CN107227862A CN201710563525.XA CN201710563525A CN107227862A CN 107227862 A CN107227862 A CN 107227862A CN 201710563525 A CN201710563525 A CN 201710563525A CN 107227862 A CN107227862 A CN 107227862A
Authority
CN
China
Prior art keywords
sliding
sliding beam
steel ball
building
counter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710563525.XA
Other languages
Chinese (zh)
Other versions
CN107227862B (en
Inventor
朱奎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tancheng Economic Development Zone Pharmaceutical Development Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority to CN201811322904.0A priority Critical patent/CN109184259B/en
Priority to CN201811328587.3A priority patent/CN109184260B/en
Priority to CN201811322768.5A priority patent/CN109184256B/en
Priority to CN201811322858.4A priority patent/CN109184258A/en
Priority to CN201811337134.7A priority patent/CN109184261B/en
Application filed by Individual filed Critical Individual
Priority to CN201811322818.XA priority patent/CN109184257A/en
Priority to CN201710563525.XA priority patent/CN107227862B/en
Publication of CN107227862A publication Critical patent/CN107227862A/en
Application granted granted Critical
Publication of CN107227862B publication Critical patent/CN107227862B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/06Separating, lifting, removing of buildings; Making a new sub-structure

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The invention discloses a kind of gliding construction method of building, it is characterized in that construction procedure includes:(1) section of frame column 1/5 is cut as the coupling part with sliding beam;(2) brick wall at sliding beam position is cut, supporting module;(3) sliding beam steel is installed;(4) sliding beam concrete is poured;(5) coupling reinforcing bar and abolishing the concrete of coupling part for frame column and raft plate is cut off with wind cutting mill;(6) by wooden straining beam and the pre-buried screw attachment of sliding beam;(7) the new basis at sliding beam position in place is poured;(8) in raft plate towards the embedded traction steel suspension ring of direction of draw, counter-force facility and jack are installed in construction counter-force stake;(9) rail is slid in glide direction laying, also laying slides rail above on new basis;(10) drawn using traction facility;(11) sliding beam is coupled with new basis, frame column is coupled with new basis.

Description

The gliding construction method of building
Technical field
The present invention relates to a kind of sliding construction, more particularly to a kind of gliding construction method of building.
Background technology
It is like a raging fire that urban construction is just being carried out, because urban planning and town road construction need to remove building, If a large amount of building wastes can be caused by directly carrying out demolition of buildings, and produce pollution.Especially historical protective is normal The building used, it will be very big loss to be removed.It is intact and still have the building of use value for some structures, adopt Secondary design iterations and construction are then avoided with building sliding technology, can be come into operation immediately after sliding in place, it is clear that Can have obvious economic benefit and social benefit.But, building safety how is ensured in slipping, how to carry out and builds Build thing with new basic to couple, and how cost is reduced in the case where ensuring secured premise.
The content of the invention
The present invention is to provide a kind of gliding construction method of building, solve building sliding construction is dangerous and cost High the problem of.
The present invention sets sliding beam on raft plate, and adjacent sliding beam distance is 3~3.6m, sliding beam bottom and raft plate top Portion's distance is 60~80mm, depending on sliding depth of beam is according to upper load, and when the building number of plies is 5 layers, sliding depth of beam is 800mm;When the building number of plies is 4 layers, sliding depth of beam is 750mm;When the building number of plies is 3 layers, sliding depth of beam is 700mm;When the building number of plies is 2 layers, sliding depth of beam is 650mm;When the building number of plies is 1 layer, sliding depth of beam is 600mm。
Sliding beam width is 300mm.Steel ball, a diameter of 60~80mm of steel ball is provided below in sliding beam.
In order to avoid sliding beam occurs setting wooden straining beam to increase between local failure, adjacent sliding beam in slipping Integral rigidity, the wooden a diameter of 150~180mm of straining beam, wooden straining beam and sliding beam angle are 45~60 degree.
Set counter-force stake as counter-force facility on the right side of traction building on-station position, counter-force stake is from building position in place Put distance and have 0.6~0.8m to have an operation working space, counter-force stake uses prefabricated tubular pile, prefabricated tubular pile a diameter of 500~ 600mm.Frictional force is much larger when initial frictional is than pulling motion when counter-force stake is due to traction building, is tied according to a large amount of detections Really, initial friction force coefficient is 0.15~0.2 when using this technique traction building, and the coefficient of kinetic friction is during pulling motion 0.017~0.025, in order to cost-effective, combined during initial traction using counter-force stake and engineering pile as reaction support, traction fortune When dynamic reaction support is used as only with counter-force stake.
Building has certain vibration in the process of walking, can be by taking if surrounding enviroment are high to damping requirements Technical measures reach the purpose of vibration damping.Set in sliding rail bottom every 2~3m and bullet is installed in vibration damping bloom, vibration damping bloom Spring, makes sliding rail as spring body, makes to be located at the steel ball in the range of sliding rail body when running into advance resistance, energy Alleviate impulsive force by the effect of vibration damping bloom inner spring, vibrational energy is directly attracted by vibration damping bloom inner spring, makes to run into resistance The steel ball of power avoids bearing excessive pressure and impulsive force.
Construction procedure includes:
(1) in order that sliding beam forms entirety with frame column, the section of frame column 1/5 is cut as the connecting portion with sliding beam Point;Temporary support is set near frame column.
(2) brick wall at sliding beam position is cut, supporting module, lateral template top sets fill orifice and shocks hole, fills A diameter of 40~the 50mm of orifice, fill orifice sets spacing to be 1.2~1.5m;Bore dia is shocked for 20~30mm, hole setting is shocked Spacing is 0.7~0.9m;Placed in supporting module in template bottom at the top of steel ball, steel ball insertion lower template, steel ball It is identical with lower template elevation of top, there is bearing in the middle of steel ball, bearing stretches into template, and bearing built-in length is 120~150mm.
(3) sliding beam steel is installed, the part of chiseling that sliding beam main tendon stretches into frame column bends to increase up or down Anchorage length, anchorage length is 500~700mm.
(4) sliding beam concrete is poured, then pouring frame post cuts position concrete, concrete is carried out using high-pressure pump Perfusion.
(5) that cuts off frame column and raft plate with wind cutting mill after sliding beam concrete strength reaches design strength couples reinforcing bar And the concrete of coupling part is abolished, make frame column elevation of bottom identical with sliding beam elevation of bottom.
(6) by wooden straining beam and the pre-buried screw attachment of sliding beam.
(7) the new basis at sliding beam position in place is poured.
(8) in raft plate towards the embedded traction steel suspension ring of direction of draw, counter-force facility and jack are installed in construction counter-force stake.
(9) rail is slid in glide direction laying, also laying slides rail above on new basis.
(10) drawn using traction facility.
Traction facility automatically controls hydraulic synchronous system by hydraulic system, detection using hydraulic synchronous system is automatically controlled Sensor and computer control system composition, wherein hydraulic system include oil pump, hydraulic jack.Hydraulic system is by computer control System, is automatically finished synchronous shift, realizes power and Bit andits control, operation locking, process display function.Hydraulic system working pressure 30~32MPa, spike pressure is 35MPa.Pushing tow cylinder thrust stroke is 1200mm, and pushing tow controls speed to be 0~60mm/min, group Interior each pushing tow cylinder pressure communication, position synchronization control between group and group, synchronization accuracy is ± lmm.
(11) sliding beam is coupled with new basis, frame column is coupled with new basis.
There can be two kinds of processing modes after sliding in place, one kind is that steel ball is cut with wind after jacking sliding beam and sliding is removed Rail, then transfers sliding beam and is coupled sliding beam with new basis.This technique is a risk that in jacking sliding beam mistake In journey easily because accept it is uneven there is partial structurtes destruction.
If fabric structure performance is not good, sliding rail is welded with new reinforcement foundation, slid in place afterwards by steel ball Welded with sliding rail, make that after steel ball rolling translation can not possibly be carried out in the presence of external load.Will sliding rail and steel Ball gap is poured closely knit with high strength micro expansion pea gravel concreten, and steel ball is poured in high strength micro expansion pea gravel concreten. It not only ensure that superstructure is reliably connected with new basic using above-mentioned measure, and in the effect for meeting with violent earthquake load When, part seismic energy can be absorbed by sliding the mutual friction and Extrusion deformation poured after rail between filling pea gravel concreten and steel ball Amount, reduces effect of the earthquake to superstructure, can play certain function of shock insulation.
Frame column is connected with new basis connection using pea gravel concreten shove, and shove technique ensure that after pillar Linking with foundation Its vertical displacement is zero.Shove is to use dry pea gravel concreten, and stiff degree with hand to pinch agglomerating, and landing scatters to close Lattice.By two sides mould card clamping that frame column is relative during shove, dry concrete is squeezed into from other two sides.
The present invention has a safety feature, low engineering cost.
Brief description of the drawings
Fig. 1, Sliding Structures schematic diagram, Fig. 2, formwork erection schematic diagram, Fig. 3, glide mirror (plane) schematic diagram, Fig. 4, vibration damping bloom Schematic diagram.
In each accompanying drawing:1st, sliding beam, 2, frame column, 3, raft plate, 4, steel ball, 5, sliding beam main tendon, 6, template, 7, wood draws Beam, 8, vibration damping bloom, 9, spring.
Embodiment
Embodiment one
Sliding beam 1 is set in embodiment on raft plate 3, and adjacent sliding beam 1 is apart from for 3.2m, the bottom of sliding beam 1 and raft The distance from top of plate 3 is 70mm, and the height of sliding beam 1 is 750mm.The width of sliding beam 1 is 300mm.Steel ball is provided below in sliding beam 1 4, a diameter of 70mm of steel ball 4.
Wooden straining beam 7, a diameter of 160mm of wooden straining beam 7 are set between adjacent sliding beam 1, and wooden straining beam 7 is with the angle of sliding beam 1 60 degree.
Set counter-force stake as counter-force facility on the right side of traction building on-station position, counter-force stake is from building position in place Putting distance has 0.7m, and counter-force stake uses prefabricated tubular pile, a diameter of 500mm of prefabricated tubular pile.Using counter-force stake and work during initial traction Journey stake is combined as reaction support, and reaction support is used as only with counter-force stake during pulling motion.
Set in sliding rail bottom every 2~3m and spring 9 is installed in vibration damping bloom 8, vibration damping bloom 8, make sliding rail As spring body, make to be located at the steel ball 4 in the range of sliding rail body when running into advance resistance, can be by vibration damping bloom Impulsive force is alleviated in the effect of 8 inner springs 9.
Construction procedure includes:
(1) section of frame column 1/5 is cut as the coupling part with sliding beam 1;Interim branch is set near frame column 2 Support.
(2) brick wall at the position of sliding beam 1 is cut, supporting module 6, the lateral top of template 6 sets fill orifice and shocks hole, The a diameter of 40mm of fill orifice, fill orifice sets spacing to be 1.3m;Bore dia is shocked for 25mm, hole is shocked and sets spacing to be 0.8m; Steel ball 4, the insertion lower template 6 of steel ball 4, the top of steel ball 4 and lower template 6 are placed in the bottom of template 6 in supporting module 6 Elevation of top is identical, there is bearing in the middle of steel ball 4, and bearing stretches into template 6, and bearing built-in length is 130mm.
(3) reinforcing bar of sliding beam 1 is installed, the part of chiseling that sliding beam main tendon 5 stretches into frame column 2 bends to increase up or down Plus anchorage length, anchorage length is 600mm.
(4) concrete of sliding beam 1 is poured, then pouring frame post 2 cuts position concrete, and concrete is entered using high-pressure pump Row perfusion.
(5) coupling for frame column 2 and raft plate 3 is cut off with wind cutting mill after the concrete strength of sliding beam 1 reaches design strength Reinforcing bar and the concrete for abolishing coupling part, make the elevation of bottom of frame column 2 identical with the elevation of bottom of sliding beam 1.
(6) by wooden straining beam 7 and the pre-buried screw attachment of sliding beam 1.
(7) the new basis at the position in place of sliding beam 1 is poured.
(8) in raft plate 3 towards the embedded traction steel suspension ring of direction of draw, counter-force facility and jack are installed in construction counter-force stake.
(9) rail is slid in glide direction laying, also laying slides rail above on new basis.
(10) drawn using traction facility.
Traction facility automatically controls hydraulic synchronous system by hydraulic system, detection using hydraulic synchronous system is automatically controlled Sensor and computer control system composition, wherein hydraulic system include oil pump, hydraulic jack.Hydraulic system is by computer control System, is automatically finished synchronous shift, realizes power and Bit andits control, operation locking, process display function.Hydraulic system working pressure 30~32MPa, spike pressure is 35MPa.Pushing tow cylinder thrust stroke is 1200mm, and pushing tow controls speed to be 0~60mm/min, group Interior each pushing tow cylinder pressure communication, position synchronization control between group and group, synchronization accuracy is ± lmm.
(11) sliding beam 1 is coupled with new basis, frame column 2 is coupled with new basis.
Steel ball 4 is cut with wind after jacking sliding beam 1, jacking sliding beam 1 after sliding in place and sliding rail is removed, then under Sliding beam 1 is put to be coupled sliding beam 1 with new basis.
Frame column 2 is connected with new basis connection using pea gravel concreten shove, and shove technique ensure that pillar Linking with foundation Its vertical displacement is zero afterwards.Shove is to use dry pea gravel concreten, and stiff degree with hand to pinch agglomerating, and landing scatters to close Lattice.By two sides mould card clamping that frame column 2 is relative during shove, dry concrete is squeezed into from other two sides.
Embodiment two
Sliding beam 1 is set in embodiment on raft plate 3, and adjacent sliding beam 1 is apart from for 3.2m, the bottom of sliding beam 1 and raft The distance from top of plate 3 is 70mm, and the height of sliding beam 1 is 700mm;The width of sliding beam 1 is 300mm.Steel ball is provided below in sliding beam 1 4, a diameter of 70mm of steel ball 4.
Wooden straining beam 7 is set between adjacent sliding beam 1, and a diameter of 150~180mm of wooden straining beam 7, wooden straining beam 7 is pressed from both sides with sliding beam 1 Angle is 50 degree.
Set counter-force stake as counter-force facility on the right side of traction building on-station position, counter-force stake is from building position in place Putting distance has 0.7m, and counter-force stake uses prefabricated tubular pile, a diameter of 500~600mm of prefabricated tubular pile.Using counter-force stake during initial traction Combine with engineering pile as reaction support, reaction support is used as only with counter-force stake during pulling motion.
Set in sliding rail bottom every 2~3m and spring 9 is installed in vibration damping bloom 8, vibration damping bloom 8, make sliding rail As spring body, make to be located at the steel ball 4 in the range of sliding rail body when running into advance resistance, can be by vibration damping bloom Impulsive force is alleviated in the effect of 8 inner springs 9.
Construction procedure includes:
(1) section of frame column 1/5 is cut as the coupling part with sliding beam 1;Interim branch is set near frame column 2 Support.
(2) brick wall at the position of sliding beam 1 is cut, supporting module 6, the lateral top of template 6 sets fill orifice and shocks hole, The a diameter of 45mm of fill orifice, fill orifice sets spacing to be 1.3m;Bore dia is shocked for 25mm, hole is shocked and sets spacing to be 0.8m; Steel ball 4, the insertion lower template 6 of steel ball 4, the top of steel ball 4 and lower template 6 are placed in the bottom of template 6 in supporting module 6 Elevation of top is identical, there is bearing in the middle of steel ball 4, and bearing stretches into template 6, and bearing built-in length is 130mm.
(3) reinforcing bar of sliding beam 1 is installed, the part of chiseling that sliding beam main tendon 5 stretches into frame column 2 bends to increase up or down Plus anchorage length, anchorage length is 500mm.
(4) concrete of sliding beam 1 is poured, then pouring frame post 2 cuts position concrete, and concrete is entered using high-pressure pump Row perfusion.
(5) coupling for frame column 2 and raft plate 3 is cut off with wind cutting mill after the concrete strength of sliding beam 1 reaches design strength Reinforcing bar and the concrete for abolishing coupling part, make the elevation of bottom of frame column 2 identical with the elevation of bottom of sliding beam 1.
(6) by wooden straining beam 7 and the pre-buried screw attachment of sliding beam 1.
(7) the new basis at the position in place of sliding beam 1 is poured.
(8) in raft plate 3 towards the embedded traction steel suspension ring of direction of draw, counter-force facility and jack are installed in construction counter-force stake.
(9) rail is slid in glide direction laying, also laying slides rail above on new basis.
(10) drawn using traction facility.
Traction facility automatically controls hydraulic synchronous system by hydraulic system, detection using hydraulic synchronous system is automatically controlled Sensor and computer control system composition, wherein hydraulic system include oil pump, hydraulic jack.Hydraulic system is by computer control System, is automatically finished synchronous shift, realizes power and Bit andits control, operation locking, process display function.Hydraulic system working pressure 30~32MPa, spike pressure is 35MPa.Pushing tow cylinder thrust stroke is 1200mm, and pushing tow controls speed to be 0~60mm/min, group Interior each pushing tow cylinder pressure communication, position synchronization control between group and group, synchronization accuracy is ± lmm.
(11) sliding beam 1 is coupled with new basis, frame column 2 is coupled with new basis.
Sliding rail is welded with new reinforcement foundation, sliding in place afterwards welds steel ball 4 with sliding rail, makes steel ball Rolling translation can not possibly be carried out in the presence of external load after 4.Rail will be slid and the gap of steel ball 4 is thin with high strength micro expansion Stone concrete pours closely knit, and steel ball 4 is poured in high strength micro expansion pea gravel concreten.
Frame column 2 is connected with new basis connection using pea gravel concreten shove, and shove technique ensure that pillar Linking with foundation Its vertical displacement is zero afterwards.Shove is to use dry pea gravel concreten, and stiff degree with hand to pinch agglomerating, and landing scatters to close Lattice.By two sides mould card clamping that frame column 2 is relative during shove, dry concrete is squeezed into from other two sides.

Claims (7)

1. a kind of gliding construction method of building, it is characterized in that setting sliding beam on raft plate, adjacent sliding beam distance is 3 ~3.6m, sliding beam bottom is 60~80mm with raft plate distance from top, and sliding beam width is 300mm;Steel is provided below in sliding beam Ball, a diameter of 60~80mm of steel ball;
Wooden straining beam is set between adjacent sliding beam, the wooden a diameter of 150~180mm of straining beam, wooden straining beam and sliding beam angle be 45~ 60 degree;
Construction procedure includes:
(1) section of frame column 1/5 is cut as the coupling part with sliding beam;Temporary support is set near frame column;
(2) brick wall at sliding beam position is cut, supporting module, lateral template top sets fill orifice and shocks hole, fill orifice A diameter of 40~50mm, fill orifice sets spacing to be 1.2~1.5m;Bore dia is shocked for 20~30mm, hole is shocked and spacing is set For 0.7~0.9m;Placed in supporting module in template bottom at the top of steel ball, steel ball insertion lower template, steel ball with Die head absolute altitude is identical, there is bearing in the middle of steel ball, and bearing stretches into template, and bearing built-in length is 120~150mm;
(3) sliding beam steel is installed, the part of chiseling that sliding beam main tendon stretches into frame column bends to increase anchoring up or down Length, anchorage length is 500~700mm;
(4) sliding beam concrete is poured, then pouring frame post cuts position concrete, concrete is filled using high-pressure pump Note;
(5) that cuts off frame column and raft plate with wind cutting mill after sliding beam concrete strength reaches design strength couples reinforcing bar and broken Except the concrete of coupling part, make frame column elevation of bottom identical with sliding beam elevation of bottom;
(6) by wooden straining beam and the pre-buried screw attachment of sliding beam;
(7) the new basis at sliding beam position in place is poured;
(8) in raft plate towards the embedded traction steel suspension ring of direction of draw, counter-force facility and jack are installed in construction counter-force stake;
(9) rail is slid in glide direction laying, also laying slides rail above on new basis;
(10) drawn using traction facility;
Traction facility automatically controls hydraulic synchronous system and sensed by hydraulic system, detection using hydraulic synchronous system is automatically controlled Device and computer control system composition, wherein hydraulic system include oil pump, hydraulic jack;Hydraulic system by computer control, Synchronous shift is automatically finished, power and Bit andits control, operation locking, process display function is realized;Hydraulic system working pressure 30 ~32MPa, spike pressure is 35MPa;Pushing tow cylinder thrust stroke is 1200mm, and pushing tow controls speed to be in 0~60mm/min, group Each pushing tow cylinder pressure communication, position synchronization control between group and group, synchronization accuracy is ± lmm;
(11) sliding beam is coupled with new basis, frame column is coupled with new basis.
2. the gliding construction method of building according to claim 1, it is characterized in that sliding depth of beam is according to upper load Depending on, when the building number of plies is 5 layers, sliding depth of beam is 800mm;When the building number of plies is 4 layers, sliding depth of beam is 750mm; When the building number of plies is 3 layers, sliding depth of beam is 700mm;When the building number of plies is 2 layers, sliding depth of beam is 650mm;When building It is 1 layer to build nitride layer number, and sliding depth of beam is 600mm.
3. the gliding construction method of building according to claim 1, it is characterized in that in sliding rail bottom every 2~3m Set and spring is installed in vibration damping bloom, vibration damping bloom, make sliding rail as spring body, make to be located at sliding rail body scope Interior steel ball can alleviate impulsive force when running into advance resistance by the effect of vibration damping bloom inner spring.
4. the gliding construction method of building according to claim 1, it is characterized in that in traction building on-station position Right side sets counter-force stake as counter-force facility, and counter-force stake is from there is 0.6~0.8m with a distance from building on-station position, counter-force stake is using pre- Tubulation stake, a diameter of 500~600mm of prefabricated tubular pile;Combined during initial traction using counter-force stake and engineering pile as reaction support, During pulling motion reaction support is used as only with counter-force stake.
5. the gliding construction method of building according to claim 1, it is characterized in that jacking sliding beam after sliding in place, top Rise and steel ball is cut with wind after sliding beam and sliding rail is removed, then transfer sliding beam and coupled sliding beam with new basis.
6. the gliding construction method of building according to claim 1, it is characterized in that will sliding rail and new reinforcement foundation Welding, sliding in place afterwards welds steel ball with sliding rail, makes to carry out in the presence of external load after steel ball Roll translation;Will sliding rail poured with steel ball gap with high strength micro expansion pea gravel concreten it is closely knit, by steel ball pour in In high strength micro expansion pea gravel concreten.
7. the gliding construction method of building according to claim 1, it is characterized in that frame column couples use with new basis Pea gravel concreten shove is connected, and shove technique ensure that its vertical displacement is zero after pillar Linking with foundation.Shove is using stiff Property pea gravel concreten, stiff degree with hand to pinch agglomerating, and landing is scattered to be qualified;By two sides that frame column is relative during shove With mould card clamping, dry concrete is squeezed into from other two sides.
CN201710563525.XA 2017-07-12 2017-07-12 The gliding construction method of building Active CN107227862B (en)

Priority Applications (7)

Application Number Priority Date Filing Date Title
CN201811328587.3A CN109184260B (en) 2017-07-12 2017-07-12 Slippage construction technology for building with raft
CN201811322768.5A CN109184256B (en) 2017-07-12 2017-07-12 Displacement construction method for building
CN201811322858.4A CN109184258A (en) 2017-07-12 2017-07-12 Displacement construction method with raft plate building
CN201811337134.7A CN109184261B (en) 2017-07-12 2017-07-12 Slippage construction method for building with raft
CN201811322904.0A CN109184259B (en) 2017-07-12 2017-07-12 Sliding construction technology for building
CN201811322818.XA CN109184257A (en) 2017-07-12 2017-07-12 The displacement construction technology of building
CN201710563525.XA CN107227862B (en) 2017-07-12 2017-07-12 The gliding construction method of building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710563525.XA CN107227862B (en) 2017-07-12 2017-07-12 The gliding construction method of building

Related Child Applications (6)

Application Number Title Priority Date Filing Date
CN201811322904.0A Division CN109184259B (en) 2017-07-12 2017-07-12 Sliding construction technology for building
CN201811322818.XA Division CN109184257A (en) 2017-07-12 2017-07-12 The displacement construction technology of building
CN201811328587.3A Division CN109184260B (en) 2017-07-12 2017-07-12 Slippage construction technology for building with raft
CN201811322858.4A Division CN109184258A (en) 2017-07-12 2017-07-12 Displacement construction method with raft plate building
CN201811322768.5A Division CN109184256B (en) 2017-07-12 2017-07-12 Displacement construction method for building
CN201811337134.7A Division CN109184261B (en) 2017-07-12 2017-07-12 Slippage construction method for building with raft

Publications (2)

Publication Number Publication Date
CN107227862A true CN107227862A (en) 2017-10-03
CN107227862B CN107227862B (en) 2019-04-02

Family

ID=59956289

Family Applications (7)

Application Number Title Priority Date Filing Date
CN201710563525.XA Active CN107227862B (en) 2017-07-12 2017-07-12 The gliding construction method of building
CN201811322818.XA Pending CN109184257A (en) 2017-07-12 2017-07-12 The displacement construction technology of building
CN201811322858.4A Withdrawn CN109184258A (en) 2017-07-12 2017-07-12 Displacement construction method with raft plate building
CN201811322904.0A Active CN109184259B (en) 2017-07-12 2017-07-12 Sliding construction technology for building
CN201811322768.5A Active CN109184256B (en) 2017-07-12 2017-07-12 Displacement construction method for building
CN201811337134.7A Active CN109184261B (en) 2017-07-12 2017-07-12 Slippage construction method for building with raft
CN201811328587.3A Active CN109184260B (en) 2017-07-12 2017-07-12 Slippage construction technology for building with raft

Family Applications After (6)

Application Number Title Priority Date Filing Date
CN201811322818.XA Pending CN109184257A (en) 2017-07-12 2017-07-12 The displacement construction technology of building
CN201811322858.4A Withdrawn CN109184258A (en) 2017-07-12 2017-07-12 Displacement construction method with raft plate building
CN201811322904.0A Active CN109184259B (en) 2017-07-12 2017-07-12 Sliding construction technology for building
CN201811322768.5A Active CN109184256B (en) 2017-07-12 2017-07-12 Displacement construction method for building
CN201811337134.7A Active CN109184261B (en) 2017-07-12 2017-07-12 Slippage construction method for building with raft
CN201811328587.3A Active CN109184260B (en) 2017-07-12 2017-07-12 Slippage construction technology for building with raft

Country Status (1)

Country Link
CN (7) CN107227862B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107816125A (en) * 2017-10-26 2018-03-20 叶长青 The structure of basement and superstructure synchronous construction
CN109083442A (en) * 2018-10-15 2018-12-25 北京建工四建工程建设有限公司 The construction method of dynamic load bearing structure when existing building is docked with newly-built basis
CN109281255A (en) * 2018-10-26 2019-01-29 中交路桥华南工程有限公司 Girder steel slippage bracket and system

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114969889B (en) * 2022-04-18 2024-06-04 朱胜祥 Pile-raft foundation overhanging raft stress calculation method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002013299A (en) * 2000-06-30 2002-01-18 Yutaka Kouen Structure transferring device
JP2011117242A (en) * 2009-12-07 2011-06-16 Taisei Corp Construction method for moving structure
CN103233588A (en) * 2013-04-18 2013-08-07 叶长青 Translation method for building with raft foundation
JP2014074290A (en) * 2012-10-04 2014-04-24 Kitanihon Juryo Co Ltd Heavy object moving device and heavy object transfer device
CN204738556U (en) * 2015-05-29 2015-11-04 中国建筑第六工程局有限公司 A device for landmark is whole to shift
CN105089292A (en) * 2015-08-21 2015-11-25 顾雍舟 Monolithic movement construction method for house with soil foundation
CN106760619A (en) * 2016-12-23 2017-05-31 河北省建筑科学研究院 A kind of building translation apparatus and its construction method

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1562430A (en) * 1925-01-08 1925-11-24 Alexander Orion Means for and method of moving buildings
CN1032930C (en) * 1992-09-25 1996-10-02 高继良 Building translation method and equipments
CN1034881C (en) * 1993-10-09 1997-05-14 阮蔚文 Method for moving house
CN1132302A (en) * 1995-09-29 1996-10-02 哈尔滨市道里区房屋土地开发公司 Structure displacement method of building
CN2440893Y (en) * 2000-08-16 2001-08-01 广州市鲁班建筑防水补强专业公司 Apparatus for unitary horizontal movement of construction
JP3991071B2 (en) * 2001-08-17 2007-10-17 株式会社曳家建築物不陸調整英秀外▲崎▼ H-shaped steel-framed frame construction method for base-lifting construction of wooden buildings
JP6341705B2 (en) * 2014-03-14 2018-06-13 大成建設株式会社 Moving method
CN106285040B (en) * 2016-08-19 2018-06-29 山东建筑大学 The method that building moving steering is realized using track height difference

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002013299A (en) * 2000-06-30 2002-01-18 Yutaka Kouen Structure transferring device
JP2011117242A (en) * 2009-12-07 2011-06-16 Taisei Corp Construction method for moving structure
JP2014074290A (en) * 2012-10-04 2014-04-24 Kitanihon Juryo Co Ltd Heavy object moving device and heavy object transfer device
CN103233588A (en) * 2013-04-18 2013-08-07 叶长青 Translation method for building with raft foundation
CN204738556U (en) * 2015-05-29 2015-11-04 中国建筑第六工程局有限公司 A device for landmark is whole to shift
CN105089292A (en) * 2015-08-21 2015-11-25 顾雍舟 Monolithic movement construction method for house with soil foundation
CN106760619A (en) * 2016-12-23 2017-05-31 河北省建筑科学研究院 A kind of building translation apparatus and its construction method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107816125A (en) * 2017-10-26 2018-03-20 叶长青 The structure of basement and superstructure synchronous construction
CN107816125B (en) * 2017-10-26 2024-06-07 临沂锋立建筑劳务有限公司 Structure for synchronous construction of basement and superstructure
CN109083442A (en) * 2018-10-15 2018-12-25 北京建工四建工程建设有限公司 The construction method of dynamic load bearing structure when existing building is docked with newly-built basis
CN109083442B (en) * 2018-10-15 2020-10-23 北京建工四建工程建设有限公司 Construction method of dynamic load bearing structure during butt joint of existing building and newly-built foundation
CN109281255A (en) * 2018-10-26 2019-01-29 中交路桥华南工程有限公司 Girder steel slippage bracket and system
CN109281255B (en) * 2018-10-26 2023-10-20 中交路桥华南工程有限公司 Steel beam sliding support and system

Also Published As

Publication number Publication date
CN109184258A (en) 2019-01-11
CN109184260A (en) 2019-01-11
CN109184257A (en) 2019-01-11
CN109184259B (en) 2021-06-29
CN109184261B (en) 2021-06-29
CN109184261A (en) 2019-01-11
CN107227862B (en) 2019-04-02
CN109184260B (en) 2021-06-29
CN109184256A (en) 2019-01-11
CN109184256B (en) 2021-06-29
CN109184259A (en) 2019-01-11

Similar Documents

Publication Publication Date Title
CN107227862B (en) The gliding construction method of building
CN101666081B (en) Abrupt slope bare rock drilling platform and technology in huge reservoir
CN104847380B (en) A kind of structure and its construction method for reducing tunnel lining structure internal force
CN106049281A (en) Deep-water construction method of bridge at water pebble soil and argillaceous sandstone areas and auxiliary working platform
CN107190762B (en) Pile foundation structure for reducing side friction resistance
CN103939113B (en) A kind of outstanding rail construction trolley
CN102864788A (en) Method for underpinning reinforced bridge pile foundation by bear-type static pressure cluster pile
CN105863362A (en) Deviation rectifying device for inclined transmission tower
CN106522112A (en) Cable-stayed bridge side span beam section erecting system and method thereof
CN107938666B (en) Pile end inner hammering pile sinking with pile shoe and synchronous end grouting structure and process
CN206956527U (en) A kind of damping anti-fall girder apparatus for preventing that prefabricated beam bridge from longitudinally coming off
CN103233588A (en) Translation method for building with raft foundation
CN207176713U (en) A kind of piling strtucture for reducing side friction
CN201502056U (en) Bare rock drilling platform for steep slope of deep reservoir area
CN106320192A (en) Beam section replacement reinforcement method for large-span concrete continuous beam bridge
CN111794267B (en) Construction method for foundation of construction elevator
CN204151798U (en) A kind of steel reinforced concrete anti-slide pile structure
CN103741690B (en) A kind of soil plug compensates pile tube and extracts construction method and soil plug used compensation pile tube pile pulling device thereof
CN108517795A (en) Railroad bridge protecting canopy frame structure and its construction method
CN208415124U (en) A kind of railroad bridge protecting canopy frame structure
CN204677212U (en) A kind of structure reducing tunnel lining structure internal force
CN206753488U (en) A kind of artificial digging pile reaming auxiliary equipment
CN205617160U (en) Low distributed switch foundation structure of circuit rib post that puts of moderate -low speed magnetic levitation
CN104929101B (en) Resistance to plucking prestress anchoraging broken stone pile and construction method that a kind of base expanding and base expanding multistage side is expanded
CN205063369U (en) Quick transport corridor of super deep basal pit spiral decline material

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 325000 No. 48 Xinghai Road, Jingshan Street, Ouhai District, Wenzhou City, Zhejiang Province

Applicant after: Ye Changqing

Address before: 325000 Jinchuan Road, Tianhe Street, Wenzhou Economic and Technological Development Zone, Wenzhou City, Zhejiang Province

Applicant before: Ye Changqing

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201125

Address after: No. 100, North Ring Road, Hede Town, Sheyang County, Yancheng City, Jiangsu Province

Patentee after: Gu Yaobin

Address before: 325000, No. 48, Jingshan Hill Road, Ouhai District, Wenzhou, Zhejiang

Patentee before: Ye Changqing

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230111

Address after: Room 707, Administrative Committee of Tancheng Economic Development Zone, Linyi City, Shandong Province, 276100

Patentee after: Tancheng Economic Development Zone Pharmaceutical Development Co.,Ltd.

Address before: No. 100, North Ring Road, Hede Town, Sheyang County, Yancheng City, Jiangsu Province

Patentee before: Gu Yaobin