CN107165170A - A kind of foundation ditch construction method - Google Patents

A kind of foundation ditch construction method Download PDF

Info

Publication number
CN107165170A
CN107165170A CN201710432981.0A CN201710432981A CN107165170A CN 107165170 A CN107165170 A CN 107165170A CN 201710432981 A CN201710432981 A CN 201710432981A CN 107165170 A CN107165170 A CN 107165170A
Authority
CN
China
Prior art keywords
steel
foundation ditch
construction method
construction
tongue
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710432981.0A
Other languages
Chinese (zh)
Other versions
CN107165170B (en
Inventor
吴欣之
过浩侃
王虓
张顺
李操
周蓉峰
刘颖
赵培
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Mechanized Construction Group Co Ltd
Original Assignee
Shanghai Mechanized Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Mechanized Construction Group Co Ltd filed Critical Shanghai Mechanized Construction Group Co Ltd
Priority to CN201710432981.0A priority Critical patent/CN107165170B/en
Publication of CN107165170A publication Critical patent/CN107165170A/en
Application granted granted Critical
Publication of CN107165170B publication Critical patent/CN107165170B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/20Bulkheads or similar walls made of prefabricated parts and concrete, including reinforced concrete, in situ
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/18Placing by vibrating

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The invention provides a kind of foundation ditch construction method, comprise the following steps:Some steel-pipe piles with tongue and groove are driven underground, and form continuous building enclosure;Soil cement reinforcing is carried out in the tongue and groove of adjacent steel-pipe pile;Excavation of foundation pit is to desired depth.In the foundation ditch construction method that the present invention is provided, by the way that some steel-pipe piles with tongue and groove are driven underground, and continuous building enclosure is formed, supporting is carried out to excavation of foundation pit, so as to reach that construction occupied ground is small, construction period is fast, and the low effect of construction cost;In addition, steel-pipe pile can extract recycling after foundation ditch inwall and construction of bottom plates terminate, construction cost is further saved;Further, the shaped steel of underground will be inserted as a part for inwall, the overall structural strength of foundation ditch is improved, and improve the anti-floating ability of base plate of foundation pit.

Description

A kind of foundation ditch construction method
Technical field
The invention belongs to Foundation Pit Construction technical field, relate generally to a kind of positioned at down town building dense area, friendship Lead to the construction method of busy and underground utilities more regions base pit engineering.
Background technology
Foundation ditch is the heatable adobe sleeping platform excavated in basic engineering position by substrate absolute altitude and basic plane size.Should basis before excavation Geological hydrology data, with reference to live nearby buildings situation, determines excavation plan, and perform water-proof drainage work.Excavate not deep Person can make Stability of Earth Slopes using the method for putting side slope, and the big I of its gradient is determined by relevant construction regulation.Excavate deeper and neighbouring The person that has building, can use foundation pit walls method for protecting support, gunite concrete wall protecting method, and Large Foundation Pit under construction ground even using connecting The method of continuous wall, protection outside soil layer collapse into;No influencer is nearby built, well-point method lowering of watertable can be used, used Slope open cut;It can be excavated in cold district using natural cold air freezing process.
But still there are many problems in current Foundation Pit Construction, wherein being badly in need of that to be solved built in down town Build close quarters construction problem.Because the construction periphery in down town building dense region has building to need protection, and construction Space is small, if will necessarily be adopted using conventional construction method to shaft perimeter environmental effects, particularly downtown area With method of the diaphram wall as building enclosure, greatly, long construction period influences very prominent to occupied ground on surrounding enviroment.
The content of the invention
It is an object of the invention to provide a kind of foundation ditch construction method, to solve in down town building dense region foundation ditch Construction space is small, long construction period, high foundation pit enclosure cost the problem of.
In order to solve the above technical problems, the present invention provides a kind of foundation ditch construction method, comprise the following steps:
Some steel-pipe piles with tongue and groove are driven underground, and form continuous building enclosure;
Soil cement reinforcing is carried out in the tongue and groove of adjacent steel-pipe pile;
Excavation of foundation pit is to desired depth.
Optionally, in the tongue and groove of adjacent steel-pipe pile after progress soil cement reinforcing, before excavation of foundation pit to desired depth, Also include:
Some shaped steel are driven underground along the inner side of building enclosure.
Optionally, after some shaped steel are driven underground along the inner side of building enclosure, in addition to:
Constructed at the top of building enclosure top beam, and the upper end of top beam and each shaped steel is connected.
Optionally, during excavation of foundation pit to desired depth, it is additionally included in the foundation ditch excavated and steel perimeter beam is set, And the steel perimeter beam is connected with each shaped steel.
Optionally, the border using building enclosure as excavation of foundation pit is excavated so that the upper part of every shaped steel from It is exposed in soil;
The foundation ditch construction method also includes inner lining construction wall, during inner lining construction wall, by exposed type Steel is fixed in inwall.
Optionally, after inwall construction terminates, in addition to construction bottom plate, and the bottom plate and the inwall are poured Together.
Optionally, after the completion of inner lining construction wall and construction bottom plate are equal, in addition to by some steel pipes with tongue and groove Stake is extracted from underground, and the space after extraction is filled and led up.
Optionally, soil cement reinforcing is carried out using high-pressure rotary jet grouting pile.
Optionally, the depth that soil cement reinforcing is carried out in the tongue and groove of adjacent steel-pipe pile is less than the depth that steel-pipe pile is driven underground Degree.
Optionally, using hydraulic vibration driver or exempt from resonance hammer some steel-pipe piles with tongue and groove are driven underground.
In the foundation ditch construction method that the present invention is provided, by the way that some steel-pipe piles with tongue and groove are driven underground, and shape Carry out soil cement reinforcing into continuous building enclosure, and in the tongue and groove of adjacent steel-pipe pile, supporting is carried out to excavation of foundation pit, i.e., it is real Showed the effect to pattern foundation pit supporting structure, the effect for keeping away water served again, compared to construction diaphram wall, its construct occupied ground it is small, Construction period is fast and construction cost is low;Utilized in addition, steel-pipe pile is repeatable, further save construction cost;Further, will The shaped steel of underground is inserted as a part for inwall, the overall structural strength of foundation ditch is improved.
Brief description of the drawings
Fig. 1 is the flow chart of excavation of foundation pit in the embodiment of the application one;
Fig. 2 a and Fig. 2 b are the top view and cross section view after foundation pit construction steel pipe column in the embodiment of the application one respectively;
Fig. 3 a and Fig. 3 b are the vertical view in the tongue and groove of steel pipe column after construction casting cement in the embodiment of the application one respectively Figure and cross section view;
Fig. 4 a and Fig. 4 b are the top view and cross section view after foundation pit construction shaped steel in the embodiment of the application one respectively;
Fig. 5 a and Fig. 5 b are the top view and cross section view after foundation pit construction top beam in the embodiment of the application one respectively;
Fig. 6 a and Fig. 6 b are the top view after excavation of foundation pit, and inner lining construction wall and bottom plate in the embodiment of the application one respectively And cross section view;
The section that Fig. 7 a and Fig. 7 b are the schematic cross-section of single steel-pipe pile 1 respectively and wherein three steel-pipe piles are sequentially connected Schematic diagram.
In figure:1- steel-pipe piles;11- steel-pipe pile bodies;12- matchboards;2- shaped steel;3- top beams;4- inwalls;5- bottoms Plate.
Embodiment
The purpose of the application is, solves the problems, such as down town building dense region Foundation Pit Construction.For in city The construction of Center Building close quarters base pit engineering, using the steel-pipe pile for being easy to construction as interim building enclosure, reduces construction Shared place, and the repeatable utilization of steel-pipe pile, construction period are fast;Secondly, the inwall of foundation ditch is formed along steel-pipe pile Building enclosure on the inside of construct, and enter shaped steel in inwall interpolation, solve the problems, such as base pit engineering entirety stress.
Foundation ditch construction method proposed by the present invention is described in further detail below in conjunction with the drawings and specific embodiments.Root According to following explanation and claims, advantages and features of the invention will become apparent from.It should be noted that, accompanying drawing is using very simple The form of change and use non-accurately ratio, only for the purpose of facilitating and clarifying the purpose of the embodiments of the invention.
The foundation ditch construction method that the application is provided, comprises the following steps:
First, some steel-pipe piles with tongue and groove are driven underground, and form continuous building enclosure;
Then, soil cement reinforcing is carried out in the tongue and groove of adjacent steel-pipe pile;
Finally, excavation of foundation pit is to desired depth.
Refering to Fig. 1, it is illustrated that a kind of flow chart of preferred foundation ditch construction method.Wherein, enterprise is being carried by some In the work progress that the steel-pipe pile of mouth is driven underground, hydraulic vibration driver can be used or exempt from resonance hammer and constructed.Specifically, hydraulic pressure Vibration hammer or exempt from resonance hammer steel-pipe pile is clamped, produce height by means of the high-speed rotation of the eccentric block inside hydraulic vibration driver Frequency vibration, makes the sandstone around it liquefy, soil property is soft by the steel-pipe pile of clamping, so as to reduce surrounding sandstone or soil to steel The frictional force of pile tube, at this moment steel-pipe pile buried in its deadweight and vibration hammer effect underthrust, equally can also be carried less Lift acts on lower steel-pipe pile 1 and extracted.The building enclosure formed as shown in Figure 2 a and 2 b, it is necessary to explanation, Fig. 2 a and Fig. 2 b illustrate only a kind of shape of foundation ditch, and the shape of general foundation ditch includes circular and square.The present embodiment is with Circular Pit Exemplified by illustrate, but the construction method is equally applicable to other foundation pit constructions of different shapes.Incorporated by reference to Fig. 7 a and Fig. 7 b, figure 7a shows the cross sectional shape of single steel-pipe pile 1, and Fig. 7 b are shown in which the position relationship that three steel-pipe piles 1 are sequentially connected.Figure In every steel-pipe pile 1 include steel-pipe pile body 11 and four matchboards 12 being fixed on steel-pipe pile body 11, tongue and groove is by adjacent Two matchboards 12 surround, the matchboard 12 of adjacent steel-pipe pile 1 intersects, and is arranged successively along foundation ditch position Row, and surround the shape that foundation ditch is specified.It is contemplated that by Fig. 7 b after all steel-pipe piles 1 insert underground, it is all adjacent Steel-pipe pile 1 between intersected by matchboard 12.In construction steel pile tube 1, using hydraulic vibration driver by steel-pipe pile 1 Clamp, steel-pipe pile 1 is driven underground under the exciting force effect of hydraulic vibration driver.
Matchboard 12 intersects, but still has gap between adjacent steel-pipe pile 1, is still difficult to waterproof Effect, in order to improve the waterproof ability and bulk strength of building enclosure, it is preferred that enter water-filling in the tongue and groove of adjacent steel-pipe pile 1 Soil is reinforced, and Fig. 3 a and Fig. 3 b show the top view and cross section view for carrying out foundation ditch after soil cement reinforcing, wherein, soil cement adds Admittedly can be constructed using high-pressure rotary jet grouting pile, cement is driven underground and mixed with soil, and the depth that soil cement is reinforced Degree is smaller than the depth that steel-pipe pile 1 is driven underground.One is formd in tongue and groove after soil cement reinforcing between adjacent steel-pipe pile 1 The mixture of cement and soil, that is, strengthen the stability of steel-pipe pile 1, and effectively play a part of foundation ditch waterproof.In tongue and groove The benefit for carrying out soil cement reinforcing is that cement is easy to trickle along matchboard 12, is difficult to flow in the soil body outside tongue and groove, so that Make reinforcing more effective, water retaining function is more preferable.
Preferably, in order to further enhance support force of the building enclosure to the soil body, and it is strong to strengthen the structure of later stage inwall Degree, in addition to set along on the inside of building enclosure some shaped steel.Refering to Fig. 4 a and Fig. 4 b, shaped steel 2 constructs one along steel-pipe pile 1 Circle, its insertion depth can slightly be shallower than steel-pipe pile 1.Specifically, the construction method of shaped steel 2 is similar with the construction method of steel-pipe pile 1, can Shaped steel 2 is sequentially inserted into by underground using hydraulic vibration driver, because the section of shaped steel 2 is smaller, so its construction speed is than steel-pipe pile 1 Construction speed it is fast.
Preferably, in order to further strengthen the support force of building enclosure and shaped steel 2 to the soil body, being additionally included in and going along with sb. to guard him knot Construction top beam at the top of structure, and top beam and each shaped steel 2 are connected.Top beam is reinforced concrete structure, can first use reinforcing bar Cage is arranged on the top of steel-pipe pile 1, and connects each shaped steel 2, then the casting concrete in steel reinforcement cage, finally carries out concrete and supports Shield, so as to form top beam.Fig. 5 a and Fig. 5 b, show structure and the position of construction top beam 3.
In Excavation Process, if foundation ditch is deeper, in order to further improve the support force of building enclosure, it is additionally included in Steel perimeter beam is set in the foundation ditch of excavation, and steel perimeter beam is connected with each shaped steel 2.Steel perimeter beam is to enclose steel around the one of foundation ditch inwall Structure, it can play a part of support to the soil body in the middle part of foundation ditch.According to the depth of foundation ditch, the quantity of steel perimeter beam can suitably increase Plus.
Excavation of foundation pit can be carried out using contrary sequence method, desired depth is arrived until excavating.When foundation ditch is deeper, it can use and beat precipitation Well, carries out dewatering excavation, and excavation of foundation pit can coordinate the excavator of some different models to be constructed.
Foundation pit construction also includes inner lining construction wall and bottom plate, if wherein inserted underground during inner lining construction wall Dry type steel 2 is fixed in inwall, so that a part of the shaped steel 2 as inwall, and then it is strong to enhance the structure of inwall Degree, can also improve the anti-floating ability of substrate.Specifically, the border using building enclosure as excavation of foundation pit is excavated, so that Make the upper part of every shaped steel 2 exposed from soil, and the part do not excavated is still inserted in soil;In the mistake of inner lining construction wall Cheng Zhong, exposed shaped steel 2 is fixed in inwall.It is fixed on so as to which the upper part of shaped steel 2 is poured in inwall, type The lower part of steel 2 is still inserted in soil.Refering to Fig. 6 a and Fig. 6 b, it illustrates the locations of structures of inwall 4 and the structure of bottom plate 5 Position, bottom plate 5 and inwall 4 use reinforced concrete structure, and both is linked together.
After the completion of inner lining construction wall 4 and construction bottom plate 5 are equal, the construction inside foundation ditch tends to finish.The overall knot of foundation ditch Structure is mainly bottom plate 5 and inwall 4, and the at this time supporting role of steel-pipe pile 1 diminishes, in order to improve the utilization rate of steel-pipe pile 1, also Including all some steel-pipe piles 1 with tongue and groove are extracted from underground, and the space after extraction is filled and led up, tamped;It is preferred that, can To fill the space after steel-pipe pile is extracted using cement mortar, so that the structure of foundation ditch is more firm, water proof effect is more preferable.Extract Steel-pipe pile 1 is stored after being cleared up, in case next time is used again.
In summary, in the foundation ditch construction method that the present invention is provided, on the one hand it is used as by continuous steel-pipe pile of constructing Building enclosure, gib is carried out to excavation of foundation pit, so as to reach that construction occupied ground is small, construction period is fast, and construction cost Low effect;In addition, steel-pipe pile can extract recycling after foundation ditch inwall and construction of bottom plates terminate, further save and apply Work cost;Further, the shaped steel of underground will be inserted as a part for inwall, the overall structural strength of foundation ditch is improved, and Improve the anti-floating ability of base plate of foundation pit.
Foregoing description is only the description to present pre-ferred embodiments, not to any restriction of the scope of the invention, this hair Any change, modification that the those of ordinary skill in bright field does according to the disclosure above content, belong to the protection of claims Scope.

Claims (10)

1. a kind of foundation ditch construction method, it is characterised in that comprise the following steps:
Some steel-pipe piles with tongue and groove are driven underground, and form continuous building enclosure;
Soil cement reinforcing is carried out in the tongue and groove of adjacent steel-pipe pile;
Excavation of foundation pit is to desired depth.
2. foundation ditch construction method as claimed in claim 1, it is characterised in that soil cement is carried out in the tongue and groove of adjacent steel-pipe pile After reinforcing, before excavation of foundation pit to desired depth, in addition to:
Some shaped steel are driven underground along the inner side of building enclosure.
3. foundation ditch construction method as claimed in claim 2, it is characterised in that play some shaped steel along the inner side of building enclosure After entering underground, in addition to:
Constructed at the top of building enclosure top beam, and the upper end of top beam and each shaped steel is connected.
4. foundation ditch construction method as claimed in claim 2 or claim 3, it is characterised in that in the process of excavation of foundation pit to desired depth In, it is additionally included in the foundation ditch excavated and steel perimeter beam is set, and the steel perimeter beam is connected with each shaped steel.
5. foundation ditch construction method as claimed in claim 2 or claim 3, it is characterised in that the side of excavation of foundation pit is used as using building enclosure Boundary is excavated, so that the upper part of every shaped steel is exposed from soil;
The foundation ditch construction method also includes inner lining construction wall, and during inner lining construction wall, exposed shaped steel is consolidated It is scheduled in inwall.
6. foundation ditch construction method as claimed in claim 5, it is characterised in that after inwall construction terminates, in addition to construction Bottom plate, and together with the bottom plate poured with the inwall.
7. foundation ditch construction method as claimed in claim 6, it is characterised in that completed in inner lining construction wall and construction bottom plate Afterwards, in addition to by some steel-pipe piles with tongue and groove extracted from underground, and the space after extraction is filled and led up.
8. foundation ditch construction method as claimed in claim 1, it is characterised in that soil cement reinforcing is carried out using high-pressure rotary jet grouting pile.
9. the foundation ditch construction method as described in claim 1 or 8, it is characterised in that enter water-filling in the tongue and groove of adjacent steel-pipe pile The depth that soil is reinforced is less than the depth that steel-pipe pile is driven underground.
10. foundation ditch construction method as claimed in claim 1, it is characterised in that if using hydraulic vibration driver or exempting from resonance hammer general The dry steel-pipe pile with tongue and groove is driven underground.
CN201710432981.0A 2017-06-09 2017-06-09 A kind of foundation ditch construction method Active CN107165170B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710432981.0A CN107165170B (en) 2017-06-09 2017-06-09 A kind of foundation ditch construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710432981.0A CN107165170B (en) 2017-06-09 2017-06-09 A kind of foundation ditch construction method

Publications (2)

Publication Number Publication Date
CN107165170A true CN107165170A (en) 2017-09-15
CN107165170B CN107165170B (en) 2019-11-26

Family

ID=59824806

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710432981.0A Active CN107165170B (en) 2017-06-09 2017-06-09 A kind of foundation ditch construction method

Country Status (1)

Country Link
CN (1) CN107165170B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111042147A (en) * 2019-11-20 2020-04-21 天津建岩岩土工程有限公司 Screw-in type steel pile supporting method
CN114808696A (en) * 2022-05-07 2022-07-29 广西欣港交通投资有限公司 Prefabricated and cast-in-place combined anchorage foundation enclosure structure and construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0718668A (en) * 1993-06-29 1995-01-20 Kumagai Gumi Co Ltd Temporary shutoff method with steel pipe sheet pile or steel sheet pile
CN103397634A (en) * 2013-08-16 2013-11-20 中铁上海工程局有限公司 Anchoring construction method for fastener steel tube pile cofferdam
CN104846832A (en) * 2015-06-03 2015-08-19 中船第九设计研究院工程有限公司 Construction method of circular deep foundation pit enclosure of discrete pile support
CN105442614A (en) * 2015-11-19 2016-03-30 浙江桐砚建筑规划设计有限公司 Construction method for foundation pit support

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0718668A (en) * 1993-06-29 1995-01-20 Kumagai Gumi Co Ltd Temporary shutoff method with steel pipe sheet pile or steel sheet pile
CN103397634A (en) * 2013-08-16 2013-11-20 中铁上海工程局有限公司 Anchoring construction method for fastener steel tube pile cofferdam
CN104846832A (en) * 2015-06-03 2015-08-19 中船第九设计研究院工程有限公司 Construction method of circular deep foundation pit enclosure of discrete pile support
CN105442614A (en) * 2015-11-19 2016-03-30 浙江桐砚建筑规划设计有限公司 Construction method for foundation pit support

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘宗帅等: "两种基坑支护形式在同一工程中的应用与对比分析", 《青岛理工大学学报》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111042147A (en) * 2019-11-20 2020-04-21 天津建岩岩土工程有限公司 Screw-in type steel pile supporting method
CN114808696A (en) * 2022-05-07 2022-07-29 广西欣港交通投资有限公司 Prefabricated and cast-in-place combined anchorage foundation enclosure structure and construction method

Also Published As

Publication number Publication date
CN107165170B (en) 2019-11-26

Similar Documents

Publication Publication Date Title
CN105464686B (en) Multi-layer underground space curtain posture excavating construction method and supporting construction under existing facility
CN107762535B (en) Cut-and-cover tunnel secretly does construction technology under complicated geological environment
CN103774675B (en) Combined double-row-pile combined vertical prestress anchor rod supporting system and construction method thereof
CN105464134B (en) Multi-layer underground space is along inverse combining construction method and supporting construction under existing facility
CN203320532U (en) Protection device of nearby pile foundation close to deep foundation pit
CN105672348A (en) Construction method for cropping bridge pile foundation at sandy gravel stratum of abyssal region
CN105756091B (en) A kind of Metro station excavation construction method of control adjacent building composition deformation
CN110004991B (en) Underground structure anti-floating system based on convex wing foot plate and construction method
CN102758458B (en) Underground continuous wall repairing method
CN105804007B (en) A kind of reinforced earth quaywall structure based on the soft base of beach
CN110106919A (en) A kind of lid digs the building enclosure and its construction method at station
CN109403341A (en) A kind of compound gravity retaining wall structure of soft clay area ultra-deep foundation pit and its engineering method
CN108560536A (en) The continuous piling wall construction method of Soil-cement
CN110080169A (en) A kind of construction method reclaimed fields from the sea utilized based on basement
CN104863177A (en) Composite retaining wall structure and construction method thereof
CN211200426U (en) Anti-sliding supporting and retaining structure for miniature steel pipe pile retaining wall
CN107090837A (en) Hole reinforced concrete barricade composite supporting construction and its construction method in one kind hole
CN107165170B (en) A kind of foundation ditch construction method
CN204780990U (en) Combined type retaining wall structure
CN109881683A (en) A kind of more sublevel retaining structures and its construction method for combining artificial earth fill's grouting reinforcement technique
CN204000848U (en) A kind of socketed pile for subaqueous construction
CN203729309U (en) Support system with combined double-row piles combined with vertical prestressed anchor bolts
CN105421488B (en) The construction method of sole plate support replacement in the combined fender construction system of underground
CN218346137U (en) Foundation with strong bearing capacity
CN207211176U (en) A kind of big open caisson of superelevation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant