CN107227822A CN201710606367.1A CN201710606367A CN107227822A CN 107227822 A CN107227822 A CN 107227822A CN 201710606367 A CN201710606367 A CN 201710606367A CN 107227822 A CN107227822 A CN 107227822A
Authority
CN
China
Prior art keywords
batten plate
steel pipe
cervical vertebra
spinous process
combined
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710606367.1A
Other languages
Chinese (zh)
Inventor
陈明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI OPEN STEEL JOIST CO Ltd
Original Assignee
SHANGHAI OPEN STEEL JOIST CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI OPEN STEEL JOIST CO Ltd filed Critical SHANGHAI OPEN STEEL JOIST CO Ltd
Priority to CN201710606367.1A priority Critical patent/CN107227822A/en
Publication of CN107227822A publication Critical patent/CN107227822A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts
    • E04C3/32Columns; Pillars; Struts of metal
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts
    • E04C3/34Columns; Pillars; Struts of concrete other stone-like material, with or without permanent form elements, with or without internal or external reinforcement, e.g. metal coverings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/02Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for columns or like pillars; Special tying or clamping means therefor
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • E01D2101/268Composite concrete-metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

Building post and its construction technology that steel pipe proposed by the present invention is combined with batten plate, including spinous process of the seventh cervical vertebra frame and the template that is removably mounted on the outside of spinous process of the seventh cervical vertebra frame;The spinous process of the seventh cervical vertebra frame includes the batten plate for being arranged in the rectangular steel tube of the spinous process of the seventh cervical vertebra frame corner point and being arranged between adjacent prismatic steel pipe, and the batten plate is vertically set at a certain distance along the rectangular steel tube.Spinous process of the seventh cervical vertebra frame is formed by the combination of rectangular steel tube and batten plate, steel pipe is set in each corner point of whole post skeleton structure, the cast-in-place concrete again after installation form between steel pipe forms steel and concrete combination column;Because spinous process of the seventh cervical vertebra frame corner sets steel pipe, and spinous process of the seventh cervical vertebra frame centre position only sets batten plate, when there is beam to be connected with detached column, reinforcing bar can be stretched into freely in cylinder, formation is overall after avoiding " reinforcing bar is fought " phenomenon of conventional steel bar concrete post, casting concrete, and the rigidity of node region is more preferable.

Description

Building post and its construction technology that a kind of steel pipe is combined with batten plate
Technical field
The present invention relates to building, civil engineering technical field, it is adaptable to section larger building frame post, elevated bridge The large-scale column engineering such as post, building post and its construction technology that specially a kind of steel pipe is combined with batten plate.
Background technology
《Concrete filled steel tube technical specification》、《Code for design of steel structures》Etc. national standard specification to concrete filled steel tube skill The steel tubing portions of art propose higher requirement.For example:The ratio between the rectangular steel pipe section length of side and wall thickness B/t not should be greater thanThe slenderness ratio λ of post cannot be greater than 80, compared to single steel pipe,《Code for design of steel structures》The length of middle steel pipe is thin There are more strict requirements than cannot be greater than 150.In view of the limitation of these specifications, if doing concrete-filled steel tubular column, its wall Thickness certainly will be very thick, and other conditions are also more strict, and steel using amount is very big, so as to cause the high economy of cost of total very poor.
The content of the invention
A kind of building post and its construction technology combined it is an object of the invention to provide steel pipe with batten plate, cost is far below The node connection of traditional steel core concrete column, easy construction, and detached column and beam is more convenient, and the rigidity of node region is more preferable.
To achieve the above object, the present invention proposes the building post that a kind of steel pipe is combined with batten plate, including spinous process of the seventh cervical vertebra frame and can Remove and install the template on the outside of spinous process of the seventh cervical vertebra frame;
Wherein, the spinous process of the seventh cervical vertebra frame includes being arranged in the rectangular steel tube of the spinous process of the seventh cervical vertebra frame corner point and is arranged on adjacent prismatic steel Batten plate between pipe, and the batten plate vertically sets at a certain distance along the rectangular steel tube.
Further, in the building post that the steel pipe is combined with batten plate, pre- punching has connecting hole in the template.
Further, in the building post that the steel pipe is combined with batten plate, link bolt hole is reserved with the batten plate.
Further, in the building post that the steel pipe is combined with batten plate, connecting bolt hole site and mould on the batten plate Tapped branch sleeve is provided between plate.
Further, in the building post that the steel pipe is combined with batten plate, the batten plate is vertically pressed along the rectangular steel tube One determining deviation is set, and the spacing is 200~600mm.
Further, in the building post that the steel pipe is combined with batten plate, the batten plate and the rectangular steel tube outer surface It is reserved with 30~50mm spacing.
Further, in the building post that the steel pipe is combined with batten plate, the rectangular steel pipe is hollow long strip type rod member, And rectangular cross-section or the square of the rectangular steel pipe.
Further, in the building post that the steel pipe is combined with batten plate, the template be aluminum dipping form, punching block, plank sheathing or One kind in precast concrete form.
Accordingly, a kind of construction technology for the building post that steel pipe is combined with batten plate is also proposed in the present invention, is prepared such as The building post that steel pipe described above is combined with batten plate, comprises the following steps:
The first step:Spinous process of the seventh cervical vertebra frame is built, rectangular steel tube is arranged on detached column to be manufactured each angle point, in adjacent side By equidistantly batten plate is set up between shape steel pipe, the rectangular steel tube is connected as a single entity, spinous process of the seventh cervical vertebra frame is formed;
Second step:Fixed form is installed outside spinous process of the seventh cervical vertebra frame;
3rd step:Pour into a mould concrete.
Compared with prior art, the beneficial effects of the invention are as follows:
1. rectangular steel tube is combined with batten plate, and concrete perfusion, a kind of brand-new column section is formed.Steel using amount is saved, economical Property is good.First emphasis of the present invention, is to form spinous process of the seventh cervical vertebra frame by multiple rectangular steel tubes, i.e., spinous process of the seventh cervical vertebra frame is divided into some small chambers Body, is then combined with batten plate, as big section.
2. ingenious setting link bolt hole, it is convenient to construct:Link bolt hole is reserved on batten plate, is entered with template by bolt Row is fixed.Such design and construction method so that the template of part can just be consolidated before the lifting of spinous process of the seventh cervical vertebra frame on ground It is fixed, reduce the work high above the ground of part;Meanwhile, reduce to resist many outsides required for the swollen mould power of concreting Reinforcement measure.
3. prefabrication, accelerates the duration:Because spinous process of the seventh cervical vertebra frame can be prefabricated in the factory, template installation on ground can effectively add The fast duration.
4. reducing the consumption of support system and template, scene is more civilized:Due to reducing the consumption of template and support system, Job site is cleaner and tidier.
5. stress is more preferable:Form spinous process of the seventh cervical vertebra frame by multiple less steel pipes, there is very strong " hoop effect " so that acquisition it is only Column entirety stress-bearing capability is stronger.
6. the node connection of detached column and beam is more convenient:Because spinous process of the seventh cervical vertebra frame corner sets rectangular steel tube, and in the middle of spinous process of the seventh cervical vertebra frame Position only sets batten plate, when there is beam to be connected with spinous process of the seventh cervical vertebra frame, reinforcing bar can be stretched into freely in spinous process of the seventh cervical vertebra frame, it is to avoid traditional reinforcing bar is mixed Form overall after " reinforcing bar is fought " phenomenon of solidifying earth pillar, casting concrete, the rigidity of node region is more preferable.
Brief description of the drawings
The building rod structure schematic diagram that Fig. 1 combines for steel pipe in one embodiment of the invention with batten plate;
Fig. 2 is batten plate, connecting rod connection diagram I in one embodiment of the invention;
Fig. 3 is batten plate, connecting rod connection diagram II in one embodiment of the invention;
Fig. 4 is model sheetinstallat schematic diagram in one embodiment of the invention;
Fig. 5 is model sheetinstallat cross-sectional view in one embodiment of the invention;
Fig. 6 is column combination schematic diagram when independent column cross-section size is larger in one embodiment of the invention.
Embodiment
The building post and its construction technology combined below in conjunction with schematic diagram to the steel pipe of the present invention with batten plate carries out more detailed Thin description, which show the preferred embodiments of the present invention, it should be appreciated that those skilled in the art can change and be described herein The present invention, and still realize the present invention advantageous effects.Therefore, description below is appreciated that for people in the art Member's is widely known, and is not intended as limitation of the present invention.
To make up the defect of prior art, the present invention proposes a kind of independent post design of new building, manufacture and construction Building post and its construction technology that method --- -- steel pipe is combined with batten plate, principle are simple, easy to make, and cost is less than traditional Steel core concrete column, easy construction.
As shown in Figures 1 to 5, the building post that steel pipe proposed by the present invention is combined with batten plate, mainly includes spinous process of the seventh cervical vertebra frame and sets Put the template on the outside of independent framework.The structure to the building detached column is described in detail below.
Spinous process of the seventh cervical vertebra frame 100 includes being arranged on the rectangular steel tube 1 of the corner point of spinous process of the seventh cervical vertebra frame 100, and be arranged on adjacent prismatic steel pipe 1 it Between batten plate 2.When the sectional dimension of spinous process of the seventh cervical vertebra frame 100 is larger, rectangular steel tube 1 can be neatly adjusted according to actual needs with sewing The combination of plate 2.I.e.:As shown in fig. 6, when column cross-section size is relatively bigger, continuing to increase the quantity of steel pipe and batten plate, increasing post The size in section.The corner of spinous process of the seventh cervical vertebra frame 100 sets rectangular steel tube 1, and the centre position of spinous process of the seventh cervical vertebra frame 100 only sets batten plate 2, this design When there is beam to be connected with spinous process of the seventh cervical vertebra frame 100, reinforcing bar can be stretched into freely in spinous process of the seventh cervical vertebra frame 100, it is to avoid conventional steel bar concrete post Form overall after " reinforcing bar is fought " phenomenon, casting concrete, the rigidity of node region is more preferable.
When the overall structure shape of spinous process of the seventh cervical vertebra frame 100 cuboid as shown in Figure 1, then cloth is distinguished in four angle points of spinous process of the seventh cervical vertebra frame 100 Put a rectangular steel tube 1.Wherein, rectangular steel tube 1 is hollow long strip type rod member, and the preferred square or rectangular in its section etc., which is closed, to be cut Face.Batten plate 2 is vertically set at a certain distance along rectangular steel tube 1, and spacing is generally 200~600mm, it is therefore preferable to 500mm.And sew Plate 2 leaves 30~50mm spacing with the outer surface of rectangular steel tube 1.The structure of the spinous process of the seventh cervical vertebra frame 100 can realize factory process, scene Fast hoisting.
Link bolt hole 31 is reserved with above-mentioned batten plate 2, corresponding punching pre- in template 4 has connecting hole 6, can use connection Template 4 is easily arranged on main framing 100 by bolt 5 by connecting hole 6 and link bolt hole 31.Further, can be with Tapped branch sleeve 32 is provided with the corresponding batten plate 2 in the position of link bolt hole 31, passes through connecting bolt 5 and adapter sleeve Template 4 is fixed as one by cylinder 32 with spinous process of the seventh cervical vertebra frame 100, (as shown in Figures 2 to 5) quick and easy for installation.In addition, in batten plate and mould Modulus between plate is mutually unified, and can further strengthen wall assembling and standardization.
Template 4 can use aluminum dipping form, punching block or plank sheathing, and template is also to use precast concrete form, and can also serve as Decoration, insulation.
The construction technology for the building post that the steel pipe of the present invention is combined with batten plate includes:
The first step:Build spinous process of the seventh cervical vertebra frame 100.Rectangular steel tube 1 is arranged on detached column to be manufactured each angle point, adjacent Rectangular steel tube 1 between by equidistantly batten plate 2 is set up, the rectangular steel tube 1 is connected as a single entity, spinous process of the seventh cervical vertebra frame 100 is formed.The spinous process of the seventh cervical vertebra Frame 100 can realize factory process, and live fast hoisting effectively accelerates the duration.And by the combination of steel pipe and batten plate, effectively drop Low steel using amount is economical good.
Second step:In the outer installation fixed form 4 of spinous process of the seventh cervical vertebra frame 100.Link bolt hole 31 is left on batten plate 2, it is logical with template 4 Connecting bolt 5 is crossed to be fixed.Such design and construction method so that the template 4 of part can be in the lifting of spinous process of the seventh cervical vertebra frame 100 It is preceding to be just fixed on ground, reduce the work high above the ground of part;Meanwhile, reduce to resist the swollen mould power of concreting Required many externally reinforced measures.
3rd step:Pour into a mould concrete.
To sum up, in the building post and its construction technology that steel pipe provided in an embodiment of the present invention is combined with batten plate, side is passed through The combination of shape steel pipe and batten plate forms spinous process of the seventh cervical vertebra frame, steel pipe is set in each corner point of whole post skeleton structure, between steel pipe Cast-in-place concrete again after installation form, forms concrete detached column;Because spinous process of the seventh cervical vertebra frame corner sets steel pipe, and spinous process of the seventh cervical vertebra frame interposition Put and batten plate is only set, when there is beam to be connected with detached column, reinforcing bar can be stretched into freely in cylinder, it is to avoid conventional steel bar concrete Form overall after " reinforcing bar is fought " phenomenon of post, casting concrete, the rigidity of node region is more preferable.
The preferred embodiments of the present invention are above are only, any restriction effect is not played to the present invention.Belonging to any Those skilled in the art, in the range of technical scheme is not departed from, to the invention discloses technical scheme and Technology contents make the variation such as any type of equivalent substitution or modification, belong to the content without departing from technical scheme, still Belong within protection scope of the present invention.

Claims (9)

1. the building post that a kind of steel pipe is combined with batten plate, it is characterised in that including spinous process of the seventh cervical vertebra frame and be removably mounted at outside spinous process of the seventh cervical vertebra frame The template of side;
Wherein, the spinous process of the seventh cervical vertebra frame includes being arranged in the rectangular steel tube of the spinous process of the seventh cervical vertebra frame corner point and is arranged between adjacent prismatic steel pipe Batten plate, and the batten plate vertically sets at a certain distance along the rectangular steel tube.
2. the building post that steel pipe according to claim 1 is combined with batten plate, it is characterised in that pre- punching has company in the template Connect hole.
3. the building post that steel pipe according to claim 2 is combined with batten plate, it is characterised in that the company of being reserved with the batten plate Connecting bolt hole.
4. the building post that steel pipe according to claim 3 is combined with batten plate, it is characterised in that connecting bolt on the batten plate Tapped branch sleeve is provided between hole site and template.
5. the building post that steel pipe according to claim 1 is combined with batten plate, it is characterised in that the batten plate is along described square Steel pipe is vertically set at a certain distance, and the spacing is 200~600mm.
6. the building post that steel pipe according to claim 1 is combined with batten plate, it is characterised in that the batten plate with it is described square Outer surface of steel tube is reserved with 30~50mm spacing.
7. the building post that steel pipe according to claim 1 is combined with batten plate, it is characterised in that the rectangular steel pipe is hollow Long strip type rod member, and rectangular cross-section or the square of the rectangular steel pipe.
8. the building post that steel pipe according to claim 1 is combined with batten plate, it is characterised in that the template is aluminum dipping form, steel One kind in mould, plank sheathing or precast concrete form.
9. the construction technology for the building post that a kind of steel pipe is combined with batten plate, for manufacturing as in any one in claim 1~8 The building post that is combined with batten plate of steel pipe, it is characterised in that comprise the following steps:
The first step:Spinous process of the seventh cervical vertebra frame is built, rectangular steel tube is arranged on detached column to be manufactured each angle point, in adjacent square bar By equidistantly batten plate is set up between pipe, the rectangular steel tube is connected as a single entity, spinous process of the seventh cervical vertebra frame is formed;
Second step:Fixed form is installed outside spinous process of the seventh cervical vertebra frame;
3rd step:Pour into a mould concrete.
CN201710606367.1A 2017-07-24 2017-07-24 Building post and its construction technology that a kind of steel pipe is combined with batten plate Pending CN107227822A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710606367.1A CN107227822A (en) 2017-07-24 2017-07-24 Building post and its construction technology that a kind of steel pipe is combined with batten plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710606367.1A CN107227822A (en) 2017-07-24 2017-07-24 Building post and its construction technology that a kind of steel pipe is combined with batten plate

Publications (1)

Publication Number Publication Date
CN107227822A true CN107227822A (en) 2017-10-03

Family

ID=59956746

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710606367.1A Pending CN107227822A (en) 2017-07-24 2017-07-24 Building post and its construction technology that a kind of steel pipe is combined with batten plate

Country Status (1)

Country Link
CN (1) CN107227822A (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108060747A (en) * 2017-11-24 2018-05-22 江南大学 A kind of construction and production method of New Thin-walled steel core concrete column with ribbing
CN108086592A (en) * 2018-01-05 2018-05-29 上海欧本钢结构有限公司 A kind of detached column and construction method
CN108316558A (en) * 2018-04-17 2018-07-24 上海欧本钢结构有限公司 A kind of prompt about column with cross ribbed stiffener
CN109469261A (en) * 2019-01-10 2019-03-15 江南大学 A kind of partial precast coupled column based on batten plate and its connection method with beam
CN109736510A (en) * 2018-12-18 2019-05-10 安徽同济建设集团有限责任公司 A kind of building column that steel pipe is combined with batten plate
CN110306424A (en) * 2018-03-20 2019-10-08 比亚迪股份有限公司 It is used to support support column of track girder and preparation method thereof, the track with it
CN110593085A (en) * 2019-10-24 2019-12-20 中国电建集团成都勘测设计研究院有限公司 Method for mounting steel pipes of lattice pier of bridge steel pipe
CN110820542A (en) * 2019-10-11 2020-02-21 张育闻 Assembled buttress structure is used in bridge construction that takes precautions against earthquakes convenient to pour
CN111364606A (en) * 2020-03-25 2020-07-03 中铁二院成都勘察设计研究院有限责任公司 Steel and concrete combined structure system and construction method
CN111395754A (en) * 2020-04-09 2020-07-10 晏幸福 Method for implementing formwork supporting system
CN112343332A (en) * 2020-10-24 2021-02-09 广东冠雄建设集团有限公司 Fastening system of concrete rectangular column template and construction method of concrete column
CN112681613A (en) * 2021-01-11 2021-04-20 胡兵 Assembled steel construction concrete building body
CN113699884A (en) * 2021-08-27 2021-11-26 四川省公路规划勘察设计研究院有限公司 Rectangular concrete-filled steel tube cable tower adopting prefabricated web plates
CN113756327A (en) * 2021-09-23 2021-12-07 武汉武建机械施工有限公司 Three-limb batten strip type concrete filled steel tube lattice column in deep foundation pit
CN114215270A (en) * 2021-12-21 2022-03-22 浙江恒鸿建设有限公司 Outward convex line reinforced concrete landscape column and construction method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102433962A (en) * 2011-10-19 2012-05-02 沈阳建筑大学 Square covering square hollow sandwiched carbon fiber steel rib-steel pipe concrete combined column
CN202324182U (en) * 2011-11-22 2012-07-11 中国建筑技术集团有限公司 Steel-framework concrete structural system
CN207700527U (en) * 2017-07-24 2018-08-07 上海欧本钢结构有限公司 A kind of building column that steel pipe is combined with batten plate

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102433962A (en) * 2011-10-19 2012-05-02 沈阳建筑大学 Square covering square hollow sandwiched carbon fiber steel rib-steel pipe concrete combined column
CN202324182U (en) * 2011-11-22 2012-07-11 中国建筑技术集团有限公司 Steel-framework concrete structural system
CN207700527U (en) * 2017-07-24 2018-08-07 上海欧本钢结构有限公司 A kind of building column that steel pipe is combined with batten plate

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108060747A (en) * 2017-11-24 2018-05-22 江南大学 A kind of construction and production method of New Thin-walled steel core concrete column with ribbing
CN108086592A (en) * 2018-01-05 2018-05-29 上海欧本钢结构有限公司 A kind of detached column and construction method
CN110306424A (en) * 2018-03-20 2019-10-08 比亚迪股份有限公司 It is used to support support column of track girder and preparation method thereof, the track with it
CN108316558A (en) * 2018-04-17 2018-07-24 上海欧本钢结构有限公司 A kind of prompt about column with cross ribbed stiffener
CN109736510A (en) * 2018-12-18 2019-05-10 安徽同济建设集团有限责任公司 A kind of building column that steel pipe is combined with batten plate
CN109469261A (en) * 2019-01-10 2019-03-15 江南大学 A kind of partial precast coupled column based on batten plate and its connection method with beam
CN110820542A (en) * 2019-10-11 2020-02-21 张育闻 Assembled buttress structure is used in bridge construction that takes precautions against earthquakes convenient to pour
CN110593085B (en) * 2019-10-24 2020-11-10 中国电建集团成都勘测设计研究院有限公司 Method for mounting steel pipes of lattice pier of bridge steel pipe
CN110593085A (en) * 2019-10-24 2019-12-20 中国电建集团成都勘测设计研究院有限公司 Method for mounting steel pipes of lattice pier of bridge steel pipe
CN111364606A (en) * 2020-03-25 2020-07-03 中铁二院成都勘察设计研究院有限责任公司 Steel and concrete combined structure system and construction method
CN111395754A (en) * 2020-04-09 2020-07-10 晏幸福 Method for implementing formwork supporting system
CN112343332A (en) * 2020-10-24 2021-02-09 广东冠雄建设集团有限公司 Fastening system of concrete rectangular column template and construction method of concrete column
CN112343332B (en) * 2020-10-24 2021-11-23 广东冠雄建设集团有限公司 Fastening system of concrete rectangular column template and construction method of concrete column
CN112681613A (en) * 2021-01-11 2021-04-20 胡兵 Assembled steel construction concrete building body
CN113699884A (en) * 2021-08-27 2021-11-26 四川省公路规划勘察设计研究院有限公司 Rectangular concrete-filled steel tube cable tower adopting prefabricated web plates
CN113756327A (en) * 2021-09-23 2021-12-07 武汉武建机械施工有限公司 Three-limb batten strip type concrete filled steel tube lattice column in deep foundation pit
CN113756327B (en) * 2021-09-23 2022-11-01 武汉武建机械施工有限公司 Three-limb batten strip type concrete filled steel tube lattice column in deep foundation pit
CN114215270A (en) * 2021-12-21 2022-03-22 浙江恒鸿建设有限公司 Outward convex line reinforced concrete landscape column and construction method

Similar Documents

Publication Publication Date Title
CN107227822A (en) Building post and its construction technology that a kind of steel pipe is combined with batten plate
CN202831402U (en) Concrete filled steel tubular column with inner-connected circular pipe and outer-sleeved concrete filled steel tube
CN207700527U (en) A kind of building column that steel pipe is combined with batten plate
CN107143064A (en) One kind interval steel pipe and combined concrete shear wall system
CN204001695U (en) A kind of aluminum alloy formwork system that is used in shrinkage joint building operations
CN104294920B (en) The node component of a kind of U-shaped steel-concrete combination beam and special-shaped steel pipe concrete post and preparation method
CN106677338A (en) Anti-seismic building structure provided with steel frame and crossed central support with link beams
CN103088842A (en) Rubble retaining wall reinforced single-face pattern plate support system and construction method
CN104988984A (en) U-shaped steel and concrete combined orthogonal-diagonal spatial grid box type structure and manufacturing method
CN108086592A (en) A kind of detached column and construction method
CN203129203U (en) Rubble retaining wall reinforcing single-face formwork supporting system
CN107090909A (en) A kind of concrete frame bean column node steel pipe bundle reinforcing sleeve and its assembly method
CN206157913U (en) Assembled square steel tube concrete post and girder steel connected node
CN204098241U (en) Trapezoidal steel plate interpolation type rectangular steel-tube concrete column and steel beam connecting joint
CN205875394U (en) Antidetonation concrete beam column that dry process is connected
CN104153463B (en) Assembled integrated frame system and construction method thereof
CN109372109A (en) A kind of assembled beam-column connecting node
CN103711200B (en) A kind of assembling stiffness combo box support structure
CN203462587U (en) Penetration steel bar type joint of angle steel connection type rectangular concrete-filled steel tube column and steel beam
CN105442756B (en) A kind of combined special-shaped column, the structural system and its construction method for being equipped with the post
CN104818784B (en) Thin-wall steel pipe concrete frame-light steel light concrete combined shear wall and construction method thereof
CN104727446A (en) Construction method of large aluminum alloy formwork at settlement joint
CN203034615U (en) Novel outer sleeve tube type connecting node of cold-bending rectangular steel tube column and H-shaped steel girder
CN205617611U (en) Confined concrete's steel construction dividing wall component
CN206289736U (en) A kind of assembly concrete beam-column connection

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20171003

RJ01 Rejection of invention patent application after publication