CN107217910A CN201710652131.1A CN201710652131A CN107217910A CN 107217910 A CN107217910 A CN 107217910A CN 201710652131 A CN201710652131 A CN 201710652131A CN 107217910 A CN107217910 A CN 107217910A
Authority
CN
China
Prior art keywords
electric pole
positioning
drilling
hole
horizontal frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201710652131.1A
Other languages
Chinese (zh)
Inventor
徐福强
周方
袁志勇
徐小利
张挺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Henan Electric Power Company Weishi County Power Supply Co
State Grid Corp of China SGCC
Kaifeng Power Supply Co of State Grid Henan Electric Power Co Ltd
Original Assignee
State Grid Henan Electric Power Company Weishi County Power Supply Co
State Grid Corp of China SGCC
Kaifeng Power Supply Co of State Grid Henan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Henan Electric Power Company Weishi County Power Supply Co, State Grid Corp of China SGCC, Kaifeng Power Supply Co of State Grid Henan Electric Power Co Ltd filed Critical State Grid Henan Electric Power Company Weishi County Power Supply Co
Priority to CN201710652131.1A priority Critical patent/CN107217910A/en
Publication of CN107217910A publication Critical patent/CN107217910A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/34Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
    • E04H12/347Arrangements for setting poles in the ground

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Earth Drilling (AREA)

Abstract

Supply line's electric pole plants lever apparatus, including horizontal frame, horizontal frame bottom is provided with the left of road wheel, horizontal frame and has been arranged in vertical vertical frame, vertical frame left upper portion is fixedly connected with the left of drilling oil cylinder, vertical frame by connecting plate and is provided with pitting machine structure;Hoist engine is provided with the right side of vertical frame upper end, the movable end of the pull rope wound on hoist engine, which is provided with, is provided with positioning stablity discharging mechanism, electric pole fastening structure, hydraulic station and the first support sheave and the second support sheave that electric pole is placed for supporting on the anchor ear for connecting electric pole left end, horizontal frame.The invention also discloses the cultivation bar method that supply line's electric pole plants lever apparatus.The electric pole that the present invention is erect has the reliability of overturning-preventing, and significantly reduces labor strength, improves efficiency of construction, and the place that can not be reached in crane can also carry out planting bar construction operation, and versatility is stronger.

Description

Supply line's electric pole plants lever apparatus and its plants bar method
Technical field
The invention belongs to technical field of electric power construction, and in particular to a kind of supply line's electric pole plants lever apparatus and its plants bar side Method.
Background technology
Supply line's electric pole is typically all at present manually to carry out or using crane with manually matching somebody with somebody when erectting cultivation bar operation Conjunction is constructed.Hand fit's crane construct, hand fit's crane construction and excavation bar hole and earth filling tamping be also by being accomplished manually, Labor intensity is big.Crane cost of use is higher, and in many locations(Such as cropland, with a varied topography, rugged bumpy ground Side)Crane cannot be introduced into scene.
Electric pole erect earth filling tamping after, it is necessary to set oblique rope between ground and electric pole, it is ensured that electric pole it is vertical Stability, but existing many electric pole settings are on pavement, and oblique rope just has influence on the trip of people, particularly evening, often Occurs the situation that people encounter oblique rope and injury by mistake, if oblique rope is removed, electric pole is scraped very by big wind in bad weather Easily just scraped askew or even blown down, badly influence the normal operation of power supply.
The content of the invention
The present invention has automatic drill hole there is provided one kind to solve weak point of the prior art, is easy to setting, electric pole Erect rear stability, do not need supply line's electric pole of oblique rope to plant lever apparatus and its plant bar method.
In order to solve the above technical problems, the present invention is adopted the following technical scheme that:Supply line's electric pole plants lever apparatus, including water Flat frame, horizontal frame bottom is provided with the left of road wheel, horizontal frame and has been arranged in vertical vertical frame, vertical frame Tilt prop is provided between lower front and horizontal frame, vertical frame left upper portion is fixedly connected with drilling oil by connecting plate Pitting machine structure is provided with the left of cylinder, vertical frame;The traction wound on hoist engine, hoist engine is provided with the right side of vertical frame upper end The movable end of rope, which is provided with the anchor ear for connecting electric pole left end, horizontal frame, is provided with positioning stablity discharging mechanism, electric pole Fastening structure, hydraulic station and for support place electric pole first support sheave and second support sheave, the first support slot and Second support sheave is correspondingly arranged in left-right direction, and electric pole lies in a horizontal plane in the first support sheave and the second support in left-right direction In the race of sheave, the second support sheave is located at horizontal frame right part, and hydraulic station is connected by high-pressure oil pipe with drilling oil cylinder, Positioning stablity discharging mechanism is located on the left of the second support sheave and is provided with correspondence before and after two, two positioning stablity discharging mechanisms And respectively positioned at the front side of electric pole and rear side, electric pole fastening structure is located in the middle part of horizontal frame and is fastenedly connected with electric pole;
Positioning stablity discharging mechanism includes square tube, positioning motor, positioning sleeve and locating rod, and square tube is arranged in vertical, square tube Lower end is fixedly connected with horizontal frame, and square tube upper end is provided with the left of closure plate, square tube inwall and right side is vertically right A slideway should be provided with, positioning motor is located in square tube, and the main shaft of positioning motor is set vertically downward, the left side of positioning motor It is fixedly installed a slide plate respectively with right side, two slide plates are slidably connected in a slideway respectively;
The main shaft of positioning motor is offered penetrating up and down on horizontal frame by shaft coupling and the coaxial connection in locating rod upper end Stepped hole, positioning set upper side outward flange is fixedly connected with locating ring, and locating ring is corresponding with positioning sleeve to be assemblied in stepped hole, positioning Ring is fixedly connected by trip bolt with horizontal frame, and internal thread is provided with positioning sleeve, and locating rod top is provided with external screw thread, Locating rod extend into positioning sleeve and is threadedly coupled with positioning sleeve, and locating rod lower end is sharp, and locating rod bottom is in axial direction set It is equipped with the external spiral rib below horizontal frame;
It is respectively provided with rear side of the square tube of the positioning stablity discharging mechanism of front side with front side of the square tube of the positioning stablity discharging mechanism of rear side There is the spacing guide plate that surface is smooth.
Pitting machine structure includes vertically being fixedly installed on the guide rail on the left of vertical frame, and guide rail passes through oat tail groove structure Travelling carriage is slidably connected, drilling oil cylinder is arranged in vertical, and the piston-rod lower end of drilling oil cylinder is hinged with travelling carriage upper end, Drilling motor is fixedly installed on travelling carriage, the main shaft of drilling motor is coaxial to be connected with the drilling pipe set vertically downward, Drilling pipe lower end is sharp, and drilling pipe outer surface is in axial direction provided with helical cut rib.
Electric pole fastening structure includes being provided with up around electric pole at the top of the mounting seat being fixed on horizontal frame, mounting seat And the elastic webbing tightened with electric pole.
The method that lever apparatus carries out planting bar is planted using supply line's electric pole, is comprised the following steps,
(1), electric pole is placed on the race of the first support sheave and the second support sheave, pull elastic webbing from mounting seat side Up around electric pole and fixed to mounting seat opposite side, elastic webbing tightens electric pole;
(2), described cultivation lever apparatus is shifted onto to the place for needing to plant bar, when hole point is bored in the setting of drilling pipe corresponding ground, start two Individual positioning stablity discharging mechanism, makes locating rod drill downwards into subsurface, horizontal frame is kept stable;
(3), start drilling motor and drilling oil cylinder, drilling motor drive drilling pipe rotate, drilling oil cylinder piston rod elongation, driving Travelling carriage is moved down along guide rail, and the drilling motor being fixed on travelling carriage is just slowly moved downward, thus to predetermined hole point Carry out after drilling operation, drilling to appropriate depth, operation drilling oil cylinder, piston rod shrinks, and drilling pipe sets back upwards, bores hole straight If footpath is smaller, workmen will bore hole using spade and further expand, and simultaneously clear the hack bored in hole, bore hole Complete;
(4), start two positioning stablity discharging mechanisms, make locating rod upwards from ground extract out, then by horizontal frame to the left Push away, stop after electric pole right-hand member is located at and bores hole top, then restart two positioning stablity discharging mechanisms, make locating rod downward Subsurface is crept into, horizontal frame is kept stable;
(5), the anchor ear that connects the traction end of hoist engine overhanging cable snap into electric pole left end, elastic webbing is removed, starts elevator Pull rope on machine, hoist engine pulls the left end of electric pole to be lifted up, and electric pole is rotated up using the second support sheave as fulcrum, electricity Bar right-hand member is rotated down, and electric pole keeps stable under the restriction of two pieces of smooth spacing guide plates, on the left of electric pole and moved up, with electric pole Left side is moved up, when electric pole left end is lifted to highest point, and electric pole right-hand member also is moved into downwards brill hole top, workmen's hand Help electric pole to promote electric pole to the right, now manipulate hoist engine slow release pull rope, electric pole is moved down to the right along the second support sheave, With the movement of electric pole downwardly and to the right, when electric pole is that will go into brill hole, electric pole lower end is set into Anti-inclining ruggedized construction, Then electric pole is promoted electric pole right-hand member and Anti-inclining ruggedized construction is slowly entered and is erected in drilling to the right again;
(6), workmen help electric pole electric pole is kept plumbness, the concrete sand that stirs in advance is poured into hole boring Slurry, using vibrating head by mortar jolt ramming, makes Anti-inclining ruggedized construction be poured with power distribution rod bottom and is integrated and is embedded to underground.
Vertically it is described after being erect below with electric pole, Anti-inclining ruggedized construction includes being arranged on electric pole bottom Four brace rods, electric pole radially offers four through holes, and four through holes are equal from top to bottom on the axial direction of electric pole Even arrangement, along the angle between adjacent two through hole center lines is clockwise or counterclockwise 45 ° on the circumferencial direction of electric pole;
Every brace rod includes upper straightway, first time arc and the second arc being respectively positioned on same vertical plane, on Straightway level is located in through hole, and straightway one end is fixedly connected on the upper end of first time arc, the second arc it is upper End is fixedly connected with the upper straightway other end, and the first time arc and the second arc of every support frame are in electric pole Heart line is symmetrical, and first time arc of every brace rod and the lower end of the second arc are flushed with the lower surface holding of electric pole.
The cross section of through hole is rectangle, and brace rod is formed by zinc-coated flat steel sheet bending.
First time arc of every brace rod and the bottom of the second arc pass through a horizontally disposed annular iron Silk is connected with each other, and annular iron wire is centrally located on the center line of electric pole, the side that annular iron wire passes through welding with brace rod Formula is fixedly connected.
Step(2)With(4)Operation two positioning stablity discharging mechanism position level frameworks detailed process be:Start positioning Motor, positioning motor drives locating rod to rotate by shaft coupling, because locating rod is threadedly coupled with positioning sleeve, and locating rod is just along fixed The axis direction of position set is moved vertically downward, and locating rod just drives positioning motor to move down, the cunning of the positioning motor left and right sides Plate is along slideway slide downward, and locating rod lower end is sharp and locating rod bottom is provided with external spiral rib, and locating rod is just easy to Earthward lower to creep into, locating rod drilling is arrived after the certain depth of ground, and positioning motor stops.
Step(5)The process that middle Anti-inclining ruggedized construction is arranged on electric pole lower end is, electric pole leads to for reserved four when prefabricated Hole, intercepts the brace rod of four different length, four brace rods is worn in corresponding through hole respectively, then by brace rod logical Hole both sides downward bending, the part in through hole be on straightway, the part outside through hole is the first arc and second Arc, four brace rods after four brace rods are installed in place, connected and be welded as a whole using the iron wire for holding into circle.
Using above-mentioned technical proposal, because the present invention is the electric pole that sets up supply line, therefore supply line's no power, The power supply required for hoist engine, positioning motor, hydraulic station in the present invention is by generator powered.
On the left of the electric pole it is elevated during, the square tube of positioning stablity discharging mechanism is located at electric pole front and rear sides, it is to avoid electricity Bar swing, and set smooth spacing guide plate to be contacted with electric pole, reduce frictional force.Either hardened ground is either native Ground, the locating rod of positioning stablity discharging mechanism can be crept into subsurface, play good positioning action.
The cross section of through hole is rectangle, and brace rod is formed by zinc-coated flat steel sheet bending, can so avoid brace rod in through hole It is interior to rotate, the reliability of reinforced assembly.Using four brace rods, the arc four of formation first time and the second arc four, And be uniformly arranged in the surrounding all directions of power distribution rod, it can so play good supporting role, it is ensured that power distribution rod bottom is reinforced Reliability and comprehensive.Annular iron wire, which is played, connects as one four brace rods, overcomes the elasticity of four brace rods, with It is adapted to the size for boring hole, while strengthening the effect of the intensity of four brace rods.
In summary, the present invention will bore hole and the operation of cultivation bar is combined by setting Anti-inclining ruggedized construction in electric pole lower end Completion is integrated, and carries out by the way of casting concrete reinforcing electric pole lower end, the reliability with overturning-preventing, and is subtracted significantly Light labor strength, improves efficiency of construction, the place that can not be reached in crane can also carry out planting bar construction operation, general Property is stronger.
Brief description of the drawings
Fig. 1 is the structural representation of the present invention;
Fig. 2 is the side view of the first support sheave in Fig. 1;
Fig. 3 is the side view of two positioning stablity discharging mechanisms in Fig. 1;
Fig. 4 is the structural representation of positioning stablity discharging mechanism;
Fig. 5 is the structural representation of Anti-inclining ruggedized construction after electric pole is erect in the present invention;
Fig. 6 is A-A sectional views in Fig. 5.
Embodiment
As shown in figures 1 to 6, supply line's electric pole of the invention plants lever apparatus, including horizontal frame 8, the bottom of horizontal frame 8 Road wheel 9 is provided with, the left side of horizontal frame 8 has been arranged in vertical vertical frame 10, the lower front of vertical frame 10 and water Tilt prop 11 is provided between flat frame 8, the left upper portion of vertical frame 10 is fixedly connected with drilling oil cylinder 13 by connecting plate 12, The left side of vertical frame 10 is provided with pitting machine structure;It is provided with hoist engine 14, hoist engine 14 and winds on the right side of the upper end of vertical frame 10 The movable end of pull rope 15 be provided with anchor ear 17 for connecting the left end of electric pole 1, horizontal frame 8 and be provided with positioning stablity Laying mechanism 16, electric pole fastening structure, hydraulic station 20 and the first support support of sheave 18 and second that electric pole 1 is placed for supporting Sheave 19, the first support slot and the second support sheave 19 are correspondingly arranged in left-right direction, and electric pole 1 is lain in a horizontal plane in left-right direction In the race 42 of the first support support sheave 19 of sheave 18 and second, the second support sheave 19 is located at the right part of horizontal frame 8, liquid Pressure station 20 is connected by high-pressure oil pipe with drilling oil cylinder 13, and positioning stablity discharging mechanism 16 is located at the left side of the second support sheave 19 simultaneously It is provided with front side and rear side corresponding and that be located at electric pole 1 respectively, electric pole fastening knot before and after two, two positioning stablity discharging mechanisms Structure is located at the middle part of horizontal frame 8 and is fastenedly connected with electric pole 1.
Pitting machine structure includes the guide rail 21 for being vertically fixedly installed on the left side of vertical frame 10, and guide rail 21 passes through dovetail Slot structure slidably connects travelling carriage 22, and drilling oil cylinder 13 is arranged in vertical, and creeps into the piston-rod lower end and cunning of oil cylinder 13 The upper end of moving frame 22 is hinged, and drilling motor 23, the coaxial drive connection of main shaft of drilling motor 23 are fixedly installed on travelling carriage 22 There is the drilling pipe 24 set vertically downward, the lower end of drilling pipe 24 is sharp, and the outer surface of drilling pipe 24 is in axial direction provided with helical cut rib 25。
Positioning stablity discharging mechanism 16 include square tube 26, positioning motor 27, positioning sleeve 28 and locating rod 29, square tube 26 along hang down Nogata is fixedly connected with horizontal frame 8 to setting, the lower end of square tube 26, and the upper end of square tube 26 is provided with closure plate 30, the inwall of square tube 26 Left side and right side are vertically correspondingly arranged on a slideway 31, and positioning motor 27 is located in square tube 26, positioning motor 27 Main shaft set vertically downward, the left side and right side of positioning motor 27 are fixedly installed a slide plate 32, two slide plates 32 respectively It is slidably connected at respectively in a slideway 31;
The main shaft of positioning motor 27 is offered on horizontal frame 8 by shaft coupling 33 and the coaxial connection in the upper end of locating rod 29 Under penetrating stepped hole, the upper end outward flange of positioning sleeve 28 is fixedly connected with locating ring 34, and locating ring 34 and the correspondence of positioning sleeve 28 are filled Fit in stepped hole, locating ring 34 is fixedly connected by trip bolt 35 with horizontal frame 8, interior spiral shell is provided with positioning sleeve 28 Line, the top of locating rod 29 is provided with external screw thread 36, and locating rod 29 extend into positioning sleeve 28 and is threadedly coupled with positioning sleeve 28, fixed The position lower end of bar 29 is sharp, and the bottom of locating rod 29 is in axial direction provided with the external spiral rib 37 positioned at the lower section of horizontal frame 8;
Before the square tube 26 of the rear side of square tube 26 of the positioning stablity discharging mechanism 16 of front side and the positioning stablity discharging mechanism 16 of rear side Side is provided with the smooth spacing guide plate 38 in surface.
Electric pole fastening structure includes being fixed on mounting seat 39 on horizontal frame 8, the top of mounting seat 39 be provided with upwards about The elastic webbing 40 crossed electric pole 1 and tightened with electric pole 1.
The method that lever apparatus carries out planting bar is planted using supply line's electric pole 1, is comprised the following steps,
(1), electric pole 1 is placed on the race 42 of the first support sheave 18 and the second support sheave 19, from the side of mounting seat 39 Pull elastic webbing 40 up around electric pole 1 and fixed to the opposite side of mounting seat 39, elastic webbing 40 tightens electric pole 1;
(2), described cultivation lever apparatus is shifted onto to the place for needing to plant bar, when hole point is bored in the setting of the corresponding ground of drilling pipe 24, start Two positioning stablity discharging mechanisms 16, make locating rod 29 drill downwards into subsurface, horizontal frame 8 is kept stable;
(3), start drilling motor 23 and drilling oil cylinder 13, drilling motor 23 drive drilling pipe 24 rotate, creep into oil cylinder 13 piston Bar is extended, and driving travelling carriage 22 is moved down along guide rail 21, and the drilling motor 23 being fixed on travelling carriage 22 is just slow downwards to be moved It is dynamic, thus predetermined hole point is carried out after drilling operation, drilling to appropriate depth, operation drilling oil cylinder 13, piston rod shrinks, bored Cylinder 24 sets back upwards, if bore hole diameter it is smaller, workmen will bore hole using spade and further expand, and simultaneously will brill Hack in hole is cleared, and is bored hole and is completed;
(4), start two positioning stablity discharging mechanisms 16, make locating rod 29 upwards from ground extract out, then by horizontal frame 8 Push away to the left, stop after the right-hand member of electric pole 1 is located at and bores hole top, then restart two positioning stablity discharging mechanisms 16, it is fixed to make Position bar 29 drills downwards into subsurface, horizontal frame 8 is kept stable;
(5), the anchor ear 17 that connects the traction end of the overhanging cable 15 of hoist engine 14 snap into the left end of electric pole 1, elastic webbing 40 is removed, Starting the pull rope 15 on hoist engine 14, hoist engine 14 pulls the left end of electric pole 1 to be lifted up, and electric pole 1 is with the second support sheave 19 are rotated up for fulcrum, and the right-hand member of electric pole 1 is rotated down, and electric pole 1 is under the restriction of two pieces of smooth spacing guide plates 38, electric pole 1 Left side keeps stable and moved up, with moving up for the left side of electric pole 1, when the left end of electric pole 1 is lifted to highest point, the right-hand member of electric pole 1 to Under also be moved into brill hole top, the hand steered electric pole 1 of workmen promotes to the right electric pole 1, and now the manipulation slow release of hoist engine 14 is led Messenger 15, electric pole 1 is moved down to the right along the second support sheave 19, with the movement of electric pole 1 downwardly and to the right, when electric pole 1 will enter Enter to when boring in hole, the lower end of electric pole 1 set into Anti-inclining ruggedized construction 41, then promote to the right again electric pole 1 make the right-hand member of electric pole 1 and Anti-inclining ruggedized construction 41 slowly enters and is erected in drilling;
(6), workmen help electric pole 1 electric pole 1 is kept plumbness, the concrete that stirs in advance is poured into hole boring Mortar, using vibrating head by mortar jolt ramming, makes Anti-inclining ruggedized construction 41 be poured with the bottom of power distribution rod 1 and is integrated and is embedded to ground Under.
Vertically it is described after being erect below with electric pole 1, Anti-inclining ruggedized construction 41 includes being arranged under electric pole 1 Four brace rods 2 in portion, electric pole 1 radially offers four through holes 3, four through holes 3 on the axial direction of electric pole 1 from It is evenly arranged under above, along the folder between adjacent two through holes 3 center line clockwise or counterclockwise on the circumferencial direction of electric pole 1 Angle is 45 °;
Every brace rod 2 includes upper straightway 4, the first time arc of arc 5 and second being respectively positioned on same vertical plane 6, the upper level of straightway 4 is located in through hole 3, and the one end of straightway 4 is fixedly connected on the upper end of first time arc 5, the second arc The upper end of line segment 6 is fixedly connected with the upper other end of straightway 4, and the arc 6 of first time arc 5 and second of every support frame is equal Center line on electric pole 1 is symmetrical, the lower end of the arc 6 of first time arc 5 and second of every brace rod 2 with electric pole 1 Lower surface keep flush.
The cross section of through hole 3 is rectangle, and brace rod 2 is formed by zinc-coated flat steel sheet bending.
The bottom of the arc 6 of first time arc 5 and second of every brace rod 2 passes through a horizontally disposed annular Iron wire 7 is connected with each other, and annular iron wire 7 is centrally located on the center line of electric pole 1, and annular iron wire 7 passes through weldering with brace rod 2 The mode connect is fixedly connected.
Step(2)With(4)Operation two position level frameworks 8 of positioning stablity discharging mechanism 16 detailed process be:Start Positioning motor 27, positioning motor 27 drives locating rod 29 to rotate by shaft coupling 33, due to locating rod 29 and the screw thread of positioning sleeve 28 Connection, locating rod 29 is just moved vertically downward along the axis direction of positioning sleeve 28, and locating rod 29 just drives positioning motor 27 downward Mobile, the slide plate 32 of the left and right sides of positioning motor 27 is along the slide downward of slideway 31, and the lower end of locating rod 29 is sharp and locating rod 29 Bottom is provided with external spiral rib 37, and locating rod 29 is just easy to earthward lower drilling, and the drilling of locating rod 29 arrives the depthkeeping of ground one After degree, positioning motor 27 stops.
Step(5)The process that middle Anti-inclining ruggedized construction 41 is arranged on the lower end of electric pole 1 is, electric pole 1 is reserved four when prefabricated Bar through hole 3, intercepts the brace rod 2 of four different length, four brace rods 2 is worn in corresponding through hole 3 respectively, then will branch Support muscle 2 in the both sides downward bending of through hole 3, the part in through hole 3 be on straightway 4, the part outside through hole 3 is first Arc and the second arc 6, after four brace rods 2 are installed in place, are connected four brace rods 2 using the iron wire for holding into circle Connect and be welded as a whole.
Because the present invention is the electric pole 1 that sets up supply line, therefore supply line's no power, the hoist engine in the present invention 14th, the power supply required for positioning motor 27, hydraulic station 20 is by generator powered.
During elevated in the left side of electric pole 1, the square tube 26 of positioning stablity discharging mechanism 16 is located at the front and rear sides of electric pole 1, The swing of electric pole 1 is avoided, and sets smooth spacing guide plate 38 to be contacted with electric pole 1, frictional force is reduced.Either hardened ground Or soil, the locating rod 29 of positioning stablity discharging mechanism 16, which can be crept into, arrives subsurface, plays good positioning action.
The cross section of through hole 3 is rectangle, and brace rod 2 is formed by zinc-coated flat steel sheet bending, can so avoid brace rod 2 logical Rotated in hole 3, the reliability of reinforced assembly.Using four brace rods 2, the arc 5 four of formation first time and the second arc 6 Four, and be uniformly arranged in the surrounding all directions of power distribution rod 1, it can so play good supporting role, it is ensured that the bottom of power distribution rod 1 The reliability and comprehensive that portion is reinforced.Annular iron wire 7, which is played, connects as one four brace rods 2, overcomes four brace rods 2 Elasticity, be adapted to bore hole size, while strengthen four brace rods 2 intensity effect.
The present embodiment not makees any formal limitation to shape, material, structure of the present invention etc., every according to this hair Any simple modification, equivalent variations and modification that bright technical spirit is made to above example, belong to the technology of the present invention side The protection domain of case.

Claims (9)

1. supply line's electric pole plants lever apparatus, it is characterised in that:Including horizontal frame, horizontal frame bottom is provided with road wheel, Vertical frame has been arranged in vertical on the left of horizontal frame, diagonal brace is provided between vertical frame lower front and horizontal frame Plate, vertical frame left upper portion is fixedly connected with the left of drilling oil cylinder, vertical frame by connecting plate and is provided with pitting machine structure;Hang down The movable end that the pull rope wound on hoist engine, hoist engine is provided with the right side of straight framework upper end is provided with for connecting electric pole left end Anchor ear, positioning stablity discharging mechanism, electric pole fastening structure, hydraulic station are provided with horizontal frame and electricity is placed for supporting First support sheave of bar and the second support sheave, the first support slot and the second support sheave are correspondingly arranged in left-right direction, electricity Bar is lain in a horizontal plane in the race of the first support sheave and the second support sheave in left-right direction, and the second support sheave is located at level Framework right part, hydraulic station is connected by high-pressure oil pipe with drilling oil cylinder, and positioning stablity discharging mechanism is located at the second support sheave Left side is simultaneously provided with front side and rear side corresponding and that be located at electric pole respectively, electric pole before and after two, two positioning stablity discharging mechanisms Fastening structure is located in the middle part of horizontal frame and is fastenedly connected with electric pole;
Positioning stablity discharging mechanism includes square tube, positioning motor, positioning sleeve and locating rod, and square tube is arranged in vertical, square tube Lower end is fixedly connected with horizontal frame, and square tube upper end is provided with the left of closure plate, square tube inwall and right side is vertically right A slideway should be provided with, positioning motor is located in square tube, and the main shaft of positioning motor is set vertically downward, the left side of positioning motor It is fixedly installed a slide plate respectively with right side, two slide plates are slidably connected in a slideway respectively;
The main shaft of positioning motor is offered penetrating up and down on horizontal frame by shaft coupling and the coaxial connection in locating rod upper end Stepped hole, positioning set upper side outward flange is fixedly connected with locating ring, and locating ring is corresponding with positioning sleeve to be assemblied in stepped hole, positioning Ring is fixedly connected by trip bolt with horizontal frame, and internal thread is provided with positioning sleeve, and locating rod top is provided with external screw thread, Locating rod extend into positioning sleeve and is threadedly coupled with positioning sleeve, and locating rod lower end is sharp, and locating rod bottom is in axial direction set It is equipped with the external spiral rib below horizontal frame;
It is respectively provided with rear side of the square tube of the positioning stablity discharging mechanism of front side with front side of the square tube of the positioning stablity discharging mechanism of rear side There is the spacing guide plate that surface is smooth.
2. supply line's electric pole according to claim 1 plants lever apparatus, it is characterised in that:Pitting machine structure is included along Vertical Square To the guide rail being fixedly installed on the left of vertical frame, guide rail slidably connects travelling carriage, drilling oil cylinder edge by oat tail groove structure Vertical direction is set, and the piston-rod lower end of drilling oil cylinder is hinged with travelling carriage upper end, and drilling motor is fixedly installed on travelling carriage, The main shaft of drilling motor is coaxial to be connected with the drilling pipe set vertically downward, and drilling pipe lower end is sharp, and drilling pipe outer surface is along axle Direction is provided with helical cut rib.
3. supply line's electric pole according to claim 2 plants lever apparatus, it is characterised in that:Electric pole fastening structure includes fixing The elastic webbing for being provided with up around electric pole and being tightened with electric pole at the top of mounting seat on horizontal frame, mounting seat.
4. the method that lever apparatus carries out planting bar is planted using supply line's electric pole as claimed in claim 3, it is characterised in that:Including Following steps,
(1), electric pole is placed on the race of the first support sheave and the second support sheave, pull elastic webbing from mounting seat side Up around electric pole and fixed to mounting seat opposite side, elastic webbing tightens electric pole;
(2), described cultivation lever apparatus is shifted onto to the place for needing to plant bar, when hole point is bored in the setting of drilling pipe corresponding ground, start two Individual positioning stablity discharging mechanism, makes locating rod drill downwards into subsurface, horizontal frame is kept stable;
(3), start drilling motor and drilling oil cylinder, drilling motor drive drilling pipe rotate, drilling oil cylinder piston rod elongation, driving Travelling carriage is moved down along guide rail, and the drilling motor being fixed on travelling carriage is just slowly moved downward, thus to predetermined hole point Carry out after drilling operation, drilling to appropriate depth, operation drilling oil cylinder, piston rod shrinks, and drilling pipe sets back upwards, bores hole straight If footpath is smaller, workmen will bore hole using spade and further expand, and simultaneously clear the hack bored in hole, bore hole Complete;
(4), start two positioning stablity discharging mechanisms, make locating rod upwards from ground extract out, then by horizontal frame to the left Push away, stop after electric pole right-hand member is located at and bores hole top, then restart two positioning stablity discharging mechanisms, make locating rod downward Subsurface is crept into, horizontal frame is kept stable;
(5), the anchor ear that connects the traction end of hoist engine overhanging cable snap into electric pole left end, elastic webbing is removed, starts elevator Pull rope on machine, hoist engine pulls the left end of electric pole to be lifted up, and electric pole is rotated up using the second support sheave as fulcrum, electricity Bar right-hand member is rotated down, and electric pole keeps stable under the restriction of two pieces of smooth spacing guide plates, on the left of electric pole and moved up, with electric pole Left side is moved up, when electric pole left end is lifted to highest point, and electric pole right-hand member also is moved into downwards brill hole top, workmen's hand Help electric pole to promote electric pole to the right, now manipulate hoist engine slow release pull rope, electric pole is moved down to the right along the second support sheave, With the movement of electric pole downwardly and to the right, when electric pole is that will go into brill hole, electric pole lower end is set into Anti-inclining ruggedized construction, Then electric pole is promoted electric pole right-hand member and Anti-inclining ruggedized construction is slowly entered and is erected in drilling to the right again;
(6), workmen help electric pole electric pole is kept plumbness, the concrete sand that stirs in advance is poured into hole boring Slurry, using vibrating head by mortar jolt ramming, makes Anti-inclining ruggedized construction be poured with power distribution rod bottom and is integrated and is embedded to underground.
5. the method according to claim 4 for planting bar, it is characterised in that:Vertically carried out after being erect below with electric pole Description, Anti-inclining ruggedized construction includes being arranged on four brace rods of electric pole bottom, and electric pole radially offers four and led to Hole, four through holes are evenly arranged from top to bottom on the axial direction of electric pole, along clockwise or inverse on the circumferencial direction of electric pole Angle between the adjacent two through hole center lines of hour hands is 45 °;
Every brace rod includes upper straightway, first time arc and the second arc being respectively positioned on same vertical plane, on Straightway level is located in through hole, and straightway one end is fixedly connected on the upper end of first time arc, the second arc it is upper End is fixedly connected with the upper straightway other end, and the first time arc and the second arc of every support frame are in electric pole Heart line is symmetrical, and first time arc of every brace rod and the lower end of the second arc are flushed with the lower surface holding of electric pole.
6. the method according to claim 5 for planting bar, it is characterised in that:The cross section of through hole is rectangle, brace rod by Zinc-coated flat steel sheet bending is formed.
7. the method according to claim 6 for planting bar, it is characterised in that:First time arc and second of every brace rod The bottom of arc is connected with each other by a horizontally disposed annular iron wire, and annular iron wire is centrally located in electric pole On heart line, annular iron wire is fixedly connected with brace rod by way of welding.
8. the method according to claim 4 for planting bar, it is characterised in that:Step(2)With(4)Operate under two positioning stablities The detailed process of laying mechanism position level framework is:Start positioning motor, positioning motor drives locating rod to rotate by shaft coupling, Because locating rod is threadedly coupled with positioning sleeve, locating rod is just moved vertically downward along the axis direction of positioning sleeve, and locating rod is with regard to band Dynamic positioning motor is moved down, and the slide plate of the positioning motor left and right sides is along slideway slide downward, and locating rod lower end is sharp and fixed Position bar bottom is provided with external spiral rib, and locating rod is just easy to earthward lower drilling, and locating rod drilling arrives ground certain depth Afterwards, positioning motor stops.
9. the method according to claim 7 for planting bar, it is characterised in that:Step(5)Middle Anti-inclining ruggedized construction is arranged on The process of electric pole lower end is, electric pole reserves four through holes when prefabricated, the brace rod of four different length is intercepted, by four supports Muscle is worn in corresponding through hole respectively, then by brace rod in through hole both sides downward bending, the part in through hole be on it is straight Line segment, the part outside through hole is the first arc and the second arc, after four brace rods are installed in place, using holding into Four brace rods are connected and are welded as a whole by circular iron wire.
CN201710652131.1A 2017-08-02 2017-08-02 Supply line's electric pole plants lever apparatus and its plants bar method Withdrawn CN107217910A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710652131.1A CN107217910A (en) 2017-08-02 2017-08-02 Supply line's electric pole plants lever apparatus and its plants bar method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710652131.1A CN107217910A (en) 2017-08-02 2017-08-02 Supply line's electric pole plants lever apparatus and its plants bar method

Publications (1)

Publication Number Publication Date
CN107217910A true CN107217910A (en) 2017-09-29

Family

ID=59953860

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710652131.1A Withdrawn CN107217910A (en) 2017-08-02 2017-08-02 Supply line's electric pole plants lever apparatus and its plants bar method

Country Status (1)

Country Link
CN (1) CN107217910A (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107605232A (en) * 2017-10-11 2018-01-19 宁波鄞州晶浩正机械设备有限公司 A kind of cable electric pole fixing device of stabilization
CN107916824A (en) * 2017-11-30 2018-04-17 袁萍 A kind of installation equipment of construction site concrete wire pole
CN109322530A (en) * 2018-09-07 2019-02-12 戴少武 A kind of anti-loosening electric pole embedded device based on variable speed
CN110872071A (en) * 2019-11-28 2020-03-10 安徽省徽源电杆有限公司 Wire pole supporting device
CN110984676A (en) * 2019-12-23 2020-04-10 国网河南省电力公司西峡县供电公司 Auxiliary device is erect to line pole
CN111042628A (en) * 2019-11-28 2020-04-21 国网山东省电力公司经济技术研究院 Drilling pole setting device for laying field power grid
CN112664037A (en) * 2021-01-08 2021-04-16 上海沉留数码通讯有限公司 Be used for radio tower to dismantle auxiliary assembly
CN112664034A (en) * 2020-12-10 2021-04-16 上海市机械施工集团有限公司 Integral installation method of wind power generation tower
CN113123662A (en) * 2021-04-09 2021-07-16 上海康达电力安装工程有限公司 Telegraph pole vertical rod device and vertical rod method thereof
CN114909015A (en) * 2022-05-20 2022-08-16 国网河南省电力公司新安县供电公司 Pole demolishs device
CN114934713A (en) * 2022-05-30 2022-08-23 国网山东省电力公司东明县供电公司 Pole rotation pole setting device
CN116575790A (en) * 2023-06-09 2023-08-11 哈尔滨入云科技有限公司 5G lamp post base station construction method

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107605232A (en) * 2017-10-11 2018-01-19 宁波鄞州晶浩正机械设备有限公司 A kind of cable electric pole fixing device of stabilization
CN107605232B (en) * 2017-10-11 2018-11-09 江苏美霖铜业有限公司 A kind of cable electric pole fixing device of stabilization
CN107916824A (en) * 2017-11-30 2018-04-17 袁萍 A kind of installation equipment of construction site concrete wire pole
CN109322530A (en) * 2018-09-07 2019-02-12 戴少武 A kind of anti-loosening electric pole embedded device based on variable speed
CN110872071A (en) * 2019-11-28 2020-03-10 安徽省徽源电杆有限公司 Wire pole supporting device
CN111042628A (en) * 2019-11-28 2020-04-21 国网山东省电力公司经济技术研究院 Drilling pole setting device for laying field power grid
CN111042628B (en) * 2019-11-28 2021-06-04 国网山东省电力公司经济技术研究院 Drilling pole setting device for laying field power grid
CN110984676A (en) * 2019-12-23 2020-04-10 国网河南省电力公司西峡县供电公司 Auxiliary device is erect to line pole
CN112664034A (en) * 2020-12-10 2021-04-16 上海市机械施工集团有限公司 Integral installation method of wind power generation tower
CN112664037A (en) * 2021-01-08 2021-04-16 上海沉留数码通讯有限公司 Be used for radio tower to dismantle auxiliary assembly
CN112664037B (en) * 2021-01-08 2022-08-30 上海沉留数码通讯有限公司 Be used for radio tower to dismantle auxiliary assembly
CN113123662A (en) * 2021-04-09 2021-07-16 上海康达电力安装工程有限公司 Telegraph pole vertical rod device and vertical rod method thereof
CN114909015A (en) * 2022-05-20 2022-08-16 国网河南省电力公司新安县供电公司 Pole demolishs device
CN114909015B (en) * 2022-05-20 2023-04-25 国网河南省电力公司新安县供电公司 Device is demolishd to pole
CN114934713A (en) * 2022-05-30 2022-08-23 国网山东省电力公司东明县供电公司 Pole rotation pole setting device
CN116575790A (en) * 2023-06-09 2023-08-11 哈尔滨入云科技有限公司 5G lamp post base station construction method
CN116575790B (en) * 2023-06-09 2023-10-13 哈尔滨入云科技有限公司 5G lamp post base station construction method

Similar Documents

Publication Publication Date Title
CN107217910A (en) Supply line's electric pole plants lever apparatus and its plants bar method
CN207332754U (en) Electric pole is digged pit upright bar integrated apparatus
CN107701098B (en) Sand foundation bored concrete pile drilling pretreatment convolution drilling equipment and its construction method
CN211898338U (en) Device for preventing bored concrete pile steel reinforcement cage come-up
WO1985002435A1 (en) Method and apparatus for installing an in-ground support footing around an upstanding elongate object
CN206987509U (en) Supply line's electric pole plants lever apparatus
CN214832607U (en) Subsidence-preventing structure of soft soil foundation reinforced concrete cast-in-place pile
JP2015014157A (en) Pier construction method
CN109083591B (en) Drilling bored concrete pile body and pile cap integrated drilling pore-forming method
CN113250193A (en) Construction equipment based on synchronous drilling and precast pile splicing and construction method thereof
CN203498836U (en) Device for pulling casing by utilizing rotary drilling rig
CN210370522U (en) Drilling pile machine provided with double guide rails and double drilling machines
CN112878330A (en) Precast pile sinking equipment and construction method thereof
JP5389835B2 (en) Reinforcing method for hollow columnar object and reinforcing bar deploying device for hollow columnar object
CN107476319A (en) Mountain area steep slope region Road Bridge Pile Foundation construction method
CN110344421A (en) A kind of high slope Vierendeel girder concrete construction method
CN105776099A (en) Opening device and method for well lid
CN215211021U (en) Construction equipment based on synchronous drilling and precast pile splicing
JP2001248375A (en) Suspension mobile type pile driving device and pile driving method using it
CN209384226U (en) A kind of Manual hole pile digging device in shifting sand layers
CN113174947A (en) Drilling and hammering integrated machine and pile planting process
CN111236228A (en) Earth anchor for electric power construction
CN105804650B (en) Long spiral drilling machine
CN106567386A (en) Pouring type pile driver and pile driving method therefor
KR100945243B1 (en) Gang Form Lifting Apparatus

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination