CN107175460A - Tuyere cover of blast furnace renovation technique - Google Patents

Tuyere cover of blast furnace renovation technique Download PDF

Info

Publication number
CN107175460A
CN107175460A CN201710240430.4A CN201710240430A CN107175460A CN 107175460 A CN107175460 A CN 107175460A CN 201710240430 A CN201710240430 A CN 201710240430A CN 107175460 A CN107175460 A CN 107175460A
Authority
CN
China
Prior art keywords
welding
inspection
blast furnace
tuyere
restorative procedure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710240430.4A
Other languages
Chinese (zh)
Inventor
冯永刚
王杰
冯永强
翟文江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Rizhao Dongtai Copper Alloy Industry Co Ltd
Original Assignee
Rizhao Dongtai Copper Alloy Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Rizhao Dongtai Copper Alloy Industry Co Ltd filed Critical Rizhao Dongtai Copper Alloy Industry Co Ltd
Priority to CN201710240430.4A priority Critical patent/CN107175460A/en
Publication of CN107175460A publication Critical patent/CN107175460A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K9/00Arc welding or cutting
    • B23K9/095Monitoring or automatic control of welding parameters
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K9/00Arc welding or cutting
    • B23K9/16Arc welding or cutting making use of shielding gas

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Plasma & Fusion (AREA)
  • Manufacture Of Iron (AREA)

Abstract

A kind of tuyere cover of blast furnace renovation technique, is related to the operation and maintenance technical field of tuyere cover of blast furnace.Including the method for inspection and restorative procedure, the described method of inspection and restorative procedure is:1st, the method for inspection;2nd, restorative procedure.The present invention has by repairing the tuyere cover of blast furnace damaged, recycles to reduce waste, reduces the good effect of production cost.

Description

Tuyere cover of blast furnace renovation technique
Technical field
The present invention relates to the operation and maintenance technical field of tuyere cover of blast furnace, particularly belong to a kind of tuyere cover of blast furnace and repair work Skill.
Background technology
Blast-furnace tuyere front end, the char particle rotated at a high speed by Blast Furnace Raceway and furnace charge abrasion and slag crust come off, make air port Set front end is easily deformed, and abrasion is even burnt.After tuyere case damage, present widespread practice is to renew, and is thus made Into substantial amounts of waste, production cost is set to remain high.
The content of the invention
The purpose of the present invention is to be to provide a kind of tuyere cover of blast furnace renovation technique, to reach by repairing the blast furnace damaged Tuyere case, recycles to reduce waste, reduces the purpose of production cost.
Tuyere cover of blast furnace renovation technique provided by the present invention includes the method for inspection and restorative procedure, it is characterised in that institute The method of inspection and restorative procedure stated be:
1st, the method for inspection
A, cleaning
Clear up surface and oil contaminant and inner chamber incrustation scale;
B, inspection
Integral colouring is detected a flaw, and examines defect crack;
Water flowing experiment is carried out, examines water route whether unimpeded;
Pressure test is carried out, water is forced into 2.0Mpa, is kept for 30 minutes, checks whether leak;
2nd, restorative procedure
A, processing damaged location
Damaged location is cut;
Bearing rib is welded on the inside of cutting part;
Model is repaired in b, making
Made according to the shape cut down and repair model;
The surrounding processing welding groove of repairing duplicate sample plate;
C, weld preparation
Model will be repaired and be placed on cutting part, spot welding is fixed;
To being cleared up in the 30mm of groove both sides, polishing cleaning is carried out until exposing metallic luster from stainless steel wire wheel, weldering is brushed Agent;
Tuyere case is preheated, preheating temperature is to 500 ~ 650 DEG C, and preheating time was controlled in 1.5 hours;
C, welding
Argon arc welding is selected in welding, and welding wire selects 3.0 chromium-zirconium-copper welding wires;
First pass welding current is 300A voltage 21V, throat depth 4mm;
Second time welding current is 350A voltage 21V, throat depth 3mm;
3rd time welding current is 400A voltage 22V, throat depth 4mm;
D, welding post processing
Welding eliminates stress after finishing with 5 kilograms of power touch weld seam;
With heat-preservation cotton parcel insulation slow cooling;
Weld seam carries out reconditioning processing, dye penetrant inspection after cooling;
The progress water pressure test, pressure 2.0Mpa, pressurize 30 minutes, ne-leakage is qualified.
Described welding groove is 60 ° of double V-grooves.
The tuyere cover of blast furnace renovation technique that the present invention is provided, cuts to damaged location, and is welded on the inside of cutting part Bearing rib is connect, can prevent from being deformed during reparation;By above renovation technique technology, the tuyere case of reparation can The use condition of blast furnace is met, is reached and new product identical service life.Therefore, the present invention has is damaged by repairing Tuyere cover of blast furnace, recycle to reduce wastes, the good effect of reduction production cost.
Embodiment
Tuyere cover of blast furnace renovation technique provided by the present invention includes the method for inspection and restorative procedure, it is characterised in that institute The method of inspection and restorative procedure stated be:
1st, the method for inspection
D, cleaning
Clear up surface and oil contaminant and inner chamber incrustation scale;
E, inspection
Integral colouring is detected a flaw, and examines defect crack;
Water flowing experiment is carried out, examines water route whether unimpeded;
Pressure test is carried out, water is forced into 2.0Mpa, is kept for 30 minutes, checks whether leak;By the crackle detected, leakage Water spot is marked;
2nd, restorative procedure
A, processing damaged location
Damaged location is cut;
Bearing rib is welded on the inside of cutting part;
Model is repaired in b, making
Made according to the shape cut down and repair model;
The surrounding processing welding groove of repairing duplicate sample plate;Described welding groove is 60 ° of double V-grooves;
C, weld preparation
Model will be repaired and be placed on cutting part, spot welding is fixed;
To being cleared up in the 30mm of groove both sides, polishing cleaning is carried out until exposing metallic luster from stainless steel wire wheel, weldering is brushed Agent;
Tuyere case is preheated, preheating temperature is to 500 ~ 650 DEG C, and preheating time was controlled in 1.5 hours;
F, welding
Argon arc welding is selected in welding, and welding wire selects 3.0 chromium-zirconium-copper welding wires;
First pass welding current is 300A voltage 21V, throat depth 4mm;
Second time welding current is 350A voltage 21V, throat depth 3mm;
3rd time welding current is 400A voltage 22V, throat depth 4mm;
D, welding post processing
Welding eliminates stress after finishing with 5 kilograms of power touch weld seam;
With heat-preservation cotton parcel insulation slow cooling;
Weld seam carries out reconditioning processing, dye penetrant inspection after cooling;
The progress water pressure test, pressure 2.0Mpa, pressurize 30 minutes, ne-leakage is qualified.
By above renovation technique technology, various tuyere cases, such as tuyere small sleeve, tuyere medium sleeve can be repaired, reparation Tuyere case disclosure satisfy that the use condition of blast furnace, reach and new product identical service life.The blast-furnace tuyere repaired Set, can be recycled, and can reduce waste, reduce enterprise's production cost.

Claims (2)

1. a kind of tuyere cover of blast furnace renovation technique, including the method for inspection and restorative procedure, it is characterised in that the described method of inspection It is with restorative procedure:
1st, the method for inspection
Cleaning
Clear up surface and oil contaminant and inner chamber incrustation scale;
Examine
Integral colouring is detected a flaw, and examines defect crack;
Water flowing experiment is carried out, examines water route whether unimpeded;
Pressure test is carried out, water is forced into 2.0Mpa, is kept for 30 minutes, checks whether leak;
2nd, restorative procedure
A, processing damaged location
Damaged location is cut;
Bearing rib is welded on the inside of cutting part;
Model is repaired in b, making
Made according to the shape cut down and repair model;
The surrounding processing welding groove of repairing duplicate sample plate;
C, weld preparation
Model will be repaired and be placed on cutting part, spot welding is fixed;
To being cleared up in the 30mm of groove both sides, polishing cleaning is carried out until exposing metallic luster from stainless steel wire wheel, weldering is brushed Agent;
Tuyere case is preheated, preheating temperature is to 500 ~ 650 DEG C, and preheating time was controlled in 1.5 hours;
Welding
Argon arc welding is selected in welding, and welding wire selects 3.0 chromium-zirconium-copper welding wires;
First pass welding current is 300A voltage 21V, throat depth 4mm;
Second time welding current is 350A voltage 21V, throat depth 3mm;
3rd time welding current is 400A voltage 22V, throat depth 4mm;
D, welding post processing
Welding eliminates stress, then slow cooling after finishing with 5 kilograms of power touch weld seam;
Weld seam carries out reconditioning processing, dye penetrant inspection after cooling;
The progress water pressure test, pressure 2.0Mpa, pressurize 30 minutes, ne-leakage is qualified.
2. tuyere cover of blast furnace renovation technique according to claim 1, it is characterised in that described welding groove is 60 ° of V-types Groove.
CN201710240430.4A 2017-04-13 2017-04-13 Tuyere cover of blast furnace renovation technique Pending CN107175460A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710240430.4A CN107175460A (en) 2017-04-13 2017-04-13 Tuyere cover of blast furnace renovation technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710240430.4A CN107175460A (en) 2017-04-13 2017-04-13 Tuyere cover of blast furnace renovation technique

Publications (1)

Publication Number Publication Date
CN107175460A true CN107175460A (en) 2017-09-19

Family

ID=59830899

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710240430.4A Pending CN107175460A (en) 2017-04-13 2017-04-13 Tuyere cover of blast furnace renovation technique

Country Status (1)

Country Link
CN (1) CN107175460A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108857262A (en) * 2018-08-30 2018-11-23 中国十九冶集团有限公司 Tap-hole bar of blast furnace restorative procedure
CN109604997A (en) * 2019-01-25 2019-04-12 葫芦岛市滨海宇通自动化控制有限公司 Ship hydraulic jacking apparatus method for maintaining
CN110900127A (en) * 2019-11-28 2020-03-24 汕头华兴冶金设备股份有限公司 Manufacturing method of blast furnace tuyere sleeve

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5217658A (en) * 1990-08-03 1993-06-08 Georg Fischer Ag Method for repairing a hot-blast long-time cupola furnace
CN101638699A (en) * 2009-08-07 2010-02-03 重庆钢铁(集团)有限责任公司 Repair method of bores of blast furnace tuyere small sleeve
CN101760575A (en) * 2010-02-03 2010-06-30 南通宝钢钢铁有限公司 On-line mending way of blast-furnace tuyere large sleeve
CN102489935A (en) * 2011-11-14 2012-06-13 武汉钢铁(集团)公司 Blast-furnace tuyere preparation method
CN102766710A (en) * 2012-07-12 2012-11-07 承德金章机械配件加工有限公司 Restoration method for tuyere small sleeve of blast furnace
CN103801805A (en) * 2014-01-21 2014-05-21 马鞍山马钢设备安装工程有限公司 Sleeve welding repair method in blast-furnace tuyere

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5217658A (en) * 1990-08-03 1993-06-08 Georg Fischer Ag Method for repairing a hot-blast long-time cupola furnace
CN101638699A (en) * 2009-08-07 2010-02-03 重庆钢铁(集团)有限责任公司 Repair method of bores of blast furnace tuyere small sleeve
CN101760575A (en) * 2010-02-03 2010-06-30 南通宝钢钢铁有限公司 On-line mending way of blast-furnace tuyere large sleeve
CN102489935A (en) * 2011-11-14 2012-06-13 武汉钢铁(集团)公司 Blast-furnace tuyere preparation method
CN102766710A (en) * 2012-07-12 2012-11-07 承德金章机械配件加工有限公司 Restoration method for tuyere small sleeve of blast furnace
CN103801805A (en) * 2014-01-21 2014-05-21 马鞍山马钢设备安装工程有限公司 Sleeve welding repair method in blast-furnace tuyere

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108857262A (en) * 2018-08-30 2018-11-23 中国十九冶集团有限公司 Tap-hole bar of blast furnace restorative procedure
CN109604997A (en) * 2019-01-25 2019-04-12 葫芦岛市滨海宇通自动化控制有限公司 Ship hydraulic jacking apparatus method for maintaining
CN110900127A (en) * 2019-11-28 2020-03-24 汕头华兴冶金设备股份有限公司 Manufacturing method of blast furnace tuyere sleeve
CN110900127B (en) * 2019-11-28 2021-08-31 汕头华兴冶金设备股份有限公司 Manufacturing method of blast furnace tuyere sleeve

Similar Documents

Publication Publication Date Title
CN104801839B (en) The welding procedure of austenitic stainless steel and chrome molybdenum heat resisting steel
CN104532233B (en) Rotor axle position laser melting coating restorative procedure
CN109590668A (en) A kind of steam turbine cylinder sealing surface renovation technique
CN103084703A (en) Method for patching, overlay welding and reproducing large-scale hollow steel casting
CN102756235A (en) Field welding repair method especially for larger and penetrating defects in steel casting with heavy wall thickness
CN107175460A (en) Tuyere cover of blast furnace renovation technique
CN104924018A (en) On-site repairing method for large motor rotor large section cracks
CN103481010A (en) Novel full-automatic online cold welding repairing process for roll squeezers
CN105665898A (en) Automatic submerged arc welding method for pearlitic heat-resistant steel composite board
CN110340619A (en) Stainless steel bell crack restorative procedure
CN112621103B (en) Repair method for titanium alloy blade of aircraft engine compressor
CN111168322A (en) Repair welding process of nodular cast iron roller
CN110257825A (en) It is a kind of that material restorative procedure is increased using stainless steel powder foot couple 30CrMnSiA substrate
CN104668741A (en) Welding repair method of blast furnace gas turbine blade
CN102896459A (en) Online repair method for window rolling stress surfaces of rack archways of hot continuous rolling units
CN109108269A (en) Locomotive wheel reparation iron(-)base powder and laser 3D printing renovation technique
CN101422850B (en) Flat-head cap build-up welding repair method
CN104148874B (en) Manual arc welding restorative procedure after the wearing and tearing of universal rolling mill vertical roll axle box bearing seat
CN101934434B (en) Cast iron hot repair welding process and device
CN111250824B (en) Repairing process for inner hole wear surface of upper beam of large hydraulic press
CN106826090B (en) Build-up welding preparation process for connecting rod mold
CN109108507A (en) A kind of welding method that large-scale storage tank bottom plate renews
CN105729040A (en) Repairing method of chilling chamber of gasification furnace
CN106216939B (en) A kind of pot tending machine cleaning blade grab bucket restorative procedure
CN115415732A (en) Method for treating material degradation of induced draft blade of deep peak regulation coal-electric unit

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170919