CN107168122A - A kind of power equipment case centralized control system and method - Google Patents

A kind of power equipment case centralized control system and method Download PDF

Info

Publication number
CN107168122A
CN107168122A CN201710419636.3A CN201710419636A CN107168122A CN 107168122 A CN107168122 A CN 107168122A CN 201710419636 A CN201710419636 A CN 201710419636A CN 107168122 A CN107168122 A CN 107168122A
Authority
CN
China
Prior art keywords
authorization code
chamber door
maintenance
power equipment
equipment box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710419636.3A
Other languages
Chinese (zh)
Other versions
CN107168122B (en
Inventor
冯星语
冯曰敏
冯忠奎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710419636.3A priority Critical patent/CN107168122B/en
Publication of CN107168122A publication Critical patent/CN107168122A/en
Application granted granted Critical
Publication of CN107168122B publication Critical patent/CN107168122B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Lock And Its Accessories (AREA)
  • Alarm Systems (AREA)

Abstract

The invention discloses a kind of power equipment case centralized control system and method, wherein, the system includes:For send received after request control centre feed back the application program of authorization code, for transmission authorization code after respond request to the control centre of application program and power equipment case and for receiving and verifying that authorization code can open the power equipment case of chamber door.System provided by the present invention, is only receiving the second detection authorization code or the second maintenance authorization code that control centre sends, is just opening authorization code input unit, improve safety in utilization;And chamber door opener can just receive the control signal of equipment box processor after authorization code is verified, chamber door is opened, safety in utilization is further increased.And operator sends testing result and specific maintenance process to control centre by application program, preserved by control centre, carrying out record in detail the problems such as can be to power equipment case maintenance record puts on record, for inquiring about later, improves ease of use.

Description

A kind of power equipment case centralized control system and method
Technical field
The present invention relates to electrical equipment technical field, more particularly to a kind of power equipment case centralized control system and side Method.
Background technology
The security significance of power equipment is inestimable, due to the high value and importance of power equipment in itself, easily meets with To theft or malicious sabotage.For the larger region of power consumption, once power equipment is stolen or by malicious sabotage, due to lacking Economic loss, data loss etc. are inestimable caused by weary supply of electric power.
The outdoor electric power equipment box used now pins chamber door frequently with simple external lock, and security is low.
Therefore, prior art has yet to be improved and developed.
The content of the invention
The technical problem to be solved in the present invention is, for the drawbacks described above of prior art, there is provided a kind of power equipment case Centralized control system and method, it is intended to solve the problem of power equipment case security is low in the prior art.
The technical proposal for solving the technical problem of the invention is as follows:
A kind of power equipment case centralized control system, wherein, the power equipment case centralized control system includes:
The application program of mobile terminal is installed on, for the operation according to operator, maintenance call is sent to control centre;
Receive the first detection authorization code and the first maintenance authorization code that control centre is fed back;
And testing result and specific maintenance process or maintenance program that operator is filled in are received, and send it in control The heart, the maintenance program includes specific maintenance method and reservation maintenance time;
The control centre being connected with the application program, for after the maintenance call transmitted by application program is received, distinguishing Sending first detects authorization code and the second detection authorization code to application program and equipment box processor, the first detection authorization code It is identical with the second detection authorization code;
And preserved received testing result with specific maintenance process or maintenance program, and when received information bag When containing maintenance program, send the first maintenance authorization code respectively before reservation maintenance time is reached and the second maintenance authorization code extremely should With program and equipment box processor, it is identical that the first maintenance authorization code repairs authorization code with second;
The power equipment case being connected with the control centre, including:At chamber door, casing, equipment box processor and the equipment box The authorization code input unit of device connection is managed, and is connected with the equipment box processor and is arranged at the unlatching of the chamber door on chamber door Mechanism;
The equipment box processor is used to receive the second detection authorization code and the second maintenance authorization code transmitted by control centre, and Authorization code input unit is opened after the second detection authorization code or the second maintenance authorization code is received;
After authorization code checking is carried out, chamber door opener is sent a command to, to open chamber door;
The authorization code input unit is used to be followed by receiving that operator inputted uses as the first checking authorization code opening First detection authorization code or the first maintenance authorization code used as the second checking authorization code, and send it at equipment box Manage device.
In preferred scheme, described power equipment case centralized control system, wherein, the equipment box processor is provided with one First presetting module, for the default wrong defeated threshold value of authorization code for reporting illegal operation to control centre;
The concrete function of the equipment box processor includes:Judge the first checking authorization code that operator inputted, connect with it Whether the second detection authorization code received is identical, if then sending a command to chamber door opener, to be beaten by chamber door opener Unpacking door;If otherwise by voice or text prompt operator's authorization code input error, and accumulative authorization code input error number of times, Judge whether institute's cumulative number is more than or equal to the wrong defeated threshold value of default authorization code;If authorization code input unit is then closed, and Send illegal operation to alert to control centre, if otherwise receiving again and verifying the first checking authorization code;
And after the door open command transmitted by control centre is received, chamber door is opened by chamber door opener;
The application program is additionally operable to:According to the operation of operator, reporting power equipment case to hinder for some reason can not open into control The heart, and ask control centre's remote opening power equipment case;
The control centre is additionally operable to:According to whether receiving application program institute's reporting fault and remote control notification, judgement is electricity Power equipment box failure or power equipment case, if judged result is power equipment case failure, sends and opened the door by illegal operation Instruct to equipment box processor, remote opening chamber door;If judged result be power equipment case by illegal operation, can not perform Make.
In preferred scheme, described power equipment case centralized control system, wherein, the specific work(of the equipment box processor Can also it include:Judge the second checking authorization code that operator inputted, received with it whether second to repair authorization code identical, If then sending a command to chamber door opener, to open chamber door by chamber door opener;If otherwise passing through voice or word Operator's authorization code input error, and accumulative authorization code input error number of times are pointed out, judges whether institute's cumulative number is more than or equal to The wrong defeated threshold value of default authorization code;Alerted if then closing authorization code input unit, and sending illegal operation to control centre, If otherwise receiving again and verifying the first checking authorization code.
In preferred scheme, described power equipment case centralized control system, wherein, the chamber door opener includes:
The chamber door being connected with the equipment box processor opens motor, for receiving the control transmitted by equipment box processor After signal, rotated;
The chamber door bolt of motor connection is opened with the chamber door, under the drive that chamber door opens motor, moving to depart from casing Groove opens chamber door;
The casing groove being adapted with the chamber door bolt is provided with the casing.
In preferred scheme, described power equipment case centralized control system, wherein, one is provided with the control centre Two presetting modules, for the default interval time for safeguarding power equipment case;
The control centre is additionally operable to:According to default interval time, control centre periodically sends first and safeguards authorization code extremely Application program, safeguards authorization code to each equipment box processor while sending second;
And received maintenance process and testing result are individually stored;
The equipment box processor is additionally operable to:Receive second safeguard authorization code after, open authorization code input unit;And entering After the checking of row authorization code, chamber door is opened by chamber door opener;
The application program is additionally operable to:Maintenance process and testing result that operator is filled in are received, and sends it to control Center.
A kind of power equipment case centralized Control method, wherein, the power equipment case centralized Control method includes:
Step A:Application program sends maintenance call to control centre according to the operation of operator;
Step B:Control centre is received after the maintenance call transmitted by application program, and first is sent respectively and detects authorization code and second Authorization code is detected to application program and equipment box processor, the first detection authorization code is identical with the second detection authorization code;
Step C:Equipment box processor starts authorization code input unit after the second detection authorization code is received;
Step D:Operator inputs the first detection authorization code as the first checking on the authorization code input unit of power equipment case Authorization code is verified;
Step E:Equipment box processor opens chamber door after authorization code checking is carried out by chamber door opener;
Step F:Operator carries out problem detection, and judges whether power equipment case can directly be repaired, if then performing step Rapid G, if otherwise performing step H;
Step G:Operator carries out maintenance operation, and testing result and specific maintenance process are filled in application program;
Step H:Operator fills in testing result and maintenance program to application program, and the maintenance program, which includes specific maintenance, to be done Method and reservation maintenance time;
Step I:Application program receives operator and fills in testing result and specific maintenance process or maintenance program, and is sent to To control centre;
Step J:Control centre is preserved received testing result with specific maintenance process or maintenance program, and works as institute When receive information includes maintenance program, the first maintenance authorization code and the second maintenance are sent respectively before reservation maintenance time is reached Authorization code is to application program and equipment box processor;
Step K:Equipment box processor is on authorization code input unit after the second maintenance authorization code is received;
Step L:Operator inputs the first maintenance authorization code as the second checking on the authorization code input unit of power equipment case Authorization code is verified;
Step M:Equipment box processor opens chamber door after authorization code checking is carried out by chamber door opener;
Step N:Operator carries out power equipment case maintenance, and the locked chamber door after the completion of maintenance.
In preferred scheme, described power equipment case centralized Control method, wherein, also include before the step A:
Step SS:The equipment box processor of power equipment case default one is used to report illegal operation wrong to the authorization code of control centre Defeated threshold value;
Step E is specifically included:
Step E1:Equipment box processor judges the first checking authorization code that operator is inputted, the second detection received with it Whether authorization code is identical, if then performing step E2, if otherwise performing step E3;
Step E2:Equipment box processor sends a command to chamber door opener, to open chamber door by chamber door opener;
Step E3:Equipment box processor is by voice or text prompt operator's authorization code input error, and accumulative authorization code is defeated Enter errors number, judge whether institute's cumulative number is more than or equal to the wrong defeated threshold value of default authorization code;If then performing step E4, If otherwise return to step D;
Step E4:Equipment box processor closes authorization code input unit, and sends illegal operation and alert to control centre;
Step E5:Operator reports power equipment case to hinder for some reason and can not opened to control centre by application program, and asks control Center remote turns on power equipment box processed;
Step E6:Control centre is according to whether receive application program institute's reporting fault and remote control notification, and judgement is that electric power is set Standby case failure or power equipment case, if judged result is power equipment case failure, send door open command by illegal operation To equipment box processor, remote opening chamber door;If judged result be power equipment case by illegal operation, do not perform action.
In preferred scheme, described power equipment case centralized Control method, wherein, the M is specifically included:
Step M1:Equipment box processor judges the second checking authorization code that operator is inputted, the second maintenance received with it Whether authorization code is identical, if then performing step M2, if otherwise performing step M3;
Step M2:Equipment box processor sends a command to chamber door opener, to open chamber door by chamber door opener;
Step M3:Equipment box processor is by voice or text prompt operator's authorization code input error, and accumulative authorization code is defeated Enter errors number, judge whether institute's cumulative number is more than or equal to the wrong defeated threshold value of default authorization code;If then performing step M4, If otherwise return to step L;
Step M4:Equipment box processor closes authorization code input unit, and sends illegal operation and alert to control centre;
Step M5:Operator reports power equipment case to hinder for some reason and can not opened to control centre by application program, and asks control Center remote turns on power equipment box processed;
Step M6:Control centre is according to whether receive application program institute's reporting fault and remote control notification, and judgement is that electric power is set Standby case failure or power equipment case, if judged result is power equipment case failure, send door open command by illegal operation To equipment box processor, remote opening chamber door;If judged result be power equipment case by illegal operation, do not perform action.
In preferred scheme, described power equipment case centralized Control method, wherein, pass through case in the step E and step M It is as follows that door opener opening chamber door specifically includes step:
Equipment box processor sends a control signal to chamber door and opens motor;
Chamber door is opened motor and rotated, and drives the movement of chamber door bolt, disengages it from casing groove.
In preferred scheme, described power equipment case centralized Control method, wherein, the power equipment case centralized Control side Method also includes:
Step SSS:An interval time for being used to safeguard power equipment case is preset in control centre;
Step U:According to default interval time, control centre periodically sends first and safeguards authorization code to application program, simultaneously Sending second safeguards authorization code to each equipment box processor;
Step V:Equipment box processor receive second safeguard authorization code after, open authorization code input unit;
Step W:Operator inputs first on the authorization code input unit of power equipment case and safeguards authorization code as the 3rd checking Authorization code is verified;
Step X:Equipment box processor opens chamber door after authorization code checking is carried out by chamber door opener;
Step Y:Operator carry out power equipment case maintenance and problem detection, and by maintenance process and testing result fill in should With program, and sent by application program to control centre;
Step Z:Control centre is individually stored to received maintenance process and testing result.
Power equipment case centralized control system provided by the present invention, because power equipment case is only in control is received The authorization code that the heart is sent(Including the second detection authorization code and the second maintenance authorization code), authorization code input unit is just opened, is carried High safety in utilization;And chamber door opener can just receive the control letter of equipment box processor after authorization code is verified Number, chamber door is opened, safety in utilization is further increased.And operator sends testing result and specific maintenance by application program Process is preserved to control centre by control centre, is recorded standby in detail the problems such as can be to power equipment case maintenance record Case, for inquiry later, improves ease of use.
Brief description of the drawings
Fig. 1 is the chamber door bolt of power equipment case preferred embodiment in the present invention and the matching relationship schematic diagram of casing groove.
The functional schematic block diagram of power equipment case centralized control system preferred embodiment in Fig. 2 present invention.
Embodiment
To make the objects, technical solutions and advantages of the present invention clearer, clear and definite, develop simultaneously embodiment pair referring to the drawings The present invention is further described.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and without It is of the invention in limiting.
Heretofore described first detection authorization code, the first maintenance authorization code and first safeguard the too big difference of nothing between authorization code Not, difference is only that its transmission opportunity different, it should be noted that three sends to application program, operator and beaten by three The process of unpacking door is identical, and the present invention is for clearer description technique scheme, after it is received according to operator Purposes be detection, maintenance and safeguard for its name(But should not because operator using process to its it is counter limited, such as operator After being detected, discovery can be repaired directly, then now operator is to be detected, is also repaired, but from name It is still only the first detection authorization code and the second detection authorization code);Second detection authorization code, the second maintenance authorization code and the second dimension Between shield authorization code with this similarly.Authorization code will be detected(The general name of i.e. first detection authorization code and the second detection authorization code, maintenance Authorization code and safeguard that authorization code is identical, repeat no more), repair authorization code and safeguard that authorization code carries out different processing and application Can, but so, the implementation cost of the present invention is on the one hand added, the use complexity of the present invention is on the other hand added, Just because of with that in mind, the present invention carries out three identical and sends, receives and apply, to reduce the implementation of the present invention Cost and use complexity.
Why the description of first checking authorization code, the second checking authorization code and the 3rd checking authorization code similarly, is ordered Entitled checking authorization code(It is referred to as, it is identical with detection authorization code, repeat no more), be because:First checking authorization code, the second checking Authorization code and the 3rd checking authorization code are authorized, it is necessary to be safeguarded respectively with the second detection authorization code, the second maintenance authorization code and second Code is verified, chamber door can be opened after being only verified, it is generally the case that operator is inputted as correct authorization code i.e. First detection authorization code, the first maintenance authorization code or first safeguard authorization code, but there is other people malicious operations or operator inputs by mistake The problem of, when this two kinds of situations, institute's input validation authorization code is named as invalid code here, that is to say, that checking authorization code It is probably the first detection authorization code, the first maintenance authorization code or first safeguards authorization code, it is also possible to is invalid code, only verifies Power equipment case could be differentiated to it afterwards.
A kind of power equipment case centralized Control method provided in an embodiment of the present invention, it includes:
S100, application program send maintenance call to control centre according to the operation of operator.
The application program is preferably the APP being mountable on mobile terminal, and the mobile terminal can be mobile phone, flat board Etc. common terminal device or the terminal device for being individually for monitoring electrical equipment case and designing, preferably smart mobile phone, its Making and the use cost of power equipment case centralized control system can be reduced so that only need to carry out accordingly original power equipment case Structure improve, increase by an one APP and control centre, and APP and control centre's required function and uncomplicated, design, system Make and maintenance cost is not high.
The application program to should step be provided with a maintenance request module, control centre is provided with please with the maintenance The maintenance call processing module that modulus block is adapted.
In present pre-ferred embodiments, each operator should be put on record and be registered in control centre, so as to follow-up When transferring maintenance record, should be clear from every power equipment case, maintenance is carried out by which operator every time, in case special In the case of, can concrete condition of the direct access inquiry operator on power equipment case.
The control centre is preferably to be installed on computer, and is connected with the computer program of server, and it will apply journey Sequence is sent, and needs the information preserved to be stored in server, and each power equipment case is corresponded to can under a file, this document folder Include multiple second level files by different type, such as repair and safeguard two second level files, under the file of the second level The foundation of third level file can be carried out again according to date etc. with using.This is prior art, is no longer repeated.
S200, control centre receive application program transmitted by maintenance call after, respectively send first detect authorization code and Second detection authorization code to application program and equipment box processor, the first detection authorization code and the second detection authorizes code-phase Together.
When it is implemented, control centre sends first by maintenance call processing module detects that authorization code and the second detection are awarded Weighted code, preferably maintenance call processing module automated to respond to the transmitted request of maintenance call module, without artificial operation, to enter one Step reduces the use cost of the system.
S300, equipment box processor start authorization code input unit after the second detection authorization code is received.
It is preferred that the power equipment case is provided with WiFi network near WiFi antennas, connection, communicated with control centre Connection;Certainly, it can also be carried out by other connections and information interaction approach, this is prior art, be will not be repeated here.
As shown in figure 1, it is preferred that the chamber door bolt 10 of the power equipment case is close to casing groove 20(The casing groove is preferably provided with The chamber door bolt locating part 200 on casing is connected in one)One end is that inclined-plane is chamber door bolt inclined-plane 11, and the casing groove side is set The casing groove inclined-plane 21 being adapted with casing groove inclined-plane is equipped with, when chamber door bolt is pulled outwardly, chamber door bolt inclined-plane 11 and casing Groove inclined-plane 21 is fitted, and chamber door bolt 10 opens the movement of motor one end towards close to chamber door, until chamber door bolt 10 enters casing groove 20, and Chamber door is locked, it is to be understood that be provided with a flexible member between chamber door bolt 10 and chamber door open motor output shaft, described Flexible member is compressed when chamber door bolt is towards close to one end movement of chamber door unlatching motor, and departs from casing groove on chamber door bolt inclined-plane 11 Resetted behind inclined-plane 21, meanwhile, drive chamber door bolt 10 to enter casing groove 20.That is, the locked dependence mechanical structure lock of chamber door Extremely, direct pull chamber door, and motor rotation can only then be opened by chamber door by opening chamber door.The chamber door opens the defeated of motor Deflecting linkage between shaft and chamber door bolt 10, can realize that this is prior art, is repeated no more by mechanisms such as turbine and worms.
The equipment box processor is provided with authorization code receiving module, and the authorization code receiving module can not only be received and deposited Storage second detects authorization code, can also receive and store the second maintenance authorization code and second safeguards authorization code;And authorization code receives mould Block is then connected with an input unit opening module, when it receives the second detection authorization code, the second maintenance authorization code and the second dimension Protect after one in authorization code, send a signal to input unit opening module, authorization code is driven by input unit opening module Input unit starts.
Common cipher inputting keyboard in authorization code input unit selection life, technology maturation and cost is low.
S400, operator input the first detection authorization code on the authorization code input unit of power equipment case and tested as first Card authorization code is verified.
S500, equipment box processor open chamber door after authorization code checking is carried out by chamber door opener.
The equipment box processor is provided with a judge module, the judge module and authorization code input unit and authorization code Receiving module is connected, and it receives the authorization code that authorization code input unit is inputted first, then calls authorization code receiving module institute The authorization code of storage, finally compares the two, if the two is identical, authorization code is verified, if the two is different, authorization code is tested Card failure.Above-described authorization code can be the first detection authorization code and second detection authorization code, first maintenance authorization code with Second maintenance authorization code and first safeguard that authorization code and second safeguards any one group in three groups of authorization code.
Authorization code verifies that specific verification process refer to hereafter S510 to S560.
S600, operator carry out problem detection, and judge whether power equipment case can directly be repaired, if then performing S700, if otherwise performing S800.
Operator is after problem detection is carried out, if finding directly to repair, such as without renewal part or required renewal part It has been carried with that, then can directly have been repaired, and filled in testing result and specific maintenance process to application program, application program is then The received information of forwarding is to control centre, and control centre is preserved received information, in case inquiry, can also make Refer to, to reduce maloperation and the operating efficiency of the less operator of working experience, reduced on new for other people for service experience The training time of hilllock operator and cost.
And if operator pinpoints the problems complex or needs renewal part and required part is not carried with, can carry out Testing result is filled in, and provides predetermined method for maintaining, the time that reservation is repaired next time, to repair reaching reservation Before time, control centre can send maintenance authorization code automatically(Including the first maintenance authorization code and the second maintenance authorization code), subtract Few operating process.
In further preferred embodiment, if operator need to adjust the time, then can pass through after reservation maintenance time Application program sends the change request of reservation maintenance time, and control centre is received after the request, adjust automatically reservation maintenance time, And send maintenance identifying code automatically according to the reservation maintenance time after adjustment.
S700, operator carry out maintenance operation, and testing result and specific maintenance process are filled in application program.
S800, operator fill in testing result and maintenance program to application program, and the maintenance program includes specific dimension Repair method and reservation maintenance time.
S900, application program receive operator and fill in testing result and specific maintenance process or maintenance program, and by its Send to control centre.
S1000, control centre are preserved received testing result with specific maintenance process or maintenance program, and When received information includes maintenance program, the first maintenance authorization code and second are sent respectively before reservation maintenance time is reached Authorization code is repaired to application program and equipment box processor.
S1100, equipment box processor are on authorization code input unit after the second maintenance authorization code is received.It is logical Cross the first maintenance authorization code and the second maintenance authorization code opens the operation of chamber door, with passing through the first detection authorization code and the second detection The operation that authorization code opens chamber door is identical, on the one hand can reduce Operating Complexity, on the other hand can reduce power equipment case concentration The complex degree of structure of control system, reduces its manufacture and use cost.
S1200, operator input the first maintenance authorization code on the authorization code input unit of power equipment case and are used as second Checking authorization code is verified.
S1300, equipment box processor open chamber door after authorization code checking is carried out by chamber door opener.
S1400, operator carry out power equipment case maintenance, and the locked chamber door after the completion of maintenance.
The power equipment case provided by the present invention opened by centralized control system mandate, due to only receiving control The authorization code that center processed is sent(Including the second detection authorization code or the second maintenance authorization code), just open authorization code input dress Put, improve safety in utilization;And chamber door opener can just receive equipment box processor after authorization code is verified Control signal, opens chamber door, further increases safety in utilization.And operator sends testing result and tool by application program Body maintenance process is preserved to control centre by control centre, is carried out the problems such as can be to power equipment case maintenance record detailed Record is put on record, for inquiry later, improves ease of use.
In the present invention further preferred embodiment, the power equipment case centralized Control method also includes:
S0, the equipment box processor default one of power equipment case are used to report illegal operation to the wrong defeated threshold of authorization code of control centre Value.
The setting of the wrong defeated threshold value of authorization code be in order to prevent when equipment box processor opens authorization code input unit, other people Malice is used, and further improves the security of power equipment case centralized control system.
The S500 is specifically included:
S510, equipment box processor judge that the first checking authorization code that operator inputted, second received with it are detected and awarded Whether weighted code is identical, if then performing step S520, if otherwise performing step S530.
S520, equipment box processor send a command to chamber door opener, to open chamber door by chamber door opener.
S530, equipment box processor are by voice or text prompt operator's authorization code input error, and accumulative authorization code Input error number of times, judges whether institute's cumulative number is more than or equal to the wrong defeated threshold value of default authorization code;If then performing step S540, if otherwise returning to S400.
S540, equipment box processor close authorization code input unit, and send illegal operation and alert to control centre.
S550, operator report power equipment case to hinder for some reason and can not opened to control centre, and ask by application program Control centre's remote opening power equipment case.
Application program to should step be provided with a remote control notification module, it is to prevent power equipment case that it, which is set, Because of authorization code input unit failure, and power equipment case chamber door is caused not open.
S560, control centre are according to whether receive application program institute's reporting fault and remote control notification, and judgement is electric power Equipment box failure or power equipment case are by illegal operation, if judged result is power equipment case failure, send enabling and refer to Make to equipment box processor, remote opening chamber door;If judged result be power equipment case by illegal operation, can not perform Make.
The present invention is by inputting authorization code(Code type is authorized not limit here, i.e., it can be detection authorization code, maintenance Authorization code and safeguard any one in authorization code)And remote control two ways opens power equipment case, on the one hand improves The safety in utilization of power equipment case, on the other hand improves the failure tolerant rate of power equipment case.
In the present invention further preferred embodiment, the S1400 is specifically included:
S1410, equipment box processor judge that the second checking authorization code that operator inputted, second received with it are repaired and awarded Whether weighted code is identical, if then performing step S1420, if otherwise performing step S1430.
S1420, equipment box processor send a command to chamber door opener, to open chamber door by chamber door opener.
S1430, equipment box processor are by voice or text prompt operator's authorization code input error, and accumulative authorization code Input error number of times, judges whether institute's cumulative number is more than or equal to the wrong defeated threshold value of default authorization code;If then performing step S1440, if otherwise returning to S1300.
S1440, equipment box processor close authorization code input unit, and send illegal operation and alert to control centre.
S1450, operator report power equipment case to hinder for some reason and can not opened to control centre, and ask by application program Control centre's remote opening power equipment case.
S1460, control centre are according to whether receive application program institute's reporting fault and remote control notification, and judgement is electric power Equipment box failure or power equipment case are by illegal operation, if judged result is power equipment case failure, send enabling and refer to Make to equipment box processor, remote opening chamber door;If judged result be power equipment case by illegal operation, can not perform Make.
In the present invention further preferred embodiment, case is opened by chamber door opener in the S500 and S1400 It is as follows that door specifically includes step:
Equipment box processor sends a control signal to chamber door and opens motor;
Chamber door is opened motor and rotated, and drives the movement of chamber door bolt, disengages it from casing groove.
In the present invention further preferred embodiment, the power equipment case centralized Control method also includes:
S0000, default one interval time for safeguarding power equipment case in control centre.
The unified more convenient relevant staff of maintenance is carried out to power equipment case to supervise power equipment box-like condition Control, is reduced due to being lost caused by power equipment case failure.
S2100, according to default interval time, control centre periodically sends first and safeguards authorization code to application program, Sending second simultaneously safeguards authorization code to each equipment box processor.
S2200, equipment box processor receive second safeguard authorization code after, open authorization code input unit.
S2300, operator input first on the authorization code input unit of power equipment case and safeguard authorization code as the 3rd Checking authorization code is verified.
S2400, equipment box processor open chamber door after authorization code checking is carried out by chamber door opener.Pass through One safeguard authorization code and second safeguard authorization code open chamber door operation, with pass through first detection authorization code and second detection authorize The operation that code opens chamber door is identical, on the one hand can reduce Operating Complexity, on the other hand can reduce power equipment case centralized Control The complex degree of structure of system, reduces its manufacture and use cost.
The S2400 is specifically included:
S2410, equipment box processor judge that the 3rd checking authorization code that operator inputted, the second maintenance received with it are awarded Whether weighted code is identical, if then performing step S2420, if otherwise performing step S2430.
S2420, equipment box processor send a command to chamber door opener, to open chamber door by chamber door opener.
S2430, equipment box processor are by voice or text prompt operator's authorization code input error, and accumulative authorization code Input error number of times, judges whether institute's cumulative number is more than or equal to the wrong defeated threshold value of default authorization code;If then performing step S2440, if otherwise returning to S2300.
S2440, equipment box processor close authorization code input unit, and send illegal operation and alert to control centre.
S2450, operator report power equipment case to hinder for some reason and can not opened to control centre, and ask by application program Control centre's remote opening power equipment case.
S2460, control centre are according to whether receive application program institute's reporting fault and remote control notification, and judgement is electric power Equipment box failure or power equipment case are by illegal operation, if judged result is power equipment case failure, send enabling and refer to Make to equipment box processor, remote opening chamber door;If judged result be power equipment case by illegal operation, can not perform Make.
S2500, operator carry out maintenance and the problem detection of power equipment case, and maintenance process and testing result are filled in Sent to application program, and by application program to control centre.
S2600, control centre are individually stored to received maintenance process and testing result.
As shown in Fig. 2 present invention also offers a kind of power equipment case centralized control system, it includes:
The application program of mobile terminal is installed on, for the operation according to operator, maintenance call is sent to control centre, specifically As described in above-mentioned embodiment of the method;The installation of application program and application method as common mobile phone A PP, wherein, it is described Application method is logged in and the mode such as clicking operation including account.Preferably each one account of operator, correspondence is one or more Operating side, operator can be according to oneself use habit flexible configuration, and application program 1, application program 2 are into application program N in Fig. 2 N, refer to the account number of operator, rather than operating side number, being preferably provided with same account can not be same on two operating sides Shi Denglu, therefore, operating side number can not be fixed, and the account number of operator can then match with operator's number.
More typically, an operator is generally responsible for the power equipment case in a region, rather than single one, because This, the number of power equipment case is greater than the number of operator, natural, its number also greater than application program in Fig. 2 That is the number N of operator's account.M in Fig. 2 is the number for representing power equipment case, that is to say, that M is more than N in Fig. 2.
The first detection authorization code and the first maintenance authorization code that control centre is fed back are received, it is specific as above-mentioned method is implemented Example is described;
And testing result and specific maintenance process or maintenance program that operator is filled in are received, and send it in control The heart, the maintenance program includes specific maintenance method and reservation maintenance time, specifically as described in above-mentioned embodiment of the method;
The control centre being connected with the application program, for after the maintenance call transmitted by application program is received, distinguishing Sending first detects authorization code and the second detection authorization code to application program and equipment box processor, the first detection authorization code It is identical with the second detection authorization code, specifically as described in above-mentioned embodiment of the method;
And preserved received testing result with specific maintenance process or maintenance program, and when received information bag When containing maintenance program, send the first maintenance authorization code respectively before reservation maintenance time is reached and the second maintenance authorization code extremely should With program and equipment box processor, the first maintenance authorization code is identical with the second maintenance authorization code, specific such as above-mentioned method reality Apply described in example;
The power equipment case being connected with the control centre, including:At chamber door, casing, equipment box processor and the equipment box The authorization code input unit of device connection is managed, and is connected with the equipment box processor and is arranged at the unlatching of the chamber door on chamber door Mechanism, specifically as described in above-mentioned embodiment of the method;
The equipment box processor is used to receive the second detection authorization code and the second maintenance authorization code transmitted by control centre, and Authorization code input unit is opened after the second detection authorization code or the second maintenance authorization code is received, it is specific as above-mentioned method is implemented Example is described;
After authorization code checking is carried out, chamber door opener is sent a command to, it is specific such as above-mentioned embodiment of the method to open chamber door It is described;
The authorization code input unit is used to be followed by receiving that operator inputted uses as the first checking authorization code opening First detection authorization code or the first maintenance authorization code used as the second checking authorization code, and send it at equipment box Device is managed, specifically as described in above-mentioned embodiment of the method.
In the present invention further preferred embodiment, the equipment box processor is provided with one first presetting module, uses In the default wrong defeated threshold value of authorization code for reporting illegal operation to control centre, specifically as described in above-mentioned embodiment of the method;
The concrete function of the equipment box processor includes:Judge the first checking authorization code that operator inputted, connect with it Whether the second detection authorization code received is identical, if then sending a command to chamber door opener, to be beaten by chamber door opener Unpacking door;If otherwise by voice or text prompt operator's authorization code input error, and accumulative authorization code input error number of times, Judge whether institute's cumulative number is more than or equal to the wrong defeated threshold value of default authorization code;If authorization code input unit is then closed, and Illegal operation is sent to alert to control centre, it is specific such as above-mentioned method if otherwise receiving again and verifying the first checking authorization code Described in embodiment;
And after the door open command transmitted by control centre is received, chamber door is opened by chamber door opener, specifically as described above Described in embodiment of the method;
The application program is additionally operable to:According to the operation of operator, reporting power equipment case to hinder for some reason can not open into control The heart, and control centre's remote opening power equipment case is asked, specifically as described in above-mentioned embodiment of the method;
The control centre is additionally operable to:According to whether receiving application program institute's reporting fault and remote control notification, judgement is electricity Power equipment box failure or power equipment case, if judged result is power equipment case failure, sends and opened the door by illegal operation Instruct to equipment box processor, remote opening chamber door;If judged result be power equipment case by illegal operation, can not perform Make, specifically as described in above-mentioned embodiment of the method.
In the present invention further preferred embodiment, the concrete function of the equipment box processor also includes:Judge behaviour Work person inputted second checking authorization code, with its received second maintenance authorization code it is whether identical, if then send instruct To chamber door opener, to open chamber door by chamber door opener;If otherwise being authorized by voice or text prompt operator Code input error, and accumulative authorization code input error number of times, judge whether institute's cumulative number is more than or equal to default authorization code Wrong defeated threshold value;Alerted if then closing authorization code input unit, and sending illegal operation to control centre, if otherwise receiving again And verify that first verifies authorization code, specifically as described in above-mentioned embodiment of the method.
In the present invention further preferred embodiment, the chamber door opener includes:
The chamber door being connected with the equipment box processor opens motor, for receiving the control transmitted by equipment box processor After signal, rotated, specifically as described in above-mentioned embodiment of the method;
The chamber door bolt of motor connection is opened with the chamber door, under the drive that chamber door opens motor, moving to depart from casing Groove opens chamber door, specifically as described in above-mentioned embodiment of the method;
The casing groove being adapted with the chamber door bolt is provided with the casing, specifically as described in above-mentioned embodiment of the method.
In the present invention further preferred embodiment, one second presetting module is provided with the control centre, is used for The default interval time for safeguarding power equipment case, specifically as described in above-mentioned embodiment of the method;
The control centre is additionally operable to:According to default interval time, control centre periodically sends first and safeguards authorization code extremely Application program, while sending second safeguards authorization code to each equipment box processor, specifically as described in above-mentioned embodiment of the method;
And received maintenance process and testing result are individually stored, specifically as described in above-mentioned embodiment of the method;
The equipment box processor is additionally operable to:Receive second safeguard authorization code after, open authorization code input unit;And entering After the checking of row authorization code, chamber door is opened by chamber door opener, specifically as described in above-mentioned embodiment of the method;
The application program is additionally operable to:Maintenance process and testing result that operator is filled in are received, and sends it to control Center, specifically as described in above-mentioned embodiment of the method.
It should be appreciated that the application of the present invention is not limited to above-mentioned citing, for those of ordinary skills, can To be improved or converted according to the above description, all these modifications and variations should all belong to the guarantor of appended claims of the present invention Protect scope.

Claims (10)

1. a kind of power equipment case centralized control system, it is characterised in that the power equipment case centralized control system includes:
The application program of mobile terminal is installed on, for the operation according to operator, maintenance call is sent to control centre;
Receive the first detection authorization code and the first maintenance authorization code that control centre is fed back;
And testing result and specific maintenance process or maintenance program that operator is filled in are received, and send it in control The heart, the maintenance program includes specific maintenance method and reservation maintenance time;
The control centre being connected with the application program, for after the maintenance call transmitted by application program is received, distinguishing Sending first detects authorization code and the second detection authorization code to application program and equipment box processor, the first detection authorization code It is identical with the second detection authorization code;
And preserved received testing result with specific maintenance process or maintenance program, and when received information bag When containing maintenance program, send the first maintenance authorization code respectively before reservation maintenance time is reached and the second maintenance authorization code extremely should With program and equipment box processor, it is identical that the first maintenance authorization code repairs authorization code with second;
The power equipment case being connected with the control centre, including:At chamber door, casing, equipment box processor and the equipment box The authorization code input unit of device connection is managed, and is connected with the equipment box processor and is arranged at the unlatching of the chamber door on chamber door Mechanism;
The equipment box processor is used to receive the second detection authorization code and the second maintenance authorization code transmitted by control centre, and Authorization code input unit is opened after the second detection authorization code or the second maintenance authorization code is received;
After authorization code checking is carried out, chamber door opener is sent a command to, to open chamber door;
The authorization code input unit is used to be followed by receiving that operator inputted uses as the first checking authorization code opening First detection authorization code or the first maintenance authorization code used as the second checking authorization code, and send it at equipment box Manage device.
2. power equipment case centralized control system according to claim 1, it is characterised in that the equipment box processor is set One first presetting module is equipped with, for the default wrong defeated threshold value of authorization code for reporting illegal operation to control centre;
The concrete function of the equipment box processor includes:Judge the first checking authorization code that operator inputted, connect with it Whether the second detection authorization code received is identical, if then sending a command to chamber door opener, to be beaten by chamber door opener Unpacking door;If otherwise by voice or text prompt operator's authorization code input error, and accumulative authorization code input error number of times, Judge whether institute's cumulative number is more than or equal to the wrong defeated threshold value of default authorization code;If authorization code input unit is then closed, and Send illegal operation to alert to control centre, if otherwise receiving again and verifying the first checking authorization code;
And after the door open command transmitted by control centre is received, chamber door is opened by chamber door opener;
The application program is additionally operable to:According to the operation of operator, reporting power equipment case to hinder for some reason can not open into control The heart, and ask control centre's remote opening power equipment case;
The control centre is additionally operable to:According to whether receiving application program institute's reporting fault and remote control notification, judgement is electricity Power equipment box failure or power equipment case, if judged result is power equipment case failure, sends and opened the door by illegal operation Instruct to equipment box processor, remote opening chamber door;If judged result be power equipment case by illegal operation, can not perform Make.
3. power equipment case centralized control system according to claim 2, it is characterised in that the equipment box processor Concrete function also includes:Judge the second checking authorization code that operator inputted, received with it second repair authorization code and be It is no identical, if then sending a command to chamber door opener, to open chamber door by chamber door opener;If otherwise passing through voice Or text prompt operator's authorization code input error, and accumulative authorization code input error number of times, judge whether institute's cumulative number is big In equal to the wrong defeated threshold value of default authorization code;Alerted if then closing authorization code input unit, and sending illegal operation to control Center processed, if otherwise receiving again and verifying the first checking authorization code.
4. power equipment case centralized control system according to any one of claim 1 to 3, it is characterised in that the case Door opener includes:
The chamber door being connected with the equipment box processor opens motor, for receiving the control transmitted by equipment box processor After signal, rotated;
The chamber door bolt of motor connection is opened with the chamber door, under the drive that chamber door opens motor, moving to depart from casing Groove opens chamber door;
The casing groove being adapted with the chamber door bolt is provided with the casing.
5. power equipment case centralized control system according to any one of claim 1 to 3, it is characterised in that the control One second presetting module is provided with center processed, for the default interval time for safeguarding power equipment case;
The control centre is additionally operable to:According to default interval time, control centre periodically sends first and safeguards authorization code extremely Application program, safeguards authorization code to each equipment box processor while sending second;
And received maintenance process and testing result are individually stored;
The equipment box processor is additionally operable to:Receive second safeguard authorization code after, open authorization code input unit;And entering After the checking of row authorization code, chamber door is opened by chamber door opener;
The application program is additionally operable to:Maintenance process and testing result that operator is filled in are received, and sends it to control Center.
6. a kind of power equipment case centralized Control method, it is characterised in that the power equipment case centralized Control method includes:
Step A:Application program sends maintenance call to control centre according to the operation of operator;
Step B:Control centre is received after the maintenance call transmitted by application program, and first is sent respectively and detects authorization code and second Authorization code is detected to application program and equipment box processor, the first detection authorization code is identical with the second detection authorization code;
Step C:Equipment box processor starts authorization code input unit after the second detection authorization code is received;
Step D:Operator inputs the first detection authorization code as the first checking on the authorization code input unit of power equipment case Authorization code is verified;
Step E:Equipment box processor opens chamber door after authorization code checking is carried out by chamber door opener;
Step F:Operator carries out problem detection, and judges whether power equipment case can directly be repaired, if then performing step Rapid G, if otherwise performing step H;
Step G:Operator carries out maintenance operation, and testing result and specific maintenance process are filled in application program;
Step H:Operator fills in testing result and maintenance program to application program, and the maintenance program, which includes specific maintenance, to be done Method and reservation maintenance time;
Step I:Application program receives operator and fills in testing result and specific maintenance process or maintenance program, and is sent to To control centre;
Step J:Control centre is preserved received testing result with specific maintenance process or maintenance program, and works as institute When receive information includes maintenance program, the first maintenance authorization code and the second maintenance are sent respectively before reservation maintenance time is reached Authorization code is to application program and equipment box processor;
Step K:Equipment box processor is on authorization code input unit after the second maintenance authorization code is received;
Step L:Operator inputs the first maintenance authorization code as the second checking on the authorization code input unit of power equipment case Authorization code is verified;
Step M:Equipment box processor opens chamber door after authorization code checking is carried out by chamber door opener;
Step N:Operator carries out power equipment case maintenance, and the locked chamber door after the completion of maintenance.
7. power equipment case centralized Control method according to claim 6, it is characterised in that also wrapped before the step A Include:
Step SS:The equipment box processor of power equipment case default one is used to report illegal operation wrong to the authorization code of control centre Defeated threshold value;
Step E is specifically included:
Step E1:Equipment box processor judges the first checking authorization code that operator is inputted, the second detection received with it Whether authorization code is identical, if then performing step E2, if otherwise performing step E3;
Step E2:Equipment box processor sends a command to chamber door opener, to open chamber door by chamber door opener;
Step E3:Equipment box processor is by voice or text prompt operator's authorization code input error, and accumulative authorization code is defeated Enter errors number, judge whether institute's cumulative number is more than or equal to the wrong defeated threshold value of default authorization code;If then performing step E4, If otherwise return to step D;
Step E4:Equipment box processor closes authorization code input unit, and sends illegal operation and alert to control centre;
Step E5:Operator reports power equipment case to hinder for some reason and can not opened to control centre by application program, and asks control Center remote turns on power equipment box processed;
Step E6:Control centre is according to whether receive application program institute's reporting fault and remote control notification, and judgement is that electric power is set Standby case failure or power equipment case, if judged result is power equipment case failure, send door open command by illegal operation To equipment box processor, remote opening chamber door;If judged result be power equipment case by illegal operation, do not perform action.
8. power equipment case centralized Control method according to claim 7, it is characterised in that the M is specifically included:
Step M1:Equipment box processor judges the second checking authorization code that operator is inputted, the second maintenance received with it Whether authorization code is identical, if then performing step M2, if otherwise performing step M3;
Step M2:Equipment box processor sends a command to chamber door opener, to open chamber door by chamber door opener;
Step M3:Equipment box processor is by voice or text prompt operator's authorization code input error, and accumulative authorization code is defeated Enter errors number, judge whether institute's cumulative number is more than or equal to the wrong defeated threshold value of default authorization code;If then performing step M4, If otherwise return to step L;
Step M4:Equipment box processor closes authorization code input unit, and sends illegal operation and alert to control centre;
Step M5:Operator reports power equipment case to hinder for some reason and can not opened to control centre by application program, and asks control Center remote turns on power equipment box processed;
Step M6:Control centre is according to whether receive application program institute's reporting fault and remote control notification, and judgement is that electric power is set Standby case failure or power equipment case, if judged result is power equipment case failure, send door open command by illegal operation To equipment box processor, remote opening chamber door;If judged result be power equipment case by illegal operation, do not perform action.
9. the power equipment case centralized Control method according to any one of claim 6 to 8, it is characterised in that the step Suddenly step is specifically included by chamber door opener opening chamber door in E and step M as follows:
Equipment box processor sends a control signal to chamber door and opens motor;
Chamber door is opened motor and rotated, and drives the movement of chamber door bolt, disengages it from casing groove.
10. the power equipment case centralized Control method according to any one of claim 6 to 8, it is characterised in that the electricity Power equipment box centralized Control method also includes:
Step SSS:An interval time for being used to safeguard power equipment case is preset in control centre;
Step U:According to default interval time, control centre periodically sends first and safeguards authorization code to application program, simultaneously Sending second safeguards authorization code to each equipment box processor;
Step V:Equipment box processor receive second safeguard authorization code after, open authorization code input unit;
Step W:Operator inputs first on the authorization code input unit of power equipment case and safeguards authorization code as the 3rd checking Authorization code is verified;
Step X:Equipment box processor opens chamber door after authorization code checking is carried out by chamber door opener;
Step Y:Operator carry out power equipment case maintenance and problem detection, and by maintenance process and testing result fill in should With program, and sent by application program to control centre;
Step Z:Control centre is individually stored to received maintenance process and testing result.
CN201710419636.3A 2017-06-06 2017-06-06 A kind of power equipment case centralized control system and method Expired - Fee Related CN107168122B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710419636.3A CN107168122B (en) 2017-06-06 2017-06-06 A kind of power equipment case centralized control system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710419636.3A CN107168122B (en) 2017-06-06 2017-06-06 A kind of power equipment case centralized control system and method

Publications (2)

Publication Number Publication Date
CN107168122A true CN107168122A (en) 2017-09-15
CN107168122B CN107168122B (en) 2018-06-22

Family

ID=59825741

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710419636.3A Expired - Fee Related CN107168122B (en) 2017-06-06 2017-06-06 A kind of power equipment case centralized control system and method

Country Status (1)

Country Link
CN (1) CN107168122B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109103782A (en) * 2018-09-12 2018-12-28 深圳市东扬精密工业有限公司 Human bioequivalence intelligent electrical cabinet and its system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103390297A (en) * 2012-05-08 2013-11-13 新谊整合科技股份有限公司 Multiple security control security system and security information processing method
CN103400434A (en) * 2013-08-07 2013-11-20 珠海汇金科技股份有限公司 Dynamic and static coded lock control method and control device
CN103871133A (en) * 2014-02-25 2014-06-18 苏州美高立电气有限公司 Intelligent lock system for electric power measurement cabinet

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103390297A (en) * 2012-05-08 2013-11-13 新谊整合科技股份有限公司 Multiple security control security system and security information processing method
CN103400434A (en) * 2013-08-07 2013-11-20 珠海汇金科技股份有限公司 Dynamic and static coded lock control method and control device
CN103871133A (en) * 2014-02-25 2014-06-18 苏州美高立电气有限公司 Intelligent lock system for electric power measurement cabinet

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109103782A (en) * 2018-09-12 2018-12-28 深圳市东扬精密工业有限公司 Human bioequivalence intelligent electrical cabinet and its system

Also Published As

Publication number Publication date
CN107168122B (en) 2018-06-22

Similar Documents

Publication Publication Date Title
CN108475447B (en) System and method for controlling access to a physical space
US10115257B2 (en) Network connectivity module for electro-mechanical locks
EP2192560B1 (en) Access control
CN104282058B (en) The method for unlocking of the safety intelligent lock system of band video monitoring based on bluetooth
CN106249704A (en) For the method and apparatus controlling the communication of the end points in industrial undertaking's system based on integrity
CN103376800A (en) System and method for securing controllers
CN104318650A (en) Dynamic coded lock management and control system
CN108259497B (en) System and method for fuel dispenser security
CN110011848B (en) Mobile operation and maintenance auditing system
CN101232203A (en) Apparatus, methods and system for role-based access in an intelligent electronic device
CN103383216A (en) Bullet cabinet and identity identifying method for bullet cabinet user
CN104123769B (en) The unblanking of a kind of safety intelligent lock, close lock control method
CN104282062A (en) Locking and unlocking method based on safe and intelligent lock system
CN103400434A (en) Dynamic and static coded lock control method and control device
CN107979467A (en) Verification method and device
CN112699987B (en) Method and system for monitoring work task by using lock
CN108090357A (en) A kind of computer information safe control method and device
CN107135229A (en) Intelligent home information safe verification method, device, equipment and system
CN106230869B (en) Based on power distribution automation wireless maintenance safety certifying method and system
CN111236105B (en) Parking space lock management method, device and system and parking space lock
CN107197025A (en) A kind of intelligent POS long-distance management system and method
CN107168122A (en) A kind of power equipment case centralized control system and method
CN103220139B (en) The management method of the condom password of ATM and system
CN107065630A (en) A kind of power equipment case opened by centralized control system mandate and control method
CN110390746A (en) A kind of implementation method of fingerprint anti-theft gate inhibition

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180622

Termination date: 20190606