CN107258459A - A kind of grape planting process suitable for torrid areas - Google Patents

A kind of grape planting process suitable for torrid areas Download PDF

Info

Publication number
CN107258459A
CN107258459A CN201710559898.XA CN201710559898A CN107258459A CN 107258459 A CN107258459 A CN 107258459A CN 201710559898 A CN201710559898 A CN 201710559898A CN 107258459 A CN107258459 A CN 107258459A
Authority
CN
China
Prior art keywords
time
days
grape
torrid areas
planting process
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710559898.XA
Other languages
Chinese (zh)
Inventor
陈军强
覃有平
韦寿超
陈敏新
汪泽球
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hainan Fomdas Agricultural Science And Technology Development Co Ltd
Original Assignee
Hainan Fomdas Agricultural Science And Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hainan Fomdas Agricultural Science And Technology Development Co Ltd filed Critical Hainan Fomdas Agricultural Science And Technology Development Co Ltd
Priority to CN201710559898.XA priority Critical patent/CN107258459A/en
Publication of CN107258459A publication Critical patent/CN107258459A/en
Pending legal-status Critical Current

Links

Classifications

    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G17/00Cultivation of hops, vines, fruit trees, or like trees
    • A01G17/02Cultivation of hops or vines
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01CPLANTING; SOWING; FERTILISING
    • A01C21/00Methods of fertilising, sowing or planting
    • A01C21/005Following a specific plan, e.g. pattern

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Environmental Sciences (AREA)
  • Soil Sciences (AREA)
  • Botany (AREA)
  • Cultivation Of Plants (AREA)
  • Fertilizers (AREA)

Abstract

The invention discloses a kind of grape planting process suitable for torrid areas, different plantation mode of operations are carried out using different months, the standardization of torrid areas wine-growing is realized, breaches the technical bottleneck of torrid areas grape merchandized handling, the wine-growing of torrid areas is allowd to realize mass, it is higher that the hibernaculum of this method plantation grape contains flower rate, it is ensured that high yield, and technology is simple, cost is low, planting process is standardized, it is easy to large-scale promotion, cost-effective.

Description

A kind of grape planting process suitable for torrid areas
Technical field
The present invention relates to wine-growing technical field, more particularly to a kind of grape planting process suitable for torrid areas.
Background technology
Grape variety is a lot, and the whole world there are about 8000 kinds, and the growing environment of grape need to be planted in that summer is short of rain and sunlight fills The monsoon area of foot, torrid zone whole year high temperature and rainy is not suitable for grape growth, and plantation grape needs have low temperature during dormancy, had during growth Thermophilic.Therefore torrid areas is not suitable for plantation grape, at present in torrid areas without can plant grape in batches and can be true The implantation methods of high yield are protected, in consideration of it, applicant proposes a kind of Portugal suitable for torrid areas in discovery is constantly studied intensively Grape implantation methods.
The content of the invention
The invention provides a kind of grape planting process suitable for torrid areas, solving torrid areas can not plant in batches Plant the technical problem of grape.
The technological means that the present invention is used is as follows:A kind of grape planting process suitable for torrid areas, including following step Suddenly:
1) January, consolidation is carried out, the plantation row face after arrangement is unable to ridging, two layers of base fertilizer is applied to soil, lower floor applies With ton/mu of decomposed manure 1.5~2.5,5~15cm of earthing, ton/mu of decomposed manure 1~2, calcium superphosphate 35 are applied in upper strata ~45 kgs/acre, 15~25 kgs/acre of composite fertilizer;
2) 2 month, transplantation of seedlings is heeled in hole tray, using the hole tray of bore 30~40cm sizes, matrix uses yellow mud, turf Soil, perlite are mixed, and are planted after seedling is survived, be classified, the seeding row spacing of plantation be 200cm~250cm × 300cm~ 350cm, carries out scaffolding frame after plantation;
3) March, seedling nursing carries out water and fertilizer management by the following method:A, in trunk growth period, every 2~3 days drip irrigations Water 1 time, 1~2 hour every time, every 7~8 Tian Shi composite fertilizers 1 time, every time 3~4 kgs/acre;B, in main stem growth period, every 2~ 3 days dripping irrigation waters 1 time, 2~3 hours every time, every 5~6 Tian Shi composite fertilizers 1 time, used for every 13~15 days by 3~4 kgs/acre every time 1000~1200 times of potassium dihydrogen phosphates carry out spraying 1 time to blade face;C, in sublateral shoot growth period, every 1~2 day dripping irrigation water 1 time, often Secondary 3~4 hours, every 5~6 Tian Shi composite fertilizers 1 time, 5~6 kgs/acre every time, every 10~12 days using 1000~1200 times of phosphoric acid Potassium dihydrogen carries out foliar spray 1 time, applies trace element fertilizer 1 time within every 10~12 days, applies trace element fertilizer and carry out leaf again after 3~5 days Spray in face;
4) April, trunk carries out pinching processing, and the pinching time is when trunk top is at 9~12cm of frame;
5) May, sublateral shoot is cultivated, and pinching processing is carried out when 3 sublateral shoots are in 4 complete laminas before and after main stem;
6) June, initial stage, hibernaculum was cultivated, when the complete lamina of more than 80% sublateral shoot is to 16, by reducing liquid manure amount The sublateral shoot production impetus is controlled, water is reduced to every 5~6 days once, 1~2 hour every time;
7) July, later stage hibernaculum is cultivated, when more than 80% sublateral shoot has complete lamina 20, by reducing liquid manure control Sublateral shoot processed produces the impetus, and water is reduced to every 12~14 days once, 1~2 hour every time, using 700~800 times of potassium dihydrogen phosphates Carry out after foliar spray 1 time, 7~8 days, then foliar spray is carried out 1 time with 500~600 times of potassium dihydrogen phosphates;
8) August part, before mid-August, strictly controls liquid manure, it is ensured that leaf nutrition backflow trunk, main stem and hibernaculum;Late August, Sublateral shoot is trimmed, sprout flower;
9) September part, carries out normal flower and fruit protecting;
10) October, normal bagging, particle is carried out and expands management;
11) November, normal grape coloring, annesl management are carried out;
12) December, grape maturity, harvesting.
Preferably, in step 2) in, lower floor is apart from table 40~45cm of soil, and upper strata is apart from 20~25cm of table soil.
Preferably, in step 2) in, scaffolding frame uses "T"-shaped flat frame.
Preferably, in step 2) in, yellow mud, charcoal soil, the mixed weight ratio of perlite are 2:2:1.
Preferably, in step 2) in, often row length is not more than 3000cm.
Preferably, in step 7) in, it can be coordinated using 800~1000 times of cycocels and carry out foliar spray.
Preferably, in step 8) in, pruning method uses 3 bud pruning methods, and germination accelerating method uses 2 bud germination hastening methods.
Using a kind of grape planting process suitable for torrid areas provided by the present invention, torrid areas grape is breached The technical bottleneck of merchandized handling so that the wine-growing of torrid areas can realize mass, this method plants the winter of grape It is higher that bud contains flower rate, it is ensured that high yield, and technology is simple, and cost is low, planting process standardization, it is easy to large-scale promotion, section About cost.
Embodiment
The principles and features of the present invention are described below, and illustrated embodiment is served only for explaining the present invention, is not intended to Limit the scope of the present invention.
Embodiment 1:The plantation of huge rose grape
A kind of grape planting process suitable for torrid areas, specifically includes following steps:
1) January, consolidation is carried out, the plantation row face after arrangement is unable to ridging, and torrid areas high-temperature time is long, round the clock The temperature difference is small, and grape root system is easily limited, therefore, and Ridged plant is not conducive to root growth, two layers of base fertilizer is applied to soil, lower floor applies With ton/mu of decomposed manure 2, earthing 10cm, ton/mu of decomposed manure 2,40 kgs/acre of calcium superphosphate, composite fertilizer are applied in upper strata 20 kgs/acre.Wherein, lower floor is apart from table soil 40cm, and upper strata is apart from table soil 20cm.
2) 2 month, take huge rose grape heels in transplantation of seedlings to hole tray, and using the hole tray of bore 35cm sizes, matrix is adopted Mixed, planted after seedling is survived, is classified into the soil put in order, the strain of plantation with yellow mud, turfy soil, perlite Line-spacing is 250cm × 300cm, and scaffolding frame is carried out after plantation, and scaffolding frame uses "T"-shaped flat frame, is conducive to typhoon protection, favourable Satisfaction in growing space, reaches optimal leaf-fruit ratio (individual Foliar surface area of torrid areas is less than subtropical zone).Tropical ground Area 1, proper temperature new talent rudiment in 2 months, if without heel in using be directly entered field production occur growth it is irregular, after Phase unmanageable problem.Heel in transplantation of seedlings to adjust beneficial to slow seedling and growth potential, for ease of radiating and diseases prevention, generally, often Row length is not preferably greater than 3000cm.
3) March, seedling nursing carries out water and fertilizer management by the following method:A, in trunk growth period, every 2 days dripping irrigation waters 1 It is secondary, 1 hour every time, every 7 Tian Shi composite fertilizers 1 time, every time 3 kgs/acre;B, in main stem growth period, every 2 days dripping irrigation waters 1 time, often Secondary 2 hours, every 5 Tian Shi composite fertilizers 1 time, were sprayed for every 15 days using 1200 times of potassium dihydrogen phosphates to blade face by 3 kgs/acre every time Mist 1 time;C, in sublateral shoot growth period, every 1 day dripping irrigation water 1 time, 3 hours every time, every 5 Tian Shi composite fertilizers 1 time, 5 kilograms every time/ Mu, carries out foliar spray 1 time using 1200 times of potassium dihydrogen phosphates in every 10 days, applies trace element fertilizer 1 time within every 10 days, apply trace element Fertilizer carries out foliar spray again after 3 days.
4) April, trunk carries out pinching processing, and the pinching time is when trunk top is at frame 10cm.
5) May, sublateral shoot is cultivated, and pinching processing is carried out when 3 sublateral shoots are in 4 complete laminas before and after main stem.So that in Between sublateral shoot have good nutrient distribution, reach that all sublateral shoots are uniform, weaken apical dominance.
6) June, initial stage, hibernaculum was cultivated, when the complete lamina of more than 80% sublateral shoot is to 16, by reducing liquid manure amount The sublateral shoot production impetus is controlled, water is reduced to every 5 days once, 2 hours every time.
7) July, later stage hibernaculum is cultivated, when more than 80% sublateral shoot has complete lamina 20, by reducing liquid manure control Sublateral shoot processed produces the impetus, and water is reduced to every 12 days once, 1 hour every time, and foliar spray is carried out using 800 times of potassium dihydrogen phosphates After 1 time, 7 days, then with 600 times of potassium dihydrogen phosphates carry out foliar spray 1 time.
8) August part, before mid-August, strictly controls liquid manure, it is ensured that leaf nutrition backflow trunk, main stem and hibernaculum;Late August, Sublateral shoot is trimmed, sprout flower.
9) September part, carries out normal flower and fruit protecting.
10) October, normal bagging, particle is carried out and expands management.
11) November, normal grape coloring, annesl management are carried out.
12) December, grape maturity, harvesting.
Planted using above method, huge rose hibernaculum contains flower rate up to 97%.
Embodiment 2:The plantation of sunlight rose grape
A kind of grape planting process suitable for torrid areas, specifically includes following steps:
1) January, consolidation is carried out, the plantation row face after arrangement is unable to ridging, and torrid areas high-temperature time is long, round the clock The temperature difference is small, and grape root system is easily limited, therefore, and Ridged plant is not conducive to root growth, two layers of base fertilizer is applied to soil, lower floor applies With ton/mu of decomposed manure 1.5, earthing 8cm, upper strata is applied ton/mu of decomposed manure 1.5,35 kgs/acre of calcium superphosphate, answered 15 kgs/acre of Hefei.Wherein, lower floor is apart from table soil 45cm, and upper strata is apart from table soil 25cm.
2) 2 month, take sunlight rose grape heels in transplantation of seedlings to hole tray, using the hole tray of bore 40cm sizes, matrix Mixed using yellow mud, turfy soil, perlite, yellow mud, charcoal soil, the mixed weight ratio of perlite are 2:2:1, treat seedling into Planted after living, classification into the soil put in order, the seeding row spacing of plantation is 200cm × 300cm, is put up a shed after plantation Frame, scaffolding frame uses "T"-shaped flat frame, is conducive to typhoon protection, is conducive to the satisfaction of growing space, reaches optimal leaf-fruit ratio (individual Foliar surface area of torrid areas is less than subtropical zone).Torrid areas 1, proper temperature new talent rudiment in 2 months, if do not entered Row heel in using be directly entered field production occur growth unmanageable problem of irregular, later stage.Transplantation of seedlings is heeled in be beneficial to delay Seedling and growth potential regulation, for ease of radiating and diseases prevention, generally, often row length is not preferably greater than 3000cm.
3) March, seedling nursing carries out water and fertilizer management by the following method:A, in trunk growth period, every 3 days dripping irrigation waters 1 It is secondary, 2 hours every time, every 8 Tian Shi composite fertilizers 1 time, every time 4 kgs/acre;B, in main stem growth period, every 3 days dripping irrigation waters 1 time, often Secondary 3 hours, every 6 Tian Shi composite fertilizers 1 time, were sprayed for every 13 days using 1000 times of potassium dihydrogen phosphates to blade face by 4 kgs/acre every time Mist 1 time;C, in sublateral shoot growth period, every 2 days dripping irrigation waters 1 time, 4 hours every time, every 6 Tian Shi composite fertilizers 1 time, 6 kilograms every time/ Mu, carries out foliar spray 1 time using 1000 times of potassium dihydrogen phosphates in every 12 days, applies trace element fertilizer 1 time within every 12 days, apply trace element Fertilizer carries out foliar spray again after 5 days.
4) April, trunk carries out pinching processing, and the pinching time is when trunk top is at frame 11cm.
5) May, sublateral shoot is cultivated, and pinching processing is carried out when 3 sublateral shoots are in 4 complete laminas before and after main stem.So that in Between sublateral shoot have good nutrient distribution, reach that all sublateral shoots are uniform, weaken apical dominance.
6) June, initial stage, hibernaculum was cultivated, when the complete lamina of more than 80% sublateral shoot is to 16, by reducing liquid manure amount The sublateral shoot production impetus is controlled, water is reduced to every 6 days once, 2 hours every time.
7) July, later stage hibernaculum is cultivated, when more than 80% sublateral shoot has complete lamina 20, by reducing liquid manure control Sublateral shoot processed produces the impetus, and water is reduced to every 14 days once, 2 hours every time, and foliar spray is carried out using 700 times of potassium dihydrogen phosphates After 1 time, 8 days, then with 500 times of potassium dihydrogen phosphates carry out foliar spray 1 time, can be coordinated using 1000 times of cycocels and carry out blade faces Spraying.
8) August part, before mid-August, strictly controls liquid manure, it is ensured that leaf nutrition backflow trunk, main stem and hibernaculum;Late August, Sublateral shoot is trimmed, sprout flower, and pruning method uses 3 bud pruning methods, and germination accelerating method uses 2 bud germination hastening methods.
9) September part, carries out normal flower and fruit protecting.
10) October, normal bagging, particle is carried out and expands management.
11) November, normal grape coloring, annesl management are carried out.
12) December, grape maturity, harvesting.
Planted using above method, sunlight rose hibernaculum contains flower rate up to 92%.
Embodiment 3:The plantation of summer black grape
A kind of grape planting process suitable for torrid areas, specifically includes following steps:
1) January, consolidation is carried out, the plantation row face after arrangement is unable to ridging, and torrid areas high-temperature time is long, round the clock The temperature difference is small, and grape root system is easily limited, therefore, and Ridged plant is not conducive to root growth, two layers of base fertilizer is applied to soil, lower floor applies With ton/mu of decomposed manure 2.5, earthing 12cm, upper strata is applied ton/mu of decomposed manure 2, peroxophosphoric acid Ca45 kg/acre, is combined 25 kgs/acre of fertilizer.Wherein, lower floor is apart from table soil 42cm, and upper strata is apart from table soil 22cm.
2) 2 month, take summer black grape heels in transplantation of seedlings to hole tray, and using the hole tray of bore 30cm sizes, matrix is used Yellow mud, turfy soil, perlite are mixed, and yellow mud, charcoal soil, the mixed weight ratio of perlite are 2:2:1, treat that seedling is survived, divided Planted after level into the soil put in order, the seeding row spacing of plantation is 250cm × 350cm, scaffolding frame, scaffolding are carried out after plantation Frame uses "T"-shaped flat frame, is conducive to typhoon protection, is conducive to the satisfaction of growing space, reaches optimal leaf-fruit ratio (torrid areas Individual Foliar surface area is less than subtropical zone).Torrid areas 1, proper temperature new talent rudiment in 2 months, if adopted without heeling in Growth unmanageable problem of irregular, later stage occurs with field production is directly entered.Transplantation of seedlings is heeled in beneficial to slow seedling and growth Gesture is adjusted, and for ease of radiating and diseases prevention, generally, often row length is not preferably greater than 3000cm.
3) March, seedling nursing carries out water and fertilizer management by the following method:A, in trunk growth period, every 2 days dripping irrigation waters 1 It is secondary, 2 hours every time, every 7 Tian Shi composite fertilizers 1 time, every time 4 kgs/acre;B, in main stem growth period, every 3 days dripping irrigation waters 1 time, often Secondary 3 hours, every 5 Tian Shi composite fertilizers 1 time, were sprayed for every 14 days using 1000 times of potassium dihydrogen phosphates to blade face by 4 kgs/acre every time Mist 1 time;C, in sublateral shoot growth period, every 2 days dripping irrigation waters 1 time, 4 hours every time, every 6 Tian Shi composite fertilizers 1 time, 6 kilograms every time/ Mu, carries out foliar spray 1 time using 1000 times of potassium dihydrogen phosphates in every 11 days, applies trace element fertilizer 1 time within every 11 days, apply trace element Fertilizer carries out foliar spray again after 4 days.
4) April, trunk carries out pinching processing, and the pinching time is when trunk top is at frame 12cm.
5) May, sublateral shoot is cultivated, and pinching processing is carried out when 3 sublateral shoots are in 4 complete laminas before and after main stem.So that in Between sublateral shoot have good nutrient distribution, reach that all sublateral shoots are uniform, weaken apical dominance.
6) June, initial stage, hibernaculum was cultivated, when the complete lamina of more than 80% sublateral shoot is to 16, by reducing liquid manure amount The sublateral shoot production impetus is controlled, water is reduced to every 5 days once, 2 hours every time.
7) July, later stage hibernaculum is cultivated, when more than 80% sublateral shoot has complete lamina 20, by reducing liquid manure control Sublateral shoot processed produces the impetus, and water is reduced to every 13 days once, 2 hours every time, and foliar spray is carried out using 800 times of potassium dihydrogen phosphates After 1 time, 8 days, then with 600 times of potassium dihydrogen phosphates carry out foliar spray 1 time, can be coordinated using 900 times of cycocels and carry out blade faces Spraying.
8) August part, before mid-August, strictly controls liquid manure, it is ensured that leaf nutrition backflow trunk, main stem and hibernaculum;Late August, Sublateral shoot is trimmed, sprout flower, and pruning method uses 3 bud pruning methods, and germination accelerating method uses 2 bud germination hastening methods.
9) September part, carries out normal flower and fruit protecting.
10) October, normal bagging, particle is carried out and expands management.
11) November, normal grape coloring, annesl management are carried out.
12) December, grape maturity, harvesting.
Planted using above method, summer black hibernaculum contains flower rate up to 89.5%.
In summary, using a kind of grape planting process suitable for torrid areas provided by the present invention, breach heat Technical bottleneck with regional grape merchandized handling so that the wine-growing of torrid areas can realize mass, this method kind The hibernaculum rate containing flower for planting grape is higher, it is ensured that high yield, and technology is simple, and cost is low, planting process standardization, it is easy to big to advise Mould is promoted, cost-effective.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention God is with principle, and any modification, equivalent substitution and improvements done etc. should be included within the scope of protection of the invention.

Claims (7)

1. a kind of grape planting process suitable for torrid areas, it is characterised in that comprise the following steps:
1) January, consolidation is carried out, the plantation row face after arrangement is unable to ridging, two layers of base fertilizer is applied to soil, lower floor applies rotten Apply ton/mu of decomposed manure 1~2, calcium superphosphate 35~45 in ripe ton/mu of organic fertilizer 1.5~2.5,5~15cm of earthing, upper strata Kg/acre, 15~25 kgs/acre of composite fertilizer;
2) 2 month, heel in transplantation of seedlings to hole tray, using the hole tray of bore 30~40cm sizes, matrix using yellow mud, turfy soil, Perlite is mixed, and is planted after seedling is survived, is classified, the seeding row spacing of plantation for 200cm~250cm × 300cm~ 350cm, carries out scaffolding frame after plantation;
3) March, seedling nursing carries out water and fertilizer management by the following method:A, in trunk growth period, every 2~3 days dripping irrigation waters 1 It is secondary, 1~2 hour every time, every 7~8 Tian Shi composite fertilizers 1 time, every time 3~4 kgs/acre;B, in main stem growth period, every 2~3 days Dripping irrigation water 1 time, 2~3 hours every time, every 5~6 Tian Shi composite fertilizers 1 time, used 1000 in every 13~15 days by 3~4 kgs/acre every time ~1200 times of potassium dihydrogen phosphates carry out spraying 1 time to blade face;C, in sublateral shoot growth period, every 1~2 day dripping irrigation water 1 time, every time 3 ~4 hours, every 5~6 Tian Shi composite fertilizers 1 time, 5~6 kgs/acre every time, every 10~12 days using 1000~1200 times of di(2-ethylhexyl)phosphates Hydrogen potassium carries out foliar spray 1 time, applies trace element fertilizer 1 time within every 10~12 days, applies trace element fertilizer and carry out blade face again after 3~5 days Spraying;
4) April, trunk carries out pinching processing, and the pinching time is when trunk top is at 9~12cm of frame;
5) May, sublateral shoot is cultivated, and pinching processing is carried out when 3 sublateral shoots are in 4 complete laminas before and after main stem;
6) June, initial stage, hibernaculum was cultivated, when the complete lamina of more than 80% sublateral shoot is to 16, was controlled by reducing liquid manure amount Sublateral shoot produces the impetus, and water is reduced to every 5~6 days once, 1~2 hour every time;
7) July, later stage hibernaculum is cultivated, secondary by reducing liquid manure control when more than 80% sublateral shoot has complete lamina 20 The tip produces the impetus, and water is reduced to every 12~14 days once, 1~2 hour every time, is carried out using 700~800 times of potassium dihydrogen phosphates After foliar spray 1 time, 7~8 days, then with 500~600 times of potassium dihydrogen phosphates carry out foliar spray 1 time;
8) August part, before mid-August, strictly controls liquid manure, it is ensured that leaf nutrition backflow trunk, main stem and hibernaculum;Late August, sublateral shoot Trim, sprout flower;
9) September part, carries out normal flower and fruit protecting;
10) October, normal bagging, particle is carried out and expands management;
11) November, normal grape coloring, annesl management are carried out;
12) December, grape maturity, harvesting.
2. the grape planting process according to claim 1 suitable for torrid areas, it is characterised in that in step 2) in, Lower floor is apart from table 40~45cm of soil, and upper strata is apart from 20~25cm of table soil.
3. the grape planting process according to claim 1 suitable for torrid areas, it is characterised in that in step 2) in, Frame of puing up a shed uses "T"-shaped flat frame.
4. the grape planting process according to claim 1 suitable for torrid areas, it is characterised in that in step 2) in, Yellow mud, charcoal soil, the mixed weight ratio of perlite are 2:2:1.
5. the grape planting process according to claim 1 suitable for torrid areas, it is characterised in that in step 2) in, Often row length is not more than 3000cm.
6. the grape planting process according to claim 1 suitable for torrid areas, it is characterised in that in step 7) in, It can be coordinated using 800~1000 times of cycocels and carry out foliar spray.
7. the grape planting process according to claim 1 suitable for torrid areas, it is characterised in that in step 8) in, Pruning method uses 3 bud pruning methods, and germination accelerating method uses 2 bud germination hastening methods.
CN201710559898.XA 2017-07-11 2017-07-11 A kind of grape planting process suitable for torrid areas Pending CN107258459A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710559898.XA CN107258459A (en) 2017-07-11 2017-07-11 A kind of grape planting process suitable for torrid areas

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710559898.XA CN107258459A (en) 2017-07-11 2017-07-11 A kind of grape planting process suitable for torrid areas

Publications (1)

Publication Number Publication Date
CN107258459A true CN107258459A (en) 2017-10-20

Family

ID=60072424

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710559898.XA Pending CN107258459A (en) 2017-07-11 2017-07-11 A kind of grape planting process suitable for torrid areas

Country Status (1)

Country Link
CN (1) CN107258459A (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103155834A (en) * 2011-12-09 2013-06-19 孙展男 Grape planting method achieving fruiting in current year
CN105052668A (en) * 2015-08-10 2015-11-18 广西最鲜农业科技有限公司 Planting method for organic double-season grapes

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103155834A (en) * 2011-12-09 2013-06-19 孙展男 Grape planting method achieving fruiting in current year
CN105052668A (en) * 2015-08-10 2015-11-18 广西最鲜农业科技有限公司 Planting method for organic double-season grapes

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
庄伯强: "热带巨峰葡萄栽培技术", 《热带巨峰葡萄栽培技术 *
异天等: "《世界学术文库 华人卷1》", 30 September 1999 *

Similar Documents

Publication Publication Date Title
CN107360937A (en) A kind of implantation methods of grape
CN103493709A (en) High-yield planting method for Cuiguan pear
CN106034930A (en) Apple planting method
CN103340129B (en) Grape cultivating method enabling grapes to be mature for six times
CN113906944B (en) Bougainvillea spectabilis florescence regulation and control method
CN102523859A (en) High-yield planting method for soybean
CN104115663A (en) Greenhouse cultivation method for passion fruits
CN104054501A (en) Phoebe bournei cutting propagation method
CN107135801A (en) It is a kind of to prevent the implantation methods of Spring Peanut continuous cropping obstacle
CN105612984A (en) Water-saving and high-yield cultivation method of winter wheat
CN1817092A (en) Forced double cropping cultivation technique for fresh Jingwei jujube
CN104322251A (en) Phellodendron planting method
CN105145063A (en) Slender wheatgrass high-yield cultivation method
CN106508586B (en) A kind of cultivation technique of young age large cherry interplanting Opius dimidiatus Ashmead
CN108174647A (en) A kind of high-yield planting method of winter Crops '
CN104604464A (en) Planting method for wolfberry
CN114208618A (en) Method for improving peony propagation efficiency by promoting cultivation in two seasons in one year
CN105532220A (en) Method for planting black peanuts
CN108849216A (en) A kind of implantation methods of grape
CN108064526A (en) A kind of implantation methods of green fruit high yield
CN104488646A (en) Black honey grape cultivation technology
CN106982614A (en) A kind of implantation methods for preventing and treating broccoli downy mildew
CN109566032B (en) Water and fertilizer regulation and control method for kiwi fruit planting
CN106069125A (en) A kind of method of Fructus Ananadis comosi interplanting
CN104488505B (en) A kind of implantation methods of corn

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20171020

RJ01 Rejection of invention patent application after publication