of extra-high voltage alternating current-direct current sending end power grid multi-source coordination peak regulation potentiality computation model
CN110443509A (en) * 2019-08-08 2019-11-12 华中科技大学 A method of all kinds of flexibility resources are assessed to electric system flexibility contribution degree
CN114039347A (en) * 2021-11-16 2022-02-11 国网河南省电力公司经济技术研究院 Wind power pumped storage dispatching method considering condition risk and uncertainty
CN114039347B (en) * 2021-11-16 2023-08-22 国网河南省电力公司经济技术研究院 Wind power pumped storage scheduling method considering conditional risk and uncertainty
CN114421469A (en) * 2022-01-26 2022-04-29 中国大唐集团科学技术研究院有限公司中南电力试验研究院 Method for identifying and counting peak shaving frequency of turbonator under deep peak shaving working condition
CN114421469B (en) * 2022-01-26 2024-05-10 中国大唐集团科学技术研究院有限公司中南电力试验研究院 Method for identifying and counting peak regulation frequency of steam turbine generator under deep peak regulation working condition
CN114818095A (en) * 2022-06-30 2022-07-29 武昌理工学院 Green building elastic constraint energy-saving optimization method
CN114818095B (en) * 2022-06-30 2022-09-20 武昌理工学院 Green building elastic constraint energy-saving optimization method
CN117638874A (en) * 2023-11-07 2024-03-01 国网四川省电力公司经济技术研究院 New energy system cost determination method based on source network charge storage collaborative optimization

Also Published As

Publication number Publication date
CN107276122B (en) 2020-02-21

Similar Documents

Publication Publication Date Title
CN107276122A (en) Adapt to the grid-connected peak regulation resource transfer decision-making technique of extensive regenerative resource
CN105048516B (en) A kind of honourable extreme misery multi-source complementation Optimization Scheduling
CN103151803B (en) Method for optimizing wind power system-contained unit and backup configuration
CN105305419B (en) A kind of independent micro-grid capacity configuration optimizing method containing compressed-air energy storage
CN103699941B (en) A kind of formulating method of electric power system dispatching operation year scheme
CN106485352A (en) A kind of multiclass power supply generation schedule combination decision-making method
CN106130079B (en) A kind of short-term joint optimal operation method of geomantic omen fire
CN104779611B (en) Micro-capacitance sensor economic load dispatching method based on centralized and distributed dual-layer optimization strategy
CN111769600B (en) Power system source-load-storage coordination rolling scheduling method based on flexibility margin
CN109919399B (en) Day-ahead economic dispatching method and system for comprehensive energy system
CN110544025B (en) Optimal scheduling method for gas-electricity comprehensive energy system combining electricity to gas and gas storage tank
CN107292766A (en) Towards the power system peak regulation means economic evaluation method and system of wind electricity digestion
CN115018260B (en) Peak regulation optimization scheduling method for cascade water-light complementary power generation system
CN103997039B (en) Method for predicting rotating standby interval with wind power acceptance considered based on probability interval prediction
CN102496968A (en) Generation plan optimizing method in intermittent energy and conventional energy coordinated dispatching mode
CN108039737A (en) One introduces a collection net lotus coordinated operation simulation system
CN106026184A (en) Pumped storage power station and wind power plant combination system for power grid peak regulation and optimized scheduling method thereof
CN104993523A (en) Pumped storage power station characteristic accurate simulation method for optimized operation of wind power contained power grid system
CN113141005B (en) New energy consumption-oriented comprehensive energy system multi-time scale scheduling method
CN104392284A (en) Situational analysis based large, medium and small hydropower station short-period largest consumable electric quantity coordination optimization scheduling method
CN110867907B (en) Power system scheduling method based on multi-type power generation resource homogenization
CN102593855A (en) Method for stabilizing fluctuation of output power of renewable energy power supply in power system
CN111130145B (en) Wind-solar unit assembly capacity optimization planning method based on wind and light discarding
CN106257792A (en) A kind of new forms of energy priority scheduling method based on two benches Unit Combination
CN104659818B (en) A kind of optimum allocation method of positive and negative spinning reserve capacity in containing wind power system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 102200 Beiqijia future science and Technology City National Grid Park in Beiqijia, Changping District, Beijing

Applicant after: National Grid Energy Research Institute Co., Ltd.

Applicant after: Electric Power Research Institute of State Grid Liaoning Electric Power Co., Ltd.

Applicant after: ECONOMIC TECHNOLOGY RESEARCH INSTITUTE OF STATE GRID HENAN ELECTRIC POWER COMPANY

Address before: 102200 Beiqijia future science and Technology City National Grid Park in Beiqijia, Changping District, Beijing

Applicant before: State Grid Energy Research Institute

Applicant before: Electric Power Research Institute of State Grid Liaoning Electric Power Co., Ltd.

Applicant before: ECONOMIC TECHNOLOGY RESEARCH INSTITUTE OF STATE GRID HENAN ELECTRIC POWER COMPANY

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant