CN107238102A - A kind of primary air fan RB control methods under full load mode - Google Patents

A kind of primary air fan RB control methods under full load mode Download PDF

Info

Publication number
CN107238102A
CN107238102A CN201710397437.7A CN201710397437A CN107238102A CN 107238102 A CN107238102 A CN 107238102A CN 201710397437 A CN201710397437 A CN 201710397437A CN 107238102 A CN107238102 A CN 107238102A
Authority
CN
China
Prior art keywords
primary air
air fan
pressure
full load
coal pulverizer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710397437.7A
Other languages
Chinese (zh)
Other versions
CN107238102B (en
Inventor
归数
归一数
陈欢乐
王松
姚峻
祝建飞
朱宇新
邱寅琪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Minghua Electric Power Technology and Engineering Co Ltd
Original Assignee
Shanghai Minghua Electric Power Technology and Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Minghua Electric Power Technology and Engineering Co Ltd filed Critical Shanghai Minghua Electric Power Technology and Engineering Co Ltd
Priority to CN201710397437.7A priority Critical patent/CN107238102B/en
Publication of CN107238102A publication Critical patent/CN107238102A/en
Application granted granted Critical
Publication of CN107238102B publication Critical patent/CN107238102B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23NREGULATING OR CONTROLLING COMBUSTION
    • F23N3/00Regulating air supply or draught
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23NREGULATING OR CONTROLLING COMBUSTION
    • F23N5/00Systems for controlling combustion
    • F23N5/24Preventing development of abnormal or undesired conditions, i.e. safety arrangements

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Regulation And Control Of Combustion (AREA)
  • Disintegrating Or Milling (AREA)

Abstract

The present invention relates to the primary air fan RB control methods under a kind of full load mode, including:According to primary air fan main-piping pressure, primary air fan outlet pressure and primary air fan current of electric situation of change in full load section; judge whether occur the unusual service condition that primary air fan does not trip but can not exerted oneself in running; when detecting unusual service condition; a series of triggering primary air system exception RB, and carry out protection acts in time.Compared with prior art, the present invention has judges the unusual service condition that blower fan can not exert oneself when primary air fan does not trip in time, and realizes unit fast cutback, the advantages of maintaining the safe and stable operation of unit.

Description

A kind of primary air fan RB control methods under full load mode
Technical field
The present invention relates to thermal technics and protection technique, more particularly, to the primary air fan under a kind of full load mode RB control methods.
Background technology
RB (RUNBACK) in thermal power generation unit refers to that unit major pant item fault trip causes unit output to be limited When processed, exerted oneself to adapt to equipment, maintain unit safety stable operation, control system forces unit load reducing to auxiliary still in operation The load desired value that machine can bear, this function is otherwise known as runback.
Primary air fan is an important auxiliary equipment of thermal power generation unit air and flue system, when primary air fan fault trip When, it is necessary to trigger unit RB.When primary air fan RB occurs for conventional fired power generating unit, can put into operation feelings according to input combustion system at that time Condition, carries out coal seam tripping operation according to the order of setting and cuts off, retain untill the coal seam number of plies of setting, during the interval of its coal seam excision Between be typically set to 3-10 seconds, reduce leakage of the First air from coal pulverizer, as far as possible ensure First air main-piping pressure.
In the prior art, triggering unit RB condition tripped for primary air fan and the power of the assembling unit exert oneself it is specified more than 50% negative Lotus.However, when occurring, primary air piping is damaged, connecting rod comes off or during the failure such as shaft coupling fracture between primary air fan and motor, and this one Secondary wind system is not exerted oneself substantially, but because primary air fan does not trip, it is impossible to reach triggering unit RB condition, it is impossible to automatic real The urgent load down of existing unit, has a strong impact on safe and stable operation of the unit under the operating mode.
The content of the invention
It is an object of the present invention to overcome the above-mentioned drawbacks of the prior art and provide under a kind of full load mode Primary air fan RB control methods.
The purpose of the present invention can be achieved through the following technical solutions:
A kind of primary air fan RB control methods under full load mode, including:According to primary air fan main pipe in full load section Pressure, primary air fan outlet pressure and primary air fan current of electric situation of change, judge whether First air occur in running The unusual service condition that machine does not trip but can not exerted oneself, when detecting unusual service condition, triggering primary air system exception RB, goes forward side by side in time A series of protection acts of row, realize unit fast cutback, maintain the safe and stable operation of unit.
Described primary air system unusual service condition detection process is as follows:In full load section, when coal pulverizer machine operation number of units is big In equal to 2 and during the operation of two primary air fans, detection primary air fan main-piping pressure, primary air fan outlet pressure and primary air fan Current of electric situation of change, to judge and trigger primary air system exception RB.
Described judgement and triggering primary air system exception RB are specially:
1) primary air fan electric current bust to idle electric current or two primary air fan current of electric deviations is more than 15% specified electricity Stream, and primary air fan main-piping pressure is less than alarming value, is delayed 3 seconds, triggering primary air system exception RB;
2) primary air fan pressure is less than tripping operation pressure, and be delayed 3s, triggering primary air system exception RB.
When the bad quality of any primary air fan motor current signal, " two primary air fan outlet pressure deviations are more than for use 10% rated pressure, and primary air fan main-piping pressure is less than alarming value, is delayed 3 seconds " judged.
Alarm pressure uses the low alarming value of unit First air main-piping pressure in two kinds of situations, and tripping operation pressure is by First air main pipe The definite value increase setting biasing of the low tripping operation pulverized coal preparation system of pressure is determined.
A series of described protection acts of carry out include:
1) do not trip primary air fan, according to setting order trip a coal pulverizer, connection close tripping operation coal pulverizer cold-hot air door and Outlet portal;
2) after coal pulverizer tripping operation, if primary air fan outlet main-piping pressure continues less than tripping operation pressure, by setting order in 10s Continue the coal pulverizer that trips, connection closes tripping operation coal pulverizer cold-hot air door and outlet portal;
3) step 2 is continued executing with), until remaining 1 coal pulverizer operation or primary air fan main-piping pressure are more than tripping operation pressure Untill,
4) during primary air system exception RB, total coal-supplying amount of unit boiler master control output tracking residue operation coal pulverizer Corresponding boiler load.
During coal pulverizer tripping operation, after less than or equal to 3 coal pulverizer operations, startup unit fuel oil is combustion-supporting or plasma is drawn Arc is combustion-supporting.
Compared with prior art, according to primary air fan main-piping pressure, primary air fan outlet pressure in full load section of the present invention With primary air fan current of electric situation of change, judge occur the abnormal work that primary air fan does not trip but can not exerted oneself in running Condition, when detecting unusual service condition, a series of triggering primary air system exception RB, and carry out protection acts in time realizes unit Fast cutback, maintains the safe and stable operation of unit.
Brief description of the drawings
Fig. 1 is workflow diagram of the invention.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation is described, it is clear that described embodiment is a part of embodiment of the present invention, rather than whole embodiments.Based on this hair Embodiment in bright, the every other reality that those of ordinary skill in the art are obtained on the premise of creative work is not made Example is applied, should all belong to the scope of protection of the invention.
As shown in figure 1, according to primary air fan main-piping pressure, primary air fan outlet pressure and once in full load of the present invention section Blower motor curent change situation, judges that occurring primary air piping damage, primary air fan connecting rod in running comes off or shaft coupling The primary air system unusual service conditions such as fracture, when detecting unusual service condition, triggering primary air system exception RB, and carry out one in time Serial protection act, realizes unit fast cutback, maintains the safe and stable operation of unit:
In full load section, when coal pulverizer machine operation number of units is more than or equal to 2 and two primary air fan operations, detection is once Blower fan main-piping pressure, primary air fan outlet pressure and primary air fan current of electric situation of change, judge and trigger as follows Primary air system exception RB:
1) primary air fan electric current bust to idle electric current or two primary air fan current of electric deviations is more than 15% specified electricity Stream (when the bad quality of any primary air fan motor current signal, is more than 10% volume using two primary air fan outlet pressure deviations Constant-pressure is judged), and primary air fan main-piping pressure is less than alarming value, is delayed 3 seconds, triggering primary air system exception RB;
2) primary air fan pressure is less than tripping operation pressure, and be delayed 3s, triggering primary air system exception RB;
3) above-mentioned two middle alarm pressures can use the low alarming value of unit First air main-piping pressure, and tripping operation pressure is by First air The certain biasing of definite value increase of the low tripping operation pulverized coal preparation system of main-piping pressure is determined.
Situation is acted after primary air system exception RB triggerings:
1) do not trip primary air fan, according to setting order trip a coal pulverizer, connection close tripping operation coal pulverizer cold-hot air door and Outlet portal;
2) after coal pulverizer tripping operation, primary air fan outlet main-piping pressure continues less than tripping operation pressure, by setting order in such as 10s Continue the coal pulverizer that trips, connection closes tripping operation coal pulverizer cold-hot air door and outlet portal.
3) step 2 is continued executing with), until remaining 1 coal pulverizer operation or primary air fan main-piping pressure are more than tripping operation pressure Untill.After less than or equal to 3 coal pulverizer operations, startup unit fuel oil is combustion-supporting or plasma arcing is combustion-supporting;
4) during primary air system exception RB, total coal-supplying amount of unit boiler master control output tracking residue operation coal pulverizer Corresponding boiler load.
Specific embodiment
Primary air fan system exception RB is implemented in certain 660MW units full load section:
1) unit primary air fan main-piping pressure alarming value is set as 7kPa, and trip value settings are 6.3kPa, coal pulverizer tripping operation Order is set as F-E-D-C-B;
2) according to primary air fan main-piping pressure, primary air fan outlet pressure and blower motor curent change situation, by as follows Method judges and triggering primary air system exception RB:
A) primary air fan electric current bust is more than 17A to idle electric current 42A or so or two primary air fan current of electric deviations (when the bad quality of any primary air fan motor current signal, carried out using two primary air fan outlet pressure deviations more than 1kPa Judge), and primary air fan main-piping pressure is less than 7kPa, is delayed 3 seconds, triggering primary air system exception RB;
B) primary air fan pressure is less than 6.3kPa, and be delayed 3s, triggering primary air system exception RB;
Primary air fan:
3) after primary air fan exception RB triggerings:
A) according to coal pulverizer running situation, by F-E-D-C-B order one coal pulverizer of tripping operation, it is cold that connection closes tripping operation coal pulverizer Hot air disperser and outlet portal;
B) coal pulverizer tripping operation 10s in as primary air fan main-piping pressure be more than 6.3kPa, then RB success, otherwise by step a) after Continuous tripping operation coal pulverizer, RB fails if only remaining coal pulverizer operation, stops tripping operation coal pulverizer.During coal pulverizer tripping operation, The fuel system that put into operation automatically when running coal pulverizer and being less than or equal to 3 or plasma arcing are combustion-supporting.
C) during primary air system exception RB, total coal-supplying amount of unit boiler master control output tracking residue operation coal pulverizer Corresponding boiler load.
The foregoing is only a specific embodiment of the invention, but protection scope of the present invention is not limited thereto, any Those familiar with the art the invention discloses technical scope in, various equivalent modifications can be readily occurred in or replaced Change, these modifications or substitutions should be all included within the scope of the present invention.Therefore, protection scope of the present invention should be with right It is required that protection domain be defined.

Claims (7)

1. the primary air fan RB control methods under a kind of full load mode, it is characterised in that including:According to once in full load section Whether blower fan main-piping pressure, primary air fan outlet pressure and primary air fan current of electric situation of change, judge to go out in running The unusual service condition that existing primary air fan does not trip but can not exerted oneself, when detecting unusual service condition, triggering primary air system is different in time Normal RB, and a series of protection acts are carried out, unit fast cutback is realized, the safe and stable operation of unit is maintained.
2. the primary air fan RB control methods under a kind of full load mode according to claim 1, it is characterised in that described Primary air system unusual service condition detection process it is as follows:In full load section, when coal pulverizer machine operation number of units is more than or equal to 2 and two When platform primary air fan is run, detection primary air fan main-piping pressure, primary air fan outlet pressure and the change of primary air fan current of electric Situation, to judge and trigger primary air system exception RB.
3. the primary air fan RB control methods under a kind of full load mode according to claim 2, it is characterised in that described Judgement and triggering primary air system exception RB be specially:
1) primary air fan electric current bust to idle electric current or two primary air fan current of electric deviations is more than 15% rated current, and Primary air fan main-piping pressure is less than alarming value, is delayed 3 seconds, triggering primary air system exception RB;
2) primary air fan pressure is less than tripping operation pressure, and be delayed 3s, triggering primary air system exception RB.
4. the primary air fan RB control methods under a kind of full load mode according to claim 3, it is characterised in that when appointing During the bad quality of one blower motor current signals, use " two primary air fan outlet pressure deviations are more than 10% rated pressure, And primary air fan main-piping pressure is less than alarming value, it is delayed 3 seconds " judged.
5. the primary air fan RB control methods under a kind of full load mode according to claim 3, it is characterised in that two kinds Alarm pressure uses the low alarming value of unit First air main-piping pressure in situation, and tripping operation pressure is made by the low tripping operation of First air main-piping pressure The definite value increase setting biasing of powder system is determined.
6. the primary air fan RB control methods under a kind of full load mode according to claim 1, it is characterised in that described A series of protection acts of carry out include:
1) do not trip primary air fan, and according to setting order one coal pulverizer of tripping operation, connection closes tripping operation coal pulverizer cold-hot air door and outlet Door;
2) after coal pulverizer tripping operation, if primary air fan outlet main-piping pressure continues, less than tripping operation pressure, by setting order to continue in 10s Trip a coal pulverizer, and connection closes tripping operation coal pulverizer cold-hot air door and outlet portal;
3) step 2 is continued executing with), untill remaining 1 coal pulverizer operation or primary air fan main-piping pressure are more than tripping operation pressure,
4) during primary air system exception RB, total coal-supplying amount correspondence of unit boiler master control output tracking residue operation coal pulverizer Boiler load.
7. the primary air fan RB control methods under a kind of full load mode according to claim 6, it is characterised in that coal-grinding During machine tripping operation, after less than or equal to 3 coal pulverizer operations, startup unit fuel oil is combustion-supporting or plasma arcing is combustion-supporting.
CN201710397437.7A 2017-05-31 2017-05-31 A kind of primary air fan RB control method under full load mode Active CN107238102B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710397437.7A CN107238102B (en) 2017-05-31 2017-05-31 A kind of primary air fan RB control method under full load mode

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710397437.7A CN107238102B (en) 2017-05-31 2017-05-31 A kind of primary air fan RB control method under full load mode

Publications (2)

Publication Number Publication Date
CN107238102A true CN107238102A (en) 2017-10-10
CN107238102B CN107238102B (en) 2019-01-29

Family

ID=59985956

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710397437.7A Active CN107238102B (en) 2017-05-31 2017-05-31 A kind of primary air fan RB control method under full load mode

Country Status (1)

Country Link
CN (1) CN107238102B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108644804A (en) * 2018-03-30 2018-10-12 大唐阳城发电有限责任公司 It is a kind of for the First air low-voltage variation system of pulverized-coal fired boiler and guard method
CN110793056A (en) * 2019-11-06 2020-02-14 华北电力科学研究院有限责任公司 Fault load reduction control system and method for primary fan auxiliary machine of power station boiler

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61202011A (en) * 1985-03-01 1986-09-06 Sanyo Electric Co Ltd Combustion apparatus of forced feed and discharge type
JPS6475814A (en) * 1987-09-17 1989-03-22 Hitachi Ltd Control system for pressure in furnace
CN103256624A (en) * 2013-03-29 2013-08-21 国家电网公司 Method and system for controlling negative pressure of furnace hearths of thermal power plant
CN103712235A (en) * 2013-12-26 2014-04-09 广东电网公司电力科学研究院 Primary air fan controlling method and device
CN104197367A (en) * 2014-08-04 2014-12-10 国家电网公司 Primary air fan RB optimal control method based on mother tube pressure
CN105805040A (en) * 2014-12-30 2016-07-27 华润电力(菏泽)有限公司 Method for triggering RB after primary air fan stalls and stall detection system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61202011A (en) * 1985-03-01 1986-09-06 Sanyo Electric Co Ltd Combustion apparatus of forced feed and discharge type
JPS6475814A (en) * 1987-09-17 1989-03-22 Hitachi Ltd Control system for pressure in furnace
CN103256624A (en) * 2013-03-29 2013-08-21 国家电网公司 Method and system for controlling negative pressure of furnace hearths of thermal power plant
CN103712235A (en) * 2013-12-26 2014-04-09 广东电网公司电力科学研究院 Primary air fan controlling method and device
CN104197367A (en) * 2014-08-04 2014-12-10 国家电网公司 Primary air fan RB optimal control method based on mother tube pressure
CN105805040A (en) * 2014-12-30 2016-07-27 华润电力(菏泽)有限公司 Method for triggering RB after primary air fan stalls and stall detection system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108644804A (en) * 2018-03-30 2018-10-12 大唐阳城发电有限责任公司 It is a kind of for the First air low-voltage variation system of pulverized-coal fired boiler and guard method
CN110793056A (en) * 2019-11-06 2020-02-14 华北电力科学研究院有限责任公司 Fault load reduction control system and method for primary fan auxiliary machine of power station boiler
CN110793056B (en) * 2019-11-06 2021-03-30 华北电力科学研究院有限责任公司 Fault load reduction control system and method for primary fan auxiliary machine of power station boiler

Also Published As

Publication number Publication date
CN107238102B (en) 2019-01-29

Similar Documents

Publication Publication Date Title
CN107255268B (en) A kind of primary air fan RB control method based on primary air fan system state monitoring
CN107228088A (en) A kind of pressure fan RB control methods based on blower system status monitoring
CN105805040B (en) The method and stall detecting system of RB are triggered after primary air fan stall
CN104197367B (en) Primary air fan RB optimal control method based on mother tube pressure
CN111102024A (en) High-pressure-rise RB (radio frequency) comprehensive control device and method based on boiler following strategy
CN107238102B (en) A kind of primary air fan RB control method under full load mode
CN112628711A (en) Auxiliary engine fault stable combustion control method based on 600MW supercritical unit low load
CN107246401A (en) A kind of air-introduced machine RB control methods based on draught fan system status monitoring
CN112909903A (en) High-voltage station grounding protection and fast switching device protection starting combined optimization method
CN104765004A (en) Detection method and system for variable-pitch battery of wind generating set
CN109974028B (en) Optimization method for shutdown and non-shutdown of 660MW supercritical coal-fired unit
CN103700411A (en) Method and system for dealing with loss of coolant accident (LOCA) of nuclear power station
CN111678120A (en) Control method for joint start of steam feed pump and trip electric pump of 330MW subcritical unit
CN102966578A (en) Pressure control method and device for pump unit of nuclear power station
CN202093147U (en) Fault detection device of alternating current motor
CN211524912U (en) Safety device of steam turbine feed pump
CN103615322B (en) TRT unit overspeed control system and hypervelocity controlling method thereof
CN106907245B (en) Fuel supply system and method of controlling an overspeed event in a gas turbine engine
CN104637558B (en) Safe and stable control method for asynchronous oscillation of nuclear power unit
CN204388116U (en) A kind of boiler fire inspection cooling air system
CN202690402U (en) Control device for water feeding pump of thermal power plant
CN114768142B (en) Control method of energy storage system and energy storage system
JP2008035619A (en) Determination method for individual operation of dispersed power system
KR102247917B1 (en) Safety accident prevention photovoltaics generation system related to ess
CN106875993B (en) Presurized water reactor power generator turbine, which has tripped, characterizes signal generating method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant