CN107227733A CN201710517701.6A CN201710517701A CN107227733A CN 107227733 A CN107227733 A CN 107227733A CN 201710517701 A CN201710517701 A CN 201710517701A CN 107227733 A CN107227733 A CN 107227733A
Authority
CN
China
Prior art keywords
drill bit
steel reinforcement
reinforcement cage
bar
under water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710517701.6A
Other languages
Chinese (zh)
Inventor
郑金平
王朋林
吴桐
罗刚
郭继舟
李少祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN201710517701.6A priority Critical patent/CN107227733A/en
Publication of CN107227733A publication Critical patent/CN107227733A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21FWORKING OR PROCESSING OF METAL WIRE
    • B21F11/00Cutting wire
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/52Submerged foundations, i.e. submerged in open water

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Piles And Underground Anchors (AREA)
  • Earth Drilling (AREA)

Abstract

The present invention provides a kind of bored concrete pile steel reinforcement cage cutting method under water, and the drilling rod by using two kinds of drill bits directly with convolution rig is connected, and realizes the cutting to steel reinforcement cage under water.One kind is rig fixed, using conflict diffused drill bit;It is another be fixed absolute altitude in reinforcing bar cage location, planar movement rig is cut in the certain absolute altitude of steel reinforcement cage.For cutting and the reinforcing bar of cut-out and cut wound, finally examined with tensioning punching jack, such as also partly link, then directly broken with punching jack.Present invention is generally directed to during Underwater pile construction, the processing mode after the failure of bored concrete pile first watering reduces the impact steel bar reinforced cage of processing, accelerating construction progress.The present invention has easy construction, and safety coefficient is high, and simple in construction, handling ease, speed of application is fast, saves construction cost, the advantages of shortening the duration.It is particularly suitable for use in the construction of bored concrete pile.

Description

A kind of bored concrete pile steel reinforcement cage cutting method under water
Technical field
The invention belongs to underwater concrete pouring pile driving construction field, and in particular to a kind of bored concrete pile steel reinforcement cage cutting method under water.
Background technology
At present, pile foundation is all largely used in all kinds of engineering constructions, cast-in-situ bored pile is the first choice on heavy construction basis, is bored The construction of hole pouring pile, has been a highly developed construction method, when being widely used in foundation engineering, and irrigating concrete process Due to reasons such as machinery, equipment, when have perfusion failure phenomenon, the bored concrete pile of processing failure is usually whole stake slabstone backfill, again Punching, time-consuming, Fei Cai, the amount of doing over again is big etc..Do not consider the influence such as casing leak, collapse hole, analyze its perfusion failure reason main Have several:1st, indivedual construction technologies and commanding or operating personnel error;2nd, it is improper using material, or concrete isolation and plugging; 3rd, engineering machinery, breaks down suddenly, it is impossible to exclude in time, again without under sufficient plant equipment preparation;4th, it is other prominent Hair event, such as traffic congestion, road destroy by rush of water.
Illustrated by taking certain building site as an example.
Pile foundation aperture is 1.5m, and hole depth is 33.18m.Make, steel reinforcement cage cage bar is installed and be:φ 22, overall length is:32m.Evening 7 Point 40 is distinguished behind hole, carries out cast Underwater Concrete.First watering is very smooth, and the car concrete of continuous pouring two, counts 12m3Left and right.When 8: 20 When dividing the 3rd car concrete of cast, concrete pump truck hydraulic fluid leak, it is impossible to work.Use crane instead and hang and send concrete to construct, to 9 points, conduit has been blocked up Plug, concrete can not be irrigated, and rescued through all one's effort, be also unable to dredging conduit, building site(Person in charge and supervising engineer)Filling can only be made Note failure, withdrawing conduit, site clearing.Drilling rod is installed to take out slag and inhale concrete and cement mortar to 3:00 AM, measured in hole depth 28m, hole Still there are 5m concretes.As Fig. 1 shows:
In view of still have 28m steel reinforcement cage in hole, and such as backfill, then impacted with impact drill completely, second of pore-forming had both been difficult reinforcing bar Cage is destroyed, and tangible unfortunate.Therefore this patent is intended providing a kind of bored concrete pile steel reinforcement cage cutting method and corresponding cutting equipment under water, To solve the practical problem of engineering.
The content of the invention
The problem of existing for prior art, the present invention is solution problems of the prior art, the technical side of use Case is as follows:
A kind of bored concrete pile steel reinforcement cage cutting method under water, it is characterised in that:Comprise the following steps:
Step 1: being connected to the drill bit with circumferentially cutting tooth on rotary rig, steel reinforcement cage hole center is directed at, lower drill bit will Under drill bit concrete top surface is remained to bottom hole;
Step 2: after drill bit reaches bottom hole, starting rig, steel reinforcement cage cage bar under water being cut using horizontal resection tooth;
Step 3: after the completion of anticipation cutting, drill bit being taken out, detects that reinforcing bar is using tensioning punching jack and oil pump device No cut-out;
Step 4: steel reinforcement cage takes out steel reinforcement cage entirety after completely cutting through from underwater cast-in-place pile.
The drill bit is that bottom hole expands drill bit, and drill bit is connected to the support bar group by the symmetrical branch of some circumferences below drilling rod Into, support bar is hinged with drilling rod, can be rotated around with drilling rod tie point, a piece conflict bar 7 of connection in the middle part of each support bar, contradict bar with Connected, be hinged between connecting rod and support bar and conflict bar by connecting rod between each support bar, under nature, contradicted bar bottom and dash forward For each support bar bottom, in drill bit decentralization process, contradict bar and contacted at first with bottom hole, contradict the upward thrust of bar Under, connecting rod struts each support bar so that support bar bottom cutting teeth is contacted with bottom reinforcement bars cage.
The steel alloy tooth that described support bar bottom connection is provided projectingly in the horizontal direction, for circumgyration incision.
When described drill bit is that bottom hole expands drill bit, drilling rod rotation is downward, deepens cutting.
Described drill bit is taper iron sand wheel drill bit, and drill bit bottom is a round iron plate, and round iron plate is vertically connected on brill Bar bottom, is connected between round iron plate top surface edge and drilling rod by welding branch bar, forms a brill being integrally conical Head.
Described round iron plate bottom margin is welded with the steel alloy tooth of a whole circle, for circumgyration incision.
When drill bit is taper iron sand wheel drill bit, rig is moved horizontally, all around, the purpose of cutting reinforcing cage is reached.
The specific detection process of the step 3 is:When using punching jack(Easily operated for workman, with small top) When drawing reinforcing bar force value smaller, produce elongation greatly, represent reinforcing bar and completely cut through;It is no corresponding when there is certain stretching force Elongation when, represent reinforcing bar and be not completely severed, then broken reinforcing bar using tensioning punching jack;When tensioning force value is reached During 18t(Single top pull power feasible value), represent reinforcing bar and do not wear and tear, then answer repeat step one and step 2 to continue to cut reinforcing bar.
The invention has the advantages that:
The invention provides a kind of cutting method of bored concrete pile steel reinforcement cage under water, and two kinds of target drills are devised, realized to surplus Effective cutting of remaining steel reinforcement cage bottom, so that overall lifting steel reinforcement cage, overcomes in the prior art, water during for perfusion failure stake The processing of descending reinforcing cage, backfills slabstone, punching is time-consuming again, Fei Cai, the big amount of doing over again the problems such as, so as to greatly save construction Human and material resources, have saved the engineering time, improve efficiency of construction.
Brief description of the drawings
Fig. 1 for steel reinforcement cage in being drilled in the present invention after underwater cast-in-place pile perfusion failure view;
Fig. 2 is that the first cutting equipment bottom hole expands drill bit structure schematic diagram;
Fig. 3 is the cage bar cutting section schematic diagram under expansion drill bit cutting;
Fig. 4 is second of cutting equipment taper bit structural representation;
Fig. 5 is the cage bar cutting section schematic diagram under circular bite is cut;
Wherein:1st, steel reinforcement cage, 2- cage bars, 3- reinforcements, 4- casings, 5- suspension ring, 6- ring flanges, 7- conflict bars, 8- steel alloy teeth, 9- drilling rods, 10- branch holds in both hands bar, 11- cutting sections.
Embodiment
Below by embodiment, and with reference to accompanying drawing, to technical scheme, it is described in further detail, such as schemes Shown in 1-5, the present invention uses the following two kinds cutting equipment, and steel reinforcement cage 1 under water is cut:
The cutting bit of the first cutting equipment expands drill bit to contradict rod aperture bottom;
Expanded using bottom hole to bottom hole under drill bit, drill bit, contradict bar 7 and contacted with bottom hole face, improve its drill bit structure, steel alloy tooth 8 levels are welded on each support bar of drill bit outer edge, as shown in Figure 2.
This kind of drill bit is arranged on rotary rig, alignment hole center, lower drill bit.The drill bit is in no arrival bottom hole(Pour The concrete top surface built)Before, its bit diameter very little, only 80cm, it is impossible to and steel reinforcement cage is in contact in hole.When reach bottom hole, its Contradict bar and contradict bottom hole face, drill bit opens, rig rotation, progressively using steel alloy tooth, mill cut hole bottom reinforcing bar.
Cutting form is horizontal direction, progressively downwards, deepens cutting, such as Fig. 3 shows.
Steel reinforcement cage and hole center on concrete face may have some off normals, therefore produce three possibility to cage bar 2:
1. completely cut through;
2. local fray;
3. do not move completely.
For these three situations, it will be detected with tensioning punching jack, oil pump.
1. when stretching force is smaller, the elongation of generation is big, then represents the reinforcing bar and necessarily have been turned off;
2. when there is certain stretching force, when but without corresponding elongation, just broken using tensioning punching jack;
3. when stretching force has 18t(Single top pull power feasible value)During left and right, illustrate that the root reinforcing bar does not fray, then should continue mill and cut, Part is eventually formed to fray, then tensioning, break reinforcing bar;
Last entirety lifts steel reinforcement cage.
It is easy to operate as the cutting method of cutting equipment using bottom hole expansion drill bit, it is practical, but in Specific construction When, it should be noted that:
1. start to be cut with rig mill, speed is slow, in case the brill leaf opened, is blocked by the reinforcing bar of steel reinforcement cage, causes bit freezing.
2. mill cuts part should be close proximity on the face of concrete, otherwise when mill is cut, reinforcing bar produces outside amount of deflection, causes to skid, The effect that reduction mill is cut.
3. mill that reinforcing bar should be tried one's best in theory is cut, retain some reinforcing bar incomplete cut-offs, both avoided whole steel reinforcement cage Stirred, can use minimum stretching force to break cage bar again.
The cutting bit of second of cutting equipment is taper " iron sand wheel " drill bit;
Using taper iron sand wheel drill bit, such as Fig. 4 shows, by steel alloy Dental soldering on round iron plate, and branch bar 10 is total to circular bottom plate With composition taper bit, taper bit structure can prevent the cage bar 2 of steel reinforcement cage 1 from propping up round iron plate, even if propping up on taper surface, It can slide, bit freezing when not causing to carry brill.
The drill bit is arranged on drilling rod, then by the in rotary moving of rig, the reinforcing bar of steel reinforcement cage 1 mill cut.After mill is cut, adopt Method of pulling up is detected with identical, steel reinforcement cage reinforcing bar is broken, by the whole taking-up out of hole of steel reinforcement cage.
During using taper bit, it is noted that Railway Project in construction:
1. mill cuts position, it should try one's best and lean on concrete face, to reduce amount of deflection and the skidding of steel reinforcement cage reinforcing bar.
2. keeping a close eye on mill cuts the absolute altitude at position, it is necessary to make length positioning on drilling rod, and check drilling machine platform absolute altitude, Mill is set to cut position substantially in same level, as Fig. 5 shows.
3. because iron tyre diameter is small, only 0.9m will grind the steel reinforcement cage for cutting 1.3m, it must just make rig centering that iron tyre is installed Afterwards, position is cut to mill under, then carries out front, rear, left and right all directions mill and cuts movement.It is pulled in two chain blocks and holds rig It is reaction force on rail, is moved horizontally to rig, and note average rate, slow mobile drill, deepens otch.
4. because hole is deeper, the nearly 28m length of drilling rod, while rotation, drilling rod has swing, and steel alloy tooth is while mill is cut There can be Effects to reinforcing bar, to pay special attention to welding quality, smoothly complete mill and cut task.
This method is in construction application, and speed is slightly slow, again omnirange mobile drill, there is certain difficulty in constructing operation Degree, but least risk.
Protection scope of the present invention is not limited to the above embodiments, it is clear that those skilled in the art can be to this hair It is bright to carry out various changes and deformation, without departing from scope and spirit of the present invention.If these are changed and deformation belongs to the present invention In the range of claim and its equivalent technologies, then including the intent of the present invention is also changed and deformed comprising these.

Claims (8)

1. a kind of bored concrete pile steel reinforcement cage cutting method under water, it is characterised in that:Comprise the following steps:
Step 1: being connected to the drill bit with circumferentially cutting tooth on rotary rig, steel reinforcement cage hole center is directed at, lower drill bit will Under drill bit concrete top surface is remained to bottom hole;
Step 2: after drill bit reaches bottom hole, starting rig, steel reinforcement cage cage bar under water being cut using horizontal resection tooth;
Step 3: after the completion of anticipation cutting, drill bit being taken out, detects that reinforcing bar is using tensioning punching jack and oil pump device No cut-out;
Step 4: steel reinforcement cage takes out steel reinforcement cage entirety after completely cutting through from underwater cast-in-place pile.
2. a kind of bored concrete pile as claimed in claim 1 steel reinforcement cage cutting method under water, it is characterised in that:The drill bit is bottom hole Expand drill bit, drill bit is connected to below drilling rod by the support bar group of the symmetrical branch of some circumferences into support bar is hinged with drilling rod, respectively A piece conflict bar of connection in the middle part of support bar, contradicts and is connected between bar and each support bar by connecting rod, connecting rod and support bar and conflict It is hinged between bar.
3. a kind of bored concrete pile as claimed in claim 2 steel reinforcement cage cutting method under water, it is characterised in that:Described support bar bottom The steel alloy tooth that portion's connection is provided projectingly in the horizontal direction, for circumgyration incision.
4. a kind of bored concrete pile as claimed in claim 2 steel reinforcement cage cutting method under water, it is characterised in that:When described drill bit is When bottom hole expands drill bit, drilling rod rotation is downward, deepens cutting.
5. a kind of bored concrete pile as claimed in claim 1 steel reinforcement cage cutting method under water, it is characterised in that:Described drill bit is cone Shape drill bit, drill bit bottom is a round iron plate, and round iron plate is vertically connected on drilling rod bottom, and round iron plate top surface edge is with boring Connected between bar by welding branch bar, form a drill bit being integrally conical.
6. a kind of bored concrete pile as claimed in claim 5 steel reinforcement cage cutting method under water, it is characterised in that:Described round iron plate Bottom margin is welded with the steel alloy tooth of a whole circle, for circumgyration incision.
7. a kind of bored concrete pile as claimed in claim 5 steel reinforcement cage cutting method under water, it is characterised in that:When drill bit is taper iron During emery wheel drill bit, rig is moved horizontally, all around, the purpose of cutting reinforcing cage is reached.
8. a kind of bored concrete pile as claimed in claim 1 steel reinforcement cage cutting method under water, it is characterised in that:The tool of the step 3 Body detection process is:When the tension reinforcing steel bar force value of punching jack is smaller, produces elongation greatly, represent reinforcing bar and cut completely It is disconnected;When there is certain stretching force no corresponding elongation, representing reinforcing bar and not being completely severed, then utilizing tensioning punching Jack breaks reinforcing bar;When tensioning force value reaches 18t, represent reinforcing bar and do not wear and tear, then answer repeat step one and step 2 Continue to cut reinforcing bar.
CN201710517701.6A 2017-06-29 2017-06-29 A kind of bored concrete pile steel reinforcement cage cutting method under water Pending CN107227733A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710517701.6A CN107227733A (en) 2017-06-29 2017-06-29 A kind of bored concrete pile steel reinforcement cage cutting method under water

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710517701.6A CN107227733A (en) 2017-06-29 2017-06-29 A kind of bored concrete pile steel reinforcement cage cutting method under water

Publications (1)

Publication Number Publication Date
CN107227733A true CN107227733A (en) 2017-10-03

Family

ID=59936580

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710517701.6A Pending CN107227733A (en) 2017-06-29 2017-06-29 A kind of bored concrete pile steel reinforcement cage cutting method under water

Country Status (1)

Country Link
CN (1) CN107227733A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107724253A (en) * 2017-11-22 2018-02-23 天津城建大学 A kind of hollow drill and sweep-out method for being used to remove cantilever construction prestressing tendon
CN109098657A (en) * 2018-10-24 2018-12-28 云南建投基础工程有限责任公司 A kind of high-voltage water jet device and method of the processing erratic boulder in conjunction with rotary pile-digging machine
CN109183783A (en) * 2018-10-24 2019-01-11 南宁职业技术学院 It is a kind of to exempt from broken apart concrete filling pile head

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05222722A (en) * 1992-02-08 1993-08-31 Mineichi Iwamoto Pile head surcharge disposal sheet
CN201400958Y (en) * 2009-04-16 2010-02-10 中铁六局集团有限公司 Cage pressing device for reinforcing cage
CN103850237A (en) * 2012-12-03 2014-06-11 同济大学 Blade-cut-in type soft soil multi-point displacement meter anchor head
CN205047161U (en) * 2015-10-08 2016-02-24 福建永强岩土股份有限公司 Dig soon and expand subdrilling head

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05222722A (en) * 1992-02-08 1993-08-31 Mineichi Iwamoto Pile head surcharge disposal sheet
CN201400958Y (en) * 2009-04-16 2010-02-10 中铁六局集团有限公司 Cage pressing device for reinforcing cage
CN103850237A (en) * 2012-12-03 2014-06-11 同济大学 Blade-cut-in type soft soil multi-point displacement meter anchor head
CN205047161U (en) * 2015-10-08 2016-02-24 福建永强岩土股份有限公司 Dig soon and expand subdrilling head

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
南峰: "《钻孔灌注桩处理水下钢筋笼的切割实例》", 《陕西地质》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107724253A (en) * 2017-11-22 2018-02-23 天津城建大学 A kind of hollow drill and sweep-out method for being used to remove cantilever construction prestressing tendon
CN109098657A (en) * 2018-10-24 2018-12-28 云南建投基础工程有限责任公司 A kind of high-voltage water jet device and method of the processing erratic boulder in conjunction with rotary pile-digging machine
CN109183783A (en) * 2018-10-24 2019-01-11 南宁职业技术学院 It is a kind of to exempt from broken apart concrete filling pile head
CN109183783B (en) * 2018-10-24 2023-10-24 南宁职业技术学院 Breaking-free separated pile head of concrete filling pile

Similar Documents

Publication Publication Date Title
CN101358452B (en) Construction method and construction equipment of total rotary rapid cutting barrier clearance and pile extracting
CN105569560B (en) A full set of tubular type long auger stake machine and the method for utilizing the ram machine construction
CN107227733A (en) A kind of bored concrete pile steel reinforcement cage cutting method under water
CN104047542B (en) Embedding rock taper pile impacts drilling pipe hammer system and embedding rock taper pile impacts construction method
CN110016920A (en) The construction method of interlocking pile of meat and vegetables collocation
CN101538857A (en) Pile extraction construction method
CN105649083A (en) All-casing one-time rotary cutting type pile removing device and pile removing method thereof
CN106545007A (en) The method of pile in stratum of the bottom for hard rock stratum
CN109667985A (en) The method that push-bench is docked with received well steel sleeve in jacking construction
CN111058458A (en) Construction method and structure based on cutter suction type ground connecting wall local replacement row pile support
CN105697018A (en) Shaft excavation construction technology
CN104295234A (en) Long spiral extrusion bottom ramming pile machine and pile foundation pouring pile forming method
CN107178078B (en) Change to half intercept form block wall construction method of section in subway station
CN106948347A (en) Pile extracting method and pile pulling system
CN110965553A (en) High-efficient broken pile head device
CN105926584B (en) Construction method for diaphragm walls under ultra-wide pipeline
CN208280969U (en) Shield tunnel gravity type sealing plugging structure
CN207260148U (en) Service sleeve pile crown integrally abolishes device
CN112360468B (en) Excavation supporting method for vertical shaft slag sliding well
CN113969581A (en) Construction method for rock-entering pile planting
CN112282029B (en) Connection construction method for urban high-water-level large-diameter reinforced concrete sewage pipeline
CN212001106U (en) Hole cleaning system for cast-in-place pile
CN108222012A (en) A kind of foundation pit anchor cable excision and the construction method that supporting pile is carried out using anchor cable excision system
CN109056808A (en) Stake and steel pipe column construction method in a kind of subway station
JP2019007221A (en) Tubular pile installation method and tubular pile holding device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20171003