CN107227959B - A kind of in-place blasting out boundary coal column/body promotes the water damage control method of closing of fracture - Google Patents

A kind of in-place blasting out boundary coal column/body promotes the water damage control method of closing of fracture Download PDF

Info

Publication number
CN107227959B
CN107227959B CN201710479400.9A CN201710479400A CN107227959B CN 107227959 B CN107227959 B CN 107227959B CN 201710479400 A CN201710479400 A CN 201710479400A CN 107227959 B CN107227959 B CN 107227959B
Authority
CN
China
Prior art keywords
water
fracture
flowing fractured
water flowing
fractured zone
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710479400.9A
Other languages
Chinese (zh)
Other versions
CN107227959A (en
Inventor
鞠金峰
许家林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN201710479400.9A priority Critical patent/CN107227959B/en
Publication of CN107227959A publication Critical patent/CN107227959A/en
Application granted granted Critical
Publication of CN107227959B publication Critical patent/CN107227959B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/006Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries by making use of blasting methods
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Environmental & Geological Engineering (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses the water damage control methods that a kind of in-place blasting out boundary coal column/body promotes closing of fracture, according to the development characteristics of mining overburden height of water flowing fractured zone under specific mining conditions, by the surface drilling column data for collecting each coal mining region, each crucial position layer by layer in overlying strata is determined using position of key stratum method of discrimination, the method for predicting of overlying strata height of water flowing fractured zone is combined later, it determines each region water flowing fractured zone development height and its links up the distributed areas in stratum water-bearing layer, finally, to goaf direction to boundary coal column/body construction blasting boreholes in the tunnel that water flowing fractured zone links up the areas adjacent in water-bearing layer, and implement in-place blasting out, to promote overlying rock that advanced fracture occurs, so that original boundary crack open is gradually closed, reduce fracture opening, reduce its water transmitting ability.

Description

A kind of in-place blasting out boundary coal column/body promotes the water damage control method of closing of fracture
Technical field
The present invention relates to a kind of top plate water damage control methods, especially a kind of to be suitable for coal mining fwaater resources protection and mine In-place blasting out boundary coal column/body in well water evil Prevention Technique field promotes the water damage control method of closing of fracture,
Background technique
Coal underground mining will cause the movement and destruction of overlying rock, to form mining induced fissure in overlying strata;Overlying strata Mining induced fissure, which generates, both provided channel for regional water resources loss, while also becoming the geology root that underground flood damage occurs.When It, will be along leading by the water-bearing layer water body of Mining failure when preservation has one or more layers watery stronger water-bearing layer in coal measure strata Water crack passage influxs underground goaf, and the crack passage in conducting stratum water-bearing layer is more, aquifer water well is stronger, then underground Water yield is bigger, will cause top plate water damage problem when serious, and jeopardize mine safety and efficiently produce.From mining overburden water flowing fractured zone The general features of distribution sees that water flowing fractured zone " shape of a saddle " elevated regions (see attached drawing 2) are in the crack open area of productive limit, Cranny development aperture is big, channel conveyance capacity is strong;If the distribution in the region can be accurately identified, and reduction of taking measures on customs clearance The conveyance capacity in crack, this undoubtedly will be greatly reduced the water leakage degree in water-bearing layer, mitigates underground flood damage threat.
Currently, related top plate water damage prevention and treatment there are two main classes countermeasure.One kind is to pass through construction drill extremely before seam mining Stratum water-bearing layer position carries out water-bearing layer water body into preceding unrestrained, drainage or reduction aquifer water well, reduction underground gushing water Amount.Another kind of is that the angle developed from control water flowing fractured zone carries out, i.e., by controlling mining height or improving coal winning technology and method, Water flowing fractured zone development height is reduced, so that it is not linked up stratum water-bearing layer, to achieve the purpose that prevent water damage.However, The above method all has some limitations, and first kind method is stratum water-bearing layer is more, watery is big, aquifer water supply capacity It will be no longer applicable under strong mining conditions, it is simple by the unrestrained purpose for being unable to reach reduction water-bearing layer rich water amount that drills;And the Two class methods are also difficult to be applicable under conditions of coal seam thickness is big, water-bearing layer is close apart from coal seam, even if in the lesser situation of mining height Lower water flowing fractured zone can still link up water-bearing layer.Therefore, it is necessary to be based on mining overburden water flowing fractured zone development characteristics, carry out people Work promotes the special design of the water damage control method of closing of fracture.
Summary of the invention
Goal of the invention: in order to overcome the deficiencies in the prior art, the present invention provide a kind of in-place blasting out boundary coal column/ Body promotes the water damage control method of closing of fracture, in conjunction with seam mining parameter and hydrogeologic condition, by differentiating mining overburden Water flowing fractured zone link up stratum water-bearing layer distributed areas, establish in-place blasting out boundary coal column/body with promote water producing fractures closure, Reduce the top plate water damage method of fracture opening, to reduce aquifer water resource leak degree, mitigate underground flood damage threat, realizes The safe and efficient production of mine.
Technical solution: to achieve the above object, the technical solution adopted by the present invention are as follows:
A kind of in-place blasting out boundary coal column/body promotes the water damage control method of closing of fracture, according under specific mining conditions The development characteristics of mining overburden height of water flowing fractured zone, by collecting the surface drilling column data in each coal mining region, using pass Key layer position method of discrimination determines each crucial position layer by layer in overlying strata, combines the method for predicting of overlying strata height of water flowing fractured zone later, It determines each region water flowing fractured zone development height and its links up the distributed areas in stratum water-bearing layer, finally, in water flowing fractured zone ditch To goaf direction to boundary coal column/body construction blasting boreholes in the tunnel of the areas adjacent in logical water-bearing layer, and implement explosion pine It is dynamic, to promote overlying rock that advanced fracture occurs, so that original boundary crack open is gradually closed, reduce crack Aperture reduces its water transmitting ability.
Specifically includes the following steps:
A. the geological survey drilling column that mine was once constructed in coal mining region is collected, different production zone roof stratas are obtained Preservation, the physico mechanical characteristic parameter of each rock stratum.Each drill hole key strata of covering rock position is differentiated, so that it is determined that each region Key strata of covering rock position.
B. use " method for predicting of the height of water flowing fractured zone based on position of key stratum ", by key strata of covering rock position with The relationship of mining thickness judges mining overburden height of water flowing fractured zone, so that it is high to obtain each region overlying strata water flowing fractured zone The relativeness of degree and stratum water-bearing layer present position.When there are when water-bearing layer, then correspondence is bored within the scope of height of water flowing fractured zone Bore region water flowing fractured zone has linked up water-bearing layer, needs to take in-place blasting out boundary coal column/body to promote water producing fractures to be closed.When When water-bearing layer being not present within the scope of height of water flowing fractured zone, then without taking in-place blasting out measure.
C. in the production zone that water flowing fractured zone links up stratum water-bearing layer, to boundary coal column/body construction blasting boreholes, and Implement in-place blasting out, to promote overlying rock that advanced fracture revolution occurs, so that original boundary crack open is gradually sent out Raw closure, reduces fracture opening, reduces its water transmitting ability.
It is preferred: each drill hole key strata of covering rock position being carried out using Judging key stratum software KSPB in the step a Differentiate.
Preferred: the blasting boreholes are constructed in the tunnel near the production zone to goaf direction, between average A drill site is set respectively every 25-35m, and each drill site arranges 2-4 drilling, and the whole hole that drills is apart from gob edge 4.5-5.5m.
Preferred: the horizontal space in each drill site 2-4 whole hole that drills is 8-11m, the perpendicular layers in each whole hole that drills Position can be evenly arranged according to coal seam thickness.
It is preferred: after the drilling construction, charge explosion can be carried out, the range of in-place blasting out should reach 30-40m It is wide.
Preferred: the interval 30m between drill site, each drill site arrange 3 drillings, and the whole hole that drills is apart from gob edge 5m。
Preferred: the horizontal space in each drill site 3 whole holes that drill is 10m.
The present invention is based on the influences that coal geology occurrence condition and operational parameter develop overlying strata water flowing fractured zone, it is contemplated that Overlying strata water flowing fractured zone links up the regional scope in stratum water-bearing layer, targetedly implements in-place blasting out boundary coal to these regions Column/body, so that crack is gradually closed, reduces fracture opening, finally reaches to promote overlying rock that fracture revolution occurs in advance To the purpose for reducing crack passage water transmitting ability, preventing top plate water damage from occurring.The present invention will adapt under different exploitation condition In-place blasting out boundary coal column/body promotes the determination of the water damage control method of closing of fracture, can protect for mining area coal mining water resource Shield and water damage prevention and treatment etc. provide safeguard, and application method is reliable, practical.Compared with prior art in, the present invention have with Lower advantage:
(1) mode that the overlying strata water producing fractures for linking up stratum water-bearing layer are taken with " grabbing principal contradiction ", covers productive limit Aperture is larger in rock, the stronger crack implementation of conveyance capacity is artificial promotes closure measures, and not only science is reliable, project amount is low, and And the generation interference that will not also normally mine to working face.
(2) it can adapt to the water damage prevention and treatment side that in-place blasting out boundary coal column under different exploitation condition/body promotes closing of fracture The determination of method can be China stratum watery is strong, top plate water damage threatens big mining area coal mining fwaater resources protection and water damage Prevention and treatment provides safeguard, and implementation method is simple, practical.
Detailed description of the invention
Fig. 1 is the explosion brill that drillhole blasting of the present invention loosens that boundary coal column/body promotes the water damage control method of closing of fracture Hole plane of arrangement figure;
Fig. 2 is that productive limit corresponds to overlying strata water producing fractures crack open distributed areas schematic diagram before the present invention is implemented;
Fig. 3 is that productive limit corresponds to the schematic diagram that closure or aperture reduction occur for overlying strata water producing fractures after the present invention is implemented;
Fig. 4 is that 21401 working face T1 of certain coal mine drilling column and position of key stratum differentiate in actual application of the present invention Result schematic diagram;
Fig. 5 is that 21401 working face T2 of certain coal mine drilling column and position of key stratum differentiate in actual application of the present invention Result schematic diagram;
Fig. 6 is certain 21401 working face boundary pillar blast firing pattern of coal mine in actual application of the present invention;
Wherein, 1 is boundary coal column/body, and 2 be tunnel, and 3 be blasting boreholes, and L1 is in-place blasting out range, and L2 is the whole hole that drills Horizontal space, L3 be drill site interval.
Specific embodiment
In the following with reference to the drawings and specific embodiments, the present invention is furture elucidated, it should be understood that these examples are merely to illustrate this It invents rather than limits the scope of the invention, after the present invention has been read, those skilled in the art are to of the invention various The modification of equivalent form falls within the application range as defined in the appended claims.
As shown in FIG. 1 to 3, a kind of in-place blasting out boundary coal column of the invention/body promotes the water damage prevention and treatment of closing of fracture Method, according to the development characteristics of mining overburden height of water flowing fractured zone under specific mining conditions, by collecting each coal mining region Surface drilling column data determines each crucial position layer by layer in overlying strata using position of key stratum method of discrimination, leads later in conjunction with overlying strata The method for predicting of water fissure zone height determines each region water flowing fractured zone development height and its links up the distributed area in stratum water-bearing layer Domain, finally, to goaf direction to boundary coal column/body construction in the tunnel that water flowing fractured zone links up the areas adjacent in water-bearing layer Blasting boreholes 3, and implement in-place blasting out, to promote overlying rock that advanced fracture occurs, split so that original boundary is opened Gap is gradually closed, and is reduced fracture opening, is reduced its water transmitting ability.Specifically includes the following steps:
A. the geological survey drilling column that mine was once constructed in coal mining region is collected, different production zone roof stratas are obtained Preservation, the physico mechanical characteristic parameter of each rock stratum.Using Judging key stratum software KSPB to each drill hole key strata of covering rock position Differentiated, so that it is determined that each region key strata of covering rock position.
B. use " method for predicting of the height of water flowing fractured zone based on position of key stratum ", by key strata of covering rock position with The relationship of mining thickness judges mining overburden height of water flowing fractured zone, so that it is high to obtain each region overlying strata water flowing fractured zone The relativeness of degree and stratum water-bearing layer present position.When there are when water-bearing layer, then correspondence is bored within the scope of height of water flowing fractured zone Bore region water flowing fractured zone has linked up water-bearing layer, needs to take in-place blasting out boundary coal column/body to promote water producing fractures to be closed.When When water-bearing layer being not present within the scope of height of water flowing fractured zone, then without taking in-place blasting out measure.
C. water flowing fractured zone link up stratum water-bearing layer production zone in, to boundary coal column (body) construction blasting drilling 3, The blasting boreholes 3 are constructed in the tunnel near the production zone to goaf direction, and average drill site interval L3 is 30m points A drill site is not set, and each drill site arranges 3 drillings, and the whole hole that drills is apart from gob edge 5m.Each drill site 3 drillings The horizontal space L2 in whole hole is 10m, and each perpendicular layers position for drilling whole hole can be evenly arranged according to coal seam thickness.The drilling construction After, charge explosion can be carried out, in-place blasting out range L 1 should reach 30-40m wide, advanced disconnected to promote overlying rock to occur Revolution is split, so that original boundary crack open is gradually closed, reduces fracture opening, reduces its water transmitting ability.
It as shown in Figure 4, Figure 5, is production zones drilling columns different in certain 21401 working face actual application of coal mine in figure The position of key stratum of shape differentiates as a result, differentiating that result can be seen that 21401 working faces at the two from columnar position of key stratum There are visibly different features for the rock stratum preservation in drilling region.The overlying strata water flowing fractured zone in two drilling regions can be developed as a result, Judge highly and its to whether stratum water-bearing layer is linked up.According to the mining height of working face 6.0m it is found that for T1 drilling region, Overlying strata main key stratum is located at except 7~10 times of mining heights, therefore water flowing fractured zone is developed to main key stratum bottom interface position, and overlying strata are led Water fissure zone does not link up stratum water-bearing layer;For T1 drilling region, after the same method, key strata of covering rock is respectively positioned on 7~10 Within mining height, overlying strata water producing fractures are developed to tectonic basement, and water flowing fractured zone has linked up stratum water-bearing layer.It is therefore desirable to right T2 drilling region corresponding sides circle coal column implements in-place blasting out, to cover crack open closure in boundary in promotion, reduces crack overcurrent energy Power.
It drills as shown in fig. 6, corresponding to construction blasting in the tunnel near productive limit in T2 drilling region, between average drill site A drill site is set respectively every 30m, and each drill site arranges 3 drillings, and the whole hole that drills is apart from gob edge 5m;Each drill site 3 The horizontal space in the whole hole of drilling is 10m, and each perpendicular layers position for drilling end hole can be according to the thickness of coal seam 6.0m according to the vertical of 2m Spacing is evenly arranged;After drilling construction, charge explosion is carried out, powder charge range is drilling borehole bottom location to aperture direction 25m Section guarantees that in-place blasting out range reaches 30-40m wide.
The present invention is based on the influences that coal geology occurrence condition and operational parameter develop overlying strata water flowing fractured zone, it is contemplated that Overlying strata water flowing fractured zone links up the regional scope in stratum water-bearing layer, targetedly implements in-place blasting out boundary coal to these regions Column/body, so that crack is gradually closed, reduces fracture opening, finally reaches to promote overlying rock that fracture revolution occurs in advance To the purpose for reducing crack passage water transmitting ability, preventing top plate water damage from occurring.The present invention will adapt under different exploitation condition In-place blasting out boundary coal column/body promotes the determination of the water damage control method of closing of fracture, can protect for mining area coal mining water resource Shield and water damage prevention and treatment etc. provide safeguard, and application method is simple and reliable, practical.
The above is only a preferred embodiment of the present invention, it should be pointed out that: for the ordinary skill people of the art For member, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications are also answered It is considered as protection scope of the present invention.

Claims (8)

1. a kind of in-place blasting out boundary coal column/body promotes the water damage control method of closing of fracture, which is characterized in that according to specifically opening The development characteristics of mining overburden height of water flowing fractured zone under the conditions of adopting, the surface drilling column by collecting each coal mining region provide Material determines each crucial position layer by layer in overlying strata using position of key stratum method of discrimination, later in conjunction with overlying strata height of water flowing fractured zone Method for predicting determines each region water flowing fractured zone development height and its links up the distributed areas in stratum water-bearing layer, finally, in water guide Fissure zone is linked up in the tunnel of the areas adjacent in water-bearing layer to goaf direction to boundary coal column/body construction blasting boreholes, and real In-place blasting out is applied, to promote overlying rock that advanced fracture occurs, so that original boundary crack open is gradually closed, Reduce fracture opening, reduces its water transmitting ability.
2. in-place blasting out boundary coal column/body promotes the water damage control method of closing of fracture according to claim 1, feature exists In, comprising the following steps:
A. the geological survey drilling column that mine was once constructed in coal mining region is collected, different production zone roof stratas is obtained and assigns It deposits, the physico mechanical characteristic parameter of each rock stratum;Each drill hole key strata of covering rock position is differentiated, so that it is determined that each region is covered Rock position of key stratum;
B. " method for predicting of the height of water flowing fractured zone based on position of key stratum " is used, passes through key strata of covering rock position and coal seam The relationship of mining height judges mining overburden height of water flowing fractured zone, thus obtain each region overlying strata height of water flowing fractured zone with The relativeness of stratum water-bearing layer present position;When there are when water-bearing layer, then corresponding to bore area within the scope of height of water flowing fractured zone Domain water flowing fractured zone has linked up water-bearing layer, needs to take in-place blasting out boundary coal column/body to promote water producing fractures to be closed;Work as water guide When water-bearing layer being not present in fissure zone altitude range, then without taking in-place blasting out measure;
C. in the production zone that water flowing fractured zone links up stratum water-bearing layer, to boundary coal column/body construction blasting boreholes, and implement In-place blasting out, to promote overlying rock that advanced fracture revolution occurs, so that original boundary crack open is gradually closed It closes, reduces fracture opening, reduce its water transmitting ability.
3. in-place blasting out boundary coal column/body promotes the water damage control method of closing of fracture according to claim 2, feature exists In: each drill hole key strata of covering rock position is differentiated using Judging key stratum software KSPB in the step a.
4. in-place blasting out boundary coal column/body promotes the water damage control method of closing of fracture according to claim 2, feature exists It constructs in the tunnel near the production zone to goaf direction in: blasting boreholes, equispaced 25-35m difference If a drill site, each drill site arranges 2-4 drilling, and the whole hole that drills is apart from gob edge 4.5-5.5m.
5. in-place blasting out boundary coal column/body promotes the water damage control method of closing of fracture according to claim 4, feature exists In: the horizontal space in each drill site 2-4 whole hole that drills is 8-11m, and the perpendicular layers position in each whole hole that drills is according to coal seam thickness Degree is evenly arranged.
6. in-place blasting out boundary coal column/body promotes the water damage control method of closing of fracture according to claim 2, feature exists In: after the drilling construction, charge explosion can be carried out, the range of in-place blasting out should reach 30-40m wide.
7. in-place blasting out boundary coal column/body promotes the water damage control method of closing of fracture according to claim 2, feature exists In: the interval 30m between drill site, each drill site arrange 3 drillings, and the whole hole that drills is apart from gob edge 5m.
8. in-place blasting out boundary coal column/body promotes the water damage control method of closing of fracture according to claim 2, feature exists In: the horizontal space in each drill site 3 whole holes that drill is 10m.
CN201710479400.9A 2017-06-22 2017-06-22 A kind of in-place blasting out boundary coal column/body promotes the water damage control method of closing of fracture Active CN107227959B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710479400.9A CN107227959B (en) 2017-06-22 2017-06-22 A kind of in-place blasting out boundary coal column/body promotes the water damage control method of closing of fracture

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710479400.9A CN107227959B (en) 2017-06-22 2017-06-22 A kind of in-place blasting out boundary coal column/body promotes the water damage control method of closing of fracture

Publications (2)

Publication Number Publication Date
CN107227959A CN107227959A (en) 2017-10-03
CN107227959B true CN107227959B (en) 2019-05-07

Family

ID=59935136

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710479400.9A Active CN107227959B (en) 2017-06-22 2017-06-22 A kind of in-place blasting out boundary coal column/body promotes the water damage control method of closing of fracture

Country Status (1)

Country Link
CN (1) CN107227959B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108590717B (en) * 2018-05-10 2019-11-26 中国矿业大学 The water-retaining method of chemical tendering carbonate rock promotion mining induced fissure selfreparing
CN109441450A (en) * 2018-09-03 2019-03-08 中国矿业大学(北京) A kind of double resource pit mining modes of lower coal water of overlying strata hydrogeologic condition disturbance
CN113565566B (en) * 2021-08-24 2023-03-28 中铁二院工程集团有限责任公司 Construction method for dewatering, depressurizing and stabilizing tunnel face of water-rich composite stratum

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101196123A (en) * 2007-12-27 2008-06-11 淮北矿业(集团)有限责任公司 Aquifer preventing and controlling method for coal face roof plate separation layer
WO2011148285A2 (en) * 2010-05-26 2011-12-01 Schlumberger Canada Limited Mine dewatering system and method
CN102943690A (en) * 2012-10-30 2013-02-27 神华集团有限责任公司 Method for preventing and treating separation layer water of top plate of coal face
CN103993878A (en) * 2014-05-26 2014-08-20 中国矿业大学 Water diversion fracture zone height estimating method
CN104386409A (en) * 2014-10-21 2015-03-04 中国矿业大学 Water conservancy method using grounding drilling and water source guidance and storage in goaf for coal mine areas
CN104481587A (en) * 2014-11-10 2015-04-01 山东科技大学 Large-mining depth and long-span fully-mechanized top-coal caving face roof sandstone fracture water detecting and preventing method
CN104963721A (en) * 2015-05-26 2015-10-07 安徽建筑大学 Downhole stereo rapid water drainage method through the combination of horizontal drilling holes and vertical drilling holes
AU2013252230B2 (en) * 2012-04-28 2016-05-12 China Shenhua Energy Company Limited Method for distributed storage and use of underground water in mine

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101196123A (en) * 2007-12-27 2008-06-11 淮北矿业(集团)有限责任公司 Aquifer preventing and controlling method for coal face roof plate separation layer
WO2011148285A2 (en) * 2010-05-26 2011-12-01 Schlumberger Canada Limited Mine dewatering system and method
AU2013252230B2 (en) * 2012-04-28 2016-05-12 China Shenhua Energy Company Limited Method for distributed storage and use of underground water in mine
CN102943690A (en) * 2012-10-30 2013-02-27 神华集团有限责任公司 Method for preventing and treating separation layer water of top plate of coal face
CN103993878A (en) * 2014-05-26 2014-08-20 中国矿业大学 Water diversion fracture zone height estimating method
CN104386409A (en) * 2014-10-21 2015-03-04 中国矿业大学 Water conservancy method using grounding drilling and water source guidance and storage in goaf for coal mine areas
CN104481587A (en) * 2014-11-10 2015-04-01 山东科技大学 Large-mining depth and long-span fully-mechanized top-coal caving face roof sandstone fracture water detecting and preventing method
CN104963721A (en) * 2015-05-26 2015-10-07 安徽建筑大学 Downhole stereo rapid water drainage method through the combination of horizontal drilling holes and vertical drilling holes

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
分形理论研究采动裂隙演化规律;宋白雪等;《工程勘察》;20170101;第1-6页 *

Also Published As

Publication number Publication date
CN107227959A (en) 2017-10-03

Similar Documents

Publication Publication Date Title
CN107044289B (en) A kind of bored grouting blocks the water damage control method of overlying strata water producing fractures main channel
CN108894727B (en) Water retention method for plugging main channel of overburden rock water flowing fracture by grouting in ground horizontal directional drilling
CN110242301B (en) Two-step grouting modification water-retention coal mining method for roof aquifer
CN106907175B (en) The efficient extraction coal roadway stripe gas of bottom plate concordant long drilled holes staged fracturing and region outburst elimination method
CN103867229B (en) A kind of coal mine large-mining is dark prevents and treats comprehensive treatment method for water with lower group of coal mining
CN102337919B (en) A four-period-five-purpose hole-drilling high-efficiency gas extracting process
CN106089291B (en) A kind of method for cooperateing with extraction to be caving the old dead zone of formula and lower coal seam coal bed gas
CN104314610A (en) Outburst eliminating method for coal roadway stripe region
WO2023273091A1 (en) Method for preventing and controlling rock bursts in development roadway group
CN112593936B (en) Advanced comprehensive control method for multi-disaster area of deep mine
CN108343418B (en) Method for controlling mining influence range from surface directional hydraulic fracturing pre-cracked bedrock
CN107227959B (en) A kind of in-place blasting out boundary coal column/body promotes the water damage control method of closing of fracture
CN108412453A (en) A kind of coal mining water controls system and construction method altogether with gas
CN107120137B (en) A kind of coal roadway tunneling is along seat earth Deephole pre-splitting blasting pumping method
CN107339105B (en) A method of stop adopting line coal column in the layering residual exploiting field of paste body filling second mining super high seam
CN109162731A (en) Iron producing area deep mining gushing water grouting treatment method
WO2019214031A1 (en) Water retention method for promoting self-repairing of mining-induced fracture by chemically softening carbonate rock
CN114876403B (en) Grouting repairing method for mining high-level fracture space
CN110043309A (en) Close the method for arranging and well bore installation method of the gas drainage well of coal mine
CN115749855A (en) Method for recovering fault coal pillar resources based on advanced pre-grouting
CN109098711A (en) It is a kind of to block the heavily stressed method in ore body top using pressure relief groove
CN105927192B (en) A kind of method for being caving the old dead zone of formula and lower coal seam coal bed gas unitized production
CN113622952A (en) Comprehensive treatment method for water damage of mountain green coal in structurally complex area
Han et al. Exploitation technology of pressure relief coalbed methane in vertical surface wells in the Huainan coal mining area
CN106285777B (en) The method that flood mine mineral building discharges water in advance

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant