CN107228046A CN201610176883.0A CN201610176883A CN107228046A CN 107228046 A CN107228046 A CN 107228046A CN 201610176883 A CN201610176883 A CN 201610176883A CN 107228046 A CN107228046 A CN 107228046A
Authority
CN
China
Prior art keywords
wind
wind turbines
current
driftage
relative angle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610176883.0A
Other languages
Chinese (zh)
Other versions
CN107228046B (en
Inventor
程庆阳
乔志强
李康
唐新安
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Goldwind Science and Creation Windpower Equipment Co Ltd
Original Assignee
Beijing Goldwind Science and Creation Windpower Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Goldwind Science and Creation Windpower Equipment Co Ltd filed Critical Beijing Goldwind Science and Creation Windpower Equipment Co Ltd
Priority to CN201610176883.0A priority Critical patent/CN107228046B/en
Publication of CN107228046A publication Critical patent/CN107228046A/en
Application granted granted Critical
Publication of CN107228046B publication Critical patent/CN107228046B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D7/00Controlling wind motors 
    • F03D7/02Controlling wind motors  the wind motors having rotation axis substantially parallel to the air flow entering the rotor
    • F03D7/04Automatic control; Regulation
    • F03D7/042Automatic control; Regulation by means of an electrical or electronic controller
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F05INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
    • F05BINDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
    • F05B2270/00Control
    • F05B2270/30Control parameters, e.g. input parameters
    • F05B2270/321Wind directions
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F05INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
    • F05BINDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
    • F05B2270/00Control
    • F05B2270/40Type of control system
    • F05B2270/404Type of control system active, predictive, or anticipative
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Sustainable Development (AREA)
  • Sustainable Energy (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Wind Motors (AREA)

Abstract

The invention provides a wind turbine generator predictive yaw control method, a wind turbine generator predictive yaw control device and a wind turbine generator predictive yaw control system, wherein the method comprises the following steps: acquiring wind directions collected by wind direction detectors at wind turbine generators in a wind power plant in real time; identifying whether the current wind turbine generator is the head-mounted wind turbine generator which is firstly windward in the wind direction; and if the recognition result is 'no', setting the yaw starting time of the current wind turbine generator according to the wind direction of the current wind turbine generator and the relative angle of the wind direction of the front exhaust wind turbine generator of the current wind turbine generator along the wind direction. According to the technical scheme, the power generation capacity of the wind turbine generator can be improved and the load of the wind turbine generator can be reduced in the yawing process.

Description

Wind turbines foreseeability Yaw control method, device and system
Technical field
The present invention relates to technical field of wind power, more particularly to a kind of driftage control of Wind turbines foreseeability Methods, devices and systems.
Background technology
At present, in the driftage control of wind power generating set (referred to as " Wind turbines "), each wind Group of motors can only obtain the wind direction of present position, because wind direction has fluctuation and randomness, When wind vector, Wind turbines need to wait for a period of time, and determine to carry out again partially after wind direction is stable Boat.This has resulted in the loss of generated energy, simultaneously because without just to wind, Wind turbines will be produced Very big unbalance loading, the fatigue damage thereby resulted in and mechanical shock, leverage Wind turbines Service life.
The content of the invention
The present invention provides a kind of Wind turbines foreseeability Yaw control method, device and system, with In During yaw, the generated energy of Wind turbines is lifted, load of wind turbine generator is reduced.
To reach above-mentioned purpose, The embodiment provides a kind of driftage of Wind turbines foreseeability Control method, including:Obtain what the wind direction detector in wind power plant at each Wind turbines was gathered in real time Wind direction;Whether recognize current Wind turbines is being head motor exhaust at first windward along along the wind direction Group;If recognition result is "No", according to the wind direction at the current Wind turbines and along institute The relative angle of the wind direction on wind direction at the front-seat Wind turbines of the current Wind turbines is stated, is set The driftage of the current Wind turbines starts the time.
Embodiments of the invention additionally provide a kind of Wind turbines foreseeability yaw control device, described Device includes:Wind direction acquisition module, described at each Wind turbines in acquisition wind power plant in real time The wind direction of wind direction detector collection;Unit identification module, for recognizing current Wind turbines along institute Whether state on wind direction is head motor exhaust group at first windward;First driftage control module, if for The recognition result of the unit identification module be "No", then according to the current Wind turbines at The phase of wind direction and the wind direction along along the wind direction at the front-seat Wind turbines of the current Wind turbines To angle, the driftage of the current Wind turbines is set to start the time.
Embodiments of the invention additionally provide a kind of Wind turbines foreseeability yaw control system, described System includes:Wind direction detector and wind as described above at each Wind turbines are arranged in wind power plant Group of motors foreseeability yaw control device.
Wind turbines foreseeability Yaw control method provided in an embodiment of the present invention, device and system, For the non-non- head motor exhaust group at first windward along along wind direction, by the wind direction at these Wind turbines Counted with the relative angle of the wind direction at its front-seat Wind turbines;And according to these relative angles, The driftage of non-head motor exhaust group is set to start the time.In other words, by adjusting the driftage startup time, To adjust the stand-by period of driftage, with the rack load realized maximized generating efficiency and minimized.
Brief description of the drawings
Fig. 1 is wind speed and direction transmission schematic diagram in existing wind power plant;
The side of Wind turbines foreseeability Yaw control method one embodiment that Fig. 2 provides for the present invention Method flow chart;
Wind turbines foreseeability Yaw control method another embodiment that Fig. 3 provides for the present invention Method flow diagram;
The topology diagram for the wireless bridge that Fig. 4 provides for the present invention;
The Wind turbines foreseeability Yaw control method further embodiment that Fig. 5 provides for the present invention Method flow diagram;
The knot of Wind turbines foreseeability yaw control device one embodiment that Fig. 6 provides for the present invention Structure block diagram;
Wind turbines foreseeability yaw control device another embodiment that Fig. 7 provides for the present invention Structured flowchart;
The structured flowchart for the first driftage control module that Fig. 8 provides for the present invention;
The structured flowchart for the second driftage control module that Fig. 9 provides for the present invention.
Drawing reference numeral explanation
610- wind directions acquisition module, 620- units identification module, the driftages of 630- first control module, 640- Second driftage control module, 650- wireless bridges module, the statistic units of 631- first, 632- first are opened Moving cell, the stop elements of 633- first, the statistic units of 641- second, the start units of 642- second, 643- Second stop element.
Embodiment
Fig. 1 is wind speed and direction transmission schematic diagram in existing wind power plant.It is assumed that current with just in wind power plant The north is to as upwind side, and each Wind turbines are arranged successively as windward the southwards from direct north One row, second row ... Wind turbines.Shown in Fig. 1, along upwind side first row Wind turbines Wind speed be V, wind direction and first row Wind turbines horizontal sextant angle are θ, first row Wind turbines to the The distance of two motor exhaust groups is X, and second row Wind turbines are to the distance of the 3rd motor exhaust group Y, then the time that the hearsay at first row Wind turbines is delivered at second row Wind turbines is T1, Hearsay at T1=X/ (V*sin θ), first row Wind turbines is delivered to needs at the 3rd motor exhaust group Time T2, T2=(X+Y)/(V*sin θ).Above-mentioned formula neglects wind speed and successively decreased.
Here illustrate, because the wind direction in wind power plant is fluctuation, in strict accordance with the actual transfer of wind Direction is larger come the process complexity for determining head motor exhaust group at first windward, and this needs prison in real time Survey the change for the wind direction for blowing to wind power plant.But, although wind direction is real-time fluctuations, but overall upper Wind direction is metastable, for example, in China's Mainland summer based on south wind, and to winter , can be by the positive wind direction of windward (such as positive south wind or just based on these features then based on north wind North wind) as the wind direction in the present embodiment, the head motor exhaust group of correspondence windward is as met at first First row Wind turbines in the Wind turbines in the righteous style and practice direction, such as Fig. 1 are as met just at first The Wind turbines of north wind.
The present invention inventive concept, be based on wind direction in a long time transmittance process be in relatively stablize During state, the driftage startup time of the Wind turbines in wind power plant along the heel row on wind direction is adjusted It is whole, to control the Wind turbines of heel row to chase the yaw maneuver of front-seat Wind turbines in advance, so as to contract Short driftage waiting time, realize quick to wind, the generating efficiency of raising Wind turbines, simultaneously reduction Rack load.
Embodiment one
The side of Wind turbines foreseeability Yaw control method one embodiment that Fig. 2 provides for the present invention Method flow chart, the executive agent of this method can be the control device for being arranged on each Wind turbines, It can be the control system of wind power plant.As shown in Fig. 2 using executive agent to be arranged on each wind turbine Exemplified by the control device of group, the Wind turbines foreseeability Yaw control method is specifically included:
S210, obtains the wind direction of the wind direction detector collection in wind power plant at each Wind turbines in real time.
, can be by for example, for wind direction detector and this programme executive agent on same Wind turbines The yaw system communication connection of the executive agent and Wind turbines, or directly with being arranged on the wind-powered electricity generation Wind direction detector such as wind vane on unit is communicatively coupled, so as to directly or indirectly obtain the wind The information of the wind direction detected to detector.
, can be by each wind for wind direction detector and this programme executive agent not on same Wind turbines Wind direction information at group of motors is transmitted to the master control system of wind power plant by Wind turbines, then again by These wind direction informations are distributed on each Wind turbines by master control system, so that on each Wind turbines Executive agent obtain these wind direction informations.It can lead between each Wind turbines and wind power plant master control system Cross the communication modes such as existing fiber network or cordless communication network and carry out wind direction information interaction.This implementation The mode that example shares the wind direction information at its position to each Wind turbines is not limited.
Whether S220, it is being head motor exhaust at first windward along along wind direction to recognize current Wind turbines Group.
For example, prestoring the geographical position letter of each Wind turbines in wind power plant at each Wind turbines Breath, according to the geographical location information and the wind direction detected, it can be determined that go out current Wind turbines Whether it is being head motor exhaust group at first windward along along wind direction.
Specifically, the wind direction in the present embodiment can be the actual direction of windward, or The direction of windward, such as due south direction, direct north.Replace real with the direction of windward The wind direction on border can greatly reduce the complexity for confirming head motor exhaust group at first windward, while not Influence subsequent operation.
S230, if recognition result is "No", according to the wind direction at current Wind turbines and edge The relative angle of wind direction on wind direction at the front-seat Wind turbines of current Wind turbines, sets current wind The driftage of group of motors starts the time.
Generally, when blowing over, the wind in wind power plant at each Wind turbines is relatively uniform or wind direction differential seat angle phase When poor little, the wind direction referred to along the heel row Wind turbines of wind direction at front-seat Wind turbines enters Row yaw maneuver, without limitation must wind to after current Wind turbines, further according to current wind The wind direction that wind direction detector is detected at group of motors carries out yaw maneuver.In this way, can be before and after precognition In the case that wind direction is relatively uniform or close at motor exhaust group, according to the wind at front-seat Wind turbines Driftage control is carried out in advance to heel row Wind turbines.
In the present embodiment, the differential seat angle between both direction is defined as to the relative angle of both direction. Specifically, according to the wind direction at current Wind turbines and along along wind direction current Wind turbines front row The differential seat angle of wind direction at Wind turbines, i.e. relative angle, it can be determined that go out front and rear row Wind turbines Locate the relatively uniform or close situation of wind direction.The judgement needs to count above-mentioned relative angle in a period of time The situation of change of degree.According to the situation of the relative angle of the continuous duration of the difference counted, it can sentence Break and the relatively uniform degree of wind direction at front and rear row Wind turbines, wind direction at such as front and rear row Wind turbines The time that relatively uniform or close state is kept is longer, and the stability for characterizing wind direction is better, then Heel row set yaw waiting time can be shortened, in advance into driftage state, the stability of wind direction is better, The driftage startup time of current Wind turbines (heel row Wind turbines) is set more to shift to an earlier date.
The mode of the driftage startup time of the current Wind turbines of this set (heel row Wind turbines), The Wind turbines positioned at heel row can be made quick to wind, the generating efficiency of wind power plant is improved.Meanwhile, Due to just being added to the wind time for Wind turbines, the wind direction load lateral to Wind turbines is just reduced , rack load is reduced to a certain degree.
Wind turbines foreseeability Yaw control method provided in an embodiment of the present invention, is existed based on wind direction For a long time in transmittance process be in metastable state when, in wind power plant along the heel row on wind direction The driftage startup time of Wind turbines is adjusted, and shortens driftage waiting time, realizes quickly to wind, The generating efficiency of Wind turbines is improved, while reducing rack load.
Embodiment two
The side of Wind turbines foreseeability Yaw control method one embodiment that Fig. 3 provides for the present invention Method flow chart, this method can be considered a kind of specific implementation of embodiment of the method shown in Fig. 2, right The strategy of the driftage startup time that is shared and setting current Wind turbines of wind direction information is carried out It is described in detail.As shown in figure 3, the Wind turbines foreseeability Yaw control method is specifically included:
S310, wind is obtained by wireless bridge in real time at the adjacent Wind turbines of current Wind turbines Wind direction in electric field at other each Wind turbines, and pass through the wind direction detector at current Wind turbines Obtain the wind direction at current Wind turbines.Step S310 is S210 refinement step.
For the executive agent being arranged on each Wind turbines be easy to by with positioned at same wind turbine Wind direction detector in group is communicatively coupled, and obtains the wind direction at current Wind turbines.But obtain The wind direction information at other Wind turbines is taken, otherwise executive agent and wind on each Wind turbines The control system connection of electric field, is obtained at other Wind turbines with the control system by wind power plant The information of wind direction, otherwise setting up communication network using each Wind turbines as network node is directly realized by phase Data interaction between mutually.The present embodiment gives following concrete scheme to the latter's implementation.
Each Wind turbines use Spanning-Tree Protocol as a radio node in wind power plant (spanning Tree Protocol, STP) builds wireless bridge.STP can be used to reduce in network Link failure, and provide recycling-guard.STP can effectively increase system reliability, allow net The unremitting operation of network.As shown in figure 4, STP uses IEEE 802.1D standards in the present embodiment The interconnection of whole wind power plant can be achieved in bridge, wireless bridge after setting up.Wireless section 1 and radio node 2 links, radio node 2 links with radio node 3, then radio node 1 just can with it is wireless Node 3 is linked.The like, wireless bridge generates wireless bridge net using STP/RSTP technologies Network topological structure.Because wireless communication distance is influenceed by Wind turbines distance, two remote Wind turbines between communication need other Wind turbines to provide network nodes.
Based on the network topology of the wireless bridge built in wind power plant, on each Wind turbines At the current Wind turbines that executive agent can gather the wind direction detector on current Wind turbines in real time Wind direction data, other each Wind turbines are transmitted to wind power plant by the wireless bridge, so that real Now between each Wind turbines wind direction data it is shared.
Whether S320, it is being head motor exhaust at first windward along along wind direction to recognize current Wind turbines Group.Step S320 content is identical with S220 content.
S330, if recognize current Wind turbines along along wind direction whether be at first windward head air draft electricity The result of unit is "Yes", then according to the yaw direction of current Wind turbines and its position The relative angle of wind direction, sets the driftage of current Wind turbines to start the time.
Driftage for head motor exhaust group starts time, the yaw direction according to current Wind turbines And its relative angle of the wind direction of position is configured.For example, when in fixed timing statisticses window Intraoral average relative angle is less than predetermined angle, then driftage waiting time t is set, if in the stand-by period In t, average relative angle is respectively less than predetermined angle in each fixed timing statisticses window, then when waiting Between t terminate after start driftage.
S340, if recognition result is "No", according to the wind direction at current Wind turbines and edge The relative angle of wind direction on wind direction at the front-seat Wind turbines of current Wind turbines, sets current wind The driftage of group of motors starts the time.Step S340 is similar to step S230 content.
Specifically, in embodiment as shown in Figure 5, show and recognizing current Wind turbines along wind Whether it is upwards two kinds after the head motor exhaust group at first windward methods that the driftage startup time is set Flow, corresponds to above-mentioned steps S330 and S340 thinning process respectively.As shown in figure 5, the party Method includes:
Whether S501, it is being head motor exhaust at first windward along along wind direction to recognize current Wind turbines Group, if result is "Yes", performs S502;If NO, then S507 is performed.
S502, counts the relative angle of the yaw direction of current Wind turbines and its wind direction of position Spend the relative angle average value at least one timing statisticses window.
Wherein, timing statisticses window is the time window with fixed duration, the time window with Time passage is moved rearwards by.For example, in step S502, WindDir_30sec represents phase in 30 seconds To angular average, WindDir_1min represents relative angle average value in one minute, WindDir_10min represents relative angle average value in ten minutes.
The present embodiment is not limited to above-mentioned three kinds of timing statisticses windows.
In the present embodiment, yaw position angle and the wind of present position according to current Wind turbines To the relative angle between angle, the relative angle at least one above-mentioned timing statisticses window is put down Average sets the driftage of current Wind turbines to start the time.
Specifically, for the relative angle average value of every kind of timing statisticses window, current wind-powered electricity generation is set Unit is continuously located at the first driftage waiting time in predetermined threshold value interval in its relative angle average value At the end of start driftage.For example:
S503, when relative angle average value is more than 25 degree in 30 seconds, sets driftage waiting time For t1, when in t1When relative angle average value is consistently greater than 25 degree in interior 30 seconds, it is determined that in t1 After end, start Wind turbines driftage, i.e., relative angle average value is more than 25 degree in 30 seconds, And continue t1After duration, it is determined that starting driftage.
S504, when relative angle average value is more than 20 degree in one minute, sets driftage waiting time For t2, when in t2Relative angle average value is consistently greater than 20 degree in interior one minute, it is determined that in t2 After end, start Wind turbines driftage, i.e., relative angle average value is more than 20 degree in one minute, and Continue t2After duration, it is determined that starting driftage.
S505, in ten minutes relative angle average value be more than 15 degree, set go off course waiting time be t3, when in t3Relative angle average value is consistently greater than 15 degree in interior ten minutes, it is determined that in t3Terminate Afterwards, Wind turbines driftage is started, i.e., relative angle average value is more than 15 degree in ten minutes, and continues t3After duration, it is determined that starting driftage.
Here illustrate, S503, S504 and S505 can individually select an implementation, implement after also can be combined. It is preferential to perform implementation strategy of the waiting time compared with current time nearlyer person after combination in implementation process. The above-mentioned stand-by period meets:t1< t2< t3.When the condition satisfaction in any of the above-described strategy, and most arrive first Up to waiting time, started with the waiting time end point, perform step S511, start wind turbine The yaw maneuver of group.
S507, counts wind direction at current Wind turbines and along along wind direction before current Wind turbines The relative angle of wind direction at motor exhaust group, in the relative angle of at least one timing statisticses window Average value.
For example, in step S507, WindDir_30sec represents relative angle average value in 30 seconds, WindDir_1min represents relative angle average value in one minute, and WindDir_10min is represented very Relative angle average value in clock.
The present embodiment is not limited to above-mentioned three kinds of timing statisticses windows.
In the present embodiment, the current wind turbine according to the wind direction at current Wind turbines and along along wind direction The relative angle of wind direction at the front-seat Wind turbines of group, at least one above-mentioned timing statisticses window Interior relative angle average value sets the driftage of current Wind turbines to start the time.
Specifically, for the relative angle average value of every kind of timing statisticses window, current wind-powered electricity generation is set Unit is continuously located at the first driftage waiting time in predetermined threshold value interval in its relative angle average value At the end of start driftage.For example:
S508, when relative angle average value is more than 25 degree in 30 seconds, sets driftage waiting time For t1/ 3, when in t1When relative angle average value is consistently greater than 25 degree in 30 seconds in/3, it is determined that Stand-by period t1After/3 terminate, start Wind turbines driftage, i.e., the relative angle average value in 30 seconds More than 25 degree, and continue t1After/3 durations, it is determined that starting driftage.
S509, in one minute relative angle average value be more than 20 degree, set go off course waiting time be t2/ 3, when in t2Relative angle average value is consistently greater than 20 degree in one minute in/3, it is determined that waiting Treat time t2After/3 terminate, start Wind turbines driftage, i.e., relative angle average value is big in one minute In 20 degree, and continue t2After/3 durations, it is determined that starting driftage.
S510, in ten minutes relative angle average value be more than 15 degree, set go off course waiting time be t3/ 3, when in t3Relative angle average value is consistently greater than 15 degree in ten minutes in/3, it is determined that waiting Treat time t3After/3 terminate, start Wind turbines driftage, i.e., relative angle average value is big in ten minutes In 15 degree, and continue t3After/3 durations, it is determined that starting driftage.
Here illustrate, S508, S509 and S510 can individually select an implementation, implement after also can be combined. It is preferential to perform implementation strategy of the waiting time compared with current time nearlyer person after combination in implementation process. When the condition satisfaction in any of the above-described strategy, and waiting time is reached at first, with the waiting time End point starts, and performs step S511, starts the yaw maneuver of Wind turbines.The above-mentioned stand-by period In:t1< t2< t3, and the stand-by period corresponding with head row's unit is corresponding identical.Here why by position A motor exhaust group driftage waiting time is set in the driftage waiting time of the Wind turbines of heel row 1/3, it is that the relative angle based on heel row Wind turbines is that wind direction at the front-seat Wind turbines of comparison does and joined Examine, therefore, when evaluating the stability of wind direction, its confidence level is higher.
Further, S506 can be also first carried out before S507 is performed, current Wind turbines are counted The relative angle of the wind direction at place and the wind direction along along wind direction at the front-seat Wind turbines of current Wind turbines Degree is before from current time in the short period, and whether the average relative angle in such as 30 seconds is less than Preset value (any value in such as 20 °~30 °), if the judgment is Yes, then performs the interior of S507 again Hold, to increase the necessity for performing subsequent step 507.
For example, when the average relative angle of the wind direction in 30 seconds at the Wind turbines of front and rear row is less than in advance If value, then it is more consistent at the Wind turbines of the front two rows and stably to characterize current wind direction, that When performing step 507, counting obtained relative angle, it meets S508, S509 or S510 Condition probability it is bigger, it is to avoid unnecessary calculating process.But, if performing step S506 When, the average relative angle of the wind direction in 30 seconds at the Wind turbines of front and rear row is not less than preset value, Then characterize that current wind direction is inconsistent at the Wind turbines of the front two rows, and the stability of wind direction is poor, Then heel row Wind turbines can not be done sth. in advance to be gone off course according to the wind direction at front-seat Wind turbines.Now, Current Wind turbines are considered as the content that a motor exhaust group performs step S502.
During S511 is performed, S512 is can also carry out, it is corresponding relative according to current unit Angle (WindDir represents instantaneous relative angle), if positioned at 0 degree it is interval (comprising 0 degree Interior continuous angular interval), to determine whether to stop driftage.
Specifically, during being gone off course for head motor exhaust group as current Wind turbines, Recognize whether the relative angle of the yaw direction of current Wind turbines and its wind direction of position is located at 0 degree interval, if recognition result is "Yes", performs S513 and stops driftage, otherwise continues to go off course.
During being gone off course for non-head motor exhaust group as current Wind turbines, institute is recognized State wind direction at current Wind turbines and along along wind direction at the front-seat Wind turbines of current Wind turbines Wind direction relative angle whether be located at 0 degree it is interval, if recognition result is "Yes", perform S513 Stop driftage, otherwise continue to go off course.
Wind turbines foreseeability Yaw control method provided in an embodiment of the present invention, real shown in Fig. 2 Apply on the basis of example, current Wind turbines are set with the relative angle average value of timing statisticses window Go off course the startup time.Meanwhile, it is provided with difference for head motor exhaust group and non-head motor exhaust group The driftage stand-by period, distinguishing progress goes off course the control of time, improves the whole driftage time The accuracy and reasonability of control.
Embodiment three
The knot of Wind turbines foreseeability yaw control device one embodiment that Fig. 6 provides for the present invention Structure block diagram, can perform method and step as shown in Figure 2.As shown in fig. 6, the Wind turbines foreseeability Yaw control device includes:Wind direction acquisition module 610, unit identification module 620 and first are gone off course Control module 630, wherein:
Wind direction acquisition module 610, for obtaining the wind direction inspection in wind power plant at each Wind turbines in real time Survey the wind direction of device collection;Unit identification module 620, for recognizing current Wind turbines along wind direction On whether be head motor exhaust group at first windward;First driftage control module 630, if for machine The recognition result of group identification module is "No", then according to the wind direction at current Wind turbines and edge The relative angle of wind direction on wind direction at the front-seat Wind turbines of current Wind turbines, sets current wind The driftage of group of motors starts the time.
Further, as shown in fig. 7, also being wrapped in above-mentioned Wind turbines foreseeability yaw control device Include:Second driftage control module 640, if the recognition result for unit identification module 620 is "Yes", Then according to the yaw direction of current Wind turbines and its relative angle of the wind direction of position, set The driftage of current Wind turbines starts the time.
Further, as shown in fig. 7, also being wrapped in above-mentioned Wind turbines foreseeability yaw control device Include:Wireless bridge module 650, for the wind direction detector on current Wind turbines to be gathered in real time Wind direction data at current Wind turbines, by wireless bridge transmit to wind power plant it is each other Wind turbines;The radio node of wireless bridge is provided with wind power plant at each Wind turbines.
Further, above-mentioned wind direction acquisition module 610 is additionally operable to, by wireless bridge from current wind The wind direction at other each Wind turbines in wind power plant is obtained at the adjacent Wind turbines of group of motors in real time, And pass through the wind direction at the current Wind turbines of wind direction detector acquisition at current Wind turbines.
Further, as shown in figure 8, above-mentioned first driftage control module 630 includes:
First statistic unit 631, for counting wind direction at current Wind turbines and along wind direction The relative angle of wind direction at the front-seat Wind turbines of current Wind turbines, at least one statistics Between window relative angle average value;First start unit 632, for according at least one statistics The relative angle average value of time window sets the driftage of current Wind turbines to start the time.
Further, above-mentioned first start unit 632, for for every kind of timing statisticses window Relative angle average value, sets current Wind turbines to be continuously located in its relative angle average value default Start driftage at the end of first driftage waiting time in threshold interval.
Further, as shown in figure 8, also including in above-mentioned first driftage control module 630:The One stop element 633, during being gone off course in current Wind turbines, recognizes current wind Wind direction at group of motors and the wind along along wind direction at the front-seat Wind turbines of the current Wind turbines To relative angle whether be located at 0 degree it is interval, if recognition result is "Yes", stop going off course.
Further, as shown in figure 9, above-mentioned second driftage control module 640 includes:Second Statistic unit 641, for counting the yaw direction of current Wind turbines and its wind direction of position Relative angle at least one timing statisticses window relative angle average value;Second start unit 642, for setting the current wind according to the relative angle average value of at least one timing statisticses window The driftage of group of motors starts the time.
Further, above-mentioned second start unit 642, for for every kind of timing statisticses window Relative angle average value, sets current Wind turbines to be continuously located in its relative angle average value default Start driftage at the end of first driftage waiting time in threshold interval.
Further, as shown in figure 9, also including in above-mentioned second driftage control module 640:The Two stop elements 643, during being gone off course in current Wind turbines, recognize current wind Whether the relative angle of the yaw direction of group of motors and its wind direction of position is located at 0 degree of interval, If recognition result is "Yes", stop driftage.
Wind turbines foreseeability yaw control device provided in an embodiment of the present invention, is existed based on wind direction For a long time in transmittance process be in metastable state when, in wind power plant along the heel row on wind direction The driftage startup time of Wind turbines is adjusted, and shortens driftage waiting time, realizes quickly to wind, The generating efficiency of Wind turbines is improved, while reducing rack load.
Further, on the basis of embodiment illustrated in fig. 6, in Fig. 7, Fig. 8 and Fig. 9, with The relative angle average value of timing statisticses window sets the driftage of current Wind turbines to start the time.Together When, the different driftage stand-by period are provided with for head motor exhaust group and non-head motor exhaust group, The distinguishing control for carrying out the driftage time, improves accuracy and the conjunction of whole driftage time control Rationality.
Further, the embodiment of the present invention additionally provides a kind of Wind turbines foreseeability driftage control system System, the system includes:The wind direction detector that is arranged in wind power plant at each Wind turbines and as Fig. 6- Any shown Wind turbines foreseeability yaw control device in Fig. 9.
Further, also include in said system:Wireless bridge, the radio node of the wireless bridge Be arranged in wind power plant at each Wind turbines, and with the wind turbine at identical Wind turbines The yaw control device connection of group foreseeability.
The Wind turbines foreseeability yaw control system that the present invention is provided, can be carried in During yaw The generated energy of Wind turbines is risen, load of wind turbine generator is reduced.
Finally it should be noted that:Various embodiments above is merely illustrative of the technical solution of the present invention, and It is non-that it is limited;Although the present invention is described in detail with reference to foregoing embodiments, ability The those of ordinary skill in domain should be understood:It still can be to the technology described in foregoing embodiments Scheme is modified, or carries out equivalent substitution to which part or all technical characteristic;And this A little modifications are replaced, and the essence of appropriate technical solution is departed from various embodiments of the present invention technology The scope of scheme.

Claims (20)

1. a kind of Wind turbines foreseeability Yaw control method, it is characterised in that including:
The wind direction of the wind direction detector collection in wind power plant at each Wind turbines is obtained in real time;
Whether recognize current Wind turbines is being head motor exhaust group at first windward along along the wind direction;
If recognition result is "No", according to the wind direction at the current Wind turbines and along institute The relative angle of the wind direction on wind direction at the front-seat Wind turbines of the current Wind turbines is stated, is set The driftage of the current Wind turbines starts the time.
2. according to the method described in claim 1, it is characterised in that methods described also includes:
If recognition result is "Yes", according to the yaw direction of the current Wind turbines and its institute In the relative angle of the wind direction of position, the driftage of the current Wind turbines is set to start the time.
3. method according to claim 2, it is characterised in that methods described also includes:
The current wind-powered electricity generation that the wind direction detector on the current Wind turbines is gathered in real time Wind direction data at unit, other each Wind turbines are transmitted to wind power plant by wireless bridge;Institute State the radio node for being provided with the wireless bridge in wind power plant at each Wind turbines.
4. method according to claim 3, it is characterised in that the real-time acquisition wind power plant The wind direction of wind direction detector collection at interior each Wind turbines, including:
Obtained in real time at the adjacent Wind turbines of the current Wind turbines by the wireless bridge Wind direction in wind power plant at other each Wind turbines.
5. the method according to any one of claim 1-4, it is characterised in that the basis Wind direction at the current Wind turbines and along along the wind direction the current Wind turbines front row The relative angle of wind direction at Wind turbines, sets the driftage of the current Wind turbines to start the time, Including:
Count the wind direction at the current Wind turbines and the current wind turbine along along the wind direction The relative angle of wind direction at the front-seat Wind turbines of group, in the phase of at least one timing statisticses window To angular average;
Set described current according to the relative angle average value at least one timing statisticses window The driftage of Wind turbines starts the time.
6. method according to claim 5, it is characterised in that the basis it is described at least A kind of relative angle average value of timing statisticses window sets the driftage of the current Wind turbines to start Time, including:
For the relative angle average value of every kind of timing statisticses window, current Wind turbines are set Continuously it is located at the first driftage waiting time in predetermined threshold value interval in its described relative angle average value At the end of start driftage.
7. method according to claim 6, it is characterised in that methods described also includes:
During the current Wind turbines are gone off course, recognize at the current Wind turbines Wind direction and wind direction along along the wind direction at the front-seat Wind turbines of the current Wind turbines Whether relative angle is located at 0 degree of interval, if recognition result is "Yes", stops driftage.
8. the method according to any one of claim 2-4, it is characterised in that the basis The relative angle of the yaw direction of the current Wind turbines and its wind direction of position, sets institute The driftage for stating current Wind turbines starts the time, including:
Count the relative angle of the yaw direction of the current Wind turbines and its wind direction of position In the relative angle average value of at least one timing statisticses window;
Set described current according to the relative angle average value at least one timing statisticses window The driftage of Wind turbines starts the time.
9. method according to claim 8, it is characterised in that the basis it is described at least A kind of relative angle average value of timing statisticses window sets the driftage of the current Wind turbines to start Time, including:
For the relative angle average value of every kind of timing statisticses window, current Wind turbines are set Continuously it is located at the first driftage waiting time in predetermined threshold value interval in its described relative angle average value At the end of start driftage.
10. a kind of Wind turbines foreseeability yaw control device, it is characterised in that described device bag Include:
Wind direction acquisition module, for obtaining the wind direction inspection in wind power plant at each Wind turbines in real time Survey the wind direction of device collection;
Unit identification module, for recognizing whether current Wind turbines are being at first along along the wind direction Head motor exhaust group windward;
First driftage control module, if the recognition result for the unit identification module is "No", Then current Wind turbines according to the wind direction at the current Wind turbines and along along the wind direction Front-seat Wind turbines at wind direction relative angle, set the driftage of the current Wind turbines to open The dynamic time.
11. device according to claim 10, it is characterised in that described device also includes:
Second driftage control module, if the recognition result for the unit identification module is "Yes", Then according to the yaw direction of the current Wind turbines and its relative angle of the wind direction of position, The driftage of the current Wind turbines is set to start the time.
12. device according to claim 11, it is characterised in that described device also includes:
Wireless bridge module, for the wind direction detector on the current Wind turbines is real-time Wind direction data at the current Wind turbines of collection, is transmitted to wind power plant by wireless bridge Other each Wind turbines;In the wind power plant wireless network is provided with each Wind turbines The radio node of bridge.
13. device according to claim 12, it is characterised in that the wind direction acquisition module For being obtained in real time at the adjacent Wind turbines of the current Wind turbines by the wireless bridge Take the wind direction at other each Wind turbines in wind power plant.
14. the device according to any one of claim 10-13, it is characterised in that described First driftage control module includes:
First statistic unit, for counting wind direction at the current Wind turbines and along the wind The relative angle of wind direction at the front-seat Wind turbines of the upward current Wind turbines, at least one Plant the relative angle average value of timing statisticses window;
First start unit, for according to the relative angle at least one timing statisticses window Average value sets the driftage of the current Wind turbines to start the time.
15. device according to claim 14, it is characterised in that first start unit, For the relative angle average value for every kind of timing statisticses window, current Wind turbines are set Continuously it is located at the first driftage waiting time in predetermined threshold value interval in its described relative angle average value At the end of start driftage.
16. device according to claim 15, it is characterised in that the first driftage control Module also includes:First stop element, for the process gone off course in the current Wind turbines In, recognize the wind direction at the current Wind turbines and the current wind turbine along along the wind direction Whether the relative angle of the wind direction at the front-seat Wind turbines of group is located at 0 degree of interval, if recognition result For "Yes", then stop driftage.
17. the device according to any one of claim 11-13, it is characterised in that described Second driftage control module includes:
Second statistic unit, the yaw direction and its institute for counting the current Wind turbines is in place Relative angle average value of the relative angle for the wind direction put at least one timing statisticses window;
Second start unit, for according to the relative angle at least one timing statisticses window Average value sets the driftage of the current Wind turbines to start the time.
18. device according to claim 17, it is characterised in that second start unit, For the relative angle average value for every kind of timing statisticses window, current Wind turbines are set Continuously it is located at the first driftage waiting time in predetermined threshold value interval in its described relative angle average value At the end of start driftage.
19. a kind of Wind turbines foreseeability yaw control system, it is characterised in that the system bag Include:In the wind direction detector and such as claim 10-18 that are arranged in wind power plant at each Wind turbines Wind turbines foreseeability yaw control device described in any one.
20. system according to claim 19, it is characterised in that the system also includes: Wireless bridge, the radio node of the wireless bridge is arranged in wind power plant at each Wind turbines, And connected with the Wind turbines foreseeability yaw control device at the identical Wind turbines.
CN201610176883.0A 2016-03-24 2016-03-24 Wind turbine generator predictive yaw control method, device and system Active CN107228046B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610176883.0A CN107228046B (en) 2016-03-24 2016-03-24 Wind turbine generator predictive yaw control method, device and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610176883.0A CN107228046B (en) 2016-03-24 2016-03-24 Wind turbine generator predictive yaw control method, device and system

Publications (2)

Publication Number Publication Date
CN107228046A true CN107228046A (en) 2017-10-03
CN107228046B CN107228046B (en) 2018-11-20

Family

ID=59932477

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610176883.0A Active CN107228046B (en) 2016-03-24 2016-03-24 Wind turbine generator predictive yaw control method, device and system

Country Status (1)

Country Link
CN (1) CN107228046B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107762729A (en) * 2016-08-19 2018-03-06 北京金风科创风电设备有限公司 Yaw control method and control system for wind power plant
CN108843496A (en) * 2018-06-13 2018-11-20 华润新能源(信宜)风能有限公司 A kind of control method and system of Wind turbines driftage soft initiator
CN111608857A (en) * 2020-05-09 2020-09-01 上海电气风电集团股份有限公司 Wind generating set, control method and system thereof and computer readable storage medium

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1606658A (en) * 2001-07-31 2005-04-13 艾劳埃斯·乌本 Early-warning system for wind power installations
JP2007285214A (en) * 2006-04-18 2007-11-01 Nabtesco Corp Control device for windmill
CN102168651A (en) * 2011-04-07 2011-08-31 北京金风科创风电设备有限公司 Fan operation method, wind measuring device and wind generating set
EP2696067A2 (en) * 2012-08-06 2014-02-12 General Electric Company Wind turbine yaw control within wind farm
US20140234103A1 (en) * 2013-02-19 2014-08-21 John M. Obrecht Method and system for improving wind farm power production efficiency
CN104481804A (en) * 2014-12-05 2015-04-01 北京金风科创风电设备有限公司 Wind power generator group wind correction control method, device and system
CN105041570A (en) * 2015-07-30 2015-11-11 北京天诚同创电气有限公司 Yaw control method and device for wind turbine generator
CN105065201A (en) * 2015-07-22 2015-11-18 天津瑞源电气有限公司 Control method for ensuring normal running after damage of wind indicator of wind turbine unit

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1606658A (en) * 2001-07-31 2005-04-13 艾劳埃斯·乌本 Early-warning system for wind power installations
JP2007285214A (en) * 2006-04-18 2007-11-01 Nabtesco Corp Control device for windmill
CN102168651A (en) * 2011-04-07 2011-08-31 北京金风科创风电设备有限公司 Fan operation method, wind measuring device and wind generating set
EP2696067A2 (en) * 2012-08-06 2014-02-12 General Electric Company Wind turbine yaw control within wind farm
US20140234103A1 (en) * 2013-02-19 2014-08-21 John M. Obrecht Method and system for improving wind farm power production efficiency
CN104481804A (en) * 2014-12-05 2015-04-01 北京金风科创风电设备有限公司 Wind power generator group wind correction control method, device and system
CN105065201A (en) * 2015-07-22 2015-11-18 天津瑞源电气有限公司 Control method for ensuring normal running after damage of wind indicator of wind turbine unit
CN105041570A (en) * 2015-07-30 2015-11-11 北京天诚同创电气有限公司 Yaw control method and device for wind turbine generator

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107762729A (en) * 2016-08-19 2018-03-06 北京金风科创风电设备有限公司 Yaw control method and control system for wind power plant
CN107762729B (en) * 2016-08-19 2019-06-04 北京金风科创风电设备有限公司 Yaw control method and control system for wind power plant
CN108843496A (en) * 2018-06-13 2018-11-20 华润新能源(信宜)风能有限公司 A kind of control method and system of Wind turbines driftage soft initiator
CN111608857A (en) * 2020-05-09 2020-09-01 上海电气风电集团股份有限公司 Wind generating set, control method and system thereof and computer readable storage medium

Also Published As

Publication number Publication date
CN107228046B (en) 2018-11-20

Similar Documents

Publication Publication Date Title
CN105957319B (en) Micropower wireless meter reading method
CN102761941B (en) A kind of method utilizing ultra-low power consumption wireless smart sensor's network protocol transmission
CN206060359U (en) A kind of Centralized Monitoring operational system of photovoltaic power station
CN111722540A (en) Energy Internet digital twin simulation system and method
CN107228046A (en) Wind turbine generator predictive yaw control method, device and system
CN104093180A (en) Wireless sensing network route method based on multi-gateway data transmisison
CN102797631A (en) Method, system and device for carrying out online self-correcting on optimal gain of wind generating set
CN106330265B (en) A kind of power wire broadband carrier kilowatt meter reading-out system
Shuda et al. Towards module-level performance and health monitoring of solar PV plants using LoRa wireless sensor networks
CN101902798A (en) Rapid networking method of wireless sensor network
He et al. Optimizing information freshness in RF-powered multi-hop wireless networks
CN104750077A (en) Water quality monitoring system of offshore cage based on ZigBee and GPRS (General Packet Radio Service) technologies
JP6369569B2 (en) Control device, control method, and control program
CN102184296B (en) Modelling method of impact load of electrified railway based on actually-measured data
CN202798802U (en) Apparatus used for obtaining and transmitting data of offshore blower fan control system
CN105528517B (en) Based on neural network, wavelet decomposition predicting power of photovoltaic plant method, system
CN103839396A (en) Remote transmission system for measured data of high-frequency anemograph
CN103607732A (en) Active diagnosis method based on information hiding technology in wireless sensor network
CN107271916A (en) A kind of cell plate group string method for detecting health status
CN103888967A (en) Ad-hoc network node credibility evaluation method based on bayesian network
CN103953502A (en) Data collection method and data collection system of wind generating set
CN114006392A (en) Distributed power system energy storage node capacity demand estimation system
CN104375020B (en) A kind of distributed online electric network failure diagnosis method
CN110094295A (en) Wind-powered electricity generation Centralized Monitoring management method and device
CN109450994B (en) Agricultural environment intelligent monitoring system based on big data

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant