CN107229697A - A kind of building construction bid document generating method - Google Patents

A kind of building construction bid document generating method Download PDF

Info

Publication number
CN107229697A
CN107229697A CN201710371557.XA CN201710371557A CN107229697A CN 107229697 A CN107229697 A CN 107229697A CN 201710371557 A CN201710371557 A CN 201710371557A CN 107229697 A CN107229697 A CN 107229697A
Authority
CN
China
Prior art keywords
models
engineering
building construction
schedule
resource provisioning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710371557.XA
Other languages
Chinese (zh)
Inventor
冯亚娟
钟永涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoning Technical University
Original Assignee
Liaoning Technical University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liaoning Technical University filed Critical Liaoning Technical University
Priority to CN201710371557.XA priority Critical patent/CN107229697A/en
Publication of CN107229697A publication Critical patent/CN107229697A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/40Information retrieval; Database structures therefor; File system structures therefor of multimedia data, e.g. slideshows comprising image and additional audio data
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Strategic Management (AREA)
  • Human Resources & Organizations (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Marketing (AREA)
  • Tourism & Hospitality (AREA)
  • Data Mining & Analysis (AREA)
  • General Business, Economics & Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • General Engineering & Computer Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Databases & Information Systems (AREA)
  • Multimedia (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention provides a kind of building construction bid document generating method, including:Set up civil engineering 3D models, reinforcing bar 3D models, hot-water heating electricity 3D models;Cover norm for detailed estimates, price adjustment is poor, export engineering pricing table;Work day, scheduling, resource provisioning plan according to needed for derived quantities and work norm calculate each operation;3D models needed for architectural engineering and schedule, resource provisioning plan are carried out integrated approach;Adjust schedule and resource provisioning plan, optimize schedule, be finally completed engineering simulation construction, and using the lower engineering simulation building course of record screen software record and preserve, the video file of building construction bid is generated, building construction bid file is generated together with the word content of tender documents.The present invention intuitively reflects bidding documents content, and character property narration is converted into image, improves the managerial skills and construction strength of bid company, improves the mode of traditional bidding documents, improve the confidence level of bidding documents.

Description

A kind of building construction bid document generating method
Technical field
The present invention relates to building construction bid technical field, and in particular to a kind of building construction bid document generating method.
Background technology
The master file of current Construction Item Bidding is bidding documents, auxiliary PPT explanations, lacks novelty, competitiveness, does not have There is feature, character property narration is more uninteresting unavoidably, it is impossible to intuitively reflects the level and strength of bid company, often drops The bidding documents scoring of low company, ultimately resulting in be got the bid, and certain economic loss is brought to company, influence the prestige of company.
The content of the invention
It is an object of the invention to provide a kind of building construction bid document generating method.
Technical scheme is as follows:
A kind of building construction bid document generating method, including:
Step one, according to architectural engineering bidding document provide architectural engineering drawing, set up civil engineering 3D models, reinforcing bar 3D models, Hot-water heating electricity 3D models;BIM is BIM(Building Information Modeling)Or architecture information management (Building Information Management);
Step 2, the 3D models according to needed for architectural engineering export corresponding quantities, middle set norm for detailed estimates, poor, export work of readjusting prices Journey pricing table;
Step 3, work day, scheduling, resource provisioning according to needed for derived quantities and work norm calculate each operation Plan;
3D models needed for architectural engineering and schedule, resource provisioning plan, are carried out integrated approach by step 4:Adjust benchmark Point, sets construction section, process is combined with schedule and resource provisioning plan, engineering simulation is realized;
Step 5, adjustment schedule and resource provisioning plan, optimize schedule, are finally completed engineering simulation construction, and make Lower engineering simulation building course is recorded with record screen software and is preserved, and the video file of building construction bid is generated, with tender documents Word content generate building construction bid file together.
If not specified in the norm for detailed estimates architectural engineering bidding document in the step 2, according to where architectural engineering Norm for detailed estimates is chosen on ground, and poor according to real price price adjustment.
Work day is calculated needed for each operation in the step 3, is specifically:First according to scope of operation size, constructor is primarily determined that Number;Then work day is determined according to work norm.
Schedule is worked out according to the logical order of process in the step 3, and the resource provisioning ensures standby in the works Make the amount of getting the raw materials ready more than actual use amount during material.
Adjust datum mark to be that all 3D models are all placed on into one spatially in the step 4, each 3D models is kissed completely Close.
Beneficial effect:
In order to improve the mode of current bid, solid is switched to by the bidding documents narration of character property and intuitively explained, target is several in increase Rate, improves the competitive bidding level of company, by completing the video format file of tender documents by software, creates " text+audio " New bid technology.
The present invention can intuitively reflect bidding documents content, and character property narration is converted into image, bid company is improved Managerial skills and construction strength, improve the mode of traditional bidding documents, improve the confidence level of bidding documents, in the bid of architectural engineering During add middle target probability, especially add the win bit rate of large complicated construction-engineering project, can be brought for enterprise Considerable interests.
Brief description of the drawings
Fig. 1 is building construction bid document generating method flow chart in the specific embodiment of the invention.
Embodiment
The specific embodiment of the invention is described in detail below in conjunction with the accompanying drawings.
A kind of building construction bid document generating method, as shown in figure 1, including:
Step one, according to architectural engineering bidding document provide architectural engineering drawing, using BIM softwares, set up civil engineering 3D models, Reinforcing bar 3D models, hot-water heating electricity 3D models;BIM is BIM(Building Information Modeling)Or Architecture information is managed(Building Information Management);Hot-water heating electricity 3D models include plumbing 3D models, warmed up Logical 3D models and electrical engineering 3D models;
Step 2, the 3D models according to needed for architectural engineering export corresponding quantities, and norm for detailed estimates, price adjustment are covered in BIM softwares Difference, export engineering pricing table;
Step 3, on the work day according to needed for derived quantities and work norm calculate each operation, is entered using Project software programmings Degree plan, resource provisioning plan;
Step 4, using BIM softwares, is carried out the 3D models needed for architectural engineering and schedule, resource provisioning plan integrated Change is handled:Datum mark is adjusted, construction section is set, process is combined with schedule and resource provisioning plan, engineering simulation is realized;
Step 5, adjustment schedule and resource provisioning plan, optimize schedule, are finally completed engineering simulation construction, and make Lower engineering simulation building course is recorded with record screen software and is preserved, and the video file of building construction bid is generated, with tender documents Word content generate building construction bid file together.
If not specified in the norm for detailed estimates architectural engineering bidding document in the step 2, according to where architectural engineering Norm for detailed estimates is chosen on ground, and item can not be leaked when covering norm for detailed estimates, and poor according to real price price adjustment, and these directly influence work Journey is offered, it is impossible to malfunctioned.
Work day is calculated needed for each operation in the step 3, is specifically:First according to scope of operation size, constructor is primarily determined that Number;Then work day is determined according to work norm;
" after tight before tight " method layout process is utilized during scheduling, resource provisioning plan is according to " resource enters one " method;
" after tight before tight " method refers to the logical order scheduling according to process;
" resource enters one " method and refers to that architectural engineering can cause the inevitable wasting of resources in work progress, to make when getting the raw materials ready The amount of getting the raw materials ready is more more than actual use amount, different according to the percentage that different materials have more." resource enter one " method purpose be in order to Ensure material supply, calculate each process material requested amount;Even calculating needs 1.01 bags of cement, and producer is only supplied in units of bag Should, then two bags can only be bought during purchase.
Adjust datum mark to be that all 3D models are all placed on into one spatially in the step 4, each 3D models is kissed completely Close(The basic point chosen in modeling is identical, so all 3D models can be all brought together by mobile basic point, The 3D models for forming complete set are to fit like a glove), engineering simulation is the process that simulant building thing is constructed according to schedule, should Process can intuitively reflect the relation of schedule and inter process, can be adjusted according to engineering simulation process produced problem Schedule and resource provisioning plan, optimize schedule, are finally completed engineering simulation construction.
The present invention uses BIM technology, and the narrative bidding documents of word is converted into video image, intuitively reflected in bidding documents Hold, improve the confidence level of bidding documents, indicate the strength and managerial skills of company, add acceptance of the bid probability.
The present invention is to provide a kind of new bid thinking, submitted a tender for enterprise and provide theories integration.It is any to be familiar with this skill The personage of art all can without prejudice to spirit herein and under the scope of, the above method is modified.Therefore, art In without departing from spirit disclosed herein and all equivalent modifications completed under technological thought or change, should be by this Shen Claim please is covered.

Claims (5)

1. a kind of building construction bid document generating method, it is characterised in that including:
Step one, according to architectural engineering bidding document provide architectural engineering drawing, set up civil engineering 3D models, reinforcing bar 3D models, Hot-water heating electricity 3D models;
Step 2, the 3D models according to needed for architectural engineering export corresponding quantities, set norm for detailed estimates, poor, export engineering of readjusting prices Pricing table;
Step 3, work day, scheduling, resource provisioning according to needed for derived quantities and work norm calculate each operation Plan;
3D models needed for architectural engineering and schedule, resource provisioning plan, are carried out integrated approach by step 4:Adjust benchmark Point, sets construction section, process is combined with schedule and resource provisioning plan, engineering simulation is realized;
Step 5, adjustment schedule and resource provisioning plan, optimize schedule, are finally completed engineering simulation construction, and make Lower engineering simulation building course is recorded with record screen software and is preserved, and the video file of building construction bid is generated, with tender documents Word content generate building construction bid file together.
2. building construction bid document generating method according to claim 1, it is characterised in that pre- in the step 2 If calculating not specified in quota architectural engineering bidding document, according to architectural engineering location selection norm for detailed estimates, and according to Real price price adjustment is poor.
3. building construction bid document generating method according to claim 1, it is characterised in that calculated in the step 3 Work day needed for each operation, it is specifically:First according to scope of operation size, construction number is primarily determined that;Then determined according to work norm Work day.
4. building construction bid document generating method according to claim 1, it is characterised in that progress in the step 3 Plan to work out according to the logical order of process, the resource provisioning ensures to make the amount of getting the raw materials ready measure than actual use when getting the raw materials ready in the works It is many.
5. building construction bid document generating method according to claim 1, it is characterised in that adjust base in the step 4 It is that all 3D models are all placed on one spatially on schedule, each 3D models is fitted like a glove.
CN201710371557.XA 2017-05-24 2017-05-24 A kind of building construction bid document generating method Pending CN107229697A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710371557.XA CN107229697A (en) 2017-05-24 2017-05-24 A kind of building construction bid document generating method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710371557.XA CN107229697A (en) 2017-05-24 2017-05-24 A kind of building construction bid document generating method

Publications (1)

Publication Number Publication Date
CN107229697A true CN107229697A (en) 2017-10-03

Family

ID=59933783

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710371557.XA Pending CN107229697A (en) 2017-05-24 2017-05-24 A kind of building construction bid document generating method

Country Status (1)

Country Link
CN (1) CN107229697A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108053150A (en) * 2018-01-09 2018-05-18 中建七局安装工程有限公司 A kind of site operation personnel's intelligent management based on BIM
CN108416131A (en) * 2018-02-28 2018-08-17 江苏国泰新点软件有限公司 A kind of drawing file methods of exhibiting, device, server and storage medium
CN109801372A (en) * 2018-12-27 2019-05-24 深圳市建设工程交易服务中心 The processing method and system of the BIM and GIS linkage auxiliary assessment of bids
CN109800938A (en) * 2018-11-22 2019-05-24 深圳市建设工程交易服务中心 The assessment of bids data linkage processing method and system of technical bid and commercial bid
CN110110376A (en) * 2019-04-09 2019-08-09 天津大学 A kind of hinge dam type scheme analysis method for quantitatively evaluating and device based on BIM
CN112134923A (en) * 2020-08-14 2020-12-25 广州大学 Bidding information processing method, system, device and medium based on block chain

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030225683A1 (en) * 2002-05-31 2003-12-04 Mt One, Inc. Electronic bid/proposal system for the construction industry
CN104143215A (en) * 2014-08-07 2014-11-12 北京纽曼帝莱蒙膜建筑技术有限公司 Informatization model design method of cable-membrane structure
CN106022587A (en) * 2016-05-12 2016-10-12 广州络维建筑信息技术咨询有限公司 BIM project progress and cost management system based on earned value theory

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030225683A1 (en) * 2002-05-31 2003-12-04 Mt One, Inc. Electronic bid/proposal system for the construction industry
CN104143215A (en) * 2014-08-07 2014-11-12 北京纽曼帝莱蒙膜建筑技术有限公司 Informatization model design method of cable-membrane structure
CN106022587A (en) * 2016-05-12 2016-10-12 广州络维建筑信息技术咨询有限公司 BIM project progress and cost management system based on earned value theory

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
姚瑶: "基于BIM的招投标应用研究", 《安徽建筑》 *
金睿: "《建筑施工企业BIM应用基础教程》", 31 May 2016 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108053150A (en) * 2018-01-09 2018-05-18 中建七局安装工程有限公司 A kind of site operation personnel's intelligent management based on BIM
CN108416131A (en) * 2018-02-28 2018-08-17 江苏国泰新点软件有限公司 A kind of drawing file methods of exhibiting, device, server and storage medium
CN109800938A (en) * 2018-11-22 2019-05-24 深圳市建设工程交易服务中心 The assessment of bids data linkage processing method and system of technical bid and commercial bid
CN109801372A (en) * 2018-12-27 2019-05-24 深圳市建设工程交易服务中心 The processing method and system of the BIM and GIS linkage auxiliary assessment of bids
CN109801372B (en) * 2018-12-27 2020-06-30 深圳市建设工程交易服务中心 Processing method and system for BIM and GIS linkage auxiliary bid evaluation
CN110110376A (en) * 2019-04-09 2019-08-09 天津大学 A kind of hinge dam type scheme analysis method for quantitatively evaluating and device based on BIM
CN112134923A (en) * 2020-08-14 2020-12-25 广州大学 Bidding information processing method, system, device and medium based on block chain

Similar Documents

Publication Publication Date Title
CN107229697A (en) A kind of building construction bid document generating method
CN107256005A (en) A kind of reinforcing steel bar numerical control processing method and equipment based on BIM technology
Grzyl et al. Building Information Modelling as an opportunity and risk for stakeholders involved in construction investment process
Jankowski et al. Functional assessment of BIM methodology based on implementation in design and construction company
Vladimirova et al. Digital methods of real estate asset lifecycle management
Ryal-Net et al. Assessment of building information modelling (BIM) knowledge in the Nigerian construction industry
Shivsharan et al. 3D Modeling and energy analysis of a residential building using BIM tools
CN111429100A (en) Construction project cost system and cost method
US20240070780A1 (en) Software Technology for Managing a Construction Project Involving Multiple Currencies
CN104751025A (en) License control method and License control device
Nicał et al. Procuring governmental megaprojects: Case study
McClymonds et al. Information Exchange for Supporting BIM to Robotic Construction
KR102069664B1 (en) Publication system and method of electronic cash for electric power transaction
CN103745067A (en) Power generator stator end parameterization automatic modeling system and method
KR20210026316A (en) Apparatus and method for providing quotation information
CN110275905A (en) Resource value-acquiring method, device, equipment and computer storage medium
CN105721902A (en) Intelligent push method and system
KR20230121449A (en) Renewable energy power source automatic mathcing artificial intelligence system for re100 and operating method thereof
CN114462973A (en) Integrated circuit factory project investment generation method and system
Gudnason et al. eWork and eBusiness in Architecture, Engineering and Construction: ECPPM 2012
Saeed et al. Contract design for profitability in macro‐engineering projects
US20200410560A1 (en) Prefilled Owner Invoices
Osan et al. The BIM revolution
KR20220022723A (en) Design-customized systems and methods for users
Yan et al. Application of the BIM Technique in Modern Project Management

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20171003