CN107169882A - Electric network fault actively rushes to repair command system - Google Patents
Electric network fault actively rushes to repair command system Download PDFInfo
- Publication number
- CN107169882A CN107169882A CN201710470110.8A CN201710470110A CN107169882A CN 107169882 A CN107169882 A CN 107169882A CN 201710470110 A CN201710470110 A CN 201710470110A CN 107169882 A CN107169882 A CN 107169882A
- Authority
- CN
- China
- Prior art keywords
- information database
- systems
- webserver
- database system
- information
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000004891 communication Methods 0.000 claims abstract description 17
- 230000010365 information processing Effects 0.000 claims abstract description 17
- 230000009286 beneficial effect Effects 0.000 abstract 1
- 230000005540 biological transmission Effects 0.000 description 5
- 239000011551 heat transfer agent Substances 0.000 description 3
- 238000012545 processing Methods 0.000 description 3
- 230000007257 malfunction Effects 0.000 description 2
- 230000004888 barrier function Effects 0.000 description 1
- 230000015556 catabolic process Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- DMBHHRLKUKUOEG-UHFFFAOYSA-N diphenylamine Chemical compound C=1C=CC=CC=1NC1=CC=CC=C1 DMBHHRLKUKUOEG-UHFFFAOYSA-N 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/24—Querying
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02D—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
- Y02D10/00—Energy efficient computing, e.g. low power processors, power management or thermal management
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Economics (AREA)
- Theoretical Computer Science (AREA)
- Strategic Management (AREA)
- General Physics & Mathematics (AREA)
- Physics & Mathematics (AREA)
- Entrepreneurship & Innovation (AREA)
- Marketing (AREA)
- Health & Medical Sciences (AREA)
- General Business, Economics & Management (AREA)
- Tourism & Hospitality (AREA)
- Game Theory and Decision Science (AREA)
- General Health & Medical Sciences (AREA)
- Operations Research (AREA)
- Educational Administration (AREA)
- Development Economics (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Quality & Reliability (AREA)
- Primary Health Care (AREA)
- Computational Linguistics (AREA)
- Data Mining & Analysis (AREA)
- Databases & Information Systems (AREA)
- General Engineering & Computer Science (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
A kind of electric network fault actively rushes to repair command system, includes electrical power distribution automatization system, power information acquisition system, failure information database system, OMS, PMS systems, scheduled outage information database system, information processing system, 95598 systems, the webserver, worksheet system and some handheld terminals;Wherein, power information acquisition system, electrical power distribution automatization system are communicated to connect with failure information database system respectively;PMS systems, OMS are communicated to connect with scheduled outage information database system respectively;Failure information database system, scheduled outage information database system are connected with the input communication of information processing system;Information processing system is connected with worksheet system duplex communication, and is connected by the webserver with each handheld terminal radio communication;95598 systems, PMS systems, OMS, electrical power distribution automatization system are connected with webserver communication respectively;The beneficial effects of the invention are as follows realizing to find fault message in advance, first-aid repair efficiency is improved.
Description
Technical field
The present invention relates to grid information system field, and in particular to electric network fault actively rushes to repair command system.
Background technology
With the high speed development of national economy, the construction of network system has obtained significant progress.Due to national economy pair
The dependency degree more and more higher of electric power, and power network monitoring, management have specialization, when power network has a power failure, often first when
Between be to be made a telephone call to power supply administration by user, power supply administration the distribution situation for confirming correspondence report barrier area it is non-actively to have a power failure when, then
Commander maintenance personal goes to relative region to carry out power network repairing, but because field condition information back presently, there are hysteresis quality, because
This is difficult to determine that the nearest repair personnel in failure spot, repair personnel are to catch up with to repair in way whether to hinder, and still robs
Repair in equipment;In order to shorten emergency repair time, sensed in advance electric network fault is realized, first-aid repair efficiency is accurately studied and judged, it is necessary to power network
Breakdown repair command system is furtherd investigate.
The content of the invention
For the deficiency in the presence of prior art, command system is actively rushed to repair the invention provides a kind of electric network fault,
Active its object is to realize electric network fault is rushed to repair and the accurate scheduling to repair personnel.
To achieve the above object, present invention employs following technical scheme:
A kind of electric network fault actively rushes to repair command system, includes electrical power distribution automatization system, power information acquisition system, failure
Information database system, OMS, PMS systems, scheduled outage information database system, information processing system, 95598 systems,
The webserver, worksheet system and some handheld terminals;Wherein, power information acquisition system, electrical power distribution automatization system
Communicated to connect respectively with failure information database system;PMS systems, OMS respectively with scheduled outage information database system
Communication connection;The input communication phase of failure information database system, scheduled outage information database system and information processing system
Even;Information processing system is connected with worksheet system duplex communication, and passes through the webserver and each handheld terminal channel radio
Letter is connected;95598 systems, PMS systems, OMS, electrical power distribution automatization system are connected with webserver communication respectively.
This electric network fault actively rushes to repair command system and passes through information processing system combination failure information database system, plan
The information of outage information Database Systems can judge electric network fault information in advance before user calls complaint, and transmit
Information assigns work order to handheld terminal to worksheet system, and then by the webserver.
Compared to prior art, the present invention has the advantages that:
(1) it, can realize and find fault message in advance, precisely study and judge disconnected raising first-aid repair efficiency;
(2), accessed by handheld terminal, realize the real-time passback of repairing information, lift accuracy of information;
(3), malfunction is not limited only to have a power failure, and can improve overhaul of the equipments efficiency.
Brief description of the drawings
Fig. 1 is principle logic diagram of the invention.
Embodiment
Below in conjunction with the accompanying drawings and embodiment is further illustrated to the technical scheme in the present invention.
A kind of electric network fault actively rushes to repair command system, includes electrical power distribution automatization system, power information acquisition system, failure
Information database system, OMS, PMS systems, scheduled outage information database system, information processing system, 95598 systems,
The webserver, worksheet system and some handheld terminals;Wherein, power information acquisition system, electrical power distribution automatization system
Communicated to connect respectively with failure information database system;PMS systems, OMS respectively with scheduled outage information database system
Communication connection;The input communication phase of failure information database system, scheduled outage information database system and information processing system
Even;Information processing system is connected with worksheet system duplex communication, and passes through the webserver and each handheld terminal channel radio
Letter is connected;95598 systems, PMS systems, OMS, electrical power distribution automatization system are connected with webserver communication respectively, with reality
Connection and the information transmission of existing internal network and/or internet;The handheld terminal includes the locating modules such as GPS and/or the Big Dipper.
Handheld terminal can use PDA, or the smart mobile phone equipped with corresponding A PP, facilitate repair personnel to carry and passback scene
Information, it is to avoid the situation for repeating reminder or excessively allotment repairing resource occurs.
This power network actively rushes to repair command system and gathers power information, power information collection system by power information acquisition system
System comprising integrated sensor module on each region branched line is arranged in, be arranged in control centre network communication module and
Heat transfer agent processing server;Integrated sensor module includes current sensor, voltage sensor, d GPS locating module and nothing
Line transmission unit, and by the electric current of collection, voltage and self geographical position information by wireless transmission unit by network communication mould
Group passes to heat transfer agent processing server;Corresponding informance is passed to failure information database system by heat transfer agent processing server
System;Information processing system combination failure information database system, the information of scheduled outage information database system transmission can be sentenced
Whether the fault message that breaks is consistent with scheduled outage information matches, then illustrates for electric network fault, it is necessary to rush to repair, then when inconsistent
Worksheet system is sent a message to, is formed after work order, is sent out from information processing system by the webserver to each handheld terminal
Work order information is sent to notify attendant to carry out active repairing;After 95598 systems are connected to customer complaint, pass through the webserver
Transmit repair message to information processing system, information processing system by contrasting relevant information for when having sent work order information then not
New work order information is produced, until failure is processed, work order is closed.
The information of contrast can be time, regional location, malfunction etc., and information contrast is prior art, with encoding ratio
To, text than reciprocity a variety of implementations, it will not be repeated here;Each composition system by above working method make it possible to
Family judges electric network fault information in advance before calling complaint, and transfers information to worksheet system, and then assigns work order
To handheld terminal, it is easy to attendant to reach repairing place or prepares related rush repair equipment.After the completion of repairing, repair personnel is led to
Handheld terminal is crossed to pass field data back to recover power transmission.
Finally illustrate, the above embodiments are merely illustrative of the technical solutions of the present invention and it is unrestricted, although with reference to compared with
The present invention is described in detail good embodiment, it will be understood by those within the art that, can be to skill of the invention
Art scheme is modified or equivalent substitution, and without departing from the objective and scope of technical solution of the present invention, it all should cover at this
Among the right of invention.
Claims (2)
1. a kind of electric network fault actively rushes to repair command system, it is characterised in that:Gathered comprising electrical power distribution automatization system, power information
System, failure information database system, OMS, PMS systems, scheduled outage information database system, information processing system,
95598 systems, the webserver, worksheet system and some handheld terminals;Wherein, power information acquisition system, distribution
Automated system is communicated to connect with failure information database system respectively;PMS systems, OMS respectively with scheduled outage information
Database Systems are communicated to connect;Failure information database system, scheduled outage information database system and information processing system
Input communication is connected;Information processing system is connected with worksheet system duplex communication, and by the webserver with it is each hand-held
Terminal wireless communication is connected;95598 systems, PMS systems, OMS, electrical power distribution automatization system communicate with the webserver respectively
It is connected.
2. a kind of electric network fault as claimed in claim 1 actively rushes to repair command system, it is characterised in that:The handheld terminal bag
Contain locating module.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710470110.8A CN107169882A (en) | 2017-06-20 | 2017-06-20 | Electric network fault actively rushes to repair command system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710470110.8A CN107169882A (en) | 2017-06-20 | 2017-06-20 | Electric network fault actively rushes to repair command system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107169882A true CN107169882A (en) | 2017-09-15 |
Family
ID=59818956
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710470110.8A Pending CN107169882A (en) | 2017-06-20 | 2017-06-20 | Electric network fault actively rushes to repair command system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107169882A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108596494A (en) * | 2018-04-25 | 2018-09-28 | 广州供电局有限公司 | The business work order generation method and device of power failure impaired report information |
CN112052962A (en) * | 2020-07-08 | 2020-12-08 | 国网浙江杭州市富阳区供电有限公司 | Full-process automatic fault processing platform and method |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104091231A (en) * | 2014-06-30 | 2014-10-08 | 国家电网公司 | Distribution network fault repairing commanding and processing system and method |
CN205003721U (en) * | 2015-08-21 | 2016-01-27 | 国网山东省电力公司东营供电公司 | It reports system to join in marriage net troubleshooting power failure information |
CN205540938U (en) * | 2016-03-21 | 2016-08-31 | 国网安徽省电力公司芜湖供电公司 | Join in marriage power system fault system of salvageing |
CN106655127A (en) * | 2015-11-03 | 2017-05-10 | 国家电网公司 | Urgent repair command system for distribution network |
-
2017
- 2017-06-20 CN CN201710470110.8A patent/CN107169882A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104091231A (en) * | 2014-06-30 | 2014-10-08 | 国家电网公司 | Distribution network fault repairing commanding and processing system and method |
CN205003721U (en) * | 2015-08-21 | 2016-01-27 | 国网山东省电力公司东营供电公司 | It reports system to join in marriage net troubleshooting power failure information |
CN106655127A (en) * | 2015-11-03 | 2017-05-10 | 国家电网公司 | Urgent repair command system for distribution network |
CN205540938U (en) * | 2016-03-21 | 2016-08-31 | 国网安徽省电力公司芜湖供电公司 | Join in marriage power system fault system of salvageing |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108596494A (en) * | 2018-04-25 | 2018-09-28 | 广州供电局有限公司 | The business work order generation method and device of power failure impaired report information |
CN112052962A (en) * | 2020-07-08 | 2020-12-08 | 国网浙江杭州市富阳区供电有限公司 | Full-process automatic fault processing platform and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103986227B (en) | A kind of monitoring method for running of the power matching network based on GIS platform and system | |
CN105785201B (en) | A kind of power distribution network fault analysis method and study and judge system | |
CN103714437A (en) | Power line repair commanding method based on CIS and movable operation | |
EP2528352A2 (en) | Head-end system for advanced metering infrastructure network | |
CN104698309B (en) | The method and system that a kind of power information obtains | |
CN106532935B (en) | For carrying out the method and its system of secondary system of intelligent substation fault diagnosis | |
CN104270779A (en) | Wireless network fault cause preprocessing method and wireless network fault work order dispatching system | |
CN103840552B (en) | Power distribution room monitoring method and system | |
CN105678651A (en) | Power grid big data quality standardization-based power grid information management system and method | |
CN105139118A (en) | Distribution network fault first-aid repair power failure information reporting system and method | |
CN102841293A (en) | Fault positioning system for 10kV power distribution network circuit | |
CN107786671A (en) | A kind of power equipment remote test system | |
CN107169882A (en) | Electric network fault actively rushes to repair command system | |
CN104683331A (en) | System for realizing hybrid networking of soft exchange and program-controlled exchange of power dispatching | |
CN110412421A (en) | Method and system for intelligently analyzing and positioning faults | |
CN102291442A (en) | Voice inquiry system and method for electricity data | |
CN112288281A (en) | Distribution network fault first-aid repair command processing system and method | |
CN103259336A (en) | High-voltage fault monitoring system based on internet of things technology | |
CN203455377U (en) | Power consumption monitoring device | |
CN207339915U (en) | A kind of vulnerability scanning managing device | |
CN102611198B (en) | Protecting device for automatic remote wireless transmission of data | |
CN207150253U (en) | Monitoring system for power transformation operation and maintenance | |
CN212965235U (en) | Distribution network fault positioning and inspection management and control instrument | |
CN203658816U (en) | An intelligent commercial electric power monitor system | |
CN107748920A (en) | A kind of protective relaying device abnormal state positioning and management method and system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170915 |