CN107270274A CN201710556962.9A CN201710556962A CN107270274A CN 107270274 A CN107270274 A CN 107270274A CN 201710556962 A CN201710556962 A CN 201710556962A CN 107270274 A CN107270274 A CN 107270274A
Authority
CN
China
Prior art keywords
boiler
temperature
denitration
coal
ultra
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710556962.9A
Other languages
Chinese (zh)
Other versions
CN107270274B (en
Inventor
康强
蒋跃军
杨俊祥
黄俊峰
张利军
贺洪林
张义昌
祁永峰
李伟林
陈雪峰
王鑫
蔡鹏远
刘进峰
陈京蔚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
International Lv Si Of Jiangsu Datang Port Power Generation Corp Ltd
Jiangsu Datang International Lusigang Power Generation Co Ltd
Original Assignee
International Lv Si Of Jiangsu Datang Port Power Generation Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by International Lv Si Of Jiangsu Datang Port Power Generation Corp Ltd filed Critical International Lv Si Of Jiangsu Datang Port Power Generation Corp Ltd
Priority to CN201710556962.9A priority Critical patent/CN107270274B/en
Publication of CN107270274A publication Critical patent/CN107270274A/en
Application granted granted Critical
Publication of CN107270274B publication Critical patent/CN107270274B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22DPREHEATING, OR ACCUMULATING PREHEATED, FEED-WATER FOR STEAM GENERATION; FEED-WATER SUPPLY FOR STEAM GENERATION; CONTROLLING WATER LEVEL FOR STEAM GENERATION; AUXILIARY DEVICES FOR PROMOTING WATER CIRCULATION WITHIN STEAM BOILERS
    • F22D1/00Feed-water heaters, i.e. economisers or like preheaters
    • F22D1/32Feed-water heaters, i.e. economisers or like preheaters arranged to be heated by steam, e.g. bled from turbines
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22BMETHODS OF STEAM GENERATION; STEAM BOILERS
    • F22B35/00Control systems for steam boilers
    • F22B35/06Control systems for steam boilers for steam boilers of forced-flow type
    • F22B35/10Control systems for steam boilers for steam boilers of forced-flow type of once-through type
    • F22B35/12Control systems for steam boilers for steam boilers of forced-flow type of once-through type operating at critical or supercritical pressure
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22DPREHEATING, OR ACCUMULATING PREHEATED, FEED-WATER FOR STEAM GENERATION; FEED-WATER SUPPLY FOR STEAM GENERATION; CONTROLLING WATER LEVEL FOR STEAM GENERATION; AUXILIARY DEVICES FOR PROMOTING WATER CIRCULATION WITHIN STEAM BOILERS
    • F22D1/00Feed-water heaters, i.e. economisers or like preheaters
    • F22D1/50Feed-water heaters, i.e. economisers or like preheaters incorporating thermal de-aeration of feed-water
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22GSUPERHEATING OF STEAM
    • F22G5/00Controlling superheat temperature
    • F22G5/04Controlling superheat temperature by regulating flue gas flow, e.g. by proportioning or diverting
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23JREMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES; FLUES 
    • F23J15/00Arrangements of devices for treating smoke or fumes
    • F23J15/02Arrangements of devices for treating smoke or fumes of purifiers, e.g. for removing noxious material
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23JREMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES; FLUES 
    • F23J2215/00Preventing emissions
    • F23J2215/10Nitrogen; Compounds thereof
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23JREMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES; FLUES 
    • F23J2215/00Preventing emissions
    • F23J2215/10Nitrogen; Compounds thereof
    • F23J2215/101Nitrous oxide (N2O)

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Chimneys And Flues (AREA)

Abstract

Realize that the denitration of unit full load is put into the invention discloses the new Starting mode of ultra-supercritical coal-fired units, it is related to coal combustion technology field.Its implementation is as follows:1st, economizer entrance feed temperature is improved:Boiler feed temperature is improved by putting into steam turbine height adding system before set grid-connection, is fed water by increasing boiler water circulating pump heating economizer entrance of exerting oneself, keeps economizer entrance feed temperature before boiler dry state to maintain 260 DEG C or so all the time;2nd, reheating gas baffle adjusting and optimizing is crossed:By turning down reheating gas baffle aperture to 60% aperture before set grid-connection;3rd, boiler dry and wet state conversion optimization:Three coal pulverizer dry and wet state conversion regimes of 30%BMCR loads unit are changed to four coal pulverizers of more than 40%BMCR loads and carry out dry and wet state conversion.The present invention has the beneficial effect that:It can realize that the grid-connected preceding denitration entrance flue gas temperature of unit starting is more than 300 DEG C of input denitrating systems, meet denitrification apparatus requirement of energy continuous and steady operation in the range of full load.

Description

The new Starting mode of ultra-supercritical coal-fired units realizes that the denitration of unit full load is put into
Technical field
The present invention relates to coal combustion technology field, and in particular to the new Starting mode of ultra-supercritical coal-fired units realizes that unit is complete Load denitration is put into.
Background technology
With being waited including haze, the air environmental pollution problem of influence daily life is outstanding day by day, and people are for environment The requirement of quality is also more and more high.The country has some regulations to require that unit needs to meet full load denitration operation.《Thermoelectricity Factory's atmosphere pollutants emission standardses》(GB13223-2011)After implementation, emission of NOx of boiler concentration must strictly be less than 100mg/ m3.For the riverine key area in Jiangsu, emission of NOx of boiler concentration will meet minimum discharge requirement, i.e., less than 50mg/m3.So, Under all accidental conditions of unit, it is necessary to keep denitrification apparatus to run, otherwise, underload denitration may be faced and put into operation Rate is not up to standard, causes power plant to pay charges for disposing pollutants or fine, at the same to denitration electricity price subsidize acquisition will also result in it is very unfavorable Influence.
Existing example, has 4 × 660MW ultra-supercritical coal-fired units, denitration SCR gateways cigarette temperature reaches more than 300 DEG C, it is allowed to throw Enter denitrating system.When 30%BMCR operating modes dry state is run, economizer exit design flue-gas temperature is 291.74 DEG C, and unit is 30% When load condition hygrometric state is run, economizer exit flue-gas temperature is 285 DEG C, and unit is before startup is grid-connected, economizer exit flue gas Temperature is 280 DEG C or so, and denitration in the range of SCR normal dutys can not be met during underrun and sprays ammonia needs.
The content of the invention
In view of the defects and deficiencies of the prior art, the present invention intends to provide a kind of ultra supercritical combustion reasonable in design The new Starting mode of coal unit realizes the technology of unit full load denitration input, and it runs shape by field assay boiler and SCR Condition, in the case of to equipment without any transformation, by improving economizer entrance feed temperature and adjusting heat smoke again Baffle opening, changes Flow Field Distribution of the flue gas in stove, so that denitration SCR gateway flue-gas temperatures are improved more than 300 DEG C, it is real Denitration is put into before existing set grid-connection.
In order to solve the problems existing in background technology, the technical solution adopted by the present invention is:Its implementation is as follows:
1st, economizer entrance feed temperature is improved:According to boiler plant characteristic, by putting into steam turbine height before set grid-connection plus being System improves boiler feed temperature, and boiler utilizes " bypass of economizer water " principle, exerted oneself by increasing boiler water circulating pump in hygrometric state The feedwater of economizer entrance is heated, keeps economizer entrance feed temperature before boiler dry state to maintain 260 DEG C or so all the time, so as to subtract The heat that few economizer absorbs from flue gas, to reach the purpose for improving economizer exit cigarette temperature;
2nd, reheating gas baffle adjusting and optimizing is crossed:Opened before set grid-connection by turning down reheating gas baffle aperture respectively to 60% Degree, changes flow velocity of the flue gas in stove, heating surface is reduced from the caloric receptivity in flue gas, so as to improve economizer exit flue gas temperature Degree;
3rd, boiler dry and wet state conversion optimization:Three coal pulverizer dry and wet state conversion regimes of 30%BMCR loads unit are changed to 40% Four coal pulverizers of more than BMCR loads carry out dry and wet state conversion, so as to improve boiler main reheat steam temperature, improve boiler overall thermal and bear Lotus, reaches the purpose for improving denitration SCR inlet flue-gas temperature.
The present invention has the beneficial effect that:It can realize that the grid-connected preceding denitration entrance flue gas temperature of unit starting is more than 300 DEG C of inputs Denitrating system, while meeting during the following peak regulation of 30% load, denitration inlet flue gas temperature is not less than 300 DEG C, meets denitrification apparatus and exists The requirement of energy continuous and steady operation in the range of full load.
Brief description of the drawings
Fig. 1 is equipment component structural representation of the invention.
Embodiment
Below in conjunction with the accompanying drawings, the present invention is further illustrated.
In order to make the purpose , technical scheme and advantage of the present invention be clearer, below in conjunction with accompanying drawing and specific implementation Mode, the present invention will be described in further detail.It should be appreciated that embodiment described herein is only to explain this Invention, is not intended to limit the present invention.
As shown in figure 1, present embodiment is adopted the following technical scheme that:Concrete mode is as follows:
1st, economizer entrance feed temperature is improved:
(1)Oxygen-eliminating device is heated by auxiliary vapour after ignition of the boiler, remains that feed temperature is more than 120 DEG C in oxygen-eliminating device;
(2)During steam turbine 2500rpm warming-ups, height adding system is gradually put into, so that economizer entrance feed temperature is improved, Ensure that economizer entrance feed temperature reaches more than 250 DEG C before set grid-connection, can gradually be closed after steam turbine 3000rpm constant speed Small high other pitch aperture, so as to improve main steam pressure to 8.5MPa or so, improves high plus outlet feed temperature as far as possible;
(3)Increase boiler water circulating pump during boiler hygrometric state to exert oneself, utilize the higher hot water heating economizer entrance of water storage the temperature inside the box Feedwater, so as to ensure that economizer entrance feed temperature is maintained at more than 250 DEG C before set grid-connection;
(4)Reduce and arranged outside stove water, the adjustment of water storage tank water level is tried one's best and accomplishes zero outer row, so as to reduce boiler water filling amount, it is to avoid The relatively low feedwater of temperature enters economizer;
(5)During boiler hygrometric state, the load speed that rises is relatively slow, it is to avoid the quick load that rises cause the increase of economizer entrance confluent compared with It is many, cause economizer entrance feed temperature to decline to a great extent.
2nd, reheating gas baffle adjusting and optimizing is crossed:
(1)Steam turbine rushes Chinese herbaceous peony and keeps overheat gas baffle and the full-gear of reheating gas baffle 100%;
(2)Steam turbine is rushed heat smoke baffle plate and reheating gas baffle after car while turning down to 60% aperture, change flue gas is in stove Flow velocity, reduce heating surface from the caloric receptivity in flue gas, so as to improve economizer exit flue-gas temperature;
(3)After denitrating system input, when deviation occurs in both sides cigarette temperature, it is hot inclined to eliminate to adjust reheating gas baffle aperture Difference, crosses the total aperture sum maintenance 120% of reheating gas baffle constant.
3rd, boiler combustion adjusting and optimizing:
(1)The operation of A pulverized coal preparation systems is kept before set grid-connection, A pulverized coal preparation systems mix the coal with high heating value, typically based on the excellent coal of tower, Ensure that previous coal pulverizer of set grid-connection can burn main reheat steam temperature to 500 DEG C or so;
(2)During steam turbine 2500rpm warming-ups, air-introduced machine and primary air fan are sent in both sides arranged side by side, keep boiler total blast volume in 1400- 1500T/H, increases boiler air-supply volume, so as to improve boiler smoke temperature;
(3)Both sides are sent after air-introduced machine and primary air fan paired running, are recovered 6 pulverized coal preparation system hot stand-by duties, are later stage unit Steady load up eliminates all defects after grid-connected;
(4)Improve flame kernel height:Before set grid-connection in addition to A pulverized coal preparation system secondary air register larger openings are kept, turn down other Secondary air register and additional wind, improve secondary air bellow differential pressure 1.0KPa or so, while reduction pivot angle burner is put to higher Highly, so as to improve flame kernel height;Corresponding Secondary Air is opened before pulverized coal preparation system starts after set grid-connection, leeway is maintained It is pressed in more than 0.6KPa;
(5)Pressure fan improves bellows differential pressure afterwards side by side, keeps more than thermal wind sensor standard-sized sheet to 50%BMCR loads.
4th, the optimization of boiler main reheat steam temperature:Denitration SCR gateways flue gas temperature is improved using main reheat steam temperature is improved Degree.Boiler Steam temperature influences larger to flue-gas temperature, and vapor (steam) temperature improves flue-gas temperature and also accordingly improved.Therefore, in steam turbine Gradually main reheat steam temperature is improved to 430-450 DEG C during warming-up, warming-up gradually carries main reheat steam temperature after terminating It is high, it is ensured that more than 490 DEG C of grid-connected preceding main reheat steam temperature, gradually main reheat steam temperature is improved to 550 after set grid-connection ℃。
5th, boiler dry and wet state conversion optimization:The traditional dry and wet state conversion of ultra-supercritical boiler is typically selected at 30%BMCR Three pulverized coal preparation system operations of load are carried out, and are now changed traditional dry and wet state conversion regime, are selected in unit load 40%BMCR loads Four pulverized coal preparation systems are changed.Boiler is become a cadre start immediately after state under a set of pulverized coal preparation system, stoppage in transit A pulverized coal preparation systems, by this Method can successfully avoid boiler flue-gas temperature after state of becoming a cadre from declining and more cause denitrating system to trip.
6th, the optimization of steam turbine warm-up period:Steam turbine warm-up period was changed to 3.5 hours by traditional 1.5 hours, profit The effect of radiator is realized with warming-up, so as to further improve boiler smoke temperature.
4 × 660MW boilers are ultra supercritical parameter variable-pressure operation direct current cookers, and ultra supercritical parameter, pattern are П type cloth Put, a resuperheat, single burner hearth, balanced draft, using four walls tangential burning mode, design fuel is bituminous coal, product type For HG-2000/26.15-YM3.Denitration SCR gateways cigarette temperature reaches that more than 300 DEG C allow to put into denitrating system.
1-4 stove denitrating systems take SCR(SCR)Method removes the purpose of NOx in flue gas to reach.It is de- Two layers of catalyst denitration efficiency of nitre system design efficiency are up to 81%, three layer of catalyst denitration efficiency up to 90%, Catalyst Design Allow 420 DEG C of maximum operation (service) temperature, it is allowed to minimum 300 DEG C of temperature in use, the escaping of ammonia rate is less than 3ppm.1-4 stove denitrations are normal Denitration SCR gateway temperature controls are at 300-420 DEG C, cigarette temperature low protection act during less than 300 DEG C, and 4 units are without any complete Load throws denitration transformation.
Boiler start-up system is band recirculation pump system, and two vertical internal formula steam-water separators are arranged in the rear portion of boiler Top, the whole working medium for the boiler penthouse bag wall system that enclosure wall tube upper collecting chamber is drawn are sent by 4 connecting tubes after rear vertical shaft Enter two steam-water separators.In startup stage, the water isolated is connected by water communicating pipe with a vertical separator water storage tank, And arrived after the recycled pump of water that the steam separated then is sent in the lower header of horizontal low temperature superheater, separator water storage tank Economizer entrance.
Flue gas flows through division pendant superheater, pendant superheater, finishing superheater, final reheater and the tail of upper furnace successively Portion's reversal chamber, enters back into the forward and backward two back-end ductwork vertical shafts being divided into dividing wall, flue gas flows through cold reheat in preceding vertical shaft Device and prime economizer, another part flue gas then flow through low temperature superheater and rear class economizer, in the outlet of forward and backward two points of vertical shafts Flue gas distributor is arranged, flue gas is flowed through after distributor by connecting flue, denitration SCR, rotary regenerative air preheater, electricity Deduster, air-introduced machine, desulfurizer, are arranged to air from chimney.
Tested by multiple unit starting, sum up the unique extra-supercritical unit Starting mode of the above, May 19 in 2017 Day and June 11, genco is tested 1, in No. 2 start-up courses respectively, realizes the grid-connected preceding denitration SCR of unit starting Gateway flue-gas temperature reaches that more than 300 DEG C put into denitrating system, so that clothes keep denitrating system to put into operation entirely, meets simultaneously During the following peak regulation of 30% load, denitration inlet flue gas temperature is not less than 300 DEG C, meets denitrification apparatus equal energy in the range of full load The requirement of continuous and steady operation.
By the innovative Starting mode of above ultra-supercritical boiler, genco realizes ultra-supercritical boiler without setting Full load input denitrating system in the case of standby transformation.This invention can both realize the purpose of environmental protection, while also being saved for company About about 35,000,000 yuan of scrap build expense.
It is described above, it is merely illustrative of the technical solution of the present invention and unrestricted, those of ordinary skill in the art are to this hair Other modifications or equivalent substitution that bright technical scheme is made, without departing from the spirit and scope of technical solution of the present invention, It all should cover among scope of the presently claimed invention.

Claims (6)

1. the new Starting mode of ultra-supercritical coal-fired units realizes that the denitration of unit full load is put into, it is characterised in that implementation is such as Under:
(1), improve economizer entrance feed temperature:According to boiler plant characteristic, added by putting into steam turbine height before set grid-connection System improves boiler feed temperature, and boiler utilizes " bypass of economizer water " principle, gone out by increasing boiler water circulating pump in hygrometric state Power heating economizer entrance feedwater, keeps economizer entrance feed temperature before boiler dry state to maintain 260 DEG C or so all the time;
(2), cross reheating gas baffle adjusting and optimizing:By turning down reheating gas baffle aperture respectively to 60% before set grid-connection Aperture, changes flow velocity of the flue gas in stove, reduces heating surface from the caloric receptivity in flue gas;
(3), boiler dry and wet state conversion optimization:Three coal pulverizer dry and wet state conversion regimes of 30%BMCR loads unit are changed to 40% Four coal pulverizers of more than BMCR loads carry out dry and wet state conversion, so as to improve boiler main reheat steam temperature, improve boiler overall thermal and bear Lotus.
2. the new Starting mode of ultra-supercritical coal-fired units according to claim 1 realizes that the denitration of unit full load is put into, It is characterized in that improving economizer entrance feed temperature also includes:
(1)Oxygen-eliminating device is heated by auxiliary vapour after ignition of the boiler, remains that feed temperature is more than 120 DEG C in oxygen-eliminating device;
(2)During steam turbine 2500rpm warming-ups, height adding system is gradually put into, so that economizer entrance feed temperature is improved, Ensure that economizer entrance feed temperature reaches more than 250 DEG C before set grid-connection, can gradually be closed after steam turbine 3000rpm constant speed Small high other pitch aperture, so as to improve main steam pressure to 8.5MPa or so, improves high plus outlet feed temperature as far as possible;
(3)Increase boiler water circulating pump during boiler hygrometric state to exert oneself, utilize the higher hot water heating economizer entrance of water storage the temperature inside the box Feedwater, so as to ensure that economizer entrance feed temperature is maintained at more than 250 DEG C before set grid-connection;
(4)Reduce and arranged outside stove water, the adjustment of water storage tank water level is tried one's best and accomplishes zero outer row, so as to reduce boiler water filling amount;
(5)During boiler hygrometric state, the load speed that rises is relatively slow, it is to avoid the quick load that rises cause the increase of economizer entrance confluent compared with It is many.
3. the new Starting mode of ultra-supercritical coal-fired units according to claim 1 realizes that the denitration of unit full load is put into, It was characterized in that reheating gas baffle adjusting and optimizing also included:
(1)Steam turbine rushes Chinese herbaceous peony and keeps overheat gas baffle and the full-gear of reheating gas baffle 100%;
(2)Steam turbine is rushed heat smoke baffle plate and reheating gas baffle after car while turning down to 60% aperture, change flue gas is in stove Flow velocity, reduce heating surface from the caloric receptivity in flue gas, so as to improve economizer exit flue-gas temperature;
(3)After denitrating system input, when deviation occurs in both sides cigarette temperature, it is hot inclined to eliminate to adjust reheating gas baffle aperture Difference, crosses the total aperture sum maintenance 120% of reheating gas baffle constant.
4. the new Starting mode of ultra-supercritical coal-fired units according to claim 1 realizes that the denitration of unit full load is put into, Characterized by further comprising boiler combustion adjusting and optimizing:
(1)The operation of A pulverized coal preparation systems is kept before set grid-connection, A pulverized coal preparation systems mix coal blending, based on the excellent coal of tower, it is ensured that set grid-connection Previous coal pulverizer can burn main reheat steam temperature to 500 DEG C or so;
(2)During steam turbine 2500rpm warming-ups, air-introduced machine and primary air fan are sent in both sides arranged side by side, keep boiler total blast volume in 1400- 1500T/H, increases boiler air-supply volume;
(3)Both sides are sent after air-introduced machine and primary air fan paired running, recover 6 pulverized coal preparation system hot stand-by duties;
(4)Improve flame kernel height:Before set grid-connection in addition to A pulverized coal preparation system secondary air register larger openings are kept, turn down other Secondary air register and additional wind, improve secondary air bellow differential pressure 1.0KPa or so, while reduction pivot angle burner is put to higher Highly, so as to improve flame kernel height;Corresponding Secondary Air is opened before pulverized coal preparation system starts after set grid-connection, leeway is maintained It is pressed in more than 0.6KPa;
(5)Pressure fan improves bellows differential pressure afterwards side by side, keeps more than thermal wind sensor standard-sized sheet to 50%BMCR loads.
5. the new Starting mode of ultra-supercritical coal-fired units according to claim 1 realizes that the denitration of unit full load is put into, Characterized by further comprising the optimization of boiler main reheat steam temperature:Denitration SCR gateways are improved using main reheat steam temperature is improved Flue-gas temperature, Boiler Steam temperature influences larger to flue-gas temperature, and vapor (steam) temperature improves flue-gas temperature and also accordingly improved.Therefore, exist Gradually main reheat steam temperature is improved to 430-450 DEG C during steam turbine warming-up, warming-up terminate after gradually by main reheated steam Temperature is improved, it is ensured that more than 490 DEG C of grid-connected preceding main reheat steam temperature, gradually improves main reheat steam temperature after set grid-connection To 550 DEG C.
6. the new Starting mode of ultra-supercritical coal-fired units according to claim 1 realizes that the denitration of unit full load is put into, Characterized by further comprising the optimization of steam turbine warm-up period:It is small that steam turbine warm-up period was changed to 3.5 by traditional 1.5 hours When.
CN201710556962.9A 2017-07-10 2017-07-10 Novel starting mode of ultra-supercritical coal-fired unit realizes unit full-load denitration input Active CN107270274B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710556962.9A CN107270274B (en) 2017-07-10 2017-07-10 Novel starting mode of ultra-supercritical coal-fired unit realizes unit full-load denitration input

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710556962.9A CN107270274B (en) 2017-07-10 2017-07-10 Novel starting mode of ultra-supercritical coal-fired unit realizes unit full-load denitration input

Publications (2)

Publication Number Publication Date
CN107270274A true CN107270274A (en) 2017-10-20
CN107270274B CN107270274B (en) 2021-12-14

Family

ID=60072344

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710556962.9A Active CN107270274B (en) 2017-07-10 2017-07-10 Novel starting mode of ultra-supercritical coal-fired unit realizes unit full-load denitration input

Country Status (1)

Country Link
CN (1) CN107270274B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107883369A (en) * 2017-11-30 2018-04-06 华电电力科学研究院 Adapt to the boiler feedwater step heating system and adjusting method of the wide load denitration of unit
CN108613165A (en) * 2018-04-27 2018-10-02 华能国际电力股份有限公司上海石洞口第二电厂 Come into operation the control method of denitrification apparatus before a kind of fired power generating unit startup stage is grid-connected
CN108954283A (en) * 2018-06-26 2018-12-07 国网浙江省电力有限公司电力科学研究院 Overcritical or extra-supercritical unit hygrometric state become a cadre state process automatic control method
CN109323238A (en) * 2018-09-14 2019-02-12 中国电建集团江西省电力建设有限公司 Supercritical DC furnace cold start threw method of denitration in 8 hours
CN110542109A (en) * 2019-09-30 2019-12-06 大唐郓城发电有限公司 Double reheat boiler tail three-flue and installation method thereof
CN112221345A (en) * 2020-09-25 2021-01-15 华能国际电力股份有限公司上海石洞口第二电厂 Automatic control method for boiler flue gas baffle of ultra-supercritical generator set
CN112774431A (en) * 2019-11-01 2021-05-11 大唐国际发电股份有限公司陡河发电厂 Method for putting thermal power plant denitration system into operation
CN114768523A (en) * 2022-03-31 2022-07-22 西安热工研究院有限公司 SCR full-load denitration system of thermal generator set

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103592407A (en) * 2013-11-07 2014-02-19 华北电力大学 On-line power plant SCR (Selective Catalytic Reduction) denitration system catalyst activity monitoring method
CN205807454U (en) * 2016-05-23 2016-12-14 深能合和电力(河源)有限公司 A kind of ultra supercritical coal-burning boiler width load denitrating system
CN106642062A (en) * 2016-12-13 2017-05-10 湖南华电长沙发电有限公司 Beryllium oxide generation preventing method for boilers of power plant
CN106621804A (en) * 2016-11-15 2017-05-10 国家电网公司 Fume ammonia injection mixing device and SCR (selective catalytic reduction) fume denitrification system
CN106871102A (en) * 2016-12-28 2017-06-20 神华集团有限责任公司 The denitrating technique of full load

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103592407A (en) * 2013-11-07 2014-02-19 华北电力大学 On-line power plant SCR (Selective Catalytic Reduction) denitration system catalyst activity monitoring method
CN205807454U (en) * 2016-05-23 2016-12-14 深能合和电力(河源)有限公司 A kind of ultra supercritical coal-burning boiler width load denitrating system
CN106621804A (en) * 2016-11-15 2017-05-10 国家电网公司 Fume ammonia injection mixing device and SCR (selective catalytic reduction) fume denitrification system
CN106642062A (en) * 2016-12-13 2017-05-10 湖南华电长沙发电有限公司 Beryllium oxide generation preventing method for boilers of power plant
CN106871102A (en) * 2016-12-28 2017-06-20 神华集团有限责任公司 The denitrating technique of full load

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
马建华,等: "1000MW机组启动期间NOx控制方法探讨与应用", 《电力与能源》 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107883369A (en) * 2017-11-30 2018-04-06 华电电力科学研究院 Adapt to the boiler feedwater step heating system and adjusting method of the wide load denitration of unit
CN107883369B (en) * 2017-11-30 2024-01-09 华电电力科学研究院有限公司 Boiler water supply cascade heating system suitable for wide-load denitration of unit and adjusting method
CN108613165A (en) * 2018-04-27 2018-10-02 华能国际电力股份有限公司上海石洞口第二电厂 Come into operation the control method of denitrification apparatus before a kind of fired power generating unit startup stage is grid-connected
CN108954283A (en) * 2018-06-26 2018-12-07 国网浙江省电力有限公司电力科学研究院 Overcritical or extra-supercritical unit hygrometric state become a cadre state process automatic control method
CN108954283B (en) * 2018-06-26 2019-10-29 国网浙江省电力有限公司电力科学研究院 Overcritical or extra-supercritical unit hygrometric state become a cadre state process automatic control method
CN109323238A (en) * 2018-09-14 2019-02-12 中国电建集团江西省电力建设有限公司 Supercritical DC furnace cold start threw method of denitration in 8 hours
CN110542109A (en) * 2019-09-30 2019-12-06 大唐郓城发电有限公司 Double reheat boiler tail three-flue and installation method thereof
CN112774431A (en) * 2019-11-01 2021-05-11 大唐国际发电股份有限公司陡河发电厂 Method for putting thermal power plant denitration system into operation
CN112774431B (en) * 2019-11-01 2022-05-24 大唐国际发电股份有限公司陡河发电厂 Method for putting thermal power plant denitration system into operation
CN112221345A (en) * 2020-09-25 2021-01-15 华能国际电力股份有限公司上海石洞口第二电厂 Automatic control method for boiler flue gas baffle of ultra-supercritical generator set
CN114768523A (en) * 2022-03-31 2022-07-22 西安热工研究院有限公司 SCR full-load denitration system of thermal generator set

Also Published As

Publication number Publication date
CN107270274B (en) 2021-12-14

Similar Documents

Publication Publication Date Title
CN107270274A (en) The new Starting mode of ultra-supercritical coal-fired units realizes that the denitration of unit full load is put into
CN105864817B (en) The anti-AH of hot Secondary Air supercharging adverse current is blocked and heat-transfer surface etching system and its method
CN103344124A (en) Lime kiln waste gas waste heat electricity generating system with by-product coal gas afterburning function
JPH08502345A (en) Steam power plant for producing electrical energy
CN109668165A (en) Hot Secondary Air and smoke waste heat utilization system and thermal power generation unit
CN207778402U (en) The subcritical gas generating system of superhigh temperature
CN108592008A (en) A kind of double reheat electricity generation system and its operation method
CN205909262U (en) Take circulating fluidized bed boiler of re -heater
CN101832717B (en) Kiln tail waste heat boiler with independent economizer and waste heat recovery system
CN212777312U (en) Flue gas recirculation system for ultra-supercritical secondary reheating boiler
CN206281365U (en) A kind of high-temp waste gas afterheat utilizing system
CN105485894A (en) Pulverized coal type water heating boiler
CN205940176U (en) System is used multipurposely to cold quick -witted waste gas waste heat of ring
CN111981469A (en) Flue gas recirculation system for ultra-supercritical secondary reheating boiler
CN112097287B (en) Boiler energy-saving and flue gas whitening system, process and application
CN209495348U (en) Hot Secondary Air and smoke waste heat utilization system and thermal power generation unit
CN209672301U (en) One kind liquidates tower 660MW double reheat boiler
CN209371203U (en) A kind of high parameter waste heat boiler suitable for refuse incineration grate furnace
CN207751005U (en) A kind of stove cigarette recycling coupling fume afterheat becomes energy level and utilizes system
CN208312354U (en) A kind of double reheat electricity generation system
JP5766527B2 (en) Method and apparatus for controlling once-through boiler
CN111735038B (en) System and method for improving low-load operation performance of coal-fired boiler
CN219160319U (en) Sugar refinery boiler
CN209279187U (en) Use the smoke discharging device of the bagasse biomass fuel boiler of dry method dust
CN220506729U (en) Garbage incineration treatment and energy utilization system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant