CN107218059B - For Fast Installation subway tunnel electromechanical equipment and the device of pipeline - Google Patents

For Fast Installation subway tunnel electromechanical equipment and the device of pipeline Download PDF

Info

Publication number
CN107218059B
CN107218059B CN201710486888.8A CN201710486888A CN107218059B CN 107218059 B CN107218059 B CN 107218059B CN 201710486888 A CN201710486888 A CN 201710486888A CN 107218059 B CN107218059 B CN 107218059B
Authority
CN
China
Prior art keywords
tunnel
duct piece
pipeline
sliding slot
electromechanical equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201710486888.8A
Other languages
Chinese (zh)
Other versions
CN107218059A (en
Inventor
夏峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kang Yuan Rail Transport Technology (fujian) Co Ltd
Original Assignee
Kang Yuan Rail Transport Technology (fujian) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kang Yuan Rail Transport Technology (fujian) Co Ltd filed Critical Kang Yuan Rail Transport Technology (fujian) Co Ltd
Priority to CN201710486888.8A priority Critical patent/CN107218059B/en
Publication of CN107218059A publication Critical patent/CN107218059A/en
Application granted granted Critical
Publication of CN107218059B publication Critical patent/CN107218059B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/08Lining with building materials with preformed concrete slabs
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • E21D21/008Anchoring or tensioning means
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • E21F17/02Suspension devices for tubes or the like, e.g. for ventilating ducts

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The present invention relates to the technical fields of constructing tunnel, the especially installation of subway tunnel electromechanical equipment and pipeline, it is specifically a kind of for Fast Installation subway tunnel electromechanical equipment and the device of pipeline, it includes tunnel duct piece, cast-in fixing bolt, multiple external anti-seismic sliding slots and mounting bracket, the cast-in fixing bolt includes section of jurisdiction positioning device and anchor bolt, and each external anti-seismic sliding slot includes c-type band tooth sliding slot and at least two mounting seats.The present invention in tunnel duct piece by being arranged cast-in fixing bolt instead of traditional punching tendon-planted craft; without intensively being punched on tunnel structure, it ensure that and tunnel structure zero is damaged, protect the integrality of tunnel structure; the service life for greatly extending tunnel structure has also ensured subway circulation safety;And avoid the damage to construction personnel's health;Also have the advantages that Embedment Construction it is simple, it is quick for installation, can substantially save electromechanical equipment and pipeline installation period;Construction and maintenance cost can be greatly reduced simultaneously.

Description

For Fast Installation subway tunnel electromechanical equipment and the device of pipeline
Technical field:
The present invention relates to the technical fields of constructing tunnel, the especially installation of subway tunnel electromechanical equipment and pipeline, specifically Ground is a kind of for Fast Installation subway tunnel electromechanical equipment and the device of pipeline.
Background technique:
With the quickening of national economy fast development and novel Development of China's Urbanization, urban rail transit in China is built in recent years It grows rapidly.By the end of the year 2016, existing 45 cities in China's Mainland obtain state approval and build rail line, wherein 25 Seat city has route and builds up and open operation, and operating mileage is up to 3137 kilometers.In the cities such as Beijing, Shanghai, Guangzhou, Shenzhen rail While traffic base perfect megalopolis in road develops Operation Network, optimizes the structure of production, each provincial capital and other two, three The urban track traffic frame in line city is also being formed.According to the requirement built a service-oriented government with sustainable development, country It will key target for investment of the urban track traffic as basic Facilities Construction field.
China's metro industry electromechanical equipment and pipeline mounting process still fall behind compared with external, and traditional mounting means is Using punching tendon-planted craft, tunnel structure is destroyed seriously, intensive punching causes tunnel structure crack, seep water, collapses block even It collapses and brings very big hidden danger to subway circulation, cause subway circulation accident commonplace, life and national wealth peace to passenger Very big threat is brought entirely.Meanwhile traditional punching tendon-planted craft there is also when construction trouble, installation fee, labor intensity of workers it is high, Need charging construction safely not can guarantee without guarantee, the dust of work progress, noise injury workers ' health, installation quality, mounting portion The disadvantages of part displacement is difficult, finally brings long-term hidden danger to operation.
Summary of the invention:
The technical problem to be solved by the present invention is to be directed to the prior art when installing subway tunnel electromechanical equipment and pipeline In the presence of destroying to tunnel structure, serious, construction is troublesome, damage safety of workers health, installation quality not can guarantee and may be to fortune Battalion the disadvantages of bringing long-term hidden danger, provides a kind of for Fast Installation subway tunnel electromechanical equipment and the device of pipeline.
The technical scheme adopted by the invention to solve the technical problem is that: for Fast Installation subway tunnel electromechanical equipment and The device of pipeline, it is characterised in that: described pre- including tunnel duct piece, cast-in fixing bolt, multiple external anti-seismic sliding slots and mounting bracket Burying anchor bolt includes section of jurisdiction positioning device and anchor bolt, and an anchor bolt, section of jurisdiction positioning are fixed in the both ends of section of jurisdiction positioning device vertically respectively Device is embedded in the inner sidewall of tunnel duct piece, and multiple external anti-seismic sliding slots are arranged along the axis direction of tunnel duct piece, each outer Setting antidetonation sliding slot includes c-type band tooth sliding slot and at least two mounting seats, and at least two mounting seats are fixed on c-type band tooth sliding slot Back side and interval setting along its length, each external anti-seismic sliding slot passes through the anchor bolt of multiple cast-in fixing bolts and at least two For mounting seat along the inner sidewall that the circumferencial direction of tunnel duct piece is fixed on tunnel duct piece, mounting bracket and multiple external anti-seismics are sliding Slot is fixedly connected.
Wherein, tunnel duct piece includes 3 pieces of calibrated bolcks, 2 pieces of adjacent blocks and 1 piece of wedge block.
Wherein, the mounting bracket includes bracket, ring stand and hanger, and one end of bracket and external anti-seismic sliding slot, which are fixed, to be connected It connects, the other end of bracket is directed toward the centre of tunnel duct piece;One end of ring stand is fixedly connected with external anti-seismic sliding slot, ring stand it is another End is equipped with pipeline mounting hole;Hanger is fixedly connected with the external anti-seismic sliding slot being located at the top of tunnel duct piece inner sidewall.
Wherein, two axially extending tracks along tunnel duct piece are set in the inner sidewall bottom of tunnel duct piece.
Wherein, the cast-in fixing bolt further includes anchor bolt sheath, and the anchor bolt of each cast-in fixing bolt is correspondingly arranged an anchor bolt shield Set.
Wherein, the mounting seat is the steel disc opened up there are two anchor hole, and it is sliding that two anchor holes are located at c-type band tooth The two sides of slot.
Wherein, diameter of the c-type with tooth sliding slot is equal to the internal diameter of tunnel duct piece.
The present invention has the following beneficial effects: due to taking above-mentioned technical proposal
The device of the present invention for being used for Fast Installation subway tunnel electromechanical equipment and pipeline, by tunnel duct piece Cast-in fixing bolt is arranged ensure that without intensively punching on tunnel structure to tunnel knot instead of traditional punching tendon-planted craft Structure zero damages, and protects the integrality of tunnel structure, greatly extends the service life of tunnel structure, also ensured subway circulation Safety;And the looks that traditional handicraft dust is more, the big construction environment of noise is severe are revolutionized, are avoided to construction personnel's health Damage;Also have the advantages that Embedment Construction it is simple, it is quick for installation, can substantially save electromechanical equipment and pipeline installation period; Meanwhile not increasing cost in the subway construction phase, later period operation and maintenance simply without overhaul, can save huge maintenance, overhaul cost, Construction and maintenance cost can be greatly reduced.
Detailed description of the invention:
Fig. 1 is the structural representation of the present invention for Fast Installation subway tunnel electromechanical equipment and the device of pipeline Figure;
Fig. 2 is the structural schematic diagram of cast-in fixing bolt of the present invention;
Fig. 3 is the structural schematic diagram of external anti-seismic sliding slot of the present invention.
Specific embodiment:
Below in conjunction with attached drawing, the content of the present invention will be further explained.
As shown in Figure 1, Figure 2 and Figure 3, the dress of the present invention for being used for Fast Installation subway tunnel electromechanical equipment and pipeline It sets, it is characterised in that: including tunnel duct piece 1, cast-in fixing bolt 2, multiple external anti-seismic sliding slots 3 and mounting bracket 4, the pre-buried anchor Bolt 2 includes section of jurisdiction positioning device 21 and anchor bolt 22, and an anchor bolt 22, section of jurisdiction are fixed in the both ends of section of jurisdiction positioning device 21 vertically respectively Positioning device 21 is embedded in the inner sidewall of tunnel duct piece 1, axis direction cloth of multiple external anti-seismic sliding slots 3 along tunnel duct piece 1 It sets, each external anti-seismic sliding slot 3 includes c-type band tooth sliding slot 31 and at least two mounting seats 32, at least two mounting seats 32 It is fixed on back side of the c-type with tooth sliding slot 31 and along its length interval setting, each external anti-seismic sliding slot 3 passes through multiple pre-buried The anchor bolt 22 of anchor bolt 2 and at least two mounting seats 32 are fixed on the inner sidewall of tunnel duct piece 1 along the circumferencial direction of tunnel duct piece 1 On, mounting bracket 4 is fixedly connected with multiple external anti-seismic sliding slots 3;In this way by the way that cast-in fixing bolt 2 is arranged in tunnel duct piece 1, replace For traditional punching tendon-planted craft, just without intensively being punched on tunnel structure, it ensure that and tunnel structure zero is damaged, protect The integrality of tunnel structure, greatly extends the service life of tunnel structure, has also ensured subway circulation safety;And thoroughly The looks that traditional handicraft dust is more, the big construction environment of noise is severe are changed, the damage to construction personnel's health is avoided;Also have Embedment Construction is simple, it is quick for installation, can substantially save the advantages of electromechanical equipment and pipeline installation period;Meanwhile it being built in subway If the phase does not increase cost, later period operation and maintenance simply without overhaul, can save huge maintenance, overhaul cost, can be greatly reduced Construction and maintenance cost.
Wherein, tunnel duct piece 1 refers to the tunnel of shield construction, the liner structure generallyd use;Tunnel duct piece all uses Be precast block mode, then assembled cyclization;Most conventional shield method subway sectional tunnel, tunnel duct piece are generally used 5+ 1 mode, 3 pieces of calibrated bolck B blocks, 2 pieces of adjacent block L blocks and 1 piece of wedge block (bind block) K block.
In Fig. 1, the mounting bracket 4 includes bracket 41, ring stand 42 and hanger 43, one end of bracket 41 and external anti-seismic Sliding slot 3 is fixedly connected, and the other end of bracket 41 is directed toward the centre of tunnel duct piece 1;One end of ring stand 42 and external anti-seismic sliding slot 3 are solid The other end of fixed connection, ring stand 42 is equipped with pipeline mounting hole;Hanger 43 be located at it is external anti-at the top of 1 inner sidewall of tunnel duct piece Shake sliding slot 3 is fixedly connected;Certainly, the bracket 41, ring stand 42 of the mounting bracket 4 and the particular number and type of hanger 43, can Depending on the demands such as the electromechanical equipment of required installation, pipeline.Fig. 1 is also shown in the setting of the inner sidewall bottom of tunnel duct piece 1 Two axially extending tracks 5 along tunnel duct piece 1.
In Fig. 2, the cast-in fixing bolt 2 further includes anchor bolt sheath 23, and the anchor bolt 22 of each cast-in fixing bolt 2 is correspondingly arranged one A anchor bolt sheath 23.
In Fig. 3, the mounting seat 32 is the steel disc opened up there are two anchor hole, and two anchor holes are located at c-type Two sides with tooth sliding slot 31.Preferably, diameter of the c-type with tooth sliding slot 31 is equal to the internal diameter of tunnel duct piece 1.

Claims (6)

1. for Fast Installation subway tunnel electromechanical equipment and the device of pipeline, it is characterised in that: including tunnel duct piece, pre-buried anchor Bolt, multiple external anti-seismic sliding slots and mounting bracket, the cast-in fixing bolt include section of jurisdiction positioning device and anchor bolt, section of jurisdiction positioning device Both ends fix an anchor bolt vertically respectively, section of jurisdiction positioning device is embedded in the inner sidewall of tunnel duct piece, multiple external anti-seismics Sliding slot arranges that each external anti-seismic sliding slot includes c-type band tooth sliding slot and at least two installation bottoms along the axis direction of tunnel duct piece Seat, at least two mounting seats are fixed on back side of the c-type with tooth sliding slot and along its length interval setting, each external anti-seismic Sliding slot is fixed on tunneltron along the circumferencial direction of tunnel duct piece by the anchor bolt and at least two mounting seats of multiple cast-in fixing bolts On the inner sidewall of piece, mounting bracket is fixedly connected with multiple external anti-seismic sliding slots;The mounting bracket includes bracket, ring stand and hangs One end of frame, bracket is fixedly connected with external anti-seismic sliding slot, and the other end of bracket is directed toward the centre of tunnel duct piece;One end of ring stand It is fixedly connected with external anti-seismic sliding slot, the other end of ring stand is equipped with pipeline mounting hole;Hanger be located at tunnel duct piece inner sidewall The external anti-seismic sliding slot at top is fixedly connected;The lateral wall of tunnel duct piece some be non-arc surface plane.
2. the device according to claim 1 for being used for Fast Installation subway tunnel electromechanical equipment and pipeline, it is characterised in that: Tunnel duct piece includes 3 pieces of calibrated bolcks, 2 pieces of adjacent blocks and 1 piece of wedge block.
3. the device according to claim 1 for being used for Fast Installation subway tunnel electromechanical equipment and pipeline, it is characterised in that: In the inner sidewall bottom of tunnel duct piece, two axially extending tracks along tunnel duct piece are set.
4. the device according to claim 1 for being used for Fast Installation subway tunnel electromechanical equipment and pipeline, it is characterised in that: The cast-in fixing bolt further includes anchor bolt sheath, and the anchor bolt of each cast-in fixing bolt is correspondingly arranged an anchor bolt sheath.
5. the device according to claim 1 for being used for Fast Installation subway tunnel electromechanical equipment and pipeline, it is characterised in that: The mounting seat is the steel disc opened up there are two anchor hole, and two anchor holes are located at two sides of the c-type with tooth sliding slot.
6. the device according to claim 1 for being used for Fast Installation subway tunnel electromechanical equipment and pipeline, it is characterised in that: Diameter of the c-type with tooth sliding slot is equal to the internal diameter of tunnel duct piece.
CN201710486888.8A 2017-06-23 2017-06-23 For Fast Installation subway tunnel electromechanical equipment and the device of pipeline Expired - Fee Related CN107218059B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710486888.8A CN107218059B (en) 2017-06-23 2017-06-23 For Fast Installation subway tunnel electromechanical equipment and the device of pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710486888.8A CN107218059B (en) 2017-06-23 2017-06-23 For Fast Installation subway tunnel electromechanical equipment and the device of pipeline

Publications (2)

Publication Number Publication Date
CN107218059A CN107218059A (en) 2017-09-29
CN107218059B true CN107218059B (en) 2019-03-29

Family

ID=59951367

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710486888.8A Expired - Fee Related CN107218059B (en) 2017-06-23 2017-06-23 For Fast Installation subway tunnel electromechanical equipment and the device of pipeline

Country Status (1)

Country Link
CN (1) CN107218059B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108590759A (en) * 2018-06-28 2018-09-28 彭健 A kind of hangers victory assembling device and its installation method
CN109113760A (en) * 2018-07-06 2019-01-01 江苏华威线路设备集团有限公司 A kind of prompt dress engineering method of environmental protection for Fast Installation shield tunnel electromechanical equipment pipeline
CN111706356A (en) * 2020-06-19 2020-09-25 中国铁建电气化局集团第五工程有限公司 Shield piece and method for subway shield tunnel punching-free mounting bracket
CN112431610B (en) * 2020-12-17 2022-09-06 华侨大学 Mounting structure and mounting method of shield tunnel auxiliary equipment
CN113266395A (en) * 2021-07-01 2021-08-17 上海市城市建设设计研究总院(集团)有限公司 Shield tunnel pipeline support connecting device and anti-falling device in earthquake high-intensity area

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103075190A (en) * 2013-01-08 2013-05-01 嘉善三方电力器材有限公司 Cable support for supporting cable in subway tunnel
US8491061B2 (en) * 2011-10-17 2013-07-23 Michel Bernard Breault System for spraying water to reduce dust while drilling in a mine tunnel
CN104747206A (en) * 2015-03-18 2015-07-01 济南轨道交通集团有限公司 Shield tunnel segment structure considering municipal cable pipelines and installing method
CN105317460A (en) * 2014-06-04 2016-02-10 达诺尔电气(集团)有限公司 Tunnel cable hanging frame
CN205532621U (en) * 2016-02-03 2016-08-31 维机轨道交通科技(镇江)有限公司 Pre -buried formula section of jurisdiction and channel mounting structure
CN205638473U (en) * 2016-05-20 2016-10-12 北京建工混凝土构件有限公司 Novel shield tunnel section of jurisdiction
CN206987887U (en) * 2017-05-07 2018-02-09 福建康元捷装有限公司 Subway tunnel electromechanical equipment and pipeline quick fixation structure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8491061B2 (en) * 2011-10-17 2013-07-23 Michel Bernard Breault System for spraying water to reduce dust while drilling in a mine tunnel
CN103075190A (en) * 2013-01-08 2013-05-01 嘉善三方电力器材有限公司 Cable support for supporting cable in subway tunnel
CN105317460A (en) * 2014-06-04 2016-02-10 达诺尔电气(集团)有限公司 Tunnel cable hanging frame
CN104747206A (en) * 2015-03-18 2015-07-01 济南轨道交通集团有限公司 Shield tunnel segment structure considering municipal cable pipelines and installing method
CN205532621U (en) * 2016-02-03 2016-08-31 维机轨道交通科技(镇江)有限公司 Pre -buried formula section of jurisdiction and channel mounting structure
CN205638473U (en) * 2016-05-20 2016-10-12 北京建工混凝土构件有限公司 Novel shield tunnel section of jurisdiction
CN206987887U (en) * 2017-05-07 2018-02-09 福建康元捷装有限公司 Subway tunnel electromechanical equipment and pipeline quick fixation structure

Also Published As

Publication number Publication date
CN107218059A (en) 2017-09-29

Similar Documents

Publication Publication Date Title
CN107218059B (en) For Fast Installation subway tunnel electromechanical equipment and the device of pipeline
CN101914897B (en) Construction method of single main cable inclined suspender ground anchor type suspension bridge
CN206987887U (en) Subway tunnel electromechanical equipment and pipeline quick fixation structure
CN105735101B (en) A kind of high-speed railway repairing beam and its emergency repair method that can be exchanged into permanent bridge structure
CN102192368A (en) Large-span overhead pipeline sliding installation method
CN107662881A (en) Integral riser erecting device and its installation method in a kind of high stove pipe well
CN106012851A (en) Synchronous construction method of steel box girder and concrete pier studs
CN111236965A (en) In-situ jacking and assembling construction method for fabricated tunnel lining structure
CN203531922U (en) High-toughness nodular cast iron and reinforced concrete combined tunnel wall plate
CN107780337B (en) Cast-in-situ balance swivel door-shaped pier and construction method thereof
CN205638476U (en) A section of jurisdiction steel shotcrete for tunnel construction
CN105369782B (en) Auxiliary installation device and installation method for radial gate trunnions
CN100543271C (en) Magnetic suspension tunnel internal zone dividing method
CN102767140B (en) Construction method for rapidly mounting and dismounting temporary support of continuous girder bridge pier
CN203359822U (en) Indoor GIS (geographic information system) transport in-place device
CN206987826U (en) Tunnel duct piece and its external anti-seismic chute used
CN202099878U (en) Embedded part for evacuation platform of magnetic suspension project
CN203766764U (en) Subway platform reinforcing device
CN102642482B (en) Urgent repair construction method for anchor mast of catenary
CN103231993B (en) Indoor GIS transports positioning apparatus and using method
RU2534126C2 (en) Tunnel tubing ring for underground structures of subway
CN205676805U (en) Band greening grooved chain type flexible guardrail base
CN109941890B (en) Bridge hoisting method and device for insufficient safety clearance under ultrahigh voltage line
CN204825656U (en) Cast -in -place formwork support structure in bridge sound barrier basis
CN104358190A (en) Hidden type exchangeable shearing joint

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: Unit B-1 25 51 Road Gulou District of Fuzhou city of Fujian Province, No. 32 Building, 350001 yuan

Applicant after: KANGYUAN TRACK TRAFFIC TECHNOLOGY (FUJIAN) CO.,LTD.

Address before: Unit B-1 25 51 Road Gulou District of Fuzhou city of Fujian Province, No. 32 Building, 350001 yuan

Applicant before: FUJIAN KANGYUAN JIEZHUANG CO.,LTD.

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee