CN107203847A - A kind of flow nodes Efficiency Statistics method for OA system subscriber terminals - Google Patents
A kind of flow nodes Efficiency Statistics method for OA system subscriber terminals Download PDFInfo
- Publication number
- CN107203847A CN107203847A CN201710376146.XA CN201710376146A CN107203847A CN 107203847 A CN107203847 A CN 107203847A CN 201710376146 A CN201710376146 A CN 201710376146A CN 107203847 A CN107203847 A CN 107203847A
- Authority
- CN
- China
- Prior art keywords
- node
- flow
- time point
- subscriber terminals
- processing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0633—Workflow analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- Tourism & Hospitality (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Game Theory and Decision Science (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Data Mining & Analysis (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of flow nodes Efficiency Statistics method for OA system subscriber terminals.Calculate in all flows initiated in given number of days, time point and the poor summation at the time point for reaching this node that this each node processing is finished, divided by the node processing total degree;Specific formula is (A1+A2+A3...+An)/n, wherein, An is that each node processing finishes time point and the node reaches the difference at time point, and n is the number of times of the node processing in given number of days, and obtained data are shown immediately by mouse-over on the node for needing to check and checked.The average treatment that oneself application process can be viewed using the user of approval process module by solving consumes, and can be that the work after oneself carries out estimating for directiveness.
Description
Technical field
The present invention relates to technical field of data processing, more particularly to a kind of flow nodes efficiency for OA system subscriber terminals
Statistical method.
Background technology
The workflow examination and approval of one of nucleus module as OA office systems, development for many years is concentrated mainly on to flow table
The module work(such as the relevance of single ease-of-use made, diversified, the single flow of flow nodes and path configuration and other modules
The reinforcing of energy.But the raising of the treatment effeciency to enterprise staff when using workflow examination and approval is but without substantial help, member
Work is submitted after application, it is not known that approver can examine at what time, it is impossible to it is expected that when the flow initiated can terminate,
Therefore it is specific when can to deploy the work of application be unpredictable.
The content of the invention
It is an object of the invention to provide a kind of method for the efficiency that can check each node at any time.
The invention provides a kind of flow nodes Efficiency Statistics method for OA system subscriber terminals.Calculate all specifying
In the flow initiated in number of days, time point that this each node processing is finished and time point for reaching this node it is poor total
With, divided by the node processing total degree;Specific formula is (A1+A2+A3...+An)/n, wherein, An is at each node
Reason finishes time point and the node reaches the difference at time point, and n is the number of times of the node processing in given number of days, by obtained data
By mouse-over, displaying is checked immediately on the node for needing to check.
It is preferred that, the given number of days is 90 days.Within 90 days one using this deadline interim duration, this when
Between statistical efficiency in section can intuitively reflect that the actual conditions of recent flow processing efficiency (will not be by history number more remote
According to influence, statistics effect is truer).The flow processing efficiency of different time sections can be individually inquired about in management end in addition, with
Just keeper does data analysis.User terminal specifies the time to be within 90 days, and in order to allow, flow processing statistics is more succinct, essence
It is accurate, be presented to user at a glance, facilitate user quickly to estimate that flow processing finishes the time and selects suitable flow processing
Director.
It is preferred that, exhibition method is:1. flow details page is clicked to enter;2. flow chart tab is clicked on, flow chart is checked;③
Mouse-over can be checked on the node for needing to check.
It is preferred that, the time that this each node processing is finished, in pc ends or mobile terminal at background server transmission flow
Reason is asked and recorded in real time by background server after handling successfully.
It is preferred that, reach the time of this node, i.e., the time point that previous node processing is finished.
Beneficial effect:The average treatment of oneself application process can be viewed using the user of approval process module by solving
Consumption, can be that the work after oneself carries out estimating for directiveness.
Brief description of the drawings
Fig. 1 checks that processing of the flow nodes in nearly three months averagely takes schematic diagram.
Embodiment
For make present invention solves the technical problem that, the technical scheme that uses and the technique effect that reaches it is clearer, below
The present invention is described in further detail in conjunction with the accompanying drawings and embodiments.It is understood that specific implementation described herein
Example is used only for explaining the present invention, rather than limitation of the invention.It also should be noted that, for the ease of description, accompanying drawing
In illustrate only part related to the present invention rather than full content.
Fig. 1 is refer to, employee, can be by mouse-over in the side of each flow nodes when submitting flow or checking flow
Formula checks that processing of the flow nodes in nearly three months averagely takes.
Specifically the mode of checking is:1. click to enter flow details page and 2. click on flow chart tab, check flow chart 3. mouse
Hovering over can check on the node for needing to check
Implementation:Calculate in all flows initiated in 90 days, time point that this each node processing is finished and
Reach the poor summation at the time point of this node, divided by the node processing total degree.
Specific formula is (A1+A2+A3...+An)/n
(A:Each node processing finishes time point and the node reaches the difference at time point, n:The node processing in 90 days
Number of times).
This method can be extended to other flow templates, a class flow:Such as ask for leave, submit an expense account, asking money to be 3 kinds of flow moulds
Plate, each flow template has the time-consuming statistics of flat mean of mean).
Implementation:Calculate the time that each flow instance of all same flow templates initiated in 90 days is finished
Point and the poor synthesis at the time point initiated, divided by the flow instance number produced by the flow template.Specific formula is (A1+
A2+A3...+An)/n(A n:Each flow instance finishes time point with initiating the difference at time point, n under same template:90 days
The flow instance number changed under template finished.Such as:100 flows of asking for leave are finished in 90 days, n=100, A1 is represented from hair
Act flow of asking for leave and arrive the time criticized or spent by refusing.)
Summarize:Used again by the way that the present invention is put into OA systems, the client of enterprise staff can check each node of flow
The time-consuming statistics of average treatment, it is intended to be that the users of all use approval process modules can view the average place of application process
Reason is time-consuming, accomplishes the predictable and selection circulation optimal path of flow end time, improves operating efficiency.
Finally it should be noted that:Various embodiments above is merely illustrative of the technical solution of the present invention, rather than its limitations;To the greatest extent
The present invention is described in detail with reference to foregoing embodiments for pipe, it will be understood by those within the art that:Its is right
Technical scheme described in foregoing embodiments is modified, or which part or all technical characteristic are equally replaced
Change, the essence of appropriate technical solution is departed from the scope of various embodiments of the present invention technical scheme.
Claims (5)
1. a kind of flow nodes Efficiency Statistics method for OA system subscriber terminals, it is characterised in that calculate all in specified day
In the flow initiated in number, time point and the poor summation at the time point for reaching this node that this each node processing is finished,
Divided by the processing total degree of the node;Specific formula is (A1+A2+A3...+An)/n, wherein, An is that each node processing is complete
Finish time point and the node reaches the difference at time point, n is the number of times of the node processing in given number of days, and obtained data are passed through
Mouse-over on the node for needing to check check immediately by displaying.
2. the flow nodes Efficiency Statistics method according to claim 1 for OA system subscriber terminals, it is characterised in that institute
Given number of days is stated for 90 days.
3. the flow nodes Efficiency Statistics method according to claim 1 or 2 for OA system subscriber terminals, its feature exists
In exhibition method is:1. flow details page is clicked to enter;2. flow chart tab is clicked on, flow chart is checked;3. mouse-over is being needed
It can be checked on the node to be checked.
4. the flow nodes Efficiency Statistics method according to claim 1 for OA system subscriber terminals, it is characterised in that every
The time that this individual node processing is finished, after asking and handle successfully to background server transmitting flow processing at pc ends or mobile terminal
Recorded in real time by background server.
5. the flow nodes Efficiency Statistics method according to claim 1 for OA system subscriber terminals, it is characterised in that arrive
Up to the time of this node, i.e., the time point that previous node processing is finished.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710376146.XA CN107203847A (en) | 2017-05-25 | 2017-05-25 | A kind of flow nodes Efficiency Statistics method for OA system subscriber terminals |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710376146.XA CN107203847A (en) | 2017-05-25 | 2017-05-25 | A kind of flow nodes Efficiency Statistics method for OA system subscriber terminals |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107203847A true CN107203847A (en) | 2017-09-26 |
Family
ID=59905789
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710376146.XA Pending CN107203847A (en) | 2017-05-25 | 2017-05-25 | A kind of flow nodes Efficiency Statistics method for OA system subscriber terminals |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107203847A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109544093A (en) * | 2018-10-11 | 2019-03-29 | 平安科技(深圳)有限公司 | Method, apparatus and computer equipment based on O&M optimization processing exception attendance |
CN112308639A (en) * | 2019-07-25 | 2021-02-02 | 贝壳技术有限公司 | Target event aging prediction method and device |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102945519A (en) * | 2012-10-23 | 2013-02-27 | 中国建设银行股份有限公司 | Internal work approval process management system of bank |
CN104361435A (en) * | 2014-10-29 | 2015-02-18 | 中国建设银行股份有限公司 | Business process management method and business process management device |
CN105389674A (en) * | 2015-12-21 | 2016-03-09 | 用友网络科技股份有限公司 | Workflow cyclic approval system |
CN106203946A (en) * | 2016-06-28 | 2016-12-07 | 国家电投集团河南电力有限公司技术信息中心 | A kind of method and device of electrically-based enterprise ERP business process monitoring |
-
2017
- 2017-05-25 CN CN201710376146.XA patent/CN107203847A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102945519A (en) * | 2012-10-23 | 2013-02-27 | 中国建设银行股份有限公司 | Internal work approval process management system of bank |
CN104361435A (en) * | 2014-10-29 | 2015-02-18 | 中国建设银行股份有限公司 | Business process management method and business process management device |
CN105389674A (en) * | 2015-12-21 | 2016-03-09 | 用友网络科技股份有限公司 | Workflow cyclic approval system |
CN106203946A (en) * | 2016-06-28 | 2016-12-07 | 国家电投集团河南电力有限公司技术信息中心 | A kind of method and device of electrically-based enterprise ERP business process monitoring |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109544093A (en) * | 2018-10-11 | 2019-03-29 | 平安科技(深圳)有限公司 | Method, apparatus and computer equipment based on O&M optimization processing exception attendance |
CN112308639A (en) * | 2019-07-25 | 2021-02-02 | 贝壳技术有限公司 | Target event aging prediction method and device |
CN112308639B (en) * | 2019-07-25 | 2023-07-04 | 贝壳技术有限公司 | Aging prediction method and device for target event |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Yuen et al. | Task matching in crowdsourcing | |
CN106779430A (en) | The method and management equipment of a kind of Work Process Management | |
CN107169743A (en) | Flow nodes approver's Efficiency Statistics method for OA system subscriber terminals | |
He et al. | Research on rush order insertion rescheduling problem under hybrid flow shop based on NSGA-III | |
CN104063505A (en) | Job application method and system for network recruitment | |
Lines et al. | Planning in construction: Longitudinal study of pre-contract planning model demonstrates reduction in project cost and schedule growth | |
CN107169718A (en) | Factory's material allocation method and system | |
US20070192175A1 (en) | System and method for deliberating a proposal | |
CN110196943A (en) | A kind of position intelligent recommendation system, method and its system | |
Sari et al. | Quality accounting information systems with 3 important factors in BUMN Bandung Indonesia | |
Liu et al. | Service-oriented robust parallel machine scheduling | |
US20130262169A1 (en) | Automated contract mediator | |
CN101465752A (en) | Method and system for ordering linkman | |
CN110689325A (en) | Information processing method, device and computer readable storage medium | |
CN110347688A (en) | Feature fusion, device, equipment and the storage medium of multiple information | |
CN115686280A (en) | Deep learning model management system, method, computer device and storage medium | |
CN107203847A (en) | A kind of flow nodes Efficiency Statistics method for OA system subscriber terminals | |
CN109447656B (en) | Enterprise group service method, device and system based on cloud technology and storage medium | |
US20140229204A1 (en) | Estimate method and generator | |
US20160217425A1 (en) | Systems, methods, and devices for implementing a referral processor | |
Agushinta et al. | Business process reengineering on customer service and procurement units in clinical laboratory | |
Zhao et al. | Towards Effective Developer Recommendation in Software Crowdsourcing. | |
CN107767031A (en) | A kind of enterprise evaluation analysis system based on cloud management platform | |
KR20180065839A (en) | Method and apparatus for reporting job performance through analysis of job and job log data | |
Kim et al. | Exact and heuristic procedures for capacity expansion problems with congestion |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20170926 |