CN107268662A - 一种输电线路铁塔基础分坑方法 - Google Patents
一种输电线路铁塔基础分坑方法 Download PDFInfo
- Publication number
- CN107268662A CN107268662A CN201710413811.8A CN201710413811A CN107268662A CN 107268662 A CN107268662 A CN 107268662A CN 201710413811 A CN201710413811 A CN 201710413811A CN 107268662 A CN107268662 A CN 107268662A
- Authority
- CN
- China
- Prior art keywords
- foundation
- iron tower
- point
- tower foundation
- transmission line
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/42—Foundations for poles, masts or chimneys
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Geometry (AREA)
- Computer Hardware Design (AREA)
- General Physics & Mathematics (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Theoretical Computer Science (AREA)
- Computational Mathematics (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Architecture (AREA)
- Mathematical Analysis (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Evolutionary Computation (AREA)
- Mining & Mineral Resources (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
一种输电线路铁塔基础分坑方法,根据输电线路铁塔基础实际工程情况,计算出基坑坑口开挖尺寸,然后通过定位基坑每个角点的方法,确定每个基坑的最终尺寸和位置。本发明提供一种输电线路铁塔基础分坑方法,不仅适用于正方形基础分坑,而且适用于长方形基础分坑。可以推广至其他类似型式的基础分坑。
Description
技术领域
本发明一种输电线路铁塔基础分坑方法,涉及输电线路铁塔基础施工技术领域。
背景技术
输电线路铁塔基础分坑是铁塔基础质量的重要保证,现有铁塔基础一般需要开挖四个基坑,每个基坑坑口尺寸及开挖位置的确定是基坑开挖前重要的内容,而基坑坑口尺寸并非是设计尺寸,其需要施工单位根据工程具体情况进行进一步确定,基坑断面一般为正方形,但是四个基础中心点之间的连线根据铁塔的类型不同而不同。一般转角铁塔基础四个基础中心点之间的连线为长方形,直线铁塔基础四个基础中心点之间的连线为正方形,因此,传统的输电铁塔的基础分坑方法主要根据这一特征分为正方形铁塔基础分坑方法和矩形铁塔基础分坑方法。
正方形铁塔基础分坑方法和长方形铁塔基础分坑方法,主要原理是利用几何算法计算出各基座的对角线与纵向对称轴和横向对称轴的交点到基础中心点的距离,然后采用反演施工的方法,得到各基座的对角线和实际中心位置。
传统输电线路铁塔基础分坑缺陷有:
1):传统输电线路铁塔基础分坑方法,并未给出基坑坑口尺寸的计算方法。
2):传统输电线路铁塔基础分坑方法,根据基础四个基础中心点之间的连线又分为正方形铁塔基础分坑方法和长方形铁塔基础分坑方法,并未有统一的计算公式。
3):传统输电线路铁塔基础分坑方法,仅仅是确定基坑的中心点位置,并未给出每个基坑的最终位置和尺寸大小,在实际施工过程中,最终还要进行二次放样,增加了基础工程施工流程。
发明内容
针对传统输电线路铁塔基础分坑方法存在的不足,本发明提供一种输电线路铁塔基础分坑方法,不仅适用于正方形基础分坑,而且适用于长方形基础分坑;根据输电线路铁塔基础实际工程情况只需计算出基坑坑口开挖尺寸,然后通过定位基坑每个角点的方法确定每个基坑的最终尺寸和位置。该方法除了正方形基础分坑和长方形基础分坑,还可以推广至高低腿基础等其他类似型式的基础分坑。
本发明采取的技术方案为:
一种输电线路铁塔基础分坑方法,包括以下步骤:
步骤1:计算基坑坑口开挖尺寸a。
步骤2:定位铁塔基础A腿基坑的两个角点2、4,在OA方向上,将皮尺0刻度对准中心桩中心的位置,并且将皮尺拉到绷直状态找到L2数值的刻度处,打上辅助桩2,辅助桩2即是铁塔基础A腿基坑开挖的一个角点,然后将皮尺拉到绷直状态,找到L4数值的刻度处,打上辅助桩4,辅助桩4即是铁塔基础A腿基坑开挖的一个角点;
其中a为步骤1中的坑口开挖尺寸。
步骤3:定位铁塔基础A腿基坑的另外两个角点1、3,在皮尺上选三个点:0刻度点、a刻度点以及2a刻度点,将0刻度点和2a刻度点分别对准步骤4中的角点2、4,并固定,然后将a刻度点分别往两边拉至绷直状态所处的位置,即可得到另外两个角点1、3,并打上辅助桩,并用白灰定出铁塔基础A腿基坑开挖的边线。
步骤4:同理定出铁塔基础B、C、D腿基坑的开挖边线。
通过上述步骤,完成输电线路铁塔基础分坑。
所述步骤1包括:
步骤1.1:计算坑底宽度b,
b=d+2c (1)
b是坑底宽度;d是基础设计尺寸;c是基础底部需预留的施工作业宽度;
步骤1.2:确定坑壁坡度f,
步骤1.3:确定坑口开挖尺寸a;
最终坑口开挖尺寸a按照公式2进行计算。
a=b+2p (2)
b是坑底宽度;p为基坑每个边的边坡所对应的水平宽度,p=h/f;h是基坑实际坑深;f是坑壁坡度。
本发明一种输电线路铁塔基础分坑方法,技术效果如下:
1:不仅适用于正方形基础分坑,而且适用于长方形基础分坑,根据输电线路铁塔基础实际工程情况只需计算出基坑坑口开挖尺寸,然后通过定位基坑每个角点的方法确定每个基坑的最终尺寸和位置。
2:除了正方形基础分坑和长方形基础分坑,还可以推广至高低腿基础等其他类似型式的基础分坑。
3:将正方形基础分坑计算和长方形基础分坑计算合并成统一的计算公式,使得工程实践中具备通用性。
附图说明
图1为本发明的输电线路铁塔基础分坑示意图。
图2为本发明的坑口开挖示意图。
具体实施方式
一种输电线路铁塔基础分坑方法,不仅适用于正方形基础分坑,而且适用于长方形基础分坑,根据输电线路铁塔基础实际工程情况计算出基坑坑口开挖尺寸,然后通过定位基坑每个角点的方法确定每个基坑的最终尺寸和位置。具体实施步骤如下:
步骤一:计算基坑坑口开挖尺寸。
步骤1.1:计算坑底宽度b,
b=d+2c (1)
b是坑底宽度;d是基础设计尺寸;c是基础底部需预留的施工作业宽度。
步骤1.2:确定坑壁坡度f,
根据DL 5009.2—2004《电力建设安全工作规程》架空电力线路部分第105条的要求,当不用档土板挖坑时,为防止坑壁在施工过程中发生坍塌,保证安全施工,应根据土质的性质、地下水位的高低和挖掘深度等因素,对坑壁应留有稳定的坡度,见表1。
表1土质坑壁安全坡度f
步骤1.3:确定坑口开挖尺寸a,
最终坑口开挖尺寸a按照公式2进行计算。
a=b+2p (2)
b是坑底宽度;p为基坑每个边的边坡所对应的水平宽度,p=h/f;h是基坑实际坑深;f是坑壁坡度。
步骤二:根据线路中心桩定位铁塔基础的A、B、C、D腿的方向桩。如图1所示,在塔位中心O架设经纬仪并找平,将经纬仪目镜中心对准顺线路相反方向的相邻塔中心桩,水平度盘调为0°,转过arctan[(m-n)/(n-a)]角度,钉出辅助桩A,倒镜钉出辅助桩C。水平度盘回零后再转过2arctan(n/m)角度,在这方向线上钉出辅助桩B、D。
其中m为铁塔四个基础中心点连线的长边;n为铁塔四个基础中心点连线的短边;a为步骤1中的坑口开挖尺寸。当铁塔四个基础中心点连线为正方形,即m=n时,arctan[(m-n)/(n-a)]为45°。
步骤三:定位铁塔基础A腿基坑的两个角点2、4。在OA方向上,将皮尺0刻度对准中心桩中心的位置,并且将皮尺拉到绷直状态,找到L2数值的刻度处,打上辅助桩2,辅助桩2即是铁塔基础A腿基坑开挖的一个角点,然后将皮尺拉到绷直状态,找到L4数值的刻度处,打上辅助桩4,辅助桩4即是铁塔基础A腿基坑开挖的一个角点。
其中a为步骤1中的坑口开挖尺寸。
步骤四:定位铁塔基础A腿基坑的另外两个角点1、3,在皮尺上选三个点:0刻度点、a刻度点以及2a刻度点,将0刻度点和2a刻度点分别对准步骤4中的角点2、4,并固定,然后将a刻度点分别往两边拉至绷直状态所处的位置,即可得到另外两个角点1、3,并打上辅助桩,并用白灰定出铁塔基础A腿基坑开挖的边线。
步骤五:同理定出铁塔基础BCD腿基坑的开挖边线。
实施例:
例如,峡江I、II回π进安福寺(宜昌北)500kV输电线路工程,利用本发明专利验算坑口开挖尺寸以及基坑放样。该工程某一直线铁塔基础四个基础中心点连线为正方形,工程地质条件为粘土,基础跟开为12000×12000mm,基础坑深为3500mm,底板设计尺寸3400×3400mm。通过本发明专利的方法计算出坑口开挖尺寸为6100×6100mm,工程最后验证,坑口开挖尺寸不仅保证了恰当的安全边坡、基础底部适当的施工作业宽度,而且保证了基础的设计尺寸,同时没有过多的土石方开挖量。
Claims (2)
1.一种输电线路铁塔基础分坑方法,其特征在于包括以下步骤:
步骤1:计算基坑坑口开挖尺寸a;
步骤2:定位铁塔基础A腿基坑的两个角点2、4,在OA方向上,将皮尺0刻度对准中心桩中心的位置,并且将皮尺拉到绷直状态找到L2数值的刻度处,打上辅助桩2,辅助桩2即是铁塔基础A腿基坑开挖的一个角点,然后将皮尺拉到绷直状态,找到L4数值的刻度处,打上辅助桩4,辅助桩4即是铁塔基础A腿基坑开挖的一个角点;
其中a为步骤1中的坑口开挖尺寸;
步骤3:定位铁塔基础A腿基坑的另外两个角点1、3,在皮尺上选三个点:0刻度点、a刻度点以及2a刻度点,将0刻度点和2a刻度点分别对准步骤4中的角点2、4,并固定,然后将a刻度点分别往两边拉至绷直状态所处的位置,即可得到另外两个角点1、3,并打上辅助桩,并定出铁塔基础A腿基坑开挖的边线;
步骤4:同理定出铁塔基础B、C、D腿基坑的开挖边线;
通过上述步骤,完成输电线路铁塔基础分坑。
2.根据权利要求1所述一种输电线路铁塔基础分坑方法,其特征在于:所述步骤1包括:
步骤1.1:计算坑底宽度b,
b=d+2c (1)
b是坑底宽度;d是基础设计尺寸;c是基础底部需预留的施工作业宽度;
步骤1.2:确定坑壁坡度f,
步骤1.3:确定坑口开挖尺寸a;
最终坑口开挖尺寸a按照公式2进行计算;
a=b+2p (2)
b是坑底宽度;p为基坑每个边的边坡所对应的水平宽度,p=h/f;h是基坑实际坑深;f是坑壁坡度。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710413811.8A CN107268662A (zh) | 2017-06-05 | 2017-06-05 | 一种输电线路铁塔基础分坑方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710413811.8A CN107268662A (zh) | 2017-06-05 | 2017-06-05 | 一种输电线路铁塔基础分坑方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107268662A true CN107268662A (zh) | 2017-10-20 |
Family
ID=60065542
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710413811.8A Pending CN107268662A (zh) | 2017-06-05 | 2017-06-05 | 一种输电线路铁塔基础分坑方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107268662A (zh) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109358353A (zh) * | 2018-10-31 | 2019-02-19 | 中国电建集团山东电力建设第工程有限公司 | 一种集电线路基础快速分坑放样方法 |
CN109737929A (zh) * | 2018-12-26 | 2019-05-10 | 国网浙江省电力有限公司建设分公司 | 一种输电线路工程特高钢管塔分段验收方法 |
CN109798871A (zh) * | 2019-03-21 | 2019-05-24 | 中冶成都勘察研究总院有限公司 | 一种土石方回填后土面高度控制测量方法 |
CN110820727A (zh) * | 2019-09-26 | 2020-02-21 | 国家电网有限公司 | 钻孔灌注桩施工的精准定位测量方法 |
CN111121731A (zh) * | 2019-12-11 | 2020-05-08 | 荆州市荆力工程设计咨询有限责任公司 | 一种基础分坑仪及其控制方法 |
CN111485573A (zh) * | 2020-03-19 | 2020-08-04 | 衡水衡源电力建设有限责任公司 | 一种输电工程预制基础安装、铁塔组立连贯施工方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102022993A (zh) * | 2010-11-02 | 2011-04-20 | 河南省电力公司洛阳供电公司 | 一种线路单杆塔基础分坑的方法 |
CN102828519A (zh) * | 2012-09-21 | 2012-12-19 | 国家电网公司 | 矩形基础分坑及地脚螺栓的找正方法 |
CN105421480A (zh) * | 2015-11-25 | 2016-03-23 | 国家电网公司 | 输电塔的正方形基础分坑方法 |
KR20160135682A (ko) * | 2016-10-12 | 2016-11-28 | 임지훈 | 마름모기초 직선철탑 |
-
2017
- 2017-06-05 CN CN201710413811.8A patent/CN107268662A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102022993A (zh) * | 2010-11-02 | 2011-04-20 | 河南省电力公司洛阳供电公司 | 一种线路单杆塔基础分坑的方法 |
CN102828519A (zh) * | 2012-09-21 | 2012-12-19 | 国家电网公司 | 矩形基础分坑及地脚螺栓的找正方法 |
CN105421480A (zh) * | 2015-11-25 | 2016-03-23 | 国家电网公司 | 输电塔的正方形基础分坑方法 |
KR20160135682A (ko) * | 2016-10-12 | 2016-11-28 | 임지훈 | 마름모기초 직선철탑 |
Non-Patent Citations (1)
Title |
---|
戴仁发主编: "《输配电线路施工》", 30 September 2006, 中国电力出版社 * |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109358353A (zh) * | 2018-10-31 | 2019-02-19 | 中国电建集团山东电力建设第工程有限公司 | 一种集电线路基础快速分坑放样方法 |
WO2020088363A1 (zh) * | 2018-10-31 | 2020-05-07 | 中国电建集团山东电力建设第一工程有限公司 | 一种集电线路基础快速分坑放样方法 |
CN109358353B (zh) * | 2018-10-31 | 2022-12-09 | 中国电建集团山东电力建设第一工程有限公司 | 一种集电线路基础快速分坑放样方法 |
CN109737929A (zh) * | 2018-12-26 | 2019-05-10 | 国网浙江省电力有限公司建设分公司 | 一种输电线路工程特高钢管塔分段验收方法 |
CN109798871A (zh) * | 2019-03-21 | 2019-05-24 | 中冶成都勘察研究总院有限公司 | 一种土石方回填后土面高度控制测量方法 |
CN110820727A (zh) * | 2019-09-26 | 2020-02-21 | 国家电网有限公司 | 钻孔灌注桩施工的精准定位测量方法 |
CN111121731A (zh) * | 2019-12-11 | 2020-05-08 | 荆州市荆力工程设计咨询有限责任公司 | 一种基础分坑仪及其控制方法 |
CN111121731B (zh) * | 2019-12-11 | 2022-09-09 | 国网湖北省电力有限公司荆州供电公司 | 一种基础分坑仪 |
CN111485573A (zh) * | 2020-03-19 | 2020-08-04 | 衡水衡源电力建设有限责任公司 | 一种输电工程预制基础安装、铁塔组立连贯施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107268662A (zh) | 一种输电线路铁塔基础分坑方法 | |
CN104196034B (zh) | 一种利用钢板桩作为支护围堰的基坑施工方法 | |
CN106381866A (zh) | 一种富水软土地区超深地下连续墙施工方法 | |
CN111898184B (zh) | 浅埋暗挖隧道管幕加固对地面与桩基影响的分析方法 | |
WO2020029557A1 (zh) | 一种浅埋煤层开采潜水漏失致灾程度的划分方法 | |
CN103352455A (zh) | 开挖基坑坑底土体***的监测方法 | |
CN110306528A (zh) | 一种地基处理强夯置换加固方法 | |
CN108611985B (zh) | 特殊地质超重框架桥顶进施工方法 | |
CN108589699A (zh) | 一种内插h型钢trd墙及其施工方法 | |
CN109137930B (zh) | 一种适用于狭窄基坑的嵌固稳定性分析方法 | |
CN107023027A (zh) | 一种建筑物集中区大型沉井施工方法 | |
CN109779639A (zh) | 适用于砂性地层盾构上穿既有大直径隧道的抗浮控制方法 | |
CN106682364A (zh) | 桩入岩层深度的确定方法及*** | |
CN109208567A (zh) | 一种适用于狭窄基坑的坑底抗***稳定性分析方法 | |
CN110984132B (zh) | 复杂地质条件下地下连续墙成槽的施工方法 | |
CN104541643B (zh) | 一种平原区的采煤沉陷区土地整治方法 | |
CN103344214B (zh) | 一种1.6次抛物线型特大桥墩测量及墩身线形控制方法 | |
CN105887941A (zh) | 一种桩基础桩长测算方法 | |
CN105178367A (zh) | 一种基础最终沉降量的三维可视化方法 | |
CN107513993A (zh) | 超长直线组合钢板桩施工方法 | |
CN104727289B (zh) | 一种控制多层含水层越流补给保护周围环境的施工方法 | |
CN112668076A (zh) | 一种土岩组合地层多阶高边坡综合信息化施工方法 | |
CN105951844A (zh) | 一种盖挖法顶板节点结构及其施工方法 | |
CN103757999A (zh) | 一种采用园路基槽开挖定标高的整体地形改造的施工方法 | |
CN102021917B (zh) | 一种送电线路π型杆基础施工的方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171020 |
|
RJ01 | Rejection of invention patent application after publication |