CN107202220A - Built on stilts combustion gas heat-preserving anti-freezing pipeline and its application method - Google Patents

Built on stilts combustion gas heat-preserving anti-freezing pipeline and its application method Download PDF

Info

Publication number
CN107202220A
CN107202220A CN201710333486.4A CN201710333486A CN107202220A CN 107202220 A CN107202220 A CN 107202220A CN 201710333486 A CN201710333486 A CN 201710333486A CN 107202220 A CN107202220 A CN 107202220A
Authority
CN
China
Prior art keywords
conveyance conduit
stilts
support pin
combustion gas
collecting box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710333486.4A
Other languages
Chinese (zh)
Inventor
刘有萍
杨焱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hezhou Stone Information Technology Co Ltd
Original Assignee
Hezhou Stone Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hezhou Stone Information Technology Co Ltd filed Critical Hezhou Stone Information Technology Co Ltd
Priority to CN201710333486.4A priority Critical patent/CN107202220A/en
Publication of CN107202220A publication Critical patent/CN107202220A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L53/00Heating of pipes or pipe systems; Cooling of pipes or pipe systems
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • F16L3/02Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets partly surrounding the pipes, cables or protective tubing
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L55/00Devices or appurtenances for use in, or in connection with, pipes or pipe systems

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention discloses built on stilts combustion gas heat-preserving anti-freezing pipeline, it is related to electric tracing technology, is applied to thaw after pipeline condensation freezes for solving existing vortex deforst technique, antifreezing effect and bad before being frozen for pipeline condensation, if being always maintained at electric cable heating, the problem of energy waste certainly will being caused.It includes mounting groove, supporting construction, water collecting structure, isolating construction and conveyance conduit, mounting groove upper surface both sides are respectively equipped with supporting construction, conveyance conduit is set up in the supporting construction, inwall is provided with isolating construction in the middle part of the conveyance conduit, the water collecting structure is connected with isolating construction and conveyance conduit respectively, and the isolating construction includes front support framework, hollow tunica fibrosa, rear support framework.The purpose of water vapour and gaseous state C2, C3 and C4 separation is realized in tunica fibrosa intrinsic permeability and diffusion velocity difference using gas component, the dew point of gas is reduced.Present invention also offers built on stilts combustion gas heat-preserving anti-freezing pipeline application method.

Description

Built on stilts combustion gas heat-preserving anti-freezing pipeline and its application method
Technical field
It is built on stilts combustion gas heat-preserving anti-freezing pipeline and its application method specifically the present invention relates to electric tracing technology.
Background technology
Combustion gas main source is that based on liquefied oil gas, coal gas and mixing air, fuel gas transmission mode uses Gas Pipe Road.Natural gas (associated gas for including oil field production) is transported to urban gas center or industrial enterprise from exploitation ground or treatment plant The pipeline of user, also known as gas pipeline.
Patent document 201510695214.X (the applyings date:2015.10.23) disclose a kind of antifreeze house lead in of self-loopa combustion gas Device, it is intended to solve cold district winter gas house pipe because low temperature causes mass sets in combustion gas, the pipeline in turn resulted in Frozen block problem.The device includes:Gas inlet pipe, Gas Pipe external thermal insulation and Gas Pipe house lead in valve, wherein gas inlet pipe It is divided into indoor section and outdoor section, it is characterized in that piece combustion gas circulation of connection between the indoor section and outdoor section of gas inlet pipe Pipe, the outdoor section of wherein combustion gas circulation pipe adds heat-insulation layer, and gas inlet pipe constitutes peripheral passage with combustion gas circulation pipe.
The present invention is simple in construction, it is not necessary to any plant equipment power, without other any energy losses, it is adaptable to civilian to build Build and public building gas house pipe network.Significantly, the density contrast caused using the temperature difference provides power to antifreezing effect, and then is formed Circulate, indoor heat is effectively passed into outdoor section gas inlet pipe.
But above-mentioned patent document mainly solve be ground connection install gas pipeline, especially solve ground connection install combustion The introducing tube portion of feed channel, due to being restricted by conditions such as landform, house architectural structures, Some gases pipeline buried can not be applied If the then use for combustion gas has further improvement, is mainly manifested in installing for gas pipeline, pacified by past ground connection Dress is changed into hanging installation.The gas pipeline vacantly installed is not possess calorific capacity in itself, and simple insulation can not solve knot The problem of dew freezes.The main cause that condensation freezes is that water and steam can be generated with gaseous C2, C3 and C4 and crystallized in coal gas Hyrate, hyrate can reduce the circulation section of coal gas in pipeline, or even block pipeline.Condensation, which freezes, not only influences the defeated of pipeline Ability is sent, also in the presence of very big potential safety hazard.Solve the condensation ice formation issues of wet combustion gas, it is necessary to overhead gas pipeline Do heat tracing and isothermal holding.
Using under hanging installation situation, the laying of pipeline is not restricted by conditions such as landform, house architectural structures, but anti- The difficulty for freezing insulation is increased, and with the development of science and technology, now uses the heat tracing measure anti-freezing and heat-insulating of vortex deforst technique, for example 《Oil-gas field surface engineering》The Study on processing method for the gas pipeline frozen block that the 6th phase of volume 28 in 2009 delivers, author Liu Wenyang, Pipeline frozen block mostly occurs to be introduced at the introducing pipe of pipe, pressure regulating box and batch meter in cell unit, because introducing tube portion is in ground On, it is partially in underground.Solving frozen block has two approach, and one is prevented before frozen block is formed;Two are formed in frozen block Solved afterwards using the means of physics and chemistry.The measure taken includes setting up water trap, the management for strengthening equipment and application vortex Not damaged deforst technique etc..
It is to convert electrical energy into magnetic field to be vortexed deforst technique, and magnetic field converts the technology of heat energy.Cable, which is wrapped in, to thaw Pipeline on, then cable is formed the device of similar magnetic coil, the center maximum intensity in magnetic field, so producing Heat radially carries out thermograde change by pipe center along pipeline, within a certain period of time discharges the ice-out inside pipeline. The technology does not destroy heat-insulation layer, and conveyance conduit can be made to thaw and recover normal.
But vortex deforst technique is thawed after being frozen suitable for pipeline condensation, for antifreezing effect before pipeline condensation icing simultaneously It is bad, if being always maintained at electric cable heating, energy waste certainly will be caused.
The content of the invention
It is real in tunica fibrosa intrinsic permeability and diffusion velocity difference the present invention seeks to aim to provide a kind of utilization gas component The purpose of existing water vapour and gaseous state C2, C3 and C4 separation, the built on stilts combustion gas heat-preserving anti-freezing pipeline that the dew point of gas is reduced.
Built on stilts combustion gas heat-preserving anti-freezing pipeline, including mounting groove, supporting construction, water collecting structure, isolating construction and conveyance conduit, Mounting groove upper surface both sides, which are respectively equipped with supporting construction, the supporting construction, sets up conveyance conduit, the conveyance conduit Middle part inwall is provided with isolating construction, and the water collecting structure is connected with isolating construction and conveyance conduit respectively, the isolating construction bag Front support framework, hollow tunica fibrosa, rear support framework are included, the tunica fibrosa is radially provided with drainage channel, the drainage channel Lower wall uses cutout openings.
Isolating construction is set up, using different penetrating powers of the gas component in tunica fibrosa, diffusion velocity reaches separation water The purpose of steam and gaseous C2, C3 and C4, the dew point of gas is reduced.
Further limit, the drainage channel is 12~30.
Water vapour is introduced cutout openings using 12~30 drainage channels.
Further limit, the drainage channel front opening bore is more than open rearward end bore.
Further limit, a diameter of 420~450mm of the tunica fibrosa, the pipe thickness of the conveyance conduit for 8~ 14mm。
Further limit, the water collecting structure includes collecting box, the water collector inside collecting box and the baffle plate that catchments, institute State connection isolating construction at the top of collecting box, the collecting box bottom connects conveyance conduit, it is described catchment baffle plate including front apron, after Baffle plate and deflector, the deflector both sides connect front apron and rear baffle respectively.
Deflector is set up, unnecessary moisture is discharged by deflector, it is to avoid the electricity on unnecessary contact with moisture mounting groove Gas equipment, causes short circuit.
Further limit, the supporting construction includes front support pin, preceding tilt prop, adjustable plate, rear support pin and rear diagonal brace On front side of spring, the preceding tilt prop upper end connection adjustable plate, its lower end connection front support pin, the rear diagonal brace spring upper end connection On rear side of adjustable plate, its lower end connection rear support pin, the front support pin, preceding tilt prop, adjustable plate, rear support pin and rear diagonal brace bullet Spring is collectively forming triangle;The front support foot bottom is provided with the first sliding block, and the rear support foot bottom is provided with the first sliding block, institute State that trench bottom is installed and is provided with and be used for the first chute of the first sliding block of slip.
Further limit, the adjustable plate inwall is provided with least three adjusting grooves.
Using 3 adjusting grooves of adjustable plate inwall, meanwhile, cooperated and slided by the first sliding block and the first chute, The relative position of front support pin and rear support pin is adjusted, when adjustment, keeps the gradient of conveyance conduit to maintain 1.2% ~1.6%.
Further limit, be provided with inside the cable trench for being used for laying cable, the collecting box and set inside the mounting groove There is heating element heater.
Cable trench is provided with inside mounting groove, prevents overhead cable to be corroded, the service life of aerial cable is improved.
Further limit, provided with water suction medicine bag inside the collecting box, glycol is filled with the water suction medicine bag Grain.
The medicine bag that absorbs water is interior to be filled with glycol particle, in the presence of water suction medicine bag, by the moisture absorption in water vapour, The formation of hyrate is reduced, so as to avoid conveyance conduit from clogging occur.Using the water suction medicine bag of bag type, be easy to every 30~40 days, water suction medicine bag is changed.
Present invention also offers built on stilts combustion gas heat-preserving anti-freezing pipeline application method, comprise the following steps,
Step one, overall package, mounting groove upper surface both sides are respectively equipped with supporting construction, the supporting construction restocking If conveyance conduit, inwall is provided with isolating construction in the middle part of the conveyance conduit, the water collecting structure respectively with isolating construction and conveying Pipeline communication, the isolating construction includes front support framework, hollow tunica fibrosa, rear support framework, and the tunica fibrosa is radially set There is drainage channel, the drainage channel lower wall uses cutout openings;
The water collecting structure includes collecting box, the water collector inside collecting box and the baffle plate that catchments, the collecting box top Portion connects isolating construction, and the collecting box bottom connects conveyance conduit, and the baffle plate that catchments includes front apron, rear baffle and water conservancy diversion Plate, the deflector both sides connect front apron and rear baffle respectively;
The supporting construction include front support pin, preceding tilt prop, adjustable plate, rear support pin and rear diagonal brace spring, it is described before On front side of tilt prop upper end connection adjustable plate, its lower end connection front support pin, the rear diagonal brace spring upper end connection adjustable plate rear side, Its lower end connects rear support pin, and the front support pin, preceding tilt prop, adjustable plate, rear support pin and rear diagonal brace spring are collectively forming Triangle;The front support foot bottom is provided with the first sliding block, and the rear support foot bottom is provided with the first sliding block, the mounting groove bottom Portion is provided with the first chute for being used for sliding the first sliding block;
Step 2, adjusts the gradient, using 3 adjusting grooves of adjustable plate inwall, meanwhile, slided by the first sliding block and first Groove, which cooperates, to be slided, and the relative position of adjustment front support pin and rear support pin when adjustment, keeps the inclination of conveyance conduit The gradient maintains 1.2%~1.6%;
Step 3, changes and is provided with inside medicament, the mounting groove in the cable trench for being used for laying cable, the collecting box Portion is provided with heating element heater, by the cable laid in cable trench, is electrically connected with heating element heater, and then, to delivery pipe Road is generated heat, first with different penetrating powers of the gas component in tunica fibrosa, diffusion velocity, reach separation water vapour and Gaseous C2, C3 and C4 purpose, the dew point of gas is reduced, water vapour is introduced cutout openings using drainage channel, is entered Provided with water suction medicine bag inside water collector, collecting box, glycol particle is filled with the water suction medicine bag, and in water suction medicine bag In the presence of, by the moisture absorption in water vapour, the formation of hyrate is reduced, so as to avoid conveyance conduit from clogging occur; Collecting box side wall was provided with removable cover, every 30~40 days, and water suction medicine bag is changed.
The present invention compared with prior art, exclusive isolating construction design, using gas component in tunica fibrosa intrinsic permeability and Diffusion velocity difference realizes the purpose of water vapour and gaseous state C2, C3 and C4 separation, and the dew point of gas is reduced, meanwhile, fiting chemical Medicament, water collecting structure is realized antifreeze before pipeline condensation icing.
Brief description of the drawings
The nonlimiting examples that the present invention can be provided by accompanying drawing are further illustrated;
Fig. 1 is the built on stilts combustion gas heat-preserving anti-freezing pipeline schematic diagram of the present invention;
Main element symbol description is as follows:
Mounting groove 1, supporting construction 2, front support pin 21, preceding tilt prop 22, adjustable plate 23, rear support pin 24, rear diagonal brace bullet Spring 25, water collecting structure 3, collecting box 31, catchment baffle plate 32, front apron 33, rear baffle 34, deflector 35, isolating construction 4, support Framework 41, hollow tunica fibrosa 42, rear support framework 43, conveyance conduit 5.
Embodiment
In order that the present invention may be better understood in those skilled in the art, with reference to the accompanying drawings and examples to this hair Bright technical scheme is further illustrated.
Embodiment one,
As shown in figure 1, built on stilts combustion gas heat-preserving anti-freezing pipeline, including mounting groove 1, supporting construction 2, water collecting structure 3, separation knot Structure 4 and conveyance conduit 5, the upper surface both sides of mounting groove 1 are respectively equipped with erection conveyance conduit 5 in supporting construction 2, supporting construction 2, defeated The middle part inwall of pipeline 5 is sent to be provided with isolating construction 4, water collecting structure 3 is connected with isolating construction 4 and conveyance conduit 5 respectively, isolating construction 4 include front support framework 41, hollow tunica fibrosa 42, rear support framework 43, and tunica fibrosa 42 is radially provided with drainage channel, and (diagram is not Draw), drainage channel lower wall uses cutout openings.
It should be noted that being not separately shown in drainage channel figure, because the purpose of the technical program, which is protection, uses fine The isolating construction of film is tieed up, the purpose of drainage channel is that vapor is guided into water collecting structure, from water collecting structure discharge.
Drainage channel is 24.
Drainage channel front opening bore is more than open rearward end bore.
A diameter of 430mm of tunica fibrosa 42, the pipe thickness of conveyance conduit 5 is 12mm.
Water collecting structure 3 includes collecting box 31, the water collector (diagram is not drawn into) inside collecting box 31 and the baffle plate that catchments 32, the top of collecting box 31 connection isolating construction 4, the bottom of collecting box 31 connection conveyance conduit 5, the baffle plate 32 that catchments includes front apron 33rd, rear baffle 34 and deflector 35, the both sides of deflector 35 connect front apron 33 and rear baffle 34 respectively.
It should be noted that water collector uses water collector of the prior art, therefore also it is not separately shown.
Embodiment two,
As shown in figure 1, built on stilts combustion gas heat-preserving anti-freezing pipeline, including mounting groove 1, supporting construction 2, water collecting structure 3, separation knot Structure 4 and conveyance conduit 5, the upper surface both sides of mounting groove 1 are respectively equipped with erection conveyance conduit 5 in supporting construction 2, supporting construction 2, defeated The middle part inwall of pipeline 5 is sent to be provided with isolating construction 4, water collecting structure 3 is connected with isolating construction 4 and conveyance conduit 5 respectively, isolating construction 4 include front support framework 41, hollow tunica fibrosa 42, rear support framework 43, and tunica fibrosa 42 is radially provided with drainage channel, and (diagram is not Draw), drainage channel lower wall uses cutout openings.
It should be noted that being not separately shown in drainage channel figure, because the purpose of the technical program, which is protection, uses fine The isolating construction of film is tieed up, the purpose of drainage channel is that vapor is guided into water collecting structure, from water collecting structure discharge.
Drainage channel is 24.
Drainage channel front opening bore is more than open rearward end bore.
A diameter of 430mm of tunica fibrosa 42, the pipe thickness of conveyance conduit 5 is 12mm.
Water collecting structure 3 includes collecting box 31, the water collector (diagram is not drawn into) inside collecting box 31 and the baffle plate that catchments 32, the top of collecting box 31 connection isolating construction 4, the bottom of collecting box 31 connection conveyance conduit 5, the baffle plate 32 that catchments includes front apron 33rd, rear baffle 34 and deflector 35, the both sides of deflector 35 connect front apron 33 and rear baffle 34 respectively.
It should be noted that water collector uses water collector of the prior art, therefore also it is not separately shown.
Supporting construction 2 includes front support pin 21, preceding tilt prop 22, adjustable plate 23, rear support pin 24 and rear diagonal brace spring 25, The preceding front side of the upper end of tilt prop 22 connection adjustable plate 23, its lower end connection front support pin 21, the rear upper end of diagonal brace spring 25 connection regulation The rear side of plate 23, its lower end connection rear support pin 24 and retreads at front support pin 21, preceding tilt prop 22, adjustable plate 23, rear support pin 24 Support spring 25 is collectively forming triangle;Front support foot bottom is provided with the first sliding block, and the rear support foot bottom is provided with the first sliding block, The trench bottom of installing is provided with the first chute for being used for sliding the first sliding block.
Adjustable plate inwall is provided with 3 adjusting grooves.
It is provided with inside mounting groove inside the cable trench for being used for laying cable, the collecting box and is provided with heating element heater.
Provided with water suction medicine bag inside collecting box, glycol particle is filled with the water suction medicine bag.
Embodiment one is compared with embodiment two, for embodiment one, in embodiment two, on the one hand, utilize adjustable plate 3 adjusting grooves of inwall, meanwhile, cooperated and slided by the first sliding block and the first chute, adjustment front support pin and rear branch The relative position of spike, when adjustment, keeps the gradient of conveyance conduit to maintain 1.2%~1.6%;On the other hand, The medicine bag that absorbs water is interior to be filled with glycol particle, in the presence of water suction medicine bag, by the moisture absorption in water vapour, reduces aquation The formation of thing, so as to avoid conveyance conduit from clogging occur.Using the water suction medicine bag of bag type, it is easy to every 30~40 My god, water suction medicine bag is changed.
Built on stilts combustion gas heat-preserving anti-freezing pipeline application method, comprises the following steps,
Step one, overall package, mounting groove upper surface both sides are respectively equipped with supporting construction, the supporting construction restocking If conveyance conduit, inwall is provided with isolating construction in the middle part of the conveyance conduit, the water collecting structure respectively with isolating construction and conveying Pipeline communication, the isolating construction includes front support framework, hollow tunica fibrosa, rear support framework, and the tunica fibrosa is radially set There is drainage channel, the drainage channel lower wall uses cutout openings;
The water collecting structure includes collecting box, the water collector inside collecting box and the baffle plate that catchments, the collecting box top Portion connects isolating construction, and the collecting box bottom connects conveyance conduit, and the baffle plate that catchments includes front apron, rear baffle and water conservancy diversion Plate, the deflector both sides connect front apron and rear baffle respectively;
The supporting construction include front support pin, preceding tilt prop, adjustable plate, rear support pin and rear diagonal brace spring, it is described before On front side of tilt prop upper end connection adjustable plate, its lower end connection front support pin, the rear diagonal brace spring upper end connection adjustable plate rear side, Its lower end connects rear support pin, and the front support pin, preceding tilt prop, adjustable plate, rear support pin and rear diagonal brace spring are collectively forming Triangle;The front support foot bottom is provided with the first sliding block, and the rear support foot bottom is provided with the first sliding block, the mounting groove bottom Portion is provided with the first chute for being used for sliding the first sliding block;
Step 2, adjusts the gradient, using 3 adjusting grooves of adjustable plate inwall, meanwhile, slided by the first sliding block and first Groove, which cooperates, to be slided, and the relative position of adjustment front support pin and rear support pin when adjustment, keeps the inclination of conveyance conduit The gradient maintains 1.4%;
Step 3, changes and is provided with inside medicament, the mounting groove in the cable trench for being used for laying cable, the collecting box Portion is provided with heating element heater, by the cable laid in cable trench, is electrically connected with heating element heater, and then, to delivery pipe Road is generated heat, first with different penetrating powers of the gas component in tunica fibrosa, diffusion velocity, reach separation water vapour and Gaseous C2, C3 and C4 purpose, the dew point of gas is reduced, water vapour is introduced cutout openings using drainage channel, is entered Provided with water suction medicine bag inside water collector, collecting box, glycol particle is filled with the water suction medicine bag, and in water suction medicine bag In the presence of, by the moisture absorption in water vapour, the formation of hyrate is reduced, so as to avoid conveyance conduit from clogging occur; Collecting box side wall was provided with removable cover, every 30 days, and water suction medicine bag is changed.
The built on stilts combustion gas heat-preserving anti-freezing pipeline and its application method provided above the present invention is described in detail.Specifically The explanation of embodiment is only intended to the method and its core concept for helping to understand the present invention.It should be pointed out that for the art Those of ordinary skill for, under the premise without departing from the principles of the invention, can also to the present invention carry out it is some improvement and repair Decorations, these are improved and modification is also fallen into the protection domain of the claims in the present invention.

Claims (10)

1. built on stilts combustion gas heat-preserving anti-freezing pipeline, including mounting groove, supporting construction, water collecting structure, isolating construction and conveyance conduit, institute State mounting groove upper surface both sides and be respectively equipped with supporting construction, the supporting construction and set up conveyance conduit, in the conveyance conduit Portion's inwall is provided with isolating construction, and the water collecting structure is connected with isolating construction and conveyance conduit respectively, it is characterised in that:Described point Include front support framework, hollow tunica fibrosa, rear support framework from structure, the tunica fibrosa is radially provided with drainage channel, described Drainage channel lower wall uses cutout openings.
2. built on stilts combustion gas heat-preserving anti-freezing pipeline according to claim 1, it is characterised in that:The drainage channel is 12~30 It is individual.
3. built on stilts combustion gas heat-preserving anti-freezing pipeline according to claim 2, it is characterised in that:The drainage channel front opening Bore is more than open rearward end bore.
4. built on stilts combustion gas heat-preserving anti-freezing pipeline according to claim 3, it is characterised in that:The tunica fibrosa it is a diameter of 420~450mm, the pipe thickness of the conveyance conduit is 8~14mm.
5. the built on stilts combustion gas heat-preserving anti-freezing pipeline according to claim 1 or 2 or 3 or 4, it is characterised in that:The knot that catchments Structure includes connection isolating construction at the top of collecting box, the water collector inside collecting box and the baffle plate that catchments, the collecting box, described Collecting box bottom connects conveyance conduit, and the baffle plate that catchments includes front apron, rear baffle and deflector, the deflector both sides point Lian Jie not front apron and rear baffle.
6. built on stilts combustion gas heat-preserving anti-freezing pipeline according to claim 5, it is characterised in that:The supporting construction includes preceding branch On front side of spike, preceding tilt prop, adjustable plate, rear support pin and rear diagonal brace spring, the preceding tilt prop upper end connection adjustable plate, under it On rear side of end connection front support pin, the rear diagonal brace spring upper end connection adjustable plate, its lower end connection rear support pin, the front support Pin, preceding tilt prop, adjustable plate, rear support pin and rear diagonal brace spring are collectively forming triangle;The front support foot bottom is provided with the One sliding block, the rear support foot bottom is provided with the first sliding block, and the installation trench bottom, which is provided with, to be used to slide the first of the first sliding block Chute.
7. built on stilts combustion gas heat-preserving anti-freezing pipeline according to claim 6, it is characterised in that:The adjustable plate inwall is provided with extremely Few 3 adjusting grooves.
8. built on stilts combustion gas heat-preserving anti-freezing pipeline according to claim 7, it is characterised in that:Provided with use inside the mounting groove Heating element heater is provided with inside the cable trench of laying cable, the collecting box.
9. built on stilts combustion gas heat-preserving anti-freezing pipeline according to claim 8, it is characterised in that:Provided with suction inside the collecting box Glycol particle is filled with water medicine bag, the water suction medicine bag.
10. built on stilts combustion gas heat-preserving anti-freezing pipeline application method, it is characterised in that:Comprise the following steps,
Step one, overall package, mounting groove upper surface both sides are respectively equipped with supporting construction, the supporting construction and set up defeated Send pipeline, inwall is provided with isolating construction in the middle part of the conveyance conduit, the water collecting structure respectively with isolating construction and conveyance conduit Connection, the isolating construction includes front support framework, hollow tunica fibrosa, rear support framework, and the tunica fibrosa, which is radially provided with, to be drawn Circulation road, the drainage channel lower wall uses cutout openings;
The water collecting structure includes connecting at the top of collecting box, the water collector inside collecting box and the baffle plate that catchments, the collecting box Logical isolating construction, the collecting box bottom connects conveyance conduit, and the baffle plate that catchments includes front apron, rear baffle and deflector, The deflector both sides connect front apron and rear baffle respectively;
The supporting construction includes front support pin, preceding tilt prop, adjustable plate, rear support pin and rear diagonal brace spring, the preceding diagonal brace On front side of plate upper end connection adjustable plate, its lower end connection front support pin, on rear side of the rear diagonal brace spring upper end connection adjustable plate, under it End connection rear support pin, the front support pin, preceding tilt prop, adjustable plate, rear support pin and rear diagonal brace spring are collectively forming triangle Shape;The front support foot bottom is provided with the first sliding block, and the rear support foot bottom is provided with the first sliding block, and the installation trench bottom is set There is the first chute for sliding the first sliding block;
Step 2, adjusts the gradient, using 3 adjusting grooves of adjustable plate inwall, meanwhile, pass through the first sliding block and the first chute phase Mutually coordinate and slide, the relative position of adjustment front support pin and rear support pin when adjustment, keeps the gradient of conveyance conduit Maintain 1.2%~1.6%;
Step 3, changes and is set inside the cable trench being provided with inside medicament, the mounting groove for laying cable, the collecting box There is heating element heater, by the cable laid in cable trench, be electrically connected with heating element heater, and then, conveyance conduit is entered Row heating, first with different penetrating powers of the gas component in tunica fibrosa, diffusion velocity reaches the separation gentle state of water vapour C2, C3 and C4 purpose, the dew point of gas is reduced, water vapour is introduced cutout openings using drainage channel, into catchmenting Provided with water suction medicine bag inside device, collecting box, glycol particle is filled with the water suction medicine bag, and in the work of water suction medicine bag Under, by the moisture absorption in water vapour, the formation of hyrate is reduced, so as to avoid conveyance conduit from clogging occur;Catchment Box side wall was provided with removable cover, every 30~40 days, and water suction medicine bag is changed.
CN201710333486.4A 2017-05-12 2017-05-12 Built on stilts combustion gas heat-preserving anti-freezing pipeline and its application method Pending CN107202220A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710333486.4A CN107202220A (en) 2017-05-12 2017-05-12 Built on stilts combustion gas heat-preserving anti-freezing pipeline and its application method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710333486.4A CN107202220A (en) 2017-05-12 2017-05-12 Built on stilts combustion gas heat-preserving anti-freezing pipeline and its application method

Publications (1)

Publication Number Publication Date
CN107202220A true CN107202220A (en) 2017-09-26

Family

ID=59905635

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710333486.4A Pending CN107202220A (en) 2017-05-12 2017-05-12 Built on stilts combustion gas heat-preserving anti-freezing pipeline and its application method

Country Status (1)

Country Link
CN (1) CN107202220A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108331971A (en) * 2018-01-30 2018-07-27 刘凤云 A kind of highway bridge pipeline support equipment
CN108561629A (en) * 2018-04-20 2018-09-21 程刚 A kind of shallow embedding gas pipeline resisting mining deformation adjusting apparatus for coal mining
CN114321500A (en) * 2019-03-28 2022-04-12 临沂市政集团有限公司 Road and bridge pipeline supporting equipment

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0586297A1 (en) * 1992-09-04 1994-03-09 Societe Joseph Sauron Materiel Industriel Device for axial alignment and butt-positioning of two elongated members
EP0627586A1 (en) * 1993-05-04 1994-12-07 Immanuel Jeschke Mounting device for the housing of a shut off armature for buried or free laid supply-pipes
JPH11190466A (en) * 1997-12-25 1999-07-13 Ishikawajima Harima Heavy Ind Co Ltd Low temperature piping support device
US6083291A (en) * 1996-09-05 2000-07-04 Jgc Corporation Gas transfer pipe arrangement
CN101769671A (en) * 2010-01-14 2010-07-07 上海穗杉实业有限公司 Drying method for desorbing moisture in material with membrane separator and device thereof
CN201815225U (en) * 2010-10-20 2011-05-04 西梅卡亚洲气体***成都有限公司 Air membrane separation device adopting hollow fiber membrane drying technique
CN103245025A (en) * 2013-05-31 2013-08-14 中铁第一勘察设计院集团有限公司 Combined water film evaporative air-conditioning cooling device for subway station
CN103269766A (en) * 2010-11-18 2013-08-28 “盖瑞斯”股份有限公司 Membrane gas separation plant and method for operating same
CN105387346A (en) * 2015-10-23 2016-03-09 辽宁科技大学 Self-circulation gas anti-freezing house-service device
CN106002171A (en) * 2016-08-10 2016-10-12 苏州兆和通风设备制造有限公司 Assembly equipment for double-layer spiral duct
CN205781400U (en) * 2016-05-16 2016-12-07 中航工业南航(深圳)测控技术有限公司 Piping support structure and conveying equipment

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0586297A1 (en) * 1992-09-04 1994-03-09 Societe Joseph Sauron Materiel Industriel Device for axial alignment and butt-positioning of two elongated members
EP0627586A1 (en) * 1993-05-04 1994-12-07 Immanuel Jeschke Mounting device for the housing of a shut off armature for buried or free laid supply-pipes
US6083291A (en) * 1996-09-05 2000-07-04 Jgc Corporation Gas transfer pipe arrangement
JPH11190466A (en) * 1997-12-25 1999-07-13 Ishikawajima Harima Heavy Ind Co Ltd Low temperature piping support device
CN101769671A (en) * 2010-01-14 2010-07-07 上海穗杉实业有限公司 Drying method for desorbing moisture in material with membrane separator and device thereof
CN201815225U (en) * 2010-10-20 2011-05-04 西梅卡亚洲气体***成都有限公司 Air membrane separation device adopting hollow fiber membrane drying technique
CN103269766A (en) * 2010-11-18 2013-08-28 “盖瑞斯”股份有限公司 Membrane gas separation plant and method for operating same
CN103245025A (en) * 2013-05-31 2013-08-14 中铁第一勘察设计院集团有限公司 Combined water film evaporative air-conditioning cooling device for subway station
CN105387346A (en) * 2015-10-23 2016-03-09 辽宁科技大学 Self-circulation gas anti-freezing house-service device
CN205781400U (en) * 2016-05-16 2016-12-07 中航工业南航(深圳)测控技术有限公司 Piping support structure and conveying equipment
CN106002171A (en) * 2016-08-10 2016-10-12 苏州兆和通风设备制造有限公司 Assembly equipment for double-layer spiral duct

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
WBLHF016: "燃气管道发生冻堵的预防以及处理办法的研究讨论", 《百度文库》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108331971A (en) * 2018-01-30 2018-07-27 刘凤云 A kind of highway bridge pipeline support equipment
CN108331971B (en) * 2018-01-30 2018-11-13 刘凤云 A kind of highway bridge pipeline support equipment
CN108561629A (en) * 2018-04-20 2018-09-21 程刚 A kind of shallow embedding gas pipeline resisting mining deformation adjusting apparatus for coal mining
CN114321500A (en) * 2019-03-28 2022-04-12 临沂市政集团有限公司 Road and bridge pipeline supporting equipment

Similar Documents

Publication Publication Date Title
CN107461603B (en) The hot dry rock reheating compressed-air energy-storage system of gas storage heat accumulation one
CN102080857B (en) System and method for adjusting indoor temperature
CN107202220A (en) Built on stilts combustion gas heat-preserving anti-freezing pipeline and its application method
Feng et al. A full air cooling and heating system based on mine water source
CN108952806B (en) Tunnel drainage anti-freezing integrated system in severe cold region
CN104358962B (en) Solar energy photoelectric conversion accumulation of heat/electric power storage the tracing system of frozen soil pipe laying
CN106120854A (en) A kind of underground pipe gallery
CN103938658A (en) Structure capable of avoiding cold damage to high-temperature and unstable freeze soil area tunnel portal side slope
CN105225795A (en) A kind of buried oil cooling system of oil-filled transformer
CN108692407A (en) A kind of device that architectural environment is adjusted using city piping lane air
CN108757029A (en) A kind of waterproof/drainage structure for tunnel in cold area ever-frozen ground section
CN103401201B (en) A kind of de-icing method of high-voltage power transmission cable
CN103422424A (en) Bridge anti-freezing system for bridge and tunnel connection section
CN110185935A (en) A kind of cooling system of permafrost region high temperature transport pipeline
CN207277314U (en) A kind of ground heating type soil body crust freezing prevention and control device
CN208594967U (en) A kind of waterproof/drainage structure for tunnel in cold area ever-frozen ground section
CN206974257U (en) A kind of heat-pipe apparatus that the dark ice of cold area's road is eliminated using underground water heat energy
CN110107814A (en) A kind of spiral ventilating structure of Permafrost Area oil/gas pipe
CN113339873B (en) Novel cold-proof and anti-freezing system and method for cold-region high-ground-temperature tunnel
CN106368100A (en) Anti-icing road
CN108035761A (en) The surface graded cool-down method of mine country rock and gradient cooling device
CN203429591U (en) Ground surface deicing device
CN106400650A (en) Energy-saving anti-icing pavement
CN209704757U (en) Indoor environment artificial wind power generating system
CN205004134U (en) Oil -immersed transformer's ground buries cold system of formula oil

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170926