CN107244312B - Electrical changing station and orderly change controller for electric consumption, method - Google Patents

Electrical changing station and orderly change controller for electric consumption, method Download PDF

Info

Publication number
CN107244312B
CN107244312B CN201710368050.9A CN201710368050A CN107244312B CN 107244312 B CN107244312 B CN 107244312B CN 201710368050 A CN201710368050 A CN 201710368050A CN 107244312 B CN107244312 B CN 107244312B
Authority
CN
China
Prior art keywords
electricity
electric
period
station
request
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710368050.9A
Other languages
Chinese (zh)
Other versions
CN107244312A (en
Inventor
陈炯
张建兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NIO Co Ltd
Original Assignee
NIO Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NIO Co Ltd filed Critical NIO Co Ltd
Priority to CN201710368050.9A priority Critical patent/CN107244312B/en
Publication of CN107244312A publication Critical patent/CN107244312A/en
Application granted granted Critical
Publication of CN107244312B publication Critical patent/CN107244312B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60SSERVICING, CLEANING, REPAIRING, SUPPORTING, LIFTING, OR MANOEUVRING OF VEHICLES, NOT OTHERWISE PROVIDED FOR
    • B60S5/00Servicing, maintaining, repairing, or refitting of vehicles
    • B60S5/06Supplying batteries to, or removing batteries from, vehicles

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)

Abstract

Controller for electric consumption, method the present invention relates to electrical changing station and are orderly changed, the method includes obtain electric car in special time period to change electric request;According to respectively carried in default each default subdivision period electrical changing station can battery electricity calculation method, be based on preset constraint condition and preset optimization aim, generated using heuritic approach and optimal change electricity request allocation plan.Compared with prior art, electrical changing station provided by the invention and controller for electric consumption, method are orderly changed, can control electric car and carry out dynamic battery changing in an orderly manner, reduces grid loss and load impact.

Description

Electrical changing station and orderly change controller for electric consumption, method
Technical field
The present invention relates to electric cars to change electro-technical field, and in particular to electrical changing station and orderly changes controller for electric consumption, method.
Background technique
Electrical changing station is to provide charging and the quick-replaceable energy source station of power battery for the power battery of electric car, can be with The quick complementary energy for realizing electric car, can also can be used as energy storage node for the power battery replaced.But electronic vapour Vehicle changes electricity demanding there are the uncertainty of time and space, when a large amount of electric cars enter electrical changing station carry out it is unordered change electricity when, The charging load value for changing battery on a large scale is very high, it will causes greater impact to power grid, increases the difficulty of operation of power networks control. Meanwhile it also will affect the normal operation of electrical changing station.
Summary of the invention
In order to solve the above problem in the prior art, in order to solve, electric car is unordered to be changed electric mode and influences electrical changing station The technical issues of operating normally with power grid, the present invention provides one kind orderly to change electric control method and device, additionally provides simultaneously A kind of electrical changing station orderly changing controller for electric consumption including this.
In a first aspect, the orderly technical solution for changing electric control method of one kind is in the present invention:
The described method includes:
Electric car changes electric request in acquisition special time period;
According to the electricity calculation method for respectively carrying energy battery in default each default subdivision period electrical changing station, based on preset Constraint condition and preset optimization aim generate the optimal electricity that changes using heuritic approach and request allocation plan;
Wherein:
The electricity that changes requests the electricity lower limit for changing electric time and expectation replacement load energy battery the latest including setting;
Each default subdivision period is each time divided according to setting period duration to the special time period Section;
The electricity calculation method that energy battery is respectively carried in the electrical changing station is according to all loads in previous subdivision period electrical changing station The rate of charge of energy battery status and each charging station calculates the current side for segmenting all load energy battery status of period electrical changing station Method;
It is described change electricity request allocation plan include distributed change electricity request distribution change the electric moment, distribute carry energy battery The rate of charge of charging station and the station that respectively charges in each default subdivision period.
Further, an optimal technical scheme provided by the invention are as follows:
The heuritic approach includes Monte Carlo treeˉsearch method or particle swarm algorithm or genetic algorithm or simulated annealing Algorithm.
Further, an optimal technical scheme provided by the invention are as follows:
The electricity calculation method of energy battery is respectively carried in the electrical changing station are as follows:
When electrical changing station is when the t moment of special time period is there is no changing electricity, each electricity calculation formula for carrying energy battery is such as Shown in following formula:
Wherein, SOCb(t) state-of-charge of energy battery is uploaded for b-th of t moment charging station;SOCb(t-1) be t-1 when Carve the state-of-charge that b-th of charging station uploads energy battery;RcbIt (t-1) is the rate of charge of b-th of t-1 moment charging station, 1≤b≤No_bat, t >=1;Δ t is the transformation period interval of rate of charge;
When electrical changing station is when the t moment of special time period changes electricity, it is each carry can battery electricity calculation formula such as following formula It is shown:
Wherein, swapreq(n).SOCemptyIt is changed after electricity request is satisfied from electric car for n-th in special time period That displaces carries the state-of-charge of energy battery, n >=1;J is that b-th of diagonal entry is 0, the unit that remaining diagonal entry is 1 Diagonal matrix;J ' is that b diagonal line element is 1, the unit diagonal matrix that remaining diagonal entry is 0.
Further, an optimal technical scheme provided by the invention are as follows:
The default optimization aim is single optimization aim GsOr Combinatorial Optimization target Gc;Wherein, the Combinatorial Optimization target Including multiple single optimization aims, the Combinatorial Optimization target GcIt is shown below:
Gc=w1G1s+...wiGis...+wmGms
Wherein, the GisFor Combinatorial Optimization target GcI-th of single optimization aim, the wiFor the single optimization mesh Mark GisWeight.
Further, an optimal technical scheme provided by the invention are as follows:
The single optimization aim be change include in electricity request change the electric time the latest and this changes electricity request and corresponding changes electricity The time difference that the electric moment is changed in request distribution is maximum;Alternatively,
The single optimization aim carries the state-of-charge nargin maximum of energy battery by institute's distribution in electricity request allocation plan is changed; Alternatively,
The single optimization aim is the load song of power grid after the load energy battery charging that electrical changing station displaces electric car Line variance is minimum.
Further, an optimal technical scheme provided by the invention are as follows:
The preset constraint condition includes changing electric time, the electricity lower limit of expectation replacement load energy battery and charging times the latest Rate constraint condition.
Further, an optimal technical scheme provided by the invention are as follows:
The rate of charge constraint condition is shown below:
Wherein, the Rcb(t) be special time period t moment when the corresponding battery rate of charge of b-th of charging station, 1 ≤ b≤No_bat, No_bat are the sum of charging station, t >=1;
The BCFor the capacity for carrying energy battery;The Rpower is default rated power;The RcthFor default battery charging Multiplying power threshold value.
Second aspect, a kind of technical solution that orderly changing controller for electric consumption is in the present invention:
Described device includes:
It changes electric request module, is configured to obtain electric car in special time period and changes electric request;
Electricity request allocation plan generation module is changed, is configured to respectively carry according in default each default subdivision period electrical changing station The electricity calculation method of energy battery, is based on preset constraint condition and preset optimization aim, is generated most using heuritic approach Excellent changes electricity request allocation plan;
Wherein:
The electricity that changes requests the electricity lower limit for changing electric time and expectation replacement load energy battery the latest including setting;
Each default subdivision period is each time divided according to setting period duration to the special time period Section;
The electricity calculation method that energy battery is respectively carried in the electrical changing station is according to all loads in previous subdivision period electrical changing station The rate of charge of energy battery status and each charging station calculates the current side for segmenting all load energy battery status of period electrical changing station Method;
It is described change electricity request allocation plan include distributed change electricity request distribution change the electric moment, distribute carry energy battery The rate of charge of charging station and the station that respectively charges in each default subdivision period.
The third aspect, a kind of technical solution that orderly changing controller for electric consumption is in the present invention:
Described device includes:
Processor, for executing each instruction;
Equipment is stored, for storing a plurality of instruction;Described instruction is suitable for being loaded by processor and executing above-mentioned technical side Each step in electric control method is orderly changed described in case.
Fourth aspect, a kind of technical solution of electrical changing station is in the present invention:
The electrical changing station includes dynamic battery changing system, and the dynamic battery changing system includes above-mentioned technical proposal institute That states orderly changes controller for electric consumption.
Compared with prior art, above-mentioned technical proposal at least has the advantages that
1, one kind provided by the invention orderly changes electric control method, according in default each default subdivision period electrical changing station Each electricity calculation method for carrying energy battery, is based on preset constraint condition and preset optimization aim, raw using heuritic approach Electricity request allocation plan is changed at optimal, the unordered charging behavior such as electricity can be changed simultaneously to avoid extensive electric car occurs.
2, one kind provided by the invention orderly changes controller for electric consumption, and changing electricity request allocation plan generation module can foundation Respectively carried in default each default subdivision period electrical changing station can battery electricity calculation method, based on preset constraint condition and pre- If optimization aim, using heuritic approach generate it is optimal change electricity request allocation plan, electric car is carried out to realize Orderly change electricity.
3, it is provided by the invention it is another orderly change controller for electric consumption, processor, which can execute, above-mentioned orderly changes electric control Each step of method is conducive to the implementation and application of orderly changing electric control method.
4, a kind of electrical changing station provided by the invention, the electrical changing station include that electric control dress is orderly changed described in above-mentioned technical proposal It sets, the electric car for entering the electrical changing station can be carried out orderly changing electricity.
Detailed description of the invention
Fig. 1 is the implementation flow chart that electric control method is orderly changed in the embodiment of the present invention;
Fig. 2 is the structural schematic diagram that controller for electric consumption is orderly changed in the embodiment of the present invention;
Wherein, 11: changing electric request module;12: changing electricity request allocation plan generation module.
Specific embodiment
The preferred embodiment of the present invention described with reference to the accompanying drawings.It will be apparent to a skilled person that this A little embodiments are used only for explaining technical principle of the invention, it is not intended that limit the scope of the invention.
Electrical changing station is unordered to the progress of extensive electric car to change electricity, not only will affect rated power in electrical changing station planning process With the design margin of occupied area etc. and the operation management ability of electrical changing station, bigger load can be also caused to power grid Impact.Therefore, electric car is carried out orderly changing electricity and has become electric car and changes electro-technical field technical problem urgently to be resolved, In view of the state-of-charge of battery after the electricity demanding of changing of electric car, such as battery altering time and replacement, there are certain spirits Activity, can orderly changing electricity and provide schedulable space for electric car.Based on this, the present invention provides one kind orderly change it is automatically controlled Method processed can maintain electrical changing station stable operation simultaneously to reduce network load punching under the premise of meeting electric car and changing electricity demanding It hits.Meanwhile for the ease of distinguishing description, the vehicle-mounted power battery of electric car is stated with " power battery " herein, from electricity The power battery that progress charge independence is changed on electrical automobile is stated with " carrying energy battery ".
With reference to the accompanying drawing, orderly electric control method is changed to one kind in the embodiment of the present invention to be illustrated, specifically:
Fig. 1 illustrates the implementing procedure that electric control method is orderly changed in the present embodiment, as shown, the present embodiment In can as steps described below to electric car progress orderly change electricity:
Step S101: electric car changes electric request in acquisition special time period.
Special time period can be the period of any time length in the present embodiment, such as during special time period can be The national standard time 06~18 when or when 00~24.The electricity that changes of electric car requests to refer to the special time period in predeterminable area What interior electric car was initiated changes electric request, may include the electric time of changing the latest set the electricity for carrying energy battery being replaced with expectation Lower limit.Wherein, predeterminable area can be the available maximum service region of electrical changing station, i.e., electronic in the maximum service region Automobile can initiate battery altering request to the corresponding electrical changing station in the maximum service region, and carry out power electric in the electrical changing station Pond replacement.
Step S102: according to it is default it is each it is default subdivision period electrical changing station in respectively carry can battery electricity calculation method, Based on preset constraint condition and preset optimization aim, the optimal electricity that changes is generated using heuritic approach and requests allocation plan.
In the present embodiment it is each it is default subdivision the period be according to setting period duration to special time period divided it is each when Between section, for example, setting period duration can be 1min, then special time period be the Chinese Industrial Standards (CIS) time 00~24 when the case where Under, the subdivision period of the special time period a length of 1min when including 1440.
The electricity calculation method that energy battery is respectively carried in the present embodiment is according to all load energy in previous subdivision period electrical changing station The method that the rate of charge of battery status and each charging station calculates current subdivision all load energy battery status of period electrical changing station. Wherein, charging station refers to the region of Xiang Zaineng battery charging, being provided with electrically-charging equipment in the region, can Xiang Zaineng battery Charging.It meanwhile may include one or more charging stations in electrical changing station.
Specifically, when electrical changing station is when the t moment of special time period is there is no changing electricity, each electricity for carrying energy battery is calculated Shown in formula such as following formula (1):
Each meaning of parameters in formula (1) are as follows:
SOCb(t) state-of-charge of energy battery is uploaded for t-th of subdivision, b-th of period charging station;SOCbIt (t-1) is the B-th of period charging station of t-1 subdivision uploads the state-of-charge of energy battery;Rcb(t-1) for the t-1 b-th of the subdivision period The rate of charge of charging station, 1≤b≤No_bat, t >=1;Δ t is the transformation period interval of rate of charge.
When electrical changing station is when changing electricity t-th of subdivision period of special time period, each electricity for carrying energy battery calculates public Shown in formula such as following formula (2):
Each meaning of parameters in formula (2) are as follows:
swapreq(n).SOCemptyIt changes after electricity request is satisfied for n-th in special time period and is displaced from electric car Carry can battery state-of-charge, n >=1;J is that b-th of diagonal entry is 0, and the unit that remaining diagonal entry is 1 is to angular moment Battle array;J ' is that b diagonal line element is 1, the unit diagonal matrix that remaining diagonal entry is 0.At this point, t-th of subdivision period The practical replacing construction t of the power battery of as electric carswap
Using state-space equation shown in formula (1) and (2) in the present embodiment, can describe in the specific of predeterminable area The electric car occurred in period changes electric behavior, it can the battery altering row that description electrical changing station occurs in special time period For dynamic process.
Further, in this embodiment preset constraint condition may include changing electric time, expectation replacement load energy electricity the latest The electricity lower limit and rate of charge constraint condition in pond.
Wherein:
Change the latest the electric time refer to electric car carry out battery altering latest time, can be such as following formula (3) institute Show:
tswap< treq_deadline (3)
Each meaning of parameters in formula (3) are as follows:
tswapFor the practical replacing construction of power battery of electric car, treq_deadlineIt is included the latest to change electricity request Change the electric time.
It is expected that the electricity that the electricity lower limit for replacing load energy battery refers to replacing the load energy battery on electric car is minimum Value, can be as shown in following formula (4):
SOCfull> SOCreq (4)
Each meaning of parameters in formula (4) are as follows:
SOCfullTo replace to the state-of-charge actual value for carrying energy battery on electric car, SOCreqTo change electricity request institute The electricity lower limit for carrying energy battery is replaced in the expectation of load energy battery in the replacement to electric car for including.
Rate of charge constraint condition refers to carrying the sum of the rate of charge of energy battery, and the battery capacity of Ji Zaineng battery multiplies Product is not more than the rated power of electrical changing station.Meanwhile the rate of charge for carrying energy battery is less than preset charged multiplying power threshold value, and charges again The value of rate is limited discrete numerical value.It specifically, can be as shown in following formula (5):
Each meaning of parameters in formula (5) are as follows:
Rcb(t) be special time period t moment when the corresponding battery rate of charge of b-th of charging station, 1≤b≤No_ Bat, No_bat are the sum of charging station, t >=1;BCFor the capacity for carrying energy battery;Rpower is default rated power;RcthFor Default battery rate of charge threshold value.
Further, in this embodiment preset optimization aim can be single optimization aim Gs, or combination is excellent Change target Gc.Wherein, Combinatorial Optimization target may include multiple single optimization aims, as shown in following formula (6):
Gc=w1G1s+,...,wiGis,...,+wmGms (6)
Each meaning of parameters in formula (6) are as follows:
GisFor Combinatorial Optimization target GcI-th of single optimization aim, wiFor single optimization aim GisWeight.Wherein, The weight of the single optimization aim of any two can be the same or different.
Single optimization aim can be the first optimization aim, the second optimization aim or third optimization aim in the present embodiment. Correspondingly, Combinatorial Optimization target can be the combination of the first optimization aim and the second optimization aim, or the first optimization mesh The combination of mark and third optimization aim, or the combination of the second optimization aim and third optimization aim.
Wherein:
First optimization aim be change include in electricity request change the electric time the latest and this changes electricity request and corresponding changes electric request The time difference that the electric moment is changed in distribution is maximum, i.e. the average latency of user is most short.Specifically, the first optimization in the present embodiment Target can for it is multiple change electricity request in include respectively change the electric time the latest, and respectively change electricity request it is corresponding change electricity request distribution change The sum of the difference of time at electric moment maximum, can be as shown in following formula (7):
Each meaning of parameters in formula (7) are as follows:
tswap_mAnd treq_deadline_mChange that electricity request is corresponding to change electricity request distribution and change electric moment and packet for respectively m-th What is contained changes the electric time the latest, and Sum is the sum for changing electricity request.
Second optimization aim carries the state-of-charge nargin maximum of energy battery by institute's distribution in electricity request allocation plan is changed.Specifically Ground, the second optimization aim can be to change changing in electricity request allocation plan for electricity request and being distributed load energy for multiple in the present embodiment The sum of the state-of-charge nargin of battery maximum, can be as shown in following formula (8):
Each meaning of parameters in formula (8) are as follows:
Msoc_cFor the state-of-charge nargin for carrying energy battery of c-th of replacement to electric car, 1≤c≤R, R are replacement to electricity The sum for carrying energy battery of electrical automobile.
Third optimization aim is the load curve side of power grid after the load energy battery charging that electrical changing station displaces electric car It is poor minimum.Specifically, third optimization aim can be to request corresponding electric cars to be replaced for multiple electricity that change in the present embodiment Under the charging of load energy battery after, the load curve variance of power grid is minimum.
It includes that the electricity request distribution of changing distributed changes the electric moment, distributes load energy that electric request allocation plan is changed in the present embodiment The rate of charge of the charging station of battery and the station that respectively charges in each default subdivision period.Wherein, electricity request distribution is changed when changing electricity It carves after changing electricity request for response, the practical replacement moment of dynamic battery changing is carried out to electric car.It distributes and carries energy battery Charging station refers to the charging station to charge to the battery that electric car is replaced.
Electric request is changed for N number of in special time period in the present embodiment, obtains optimal electricity request allocation plan of changing Problem complexity is MNo_bat× K × N, wherein K is the sum of subdivision period in special time period, and No_bat is charging station Sum.For example, totally 24 hours when setting special time period as the Chinese Industrial Standards (CIS) time 00~24, each time span for segmenting the period It is 1 minute, then segments total K=60 × 24=1440 of period in the special time period.Meanwhile setting the number of charging station No_bat=5 is measured, the dispersion of each load energy battery rate of charge is 3, then the corresponding load energy battery charging times of 5 charging stations Rate includes 35=243 combining forms.In conclusion available when changing the number N=100 of electricity request obtain optimal change It is 243 × 1440 × 100=34992000 that electricity, which requests the problem of allocation plan complexity,.In the huge situation of above-mentioned complexity Under, it will it substantially reduces and obtains the optimal efficiency and accuracy changing electricity and request allocation plan, therefore use and open in the present embodiment Hairdo algorithm obtains the optimal electricity that changes and requests allocation plan, specifically, can be calculated using Monte Carlo treeˉsearch method or population Method or genetic algorithm or simulated annealing.
Below by taking the treeˉsearch method of Monte Carlo as an example, the implementation process that electric control method is orderly changed in the present embodiment is carried out Explanation.Specifically:
Step S201: parameter initialization is carried out to Monte Carlo treeˉsearch method, is specifically included: 0 moment in special time period Do not have electric car changes electric request, and all output powers for charging the corresponding electrically-charging equipment of station are 0 in electrical changing station.
Step S202: get first change electricity request after, start Monte Carlo treeˉsearch method.Simultaneously as this changes electricity Request changes electric request for first, and optimal changes in electricity request allocation plan: distributed change electricity request distribution change the electric moment can Think that this changes the acquisition moment of electricity request, i.e., battery altering is carried out to electric car at once;Distribute the battery charger for carrying energy battery The rate of charge of position can be set according to the acceptable charge power of energy battery is carried.
Step S203: get first change electricity request after first moment, judge whether to receive and new change electricity Request, executes Monte Carlo treeˉsearch method if receiving, and determines that the optimal electricity that changes requests allocation plan, specifically:
1, step is selected.
Since current time electrical changing station contains energy battery status, recurrence selection requests the premise whether to arrive for electricity is changed The optimisation strategy of lower optimization aim, until reaching the last one moment of special time period.Wherein, optimal policy is to change electric request Allocation plan.
Wherein:
The arrival that electricity request is changed in setting special time period meets particular probability distribution.One provided in this embodiment In preferred embodiment in the case that the time span that special time period is included is less than certain value, i.e., in the special time period It is interior at most only one change electricity request occur, assume that at this time each moment in special time period change electricity request it is general Rate all meets (0,1) bi-distribution that probability parameter is p, that is, the probability for changing electricity request is p, does not change the general of electricity request Rate is 1-p.
Different moments electrical changing station is contained energy battery status and can be determined using the electricity calculation method of aforementioned load energy battery.
2, spread step.
If the optimisation strategy selected in selection step, does not make the objective function of optimization aim reach global optimum, or Person's optimisation strategy can make it is certain change electricity request when being unable to satisfy, create one or more child nodes, i.e., one or more chargings Power regulating method, and select a child node C.
3, simulation steps.
Output that one is simulated is brought into operation as a result, if the output result meets preset constraint condition from child node C Using the functional value of the corresponding optimization aim of output result as the evaluation of estimate of the output result, if the output result be unsatisfactory for it is pre- If constraint condition then set 0 for the evaluation of estimate of the output result.
4, backpropagation step.
The evaluation of estimate of the output result obtained with simulation steps update Meng Tekaoluo search tree child nodes C father node and The local optimum functional value of its all ancestor node.
Step 1-4 is repeated, obtains the final optimisation strategy of current time optimization aim, and maintain a node band The search tree of majorized function value.
Step S204: continue to determine remaining each time optimization target in special time period using method shown in step S203 Final optimisation strategy, it can obtain the optimal electricity that changes and request allocation plan.
Although each step is described in the way of above-mentioned precedence in above-described embodiment, this field Technical staff is appreciated that the effect in order to realize the present embodiment, executes between different steps not necessarily in such order, It (parallel) execution simultaneously or can be executed with reverse order, these simple variations all protection scope of the present invention it It is interior.
Based on technical concept identical with embodiment of the method, electric control dress is orderly changed the embodiment of the invention also provides a kind of It sets.Orderly controller for electric consumption is changed to this with reference to the accompanying drawing to be specifically described.
Fig. 2 illustrates the structure that controller for electric consumption is orderly changed in the present embodiment, as shown, having in the present embodiment It may include changing electric request module 11 and changing electricity to request allocation plan generation module 12 that sequence, which changes controller for electric consumption,.Wherein, it changes Electric request module 11 is configurable to obtain electric car in special time period and changes electric request.Change electricity request allocation plan Generation module 12 is configurable to according to the electricity calculating side for respectively carrying energy battery in default each default subdivision period electrical changing station Method is based on preset constraint condition and preset optimization aim, generates the optimal electricity that changes using heuritic approach and requests distribution side Case.
It may include the electric time of changing the latest set the electricity for carrying energy battery being replaced with expectation that electricity request is changed in the present embodiment Lower limit.Each default subdivision period is each period divided according to setting period duration to special time period.In electrical changing station Each electricity calculation method for carrying energy battery is according to all load energy battery status in previous subdivision period electrical changing station and each charging The method that the rate of charge of station calculates current subdivision all load energy battery status of period electrical changing station.Change electricity request allocation plan packet The electricity request distribution of changing distributed is included to change the electric moment, distribute the charging station for carrying energy battery and respectively fill in each default subdivision period The rate of charge of electrician position.
It will be understood by those skilled in the art that above-mentioned, orderly to change controller for electric consumption further include some other known features, example Such as processor, controller, memory, wherein memory include but is not limited to random access memory, flash memory, read-only memory, can Program read-only memory, volatile memory, nonvolatile memory, serial storage, parallel storage or register etc., place Reason device includes but is not limited to CPLD/FPGA, DSP, arm processor, MIPS processor etc., in order to unnecessarily obscure the disclosure Embodiment, these well known structures are not shown in FIG. 2.
It should be understood that the quantity of the modules in Fig. 2 is only schematical.According to actual needs, each module can be with With arbitrary quantity.
Based on technical concept identical with embodiment of the method, electric control dress is orderly changed the embodiment of the invention also provides a kind of It sets, the apparatus may include processors and storage equipment.Wherein, processor can be used for executing each instruction.Storing equipment can be with For storing a plurality of instruction, the instruction can be adapted for being loaded by processor and being executed in above method embodiment orderly change it is automatically controlled Each step of method processed.
It above-mentioned storage equipment and orderly changes controller for electric consumption embodiment and can be used for executing and above-mentioned orderly change electric control method Embodiment, technical principle, it is solved the technical issues of and generation technical effect it is similar, person of ordinary skill in the field It can be understood that, for convenience and simplicity of description, the specific work process for orderly changing electric control process of foregoing description And related explanation, it can be with reference to the aforementioned corresponding process orderly changed in electric control method embodiment, details are not described herein.
It will be understood by those skilled in the art that can be adaptively changed to the module in the equipment in embodiment And they are arranged in one or more devices different from this embodiment.Can in embodiment module or unit or Component is combined into a module or unit or component, and furthermore they can be divided into multiple submodule or subelement or subgroups Part.Other than such feature and/or at least some of process or unit exclude each other, any combination can be used To all features disclosed in this specification (including adjoint claim, abstract and attached drawing) and so disclosed any side All process or units of method or equipment are combined.Unless expressly stated otherwise, this specification (is wanted including adjoint right Ask, make a summary and attached drawing) disclosed in each feature can be replaced with an alternative feature that provides the same, equivalent, or similar purpose.
Controller for electric consumption orderly is changed based on above-mentioned, the embodiment of the invention also provides a kind of electrical changing stations.Specifically, this implementation Electrical changing station includes dynamic battery changing system in example, which may include described in above-mentioned apparatus embodiment Orderly change controller for electric consumption.Orderly changing controller for electric consumption by this in the present embodiment may be implemented electrical changing station to electric car progress Electricity is orderly changed, grid loss and load impact are reduced.
In addition, it will be appreciated by those of skill in the art that although some embodiments described herein include other embodiments In included certain features rather than other feature, but the combination of the feature of different embodiments mean it is of the invention Within the scope of and form different embodiments.For example, in claims of the present invention, embodiment claimed It is one of any can in any combination mode come using.
Various component embodiments of the invention can be implemented in hardware, or to run on one or more processors Software module realize, or be implemented in a combination thereof.It will be understood by those of skill in the art that can be used in practice Microprocessor or digital signal processor (DSP) come realize server according to an embodiment of the present invention, it is some in client Or some or all functions of whole components.The present invention is also implemented as one for executing method as described herein Partly or completely device or device program (for example, PC program and PC program product).It is such to realize journey of the invention Sequence can store on PC readable medium, or may be in the form of one or more signals.Such signal can be from Downloading obtains on internet website, is perhaps provided on the carrier signal or is provided in any other form.
It should be noted that the above-mentioned embodiments illustrate rather than limit the invention, and ability Field technique personnel can be designed alternative embodiment without departing from the scope of the appended claims.In the claims, Any reference symbol between parentheses should not be configured to limitations on claims.Word "comprising" does not exclude the presence of not Element or step listed in the claims.Word "a" or "an" located in front of the element does not exclude the presence of multiple such Element.The present invention can be realized by means of including the hardware of several different elements and by means of properly programmed PC.In If listing in the unit claim of equipment for drying, several in these devices be can be through the same hardware branch come specific It embodies.The use of word first, second, and third does not indicate any sequence.These words can be construed to title.
So far, it has been combined preferred embodiment shown in the drawings and describes technical solution of the present invention, still, this field Technical staff is it is easily understood that protection scope of the present invention is expressly not limited to these specific embodiments.Without departing from this Under the premise of the principle of invention, those skilled in the art can make equivalent change or replacement to the relevant technologies feature, these Technical solution after change or replacement will fall within the scope of protection of the present invention.

Claims (10)

1. a kind of orderly change electric control method, which is characterized in that the described method includes:
Electric car changes electric request in acquisition special time period;
According to the electricity calculation method for respectively carrying energy battery in preset each default subdivision period electrical changing station, it is based on preset constraint item Part and preset optimization aim generate the optimal electricity that changes using heuritic approach and request allocation plan;
Wherein:
The electricity that changes requests the electricity lower limit for changing electric time and expectation replacement load energy battery the latest including setting;
Each default subdivision period is each period divided according to setting period duration to the special time period;
The electricity calculation method that energy battery is respectively carried in the electrical changing station is according to loads energy electricity all in previous subdivision period electrical changing station The method that the rate of charge of pond state and each charging station calculates current subdivision all load energy battery status of period electrical changing station;
The electricity request allocation plan of changing includes the charging station for changing electric request distribution and changing electric moment, distribution load energy battery distributed With the rate of charge for the station that respectively charges in each default subdivision period.
2. according to claim 1 orderly change electric control method, which is characterized in that
The heuritic approach includes that Monte Carlo treeˉsearch method or particle swarm algorithm or genetic algorithm or simulated annealing are calculated Method.
3. according to claim 1 orderly change electric control method, which is characterized in that respectively carry energy battery in the electrical changing station Electricity calculation method are as follows:
When electrical changing station is when the t moment of special time period is there is no changing electricity, it is each carry can battery electricity calculation formula such as following formula It is shown:
Wherein, SOCb(t) state-of-charge of energy battery is uploaded for b-th of t moment charging station;SOCbIt (t-1) is t-1 moment b A charging station uploads the state-of-charge of energy battery;RcbIt (t-1) is the rate of charge of b-th of t-1 moment charging station, 1≤b ≤ No_bat, No_bat are the sum of charging station, t >=1;Δ t is the transformation period interval of rate of charge;
When electrical changing station is when the t moment of special time period changes electricity, each electricity calculation formula for carrying energy battery is shown below:
Wherein, swapreq(n).SOCemptyIt changes after electricity request is satisfied for n-th in special time period and is displaced from electric car Carry can battery state-of-charge, n >=1;J is that b-th of diagonal entry is 0, and the unit that remaining diagonal entry is 1 is to angular moment Battle array;J ' is that b diagonal line element is 1, the unit diagonal matrix that remaining diagonal entry is 0.
4. according to any one of claim 1-3 orderly change electric control method, which is characterized in that
The preset optimization aim is single optimization aim GsOr Combinatorial Optimization target Gc;Wherein, the Combinatorial Optimization target packet Include multiple single optimization aims, the Combinatorial Optimization target GcIt is shown below:
Gc=w1G1s+...wiGis...+wmGms
Wherein, the GisFor Combinatorial Optimization target GcI-th of single optimization aim, the wiFor the single optimization aim Gis Weight.
5. according to claim 4 orderly change electric control method, which is characterized in that
The single optimization aim be change include in electricity request change the electric time the latest and this changes electricity request and corresponding changes electric request The time difference that the electric moment is changed in distribution is maximum;Alternatively,
The single optimization aim is to change electricity to request the state-of-charge nargin of distribution load energy battery in allocation plan maximum;Alternatively,
The single optimization aim is the load curve side of power grid after the load energy battery charging that electrical changing station displaces electric car It is poor minimum.
6. according to any one of claim 1-3 orderly change electric control method, which is characterized in that
The preset constraint condition includes changing electric time, the electricity lower limit that expectation replacement carries energy battery and rate of charge the latest about Beam condition.
7. according to claim 6 orderly change electric control method, which is characterized in that
The rate of charge constraint condition is shown below:
Wherein, the Rcb(t) be special time period t moment when the corresponding battery rate of charge of b-th of charging station, 1≤b≤ No_bat, No_bat are the sum of charging station, t >=1;
The BCFor the capacity for carrying energy battery;The Rpower is default rated power;The RcthTo preset battery rate of charge Threshold value.
8. a kind of orderly change controller for electric consumption, which is characterized in that described device includes:
It changes electric request module, is configured to obtain electric car in special time period and changes electric request;
Electricity request allocation plan generation module is changed, is configured to according to respectively load can battery in preset each default subdivision period electrical changing station Electricity calculation method, be based on preset constraint condition and preset optimization aim, optimal change is generated using heuritic approach Electricity request allocation plan;
Wherein:
The electricity that changes requests the electricity lower limit for changing electric time and expectation replacement load energy battery the latest including setting;
Each default subdivision period is each period divided according to setting period duration to the special time period;
The electricity calculation method that energy battery is respectively carried in the electrical changing station is according to loads energy electricity all in previous subdivision period electrical changing station The method that the rate of charge of pond state and each charging station calculates current subdivision all load energy battery status of period electrical changing station;
The electricity request allocation plan of changing includes the charging station for changing electric request distribution and changing electric moment, distribution load energy battery distributed With the rate of charge for the station that respectively charges in each default subdivision period.
9. a kind of orderly change controller for electric consumption, which is characterized in that described device includes:
Processor, for executing each instruction;
Equipment is stored, for storing a plurality of instruction;Described instruction is appointed suitable for by processor load and perform claim requirement 1-7 One each step orderly changed in electric control method.
10. a kind of electrical changing station, including dynamic battery changing system, which is characterized in that the dynamic battery changing system includes power Benefit orderly changes controller for electric consumption described in requiring 8 or 9.
CN201710368050.9A 2017-05-23 2017-05-23 Electrical changing station and orderly change controller for electric consumption, method Active CN107244312B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710368050.9A CN107244312B (en) 2017-05-23 2017-05-23 Electrical changing station and orderly change controller for electric consumption, method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710368050.9A CN107244312B (en) 2017-05-23 2017-05-23 Electrical changing station and orderly change controller for electric consumption, method

Publications (2)

Publication Number Publication Date
CN107244312A CN107244312A (en) 2017-10-13
CN107244312B true CN107244312B (en) 2019-11-26

Family

ID=60017026

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710368050.9A Active CN107244312B (en) 2017-05-23 2017-05-23 Electrical changing station and orderly change controller for electric consumption, method

Country Status (1)

Country Link
CN (1) CN107244312B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108429259B (en) 2018-03-29 2019-10-18 山东大学 A kind of online dynamic decision method and system of unit recovery
CN109130943B (en) * 2018-07-24 2020-06-02 燕山大学 Shared battery station control strategy
CN109191026B (en) * 2018-11-09 2022-03-25 浙江大学 Simulated annealing algorithm-based unified management method for service life of energy conversion device
CN112366739B (en) * 2020-11-03 2022-08-19 国网河北省电力有限公司衡水供电分公司 Configuration method, device and equipment of power distribution network and storage medium
WO2023028873A1 (en) * 2021-08-31 2023-03-09 宁德时代新能源科技股份有限公司 Battery swapping method, apparatus and system, and device and medium

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102074978A (en) * 2010-10-27 2011-05-25 国家电网公司 Charging and replacing power station, charging and replacing control method and system and operation monitoring system
CN102931696A (en) * 2012-10-15 2013-02-13 广东电网公司电力科学研究院 Charging scheduling method for electric automobile battery swapping station
CN104377719A (en) * 2014-12-04 2015-02-25 河海大学常州校区 Electric automobile ordered charging delaminating and districting scheduling method based on double scales of time and space
CN104953652A (en) * 2015-06-11 2015-09-30 国网山东省电力公司电力科学研究院 Control method for ordered charging of electromobile
CN105140977A (en) * 2014-05-29 2015-12-09 国家电网公司 Electric automobile battery replacement method based on power network dispatching and battery replacement service Internet of things

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013016540A1 (en) * 2011-07-26 2013-01-31 Gogoro, Inc. Apparatus, method and article for collection, charging and distributing power storage devices, such as batteries

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102074978A (en) * 2010-10-27 2011-05-25 国家电网公司 Charging and replacing power station, charging and replacing control method and system and operation monitoring system
CN102931696A (en) * 2012-10-15 2013-02-13 广东电网公司电力科学研究院 Charging scheduling method for electric automobile battery swapping station
CN105140977A (en) * 2014-05-29 2015-12-09 国家电网公司 Electric automobile battery replacement method based on power network dispatching and battery replacement service Internet of things
CN104377719A (en) * 2014-12-04 2015-02-25 河海大学常州校区 Electric automobile ordered charging delaminating and districting scheduling method based on double scales of time and space
CN104953652A (en) * 2015-06-11 2015-09-30 国网山东省电力公司电力科学研究院 Control method for ordered charging of electromobile

Also Published As

Publication number Publication date
CN107244312A (en) 2017-10-13

Similar Documents

Publication Publication Date Title
CN107244312B (en) Electrical changing station and orderly change controller for electric consumption, method
Wong et al. Optimal placement and sizing of battery energy storage system for losses reduction using whale optimization algorithm
Meng et al. Dynamic frequency response from electric vehicles considering travelling behavior in the Great Britain power system
JP6885400B2 (en) Control device, control method and storage control device
Maleki et al. Scrutiny of multifarious particle swarm optimization for finding the optimal size of a PV/wind/battery hybrid system
Kavousi-Fard et al. Reliability-oriented reconfiguration of vehicle-to-grid networks
CN107618392B (en) Charging pile self-decision-making electric vehicle charging load random access control system and method
CN109742779B (en) Distributed energy storage scheduling method and device
CN108638890A (en) Server, maintenance terminal, power battery maintenance method, apparatus and system
US20130175863A1 (en) Power Sub-grid Including Power Generated From Alternative Sources
EP3016237A1 (en) Method for controlling charging power, system for controlling charging power, and program
Cheng et al. A particle swarm optimization based power dispatch algorithm with roulette wheel re-distribution mechanism for equality constraint
KR101769776B1 (en) System and method for Frequency Control
WO2012086167A1 (en) Quick charging system, control apparatus, method of controlling amount of power stored, and program
CN107482679B (en) Day-ahead optimal scheduling method for active power distribution network considering charging and discharging times of energy storage system
CN113437754A (en) Electric automobile ordered charging method and system based on platform area intelligent fusion terminal
CN112821470A (en) Micro-grid group optimization scheduling strategy based on niche chaos particle swarm algorithm
CN109066660A (en) A kind of power distribution network congestion management and decreasing loss method and apparatus based on optimal reconfiguration
CN105896580B (en) A kind of micro-capacitance sensor multiobjective optimization control method and device
CN104484757B (en) A kind of scheduling of heterogeneous load and energy management method applied to intelligent micro-grid
JPWO2017149618A1 (en) Control device, power generation control device, control method, system, and program
Yacar et al. Storage allocation and investment optimisation for transmission‐constrained networks considering losses and high renewable penetration
CN109921464A (en) Power distribution network broad sense power supply power transformation is credible capacity evaluating method, device and calculating equipment
CN109871619A (en) Static charging pile dispositions method based on grid dividing
KR101822824B1 (en) Charge and discharge amount distribution apparatus of energy storage system and the method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant