CN107274564A - Power system remote recharge fault scatter method - Google Patents

Power system remote recharge fault scatter method Download PDF

Info

Publication number
CN107274564A
CN107274564A CN201710440610.7A CN201710440610A CN107274564A CN 107274564 A CN107274564 A CN 107274564A CN 201710440610 A CN201710440610 A CN 201710440610A CN 107274564 A CN107274564 A CN 107274564A
Authority
CN
China
Prior art keywords
user
power purchase
power
long
marketing service
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710440610.7A
Other languages
Chinese (zh)
Inventor
王璐瑶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Tianjin Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201710440610.7A priority Critical patent/CN107274564A/en
Publication of CN107274564A publication Critical patent/CN107274564A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G08SIGNALLING
    • G08CTRANSMISSION SYSTEMS FOR MEASURED VALUES, CONTROL OR SIMILAR SIGNALS
    • G08C19/00Electric signal transmission systems
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q20/00Payment architectures, schemes or protocols
    • G06Q20/30Payment architectures, schemes or protocols characterised by the use of specific devices or networks
    • G06Q20/34Payment architectures, schemes or protocols characterised by the use of specific devices or networks using cards, e.g. integrated circuit [IC] cards or magnetic cards
    • G06Q20/349Rechargeable cards
    • GPHYSICS
    • G07CHECKING-DEVICES
    • G07FCOIN-FREED OR LIKE APPARATUS
    • G07F15/00Coin-freed apparatus with meter-controlled dispensing of liquid, gas or electricity
    • G07F15/003Coin-freed apparatus with meter-controlled dispensing of liquid, gas or electricity for electricity
    • GPHYSICS
    • G07CHECKING-DEVICES
    • G07FCOIN-FREED OR LIKE APPARATUS
    • G07F15/00Coin-freed apparatus with meter-controlled dispensing of liquid, gas or electricity
    • G07F15/06Coin-freed apparatus with meter-controlled dispensing of liquid, gas or electricity with means for prepaying basic charges, e.g. rent for meters
    • GPHYSICS
    • G07CHECKING-DEVICES
    • G07FCOIN-FREED OR LIKE APPARATUS
    • G07F15/00Coin-freed apparatus with meter-controlled dispensing of liquid, gas or electricity
    • G07F15/10Coin-freed apparatus with meter-controlled dispensing of liquid, gas or electricity with alarm or warning devices, e.g. indicating the interrupting of the supply
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04BTRANSMISSION
    • H04B3/00Line transmission systems
    • H04B3/54Systems for transmission via power distribution lines
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L63/00Network architectures or network communication protocols for network security
    • H04L63/08Network architectures or network communication protocols for network security for authentication of entities
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/02Protocols based on web technology, e.g. hypertext transfer protocol [HTTP]
    • H04L67/025Protocols based on web technology, e.g. hypertext transfer protocol [HTTP] for remote control or remote monitoring of applications
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/12Protocols specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Signal Processing (AREA)
  • Business, Economics & Management (AREA)
  • Computing Systems (AREA)
  • General Health & Medical Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Computer Security & Cryptography (AREA)
  • Medical Informatics (AREA)
  • Microelectronics & Electronic Packaging (AREA)
  • Computer Hardware Design (AREA)
  • Accounting & Taxation (AREA)
  • Strategic Management (AREA)
  • General Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Power Engineering (AREA)
  • Beverage Vending Machines With Cups, And Gas Or Electricity Vending Machines (AREA)

Abstract

The present invention relates to a kind of power system remote recharge fault scatter method, its technical characterstic is:Power marketing service device is received after the load value data of payment terminal, and whether judge the user is long-range power purchase user;Whether judge the user is the first subnormal power purchase;Judge whether the user changed intelligent meter in one week;Monitor station area concentrator whether exception or carrier module failure, be, point out need carry out in-situ processing;Power marketing service device judges user's power purchase frequency abnormality;The marketing service device process of supplementing with money judges whether time-out.The present invention is reasonable in design, effectively can be analyzed and handled according to charging failure cause, improved the long-range power purchase successful recharging rate of user, facilitate the power purchase demand of more vast power consumer, while being also beneficial to the lifting of power marketing service quality level.

Description

Power system remote recharge fault scatter method
Technical field
The invention belongs to power marketing service and electric energy acquisition administrative skill field, especially a kind of power system is remotely filled It is worth fault scatter method.
Background technology
In current " internet+" epoch, increasing people start custom and solve asking in life by internet Topic, then with power marketing it is closely related be exactly online power purchase.Current power system uses payment terminal, such as computer The APP platforms such as terminal and palm electric power, electricity E treasured, facilitate that user is home-confined to realize long-range power purchase, are that people bring much It is convenient.But, due to user's intelligent meter and user causes long-range power purchase successful recharging rate using upper various reasons Relatively low always, this also turns into insoluble problem in power marketing service.
The content of the invention
Be to overcome the deficiencies in the prior art the mesh of the present invention, propose a kind of power system remote recharge accident analysis and Processing method, effectively analyzing failure cause and can effectively improve long-range power purchase successful recharging rate.
The present invention solves its technical problem and takes following technical scheme to realize:
A kind of power system remote recharge fault scatter method, comprises the following steps:
Step 1, power marketing service device are received after the load value data of payment terminal, and whether judge the user is long-range purchase Electric user, if long-range power purchase user, then into step 2, otherwise power marketing service device prompts for intelligent meter remote collection Failure information;
Step 2, power marketing service device are received after the load value data of payment terminal, and whether judge the user is for the first time Normal power purchase, if the first subnormal power purchase, then points out, first to that can carry out long-range power purchase after the power purchase of business hall, otherwise to enter Enter next step;
Step 3, power marketing service device judge whether the user changed intelligent meter in one week, if it is point out one After week can long-range power purchase, otherwise into next step;
Step 4, power marketing service device monitor station area concentrator whether exception or carrier module failure, be then prompting needs Carry out in-situ processing;Otherwise next step is entered.
Step 5, power marketing service device judge user's power purchase frequency abnormality, are, at prompting user to business hall Reason, otherwise into next step;
Step 6, the marketing service device process of supplementing with money judge whether time-out, if yes, then it is assumed that due to user safety authentication Unsuccessfully cause, point out to need to change ammeter.
The long-range power purchase user needs to meet following two conditions:Gathering continuous three days has freezing data;Have in 1 year Copy data thoroughly.
The processing method of the step 1 is:Continuous three days nothings are gathered to freeze and without copying thoroughly simultaneously exist, it is necessary to which scene is checked Platform area's concentrator where the user and user's intelligent meter are with the presence or absence of exception, and whether platform area has distinguished one from the other:Collection is freezed to connect day Continuous to have data but analyzed without needs are copied thoroughly by copying safety certification thoroughly, safety certification unsuccessfully needs to change intelligent meter, if Copy thoroughly and prompt for operation overtime and will there is a situation where intelligent meter failure or platform area mistake.
User's power purchase frequency abnormality includes two kinds of situations:One kind is not by power purchase after user is in business hall power purchase Card insertion intelligent meter, can not be issued, it is necessary to which user is by last time power purchase after long-range power purchase issues verification power purchase frequency abnormality The amount of money input ammeter after write the amount of money that long-range power purchase issues failure troactively to business hall, if user can not be by the last time power purchase amount of money Input ammeter needs to business hall respectively to write the power purchase amount of money twice troactively;Another is when the long-range power purchase of user is prolonged When, shown in power purchase success but 186 systems it is long-range issue failure can also be shown as power purchase time in long-range power purchase next time Number is abnormal, it is necessary to be handled to business hall.
Advantages and positive effects of the present invention are:
The present invention is reasonable in design, effectively can be analyzed and handled according to charging failure cause, improve user long-range Power purchase successful recharging rate, facilitates the power purchase demand of more vast power consumer, while being also beneficial to power marketing service quality water Flat lifting.
Brief description of the drawings
Fig. 1 is the system connection diagram of the present invention.
Embodiment
The embodiment of the present invention is further described below in conjunction with accompanying drawing.
A kind of power system remote recharge fault scatter method, is realized in system as shown in Figure 1.Should System is made up of power marketing service device, payment terminal, power telecom network, platform area concentrator and user's intelligent meter, payment terminal It is connected on power marketing service device and is remotely paid the fees by public network, payment terminal can be terminal, palm Electric power treasured or electric power E treasured are connected by wired mode or wireless mode with power marketing service device is paid the fees.Power marketing Server is connected by power telecom network with each area's concentrator, and user's intelligent meter is connected to one with described area's concentrator Rise, so that realizing that power marketing service device is set up to contact with user's intelligent meter realizes remote recharge function.
The present invention is that power system remote recharge fault scatter software is provided with power marketing service device, tool Body method comprises the following steps:
Step 1, power marketing service device are received after the load value data of payment terminal, and whether judge the user is long-range purchase Electric user, if long-range power purchase user, then into step 2, otherwise power marketing service device prompts for " intelligent meter remote collection Failure ".
Long-range power purchase user has to meet following two conditions:
1st, collection has freezing data in continuous three days;
2nd, data are copied in 1 year.
When wherein any one condition is unsatisfactory for power purchase, power marketing service device prompts for " intelligent meter remote collection mistake Lose ".Its processing method is:Continuous three days nothings are gathered to freeze and without copying thoroughly simultaneously exist, it is necessary to which user place platform is checked at scene Area's concentrator and user's intelligent meter are with the presence or absence of exception, and whether platform area has distinguished one from the other.Collection freezes continuously have data but nothing day Copy needs thoroughly to be analyzed by copying safety certification thoroughly, safety certification is unsuccessfully needed to change intelligent meter, and behaviour is prompted for if copied thoroughly Intelligent meter failure or platform area mistake will be had by making time-out.It is therefore desirable to which constituent parts handle concentrator failure in time With the processing work of meter reading failure user.
Step 2, power marketing service device are received after the load value data of payment terminal, and whether judge the user is for the first time Normal power purchase, if the first subnormal power purchase, then prompting must be arrived after the power purchase of business hall, can carry out long-range power purchase (also It is to say that new user's first time power purchase must be arrived after the power purchase of business hall just can remotely purchase), otherwise into next step..
Step 3, power marketing service device judge whether the user changed intelligent meter in one week, if it does, carrying Show after one week can long-range power purchase, otherwise into next step.
The whether abnormal not online or carrier module failure of step 4, power marketing service device monitor station area concentrator, then point out Need to carry out in-situ processing;Otherwise next step is entered.
Step 5, power marketing service device judge user's power purchase frequency abnormality, if it does, then pointing out user to business The Room is handled, otherwise into next step.
User's power purchase frequency abnormality includes two kinds of situations:One kind is not insert power purchase card after user is in business hall power purchase Enter intelligent meter, can not be issued after long-range power purchase issues verification power purchase frequency abnormality, it is necessary to which user is by the gold of last time power purchase After volume input ammeter the amount of money that long-range power purchase issues failure is write troactively to business hall.If user can not input the last time power purchase amount of money Ammeter needs to business hall respectively to write the power purchase amount of money twice troactively.It is another be when the long-range power purchase of user is delayed, Shown in power purchase success but 186 systems it is long-range issue failure to be also shown as power purchase number of times in long-range power purchase next time different Often, it is necessary to be handled to business hall.
Step 6, the marketing service device process of supplementing with money judge whether time-out, if yes, then it is assumed that due to user safety authentication Unsuccessfully cause, point out to need to change ammeter.
It is emphasized that embodiment of the present invention is illustrative, rather than it is limited, therefore the present invention is simultaneously The embodiment described in embodiment is not limited to, it is every to be drawn by those skilled in the art's technique according to the invention scheme Other embodiment, also belong to the scope of protection of the invention.

Claims (4)

1. a kind of power system remote recharge fault scatter method, it is characterised in that comprise the following steps:
Step 1, power marketing service device are received after the load value data of payment terminal, and whether judge the user is that long-range power purchase is used Family, if long-range power purchase user, then into step 2, otherwise power marketing service device prompts for the failure of intelligent meter remote collection Information;
Step 2, power marketing service device are received after the load value data of payment terminal, and whether judge the user is first subnormal Power purchase, if the first subnormal power purchase, is then pointed out first to can carry out long-range power purchase after the power purchase of business hall, under otherwise entering One step;
Step 3, power marketing service device judge whether the user changed intelligent meter in one week, if it is point out after one week Can long-range power purchase, otherwise into next step;
Step 4, power marketing service device monitor station area concentrator whether exception or carrier module failure, be, point out need carry out In-situ processing;Otherwise next step is entered.
Step 5, power marketing service device judge user's power purchase frequency abnormality, are, point out user to be handled to business hall, no Then enter next step;
Step 6, the marketing service device process of supplementing with money judge whether time-out, if yes, then it is assumed that due to user safety authentication failure Cause, point out to need to change ammeter.
2. power system remote recharge fault scatter method according to claim 1, it is characterised in that:It is described remote Journey power purchase user needs to meet following two conditions:Gathering continuous three days has freezing data;Data are copied in 1 year.
3. power system remote recharge fault scatter method according to claim 1 or 2, it is characterised in that:Institute The processing method for stating step 1 is:Continuous three days nothings are gathered to freeze and without copying thoroughly simultaneously exist, it is necessary to which scene is checked where the user Platform area concentrator and user's intelligent meter are with the presence or absence of exception, and whether platform area has distinguished one from the other:Collection freeze day continuously have data but Analyzed without needs are copied thoroughly by copying safety certification thoroughly, safety certification unsuccessfully needs to change intelligent meter, is prompted for if copied thoroughly Operation overtime will have intelligent meter failure or platform area mistake.
4. power system remote recharge fault scatter method according to claim 1, it is characterised in that:It is described to use Family power purchase frequency abnormality includes two kinds of situations:One kind is that power purchase card is not inserted into intelligent meter after user is in business hall power purchase, It can not be issued after long-range power purchase issues verification power purchase frequency abnormality, it is necessary to which the amount of money of last time power purchase is inputted ammeter by user Business hall is arrived afterwards and writes the amount of money that long-range power purchase issues failure troactively, if last time power purchase amount of money input ammeter can not be needed to arrive by user The power purchase amount of money twice is write troactively respectively business hall;It is another be when the long-range power purchase of user is delayed, power purchase into Shown in work(but 186 systems it is long-range issue failure also can be shown as power purchase frequency abnormality, it is necessary to arrive in long-range power purchase next time Business hall is handled.
CN201710440610.7A 2017-06-13 2017-06-13 Power system remote recharge fault scatter method Pending CN107274564A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710440610.7A CN107274564A (en) 2017-06-13 2017-06-13 Power system remote recharge fault scatter method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710440610.7A CN107274564A (en) 2017-06-13 2017-06-13 Power system remote recharge fault scatter method

Publications (1)

Publication Number Publication Date
CN107274564A true CN107274564A (en) 2017-10-20

Family

ID=60067112

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710440610.7A Pending CN107274564A (en) 2017-06-13 2017-06-13 Power system remote recharge fault scatter method

Country Status (1)

Country Link
CN (1) CN107274564A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108009051A (en) * 2017-12-19 2018-05-08 国网湖南省电力有限公司 A kind of reliability optimization method and device of power marketing service device system
CN109359962A (en) * 2018-09-20 2019-02-19 国网天津市电力公司电力科学研究院 A kind of remote recharge method for upgrading success rate based on acquisition failure defect elimination module
CN109409858A (en) * 2018-09-20 2019-03-01 国网天津市电力公司电力科学研究院 One kind being based on the improved remote recharge method for upgrading success rate of system task
CN109637024A (en) * 2018-11-26 2019-04-16 国网新疆电力有限公司电力科学研究院 Remote self-help power purchase method and system based on intelligent electric meter
CN109660529A (en) * 2018-12-06 2019-04-19 深圳蓝贝科技有限公司 Safety wind control method, apparatus, vending machine and system for vending machine
CN110009892A (en) * 2019-05-15 2019-07-12 广东电网有限责任公司 A kind of low-voltage collecting meter reading sand table exercise method
CN112927437A (en) * 2021-01-22 2021-06-08 四川杰斯顿电气设备有限公司 Network card writer and card writing method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102074076A (en) * 2011-01-19 2011-05-25 四川电力科学研究院 Intelligent electric meter centralized recharging terminal and control method thereof
CN102314729A (en) * 2011-07-27 2012-01-11 邢台供电公司 Quick electricity card meter electricity-selling fault location method
CN105488914A (en) * 2015-12-21 2016-04-13 国网四川省电力公司电力科学研究院 Local charge-control interactive data fault location system
CN105510868A (en) * 2015-12-21 2016-04-20 国网四川省电力公司电力科学研究院 Smart electric meter electricity-selling communication detection system
CN105608800A (en) * 2015-12-21 2016-05-25 国网四川省电力公司电力科学研究院 Portable intelligent electric meter recharge fault detection system
CN106781057A (en) * 2017-01-17 2017-05-31 国网四川省电力公司成都供电公司 Intelligent electric energy meter supplements the method that fault detection system and detection process supplement failure with money with money
CN106803342A (en) * 2016-12-13 2017-06-06 国网北京市电力公司 Mobile detection apparatus and fault detection method and device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102074076A (en) * 2011-01-19 2011-05-25 四川电力科学研究院 Intelligent electric meter centralized recharging terminal and control method thereof
CN102314729A (en) * 2011-07-27 2012-01-11 邢台供电公司 Quick electricity card meter electricity-selling fault location method
CN105488914A (en) * 2015-12-21 2016-04-13 国网四川省电力公司电力科学研究院 Local charge-control interactive data fault location system
CN105510868A (en) * 2015-12-21 2016-04-20 国网四川省电力公司电力科学研究院 Smart electric meter electricity-selling communication detection system
CN105608800A (en) * 2015-12-21 2016-05-25 国网四川省电力公司电力科学研究院 Portable intelligent electric meter recharge fault detection system
CN106803342A (en) * 2016-12-13 2017-06-06 国网北京市电力公司 Mobile detection apparatus and fault detection method and device
CN106781057A (en) * 2017-01-17 2017-05-31 国网四川省电力公司成都供电公司 Intelligent electric energy meter supplements the method that fault detection system and detection process supplement failure with money with money

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108009051A (en) * 2017-12-19 2018-05-08 国网湖南省电力有限公司 A kind of reliability optimization method and device of power marketing service device system
CN109359962A (en) * 2018-09-20 2019-02-19 国网天津市电力公司电力科学研究院 A kind of remote recharge method for upgrading success rate based on acquisition failure defect elimination module
CN109409858A (en) * 2018-09-20 2019-03-01 国网天津市电力公司电力科学研究院 One kind being based on the improved remote recharge method for upgrading success rate of system task
CN109637024A (en) * 2018-11-26 2019-04-16 国网新疆电力有限公司电力科学研究院 Remote self-help power purchase method and system based on intelligent electric meter
CN109660529A (en) * 2018-12-06 2019-04-19 深圳蓝贝科技有限公司 Safety wind control method, apparatus, vending machine and system for vending machine
CN110009892A (en) * 2019-05-15 2019-07-12 广东电网有限责任公司 A kind of low-voltage collecting meter reading sand table exercise method
CN112927437A (en) * 2021-01-22 2021-06-08 四川杰斯顿电气设备有限公司 Network card writer and card writing method thereof

Similar Documents

Publication Publication Date Title
CN107274564A (en) Power system remote recharge fault scatter method
US11623537B2 (en) Method and device for converting standalone EV charging stations into intelligent stations with remote communications connectivity and control
CN106114254B (en) Intelligent charge control method, device and system
US20220111747A1 (en) Methods and devices for wireless and local control of the two-way flow of electrical power between electric vehicles, between evs and electrical vehicle supply equipment(s), and between the evse(s) and the electricity grid
EP2379363B1 (en) Systems and methods for charging an electric vehicle using broadband over powerlines
CN106882069A (en) A kind of electric automobile identification system and method
CN102375999B (en) Greenhouse gas emissions or the managing device of decrement and management method
US20130169226A1 (en) Electricity transfer system for modifying an electric vehicle charging station and method of providing, using, and supporting the same
EP2199990A1 (en) Systems and methods for prepaid electricity metering for vehicles
CN107221082A (en) A kind of charging pile for electric vehicle charging application method paid based on wechat
CN102509162A (en) Intelligent resident electricity utilization management method and management system
CN106875576A (en) A kind of electric bicycle charging management method and system
CN107458241A (en) A kind of charging application method of the charging pile system with blue tooth interface
CN103023093B (en) Charging device, system and the method being used for controlling charging device
CN107351700A (en) Cloud with electric energy tariff function pays the charging method of power supply stake
CN101719292B (en) The recharge method of smart card, equipment and system
CN104134288A (en) Intelligent charging system of electric bicycle
CN116012087B (en) Electric charge settlement plan creation method based on dynamic strategy
CN107633431A (en) A kind of energy storage device leasing system based on internet
CN104915895A (en) Remote real-time power utilization charge control method
CN107972520A (en) A kind of charging station
CN106815934A (en) Billing control method and charging controller
CN206619216U (en) A kind of electric bicycle charging management system
CN207028898U (en) A kind of novel electric vehicle charging pile
CN101482994A (en) Electronic voice alarm carrier communication electric energy meter

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20171020