CN107263337A - Complete pneumatic four pipette tips submarine pipeline sandblasting walking mechanism - Google Patents

Complete pneumatic four pipette tips submarine pipeline sandblasting walking mechanism Download PDF

Info

Publication number
CN107263337A
CN107263337A CN201611049078.8A CN201611049078A CN107263337A CN 107263337 A CN107263337 A CN 107263337A CN 201611049078 A CN201611049078 A CN 201611049078A CN 107263337 A CN107263337 A CN 107263337A
Authority
CN
China
Prior art keywords
guide rail
submarine pipeline
rail device
arc guide
sandblasting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611049078.8A
Other languages
Chinese (zh)
Inventor
周延东
王收军
***
魏璇
马亚光
李彬
梁杰
鲁振兴
高指林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Offshore Oil Corp CNOOC
Tianjin University of Technology
Offshore Oil Engineering Co Ltd
Original Assignee
China National Offshore Oil Corp CNOOC
Tianjin University of Technology
Offshore Oil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Offshore Oil Corp CNOOC, Tianjin University of Technology, Offshore Oil Engineering Co Ltd filed Critical China National Offshore Oil Corp CNOOC
Priority to CN201611049078.8A priority Critical patent/CN107263337A/en
Publication of CN107263337A publication Critical patent/CN107263337A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B24GRINDING; POLISHING
    • B24CABRASIVE OR RELATED BLASTING WITH PARTICULATE MATERIAL
    • B24C3/00Abrasive blasting machines or devices; Plants
    • B24C3/02Abrasive blasting machines or devices; Plants characterised by the arrangement of the component assemblies with respect to each other
    • B24C3/06Abrasive blasting machines or devices; Plants characterised by the arrangement of the component assemblies with respect to each other movable; portable
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B24GRINDING; POLISHING
    • B24CABRASIVE OR RELATED BLASTING WITH PARTICULATE MATERIAL
    • B24C9/00Appurtenances of abrasive blasting machines or devices, e.g. working chambers, arrangements for handling used abrasive material

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Earth Drilling (AREA)

Abstract

A kind of complete pneumatic four pipette tips submarine pipeline sandblasting walking mechanism, including:One hanging apparatus, support meanss installed in hanging apparatus both sides, arc guide rail device in support meanss, supporting wheel systems on arc guide rail device, it is symmetricly set on the number set straight line slide unit component of arc guide rail device both sides, it is separately mounted to the sand-blasting gun on straight line slide unit component, fixation cylinder assembly between arc guide rail device and submarine pipeline, the gear train of positioning train and pneumatic actuation on arc guide rail device, wherein, submarine pipeline is matched somebody with somebody with arc guide rail device and merges the lower section for being arranged on arc guide rail device, arc guide rail device is driven to be rotated around submarine pipeline by the gear train of pneumatic actuation, circumferentially rotated so as to drive straight line slide unit component and sand-blasting gun to be realized around submarine pipeline.The present invention can not only be to the welding junction of different tube diameters submarine pipeline blasting treatment, moreover, easy to operate, substantially increase the efficiency to submarine pipeline sandblasting.

Description

Complete pneumatic four pipette tips submarine pipeline sandblasting walking mechanism
Technical field
The present invention relates to running gear, more particularly to a kind of it is used to carry out the complete pneumatic of blasting treatment to submarine pipeline weld bond Four pipette tips submarine pipeline sandblasting walking mechanisms.Belong to offshore oil, NG Pipeline Construction technical field.
Background technology
Submarine pipeline includes:Seabed oil, gas gathering line, main pipeline, attached supercharging platform and pipeline and platform The parts such as the supervisor of connection.Its effect is to collect the mined oil of marine petroleum-gas fiedl or natural gas, transports to and is Moor the single point mooring of oil carrier or transport to land oil, air reservoir station.
Pipelaying work mainly has three kinds of methods:Pipe laying barge laying, drawing method are laid and laid with reel ship.In operation process Select which kind of method be according to pipe diameter size, the seawater depth, sea situation and away from the conditions such as bank distance determine.Wherein, pipe laying barge is spread If mode be one of most commonly seen mode.Pipelaying work process is to aggravate submarine pipeline plus cement through land fabrication factory After layer, ship off on pipe laying barge, then by the piecewise assembly welding of submarine pipeline, the pipeline section welded when pipe laying barge is moved forward, Slipped into from the stinger of quarter marine.During whole pipelaying work, the displacement that the length that pipeline section glides must be with ship Amount is synchronous.
Operation on the sea harsh climate, environmental condition are that pipe-laying equipment institute must facing challenges.It is mainly by sea The erosion of seawater used and high salt fog condensate when foreign air, the seawater spittle, sleet, clamp down, wherein, high salt fog institute The corrosion for the acid-base solution that electrochemical corrosion, accelerated stress corrosion and the salt of generation are formed after being ionized in water, it is easy to cause Electronics damage, therefore, electric effect, the machine of insulating materials and metal erosion such as produce to conductive layer in electronics The movable part obstruction of tool part and component or influence that is cohesive, causing enamelled coating foaming by electrolysis etc. are to cause device damage Main cause.
The content of the invention
It is a primary object of the present invention to overcome the disadvantages mentioned above that prior art is present, and provide a kind of complete pneumatic four pipette tips Submarine pipeline sandblasting walking mechanism, the blasting treatment that it can not only be to the welding junction of different tube diameters submarine pipeline, is solved Influence problem due to operation on the sea harsh climate, environmental condition to electronics;Moreover, it is easy to operate, substantially increase To the efficiency of submarine pipeline sandblasting.
The purpose of the present invention is realized by following technical scheme:
A kind of complete pneumatic four pipette tips submarine pipeline sandblasting walking mechanism, it is characterised in that:Including:One hanging apparatus, installation Support meanss in hanging apparatus both sides, the arc guide rail device in support meanss, on arc guide rail device Supporting wheel systems, be symmetricly set on the number set straight line slide unit components of arc guide rail device both sides, be separately mounted to straight line slide unit group Sand-blasting gun on part, the fixation cylinder assembly between arc guide rail device and submarine pipeline, installed in arc guide rail dress The positioning train put and for the gear train for the pneumatic actuation for driving fixed cylinder assembly, wherein, submarine pipeline and circular arc Track-type facilities are arranged on the lower section of arc guide rail device with merging, and arc guide rail can be driven to fill by the gear train of pneumatic actuation Put and rotated around submarine pipeline, so as to drive straight line slide unit component and sand-blasting gun on arc guide rail device around Submarine Pipeline Realize and circumferentially rotate in road.
The hanging apparatus includes:One mast-up, the hoisting ring being arranged on mast-up and several lifting plates.
The support meanss are provided with:Two pieces of supporting plates on lifting plate are oppositely arranged on, and supporting plate is U-shaped provided with one Groove.
The arc guide rail device is connected by supporting wheel systems with support meanss, and arc-shaped rail relative support train turns It is dynamic.
The fixed cylinder assembly is made up of cylinder and firm banking, is connected cylinder with supporting plate by firm banking Together.
The positioning train is made up of the mutually isostructural locating wheel of array and positioning wheel support, wherein, locating wheel passes through Supporting plate on positioning wheel support links together.
Beneficial effects of the present invention:The present invention is due to using above-mentioned technical proposal, and it can not only be to different tube diameters seabed The blasting treatment of the welding junction of pipeline, is solved because operation on the sea harsh climate, environmental condition are to the shadows of electronics The problem of sound;Moreover, it is easy to operate, substantially increase the efficiency to submarine pipeline sandblasting.
Brief description of the drawings
Fig. 1 is dimensional structure diagram of the present invention.
Fig. 2 is structure elevational schematic view of the present invention.
Fig. 3 is structure schematic elevation view of the present invention.
Fig. 4 is structure schematic side view of the present invention.
Fig. 5 is structure spray gun run trace schematic diagram of the present invention.
Major Symbol explanation in figure:
1. hoisting ring, 2. mast-ups, 3. lifting plates, 4. supporting plates, 5. arc guide rail devices, 6. supporting wheel systems, 7. straight lines Slide unit component, 8. fix cylinder assembly, 9. submarine pipelines, 10. positioning trains.
Embodiment
As Figure 1-Figure 5, the present invention includes:One hanging apparatus, the support meanss installed in hanging apparatus both sides, peace Arc guide rail device 5 in support meanss, the supporting wheel systems 6 on arc guide rail device 5, it is symmetricly set on circular arc The number of the both sides of track-type facilities 5 covers straight line slide unit component 7 (the present embodiment is four sets), is separately mounted on straight line slide unit component 7 Sand-blasting gun, the fixation cylinder assembly 8 between arc guide rail device 5 and submarine pipeline 9, installed in arc guide rail device 5 On positioning train 10 and for the gear train for the pneumatic actuation for driving fixed cylinder assembly 8, wherein, submarine pipeline 9 with circle Arc guide rail device 5 is arranged on the lower section of arc guide rail device 5 with merging, and circular arc can be driven to lead by the gear train of pneumatic actuation Rail device 5 is rotated around submarine pipeline 9, so as to drive the straight line slide unit component 7 on arc guide rail device 5 and be installed on it Sand-blasting gun around submarine pipeline 9 realize circumferentially rotate.
Above-mentioned hanging apparatus includes:One mast-up 2, using welding or bolt connecting mode be arranged on mast-up 2 one Hoisting ring 1 and several lifting plates 3.
Above-mentioned support meanss are provided with:The mode of being connected by screw bolts is oppositely arranged on two pieces of supporting plates 4 on lifting plate 3, and Supporting plate 4 is provided with a U-type groove, can be positioned over the present invention on submarine pipeline 9 by hanging apparatus, and by positioning train 10 and fixed cylinder assembly 8 realize the coaxial of U-type groove and submarine pipeline 9.
Above-mentioned arc guide rail device 5 is connected by supporting wheel systems 6 with support meanss, and supporting wheel systems 6 are connected by screw bolts Mode is arranged in support meanss, and arc-shaped rail relative support train 6 is rotated.
Above-mentioned fixed cylinder assembly 8 is made up of cylinder and firm banking, by firm banking bolt by cylinder with propping up Fagging 4 links together.
Above-mentioned positioning train 10 constitutes that (the present embodiment is 4 by the mutually isostructural locating wheel of array and positioning wheel support Group), wherein, locating wheel is linked together by the supporting plate 4 on positioning wheel support.It is described above, only it is of the invention Preferred embodiment, not makees any form to the present invention
On limitation, it is any simple modification that every technical spirit according to the present invention is made to above example, equivalent Change and modification, in the range of still falling within technical solution of the present invention.

Claims (6)

1. a kind of complete pneumatic four pipette tips submarine pipeline sandblasting walking mechanism, it is characterised in that:Including:One hanging apparatus, it is arranged on The support meanss of hanging apparatus both sides, the arc guide rail device in support meanss, on arc guide rail device Supporting wheel systems, the number set straight line slide unit components for being symmetricly set on arc guide rail device both sides, it is separately mounted to straight line slide unit component On sand-blasting gun, the fixation cylinder assembly between arc guide rail device and submarine pipeline, installed in arc guide rail device On positioning train and for the gear train for the pneumatic actuation for driving fixed cylinder assembly, wherein, submarine pipeline is led with circular arc Rail device is arranged on the lower section of arc guide rail device with merging, and arc guide rail device is driven around sea by the gear train of pneumatic actuation Bottom pipeline is rotated, so as to drive straight line slide unit component and sand-blasting gun on arc guide rail device to be realized around submarine pipeline Circumferentially rotate.
2. complete pneumatic four pipette tips submarine pipeline sandblasting walking mechanism according to claim 1, it is characterised in that:The lifting Device includes:One mast-up, the hoisting ring being arranged on mast-up and several lifting plates.
3. complete pneumatic four pipette tips submarine pipeline sandblasting walking mechanism according to claim 1, it is characterised in that:The support Device is provided with:Two pieces of supporting plates on lifting plate are oppositely arranged on, and supporting plate is provided with a U-type groove.
4. complete pneumatic four pipette tips submarine pipeline sandblasting walking mechanism according to claim 1, it is characterised in that:The circular arc Track-type facilities are connected by supporting wheel systems with support meanss, and arc-shaped rail relative support train is rotated.
5. complete pneumatic four pipette tips submarine pipeline sandblasting walking mechanism according to claim 1, it is characterised in that:The fixation Cylinder assembly is made up of cylinder and firm banking, and cylinder is linked together with supporting plate by firm banking.
6. complete pneumatic four pipette tips submarine pipeline sandblasting walking mechanism according to claim 1, it is characterised in that:The positioning Train is made up of the mutually isostructural locating wheel of array and positioning wheel support, wherein, locating wheel passes through on positioning wheel support Supporting plate link together.
CN201611049078.8A 2016-11-25 2016-11-25 Complete pneumatic four pipette tips submarine pipeline sandblasting walking mechanism Pending CN107263337A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611049078.8A CN107263337A (en) 2016-11-25 2016-11-25 Complete pneumatic four pipette tips submarine pipeline sandblasting walking mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611049078.8A CN107263337A (en) 2016-11-25 2016-11-25 Complete pneumatic four pipette tips submarine pipeline sandblasting walking mechanism

Publications (1)

Publication Number Publication Date
CN107263337A true CN107263337A (en) 2017-10-20

Family

ID=60052061

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611049078.8A Pending CN107263337A (en) 2016-11-25 2016-11-25 Complete pneumatic four pipette tips submarine pipeline sandblasting walking mechanism

Country Status (1)

Country Link
CN (1) CN107263337A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4953496A (en) * 1989-07-17 1990-09-04 Crc-Evans Pipeline International, Inc. High pressure water jet cleaner and coating applicator
CN101010170A (en) * 2004-05-28 2007-08-01 离岸联合服务公司 Pipe weld cleaning machine
CN202174505U (en) * 2011-08-02 2012-03-28 中国海洋石油总公司 Automatic sand-blasting rust-removing oscillating device
CN202479976U (en) * 2012-02-29 2012-10-10 廊坊市管道人机械设备有限公司 Sand blasting machine for pipeline

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4953496A (en) * 1989-07-17 1990-09-04 Crc-Evans Pipeline International, Inc. High pressure water jet cleaner and coating applicator
CN101010170A (en) * 2004-05-28 2007-08-01 离岸联合服务公司 Pipe weld cleaning machine
CN202174505U (en) * 2011-08-02 2012-03-28 中国海洋石油总公司 Automatic sand-blasting rust-removing oscillating device
CN202479976U (en) * 2012-02-29 2012-10-10 廊坊市管道人机械设备有限公司 Sand blasting machine for pipeline

Similar Documents

Publication Publication Date Title
RU2527896C2 (en) Method to connect two sections of underwater pipeline for transportation of fluid medium and/or gas
CN105605314B (en) The S-shaped laying method of double-layer submarine pipeline
CN105479045A (en) External butt joint worktable of large-caliber pipes
CN201871901U (en) Three-dimensional centring device
RU2012130280A (en) METHOD (OPTIONS), REPAIR DEVICE AND SYSTEM FOR FIXING A WELDED CONNECTION AND A PIPING-LAYING VESSEL
CN102374338A (en) Process for laying deepwater S-shaped submarine pipeline
CN103899843B (en) A kind of submarine pipeline bearing device
CN106167077A (en) The ultra-large type offshore steel structure buoyancy aid that can independently navigate by water and manufacture method thereof
CN103926669B (en) A kind of method of laying safety monitoring optical cable with Ocean Oil And Gas Pipeline
CN107263337A (en) Complete pneumatic four pipette tips submarine pipeline sandblasting walking mechanism
CN206405924U (en) The running gear of submarine pipeline weld bond blasting treatment
CN104308355A (en) Method and equipment for underwater welding of sacrificial anode based on friction stud welding
CN104214439A (en) Insulating device for dissimilar metal submarine pipelines
CN206988566U (en) A kind of J-type marine pipelaying system step rate
CN102705579A (en) Mounting method for seabed water pipes, and pipe mounting device
EP2715198B1 (en) Pipe-laying system for laying pipes in water, vessel provided therewith and method therefor
CN106159846B (en) The mounting process of off-lying sea blower fan J-type extra large cable protection pipe and ICCP wire steel pipes
CN203936507U (en) Portable underwater welding wire-feed motor
CN105276286A (en) J-type laid suspension platform device
CN101892486B (en) Construction method of feed device for large-diameter pipeline for trenchless construction
CN1769753A (en) Method for laying offshore oilfield pipeline and dedicated apparatus therefor
CN102182869B (en) Limit control device for delivery pipeline terminal
CN207298065U (en) A kind of J-type marine pipelaying system loading arm
CN103522408A (en) Submarine anti-corrosion pipeline concrete counter weight production line
CN204025948U (en) A kind of different metal submarine pipeline seal

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: No. 25, Chaoyangmen North Street, Dongcheng, Beijing

Applicant after: China Offshore Oil Group Co., Ltd.

Applicant after: Offshore Oil Engineering Co., Ltd.

Applicant after: Tianjin University of Technology

Address before: 100010 Chaoyangmen North Street, Dongcheng District, Dongcheng District, Beijing

Applicant before: China National Offshore Oil Corporation

Applicant before: Offshore Oil Engineering Co., Ltd.

Applicant before: Tianjin University of Technology

CB02 Change of applicant information
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20171020

WD01 Invention patent application deemed withdrawn after publication