CN107153152A - A kind of grid adaptability test device - Google Patents

A kind of grid adaptability test device Download PDF

Info

Publication number
CN107153152A
CN107153152A CN201710589782.0A CN201710589782A CN107153152A CN 107153152 A CN107153152 A CN 107153152A CN 201710589782 A CN201710589782 A CN 201710589782A CN 107153152 A CN107153152 A CN 107153152A
Authority
CN
China
Prior art keywords
phase
voltage
transformer
disturbance
test device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710589782.0A
Other languages
Chinese (zh)
Inventor
李胜男
吴水军
何廷
何廷一
陈勇
彭俊臻
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Power Research Institute of Yunnan Power System Ltd
Original Assignee
Electric Power Research Institute of Yunnan Power System Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute of Yunnan Power System Ltd filed Critical Electric Power Research Institute of Yunnan Power System Ltd
Priority to CN201710589782.0A priority Critical patent/CN107153152A/en
Publication of CN107153152A publication Critical patent/CN107153152A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/08Locating faults in cables, transmission lines, or networks
    • G01R31/081Locating faults in cables, transmission lines, or networks according to type of conductors
    • G01R31/086Locating faults in cables, transmission lines, or networks according to type of conductors in power transmission or distribution networks, i.e. with interconnected conductors

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Inverter Devices (AREA)

Abstract

A kind of grid adaptability test device of disclosure, including:Disturb supply unit, disturbance line switching and by-pass switch, it is characterised in that the disturbance supply unit includes:Phase-shifting transformer, four quadrant convertor and master controller;The master controller is connected with the phase-shifting transformer and the four quadrant convertor respectively;The phase-shifting transformer includes:First voltage transformer, the first current transformer, second voltage transformer and the second current transformer being connected respectively with the master controller;The four quadrant convertor uses three-phase Cascade Topology Structure structure, and each cascaded by 30 power conversion units constitutes;The power conversion unit includes:Rectifier terminal, main control end and inversion end.The grid adaptability test device that the application is provided, can effectively solve the problem of existing test device power quality is low.

Description

A kind of grid adaptability test device
Technical field
The application is related to power network technical field of measurement and test, more particularly to a kind of grid adaptability test device.
Background technology
Preferable supply voltage waveform should be pure sine wave, and possess nominal amplitude and frequency, but be due to confession The stability and robustness of power network itself are not enough, easy frequency of occurrences deviation, voltage deviation, voltage pulsation in flickering, temporarily Or the disturbance sex chromosome mosaicism such as transient overvoltage, wave distortion and voltage dip and short time interruption, so as to cause electrical equipment event Barrier or cisco unity malfunction.Now, electrical equipment is generally tested and improved using grid adaptability test device to power network Adaptability.
As shown in figure 1, existing grid adaptability test device is generally comprised:Perturbation device, breaker and by-pass switch. If carrying out conventionally test to electrical equipment, separately breaker, and close by-pass switch makes electrical equipment be introduced directly into power network Electric energy;If carrying out perturbation test to electrical equipment, separately by-pass switch, and close circuit breaker makes electrical equipment introduce The perturbation electric energy that perturbation device is provided.
The device of instantaneous short-circuit occurs due to there is electric capacity etc. in electrical equipment, therefore the power supply in disturbance device is usual Dash current is reduced using soft starting mode such as variable resistor startup or electronic type thyristor voltage regulation soft starting device.But Variable resistor starter floor space is big, increases civil engineering costs, and can not repeatedly come into operation in a short time;And the brilliant lock of electronics Pipe pressure regulation soft starting device adjusts output voltage using phased approach, can reduce power factor of electric network, and then reduce electric energy conversion Efficiency, power consumption of the increase electrical equipment in test process, and harmonic pollution can be brought, reduce the quality of power supply.
The content of the invention
The application provides a kind of grid adaptability test device, and to solve, existing test device power quality is low to ask Topic.
According to embodiments herein there is provided a kind of grid adaptability test device, including:Disturb supply unit, disturbance Line switching and by-pass switch, it is characterised in that the disturbance supply unit includes:Phase-shifting transformer, four quadrant convertor and Master controller;
The master controller is connected with the phase-shifting transformer and the four quadrant convertor respectively, is referred to for producing control Make and send to the phase-shifting transformer and the four quadrant convertor;
The phase-shifting transformer is used for the input terminal for connecting disturbance power network;
The phase-shifting transformer includes:First voltage transformer, the first electric current being connected respectively with the master controller Transformer, second voltage transformer and the second current transformer, for measuring normal grid and disturbing the input voltage letter of power network Number and input current signal;
The four quadrant convertor uses three-phase Cascade Topology Structure structure, and each by 30 power conversion units cascades Composition, for according to the control instruction, producing perturbation voltage and frequency, and export sine wave;
The power conversion unit includes:Rectifier terminal, main control end and inversion end;
The main control end is used to calculate reactive power to be compensated, and controls the power conversion unit output to wait to mend with described Repay the reactive power of reactive power equivalent;
The ac voltage signal that the rectifier terminal is used to export the phase-shifting transformer is rectified into d. c. voltage signal;
The inversion end uses H bridge type circuit, and the d. c. voltage signal inversion for will be exported by the rectifier terminal strikes a bargain Flow voltage signal.
Alternatively, the phase-shifting transformer also includes:N group vice-side windings;
The output voltage amplitude of the vice-side winding is equal, and the phase angle of each winding differs a phase shifting angle successively;
The phase shifting angle is 60 °/N.
Alternatively, the inversion end also includes:DC support electric capacity and sub-controller;
The DC support electric capacity is used for stable DC voltage;
The sub-controller respectively with DC support electric capacity, H-bridge inverter circuit and the master controller, it is described for receiving The instruction of master controller, and feed back to the master controller status information at the inversion end.
Alternatively, each bridge arm of the rectifier terminal is using 2 same model IGBT or IGCT in parallel, the inversion end Each bridge arm using 3 IGBT or IGCT in parallel.
Alternatively, the four quadrant convertor is modulated using phase-shifted SPWM, for reducing the humorous of output voltage signal Ripple content.
Alternatively, the first voltage inductor, first current inductor, the second voltage inductor and described Second current inductor is connected respectively at the master controller by optical fiber.
Alternatively, described device also includes:Input breaker;
The input breaker is connected with the disturbance line switching, the break-make for controlling grid disturbance system safety testing device Electricity.
From above technology, the application provides a kind of grid adaptability test device, including:Disturb supply unit, disturb Moving-wire way switch and by-pass switch, it is characterised in that the disturbance supply unit includes:Phase-shifting transformer, four quadrant convertor And master controller;The master controller is connected with the phase-shifting transformer and the four quadrant convertor respectively, for producing control System is instructed and sent to the phase-shifting transformer and the four quadrant convertor;The phase-shifting transformer is used to connect disturbance power network Input terminal;The phase-shifting transformer includes:First voltage transformer, the first electricity being connected respectively with the master controller Current transformer, second voltage transformer and the second current transformer, for measuring normal grid and disturbing the input voltage of power network Signal and input current signal;The four quadrant convertor uses three-phase Cascade Topology Structure structure, and each by 30 power Converter unit cascade composition, for according to the control instruction, producing perturbation voltage and frequency, and export sine wave;It is described Power conversion unit includes:Rectifier terminal, main control end and inversion end;The main control end is used to calculate reactive power to be compensated, and controls Make the power conversion unit output and the reactive power of the reactive power equivalent to be compensated;The rectifier terminal is used for will be described The ac voltage signal of phase-shifting transformer output is rectified into d. c. voltage signal;The inversion end uses H bridge type circuit, for inciting somebody to action The d. c. voltage signal exported by the rectifier terminal is reverse into ac voltage signal.
In use, disturbance line switching is connected with disturbance supply unit, it is in parallel with by-pass switch to be connected into power network.If needed Conventionally test carried out to electrical equipment, then disconnect the disturbance line switching, and close the by-pass switch, by electrical equipment It is introduced directly into power network electric energy;If necessary to carry out perturbation test to electrical equipment, then the by-pass switch is disconnected, and close institute Disturbance line switching is stated, electric energy is provided for electrical equipment with the disturbance supply unit.When the electrical equipment access disturbance electricity During source device, instruction is sent to phase-shifting transformer by master controller, by the first voltage transformer in the phase-shifting transformer, First current transformer, second voltage transformer and the second current transformer are gathered from the defeated of the disturbance supply unit respectively Go out voltage/current signals, the output voltage/electric current signal enters four quadrant convertor, then by the master controller to described Four quadrant convertor sends instruction, and forcing frequency and voltage waveform, and realization pair simultaneously are adjusted by the four quadrant convertor The reactive-load compensation of the output voltage/electric current signal, so as to improve electric energy conversion efficiency, it is ensured that the electricity that disturbance supply unit is provided Can quality.
Brief description of the drawings
In order to illustrate more clearly of the technical scheme of the application, letter will be made to the required accompanying drawing used in embodiment below Singly introduce, it should be apparent that, for those of ordinary skills, without having to pay creative labor, Other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is the structural representation of existing grid adaptability test device;
A kind of structural representation for grid adaptability test device that Fig. 2 provides for the embodiment of the present application;
The internal structure schematic diagram for the disturbance supply unit that Fig. 3 provides for the embodiment of the present application;
The internal structure schematic diagram for the phase-shifting transformer that Fig. 4 provides for the embodiment of the present application;
The structural representation for the power conversion unit that Fig. 5 provides for the embodiment of the present application;
The structural representation at the power conversion unit inversion end that Fig. 6 provides for the embodiment of the present application;
The four quadrant convertor three-phase cascading topological structure schematic diagram that Fig. 7 provides for the embodiment of the present application;
H-bridge inverter circuit topological structure schematic diagram in the power conversion unit that Fig. 8 provides for the embodiment of the present application;
The structural representation for another grid adaptability test device that Fig. 9 provides for the embodiment of the present application.
Illustrate:
Wherein:100- disturbance line switchings, 200- disturbance supply units, 210- master controllers, 220- phase-shifting transformers, 221- first voltage transformers, the current transformers of 222- first, 223- second voltage transformers, the current transformers of 224- second, 230- four quadrant convertors, 240- power conversion units, 241- main control ends, 242- rectifier terminals, 243- inversions end, 244- controls Device, 245- DC support electric capacity, 246-H bridge inverter circuits, 300- by-pass switches, 400- input breakers.
Embodiment
Referring to Fig. 2, a kind of structural representation of grid adaptability test device.
The present embodiment provides a kind of grid adaptability test device, including:Disturb supply unit 200, disturbance line switching 100 and by-pass switch 300, it is characterised in that the disturbance supply unit 200 includes:Phase-shifting transformer 220, four-quadrant unsteady flow Device 230 and master controller 210;
The master controller 210 is connected with the phase-shifting transformer 220 and the four quadrant convertor 230 respectively, is used for Produce control instruction and send to the phase-shifting transformer 220 and the four quadrant convertor 230;
The phase-shifting transformer 220 is used for the input terminal for connecting disturbance power network;
The phase-shifting transformer 220 includes:The first voltage transformer 221 that is connected respectively with the master controller 210, First current transformer 222, the current transformer 224 of second voltage transformer 223 and second, for measuring normal grid and disturbance The input voltage signal and input current signal of power network;
The four quadrant convertor 230 uses three-phase Cascade Topology Structure structure, and each by 30 power conversion units 240 cascade compositions, for according to the control instruction, producing perturbation voltage and frequency, and export sine wave;
The power conversion unit 240 includes:Rectifier terminal 242, main control end 241 and inversion end 243;
The main control end 241 is used to calculate reactive power to be compensated, and controls the power conversion unit 240 to export and institute State the reactive power of reactive power equivalent to be compensated;
The ac voltage signal that the rectifier terminal 242 is used to export the phase-shifting transformer 220 is rectified into DC voltage Signal;
The inversion end 243 uses H bridge type circuit, for the d. c. voltage signal exported by the rectifier terminal to be reverse into Ac voltage signal.
From above-described embodiment as can be seen that being connected in use, line switching 100 and disturbance supply unit 200 will be disturbed, with The parallel connection of by-pass switch 300 is connected into power network.If necessary to carry out conventionally test to electrical equipment, then the disturbance line switching is disconnected 100, and the by-pass switch 300 is closed, electrical equipment is introduced directly into power network electric energy;If necessary to be disturbed to electrical equipment Dynamic property test, then disconnect the by-pass switch 300, and closes the disturbance line switching 100, with the disturbance supply unit 200 provide electric energy for electrical equipment.As shown in figure 3, when the electrical equipment access disturbance supply unit 200, passing through master control Device 210 processed sends instruction to phase-shifting transformer 220, as shown in figure 4, by the first voltage mutual inductance in the phase-shifting transformer 220 Device 221, the first current transformer 222, the current transformer 224 of second voltage transformer 223 and second are gathered from described respectively The output voltage/electric current signal of supply unit 200 is disturbed, the output voltage/electric current signal enters four quadrant convertor 230, Instruction is sent by 210 pairs of the master controller four quadrant convertor 230 again, adjusted by the four quadrant convertor 230 Forcing frequency and voltage waveform, and the reactive-load compensation to the output voltage/electric current signal is realized simultaneously, turn so as to improve electric energy Change efficiency, it is ensured that the quality of power supply that disturbance supply unit is provided.
As shown in fig. 7, the four quadrant convertor 230 uses three-phase, 30 power conversion units 240 are cascaded, to described The frequency and waveform of output voltage/electric current signal are adjusted control, because cascade number is more, can effectively improve equivalent switch frequency Rate, therefore the voltage waveform exported is very close to sine wave, so being not required to additionally using traditional LCL filter, simplifies device, and save About testing procedure, it is ensured that while power quality, improves testing efficiency.
As shown in Figures 4 and 5, the rectifier terminal 242 of the power conversion unit 240 is designed using controllable rectifier bridge, Neng Goushi When detect the input current of the power conversion unit 240, and Isobarically Control is carried out, while can be sweared to the input current Amount is decomposed.
Main control end 241 in the power conversion unit 240 uses T12407 main control chips, and the rectifier terminal 242 passes through Resolution of vectors technology, watt current and reactive current are decomposed into by input current, by the main control end 241 in DC voltage closed loop Output watt current is instructed.The first voltage inductor 221 and first current inductor 222 are arranged at the phase shift and become The grid side of depressor 220, the second voltage inductor 223 and second current inductor 224 are arranged at the phase shift and become Depressor 220 is close to AC reactor output end side, and the main control end 241 is according to the second voltage transformer 223 and described The voltage/current signals of the disturbance supply unit 200 output of second current transformer 224 measurement, calculate nothing to be compensated Work(power, and send instruction to the power conversion unit 240, the output of control power conversion unit 240 with it is described to be compensated Reactive power equivalent reactive power, so as to realize reactive-load compensation, it is ensured that the quality of power supply.
To on the interconnection of the rectifier terminal 242 of the first voltage transformer 221 to the power conversion unit 240 Voltage ua, ubAnd ucSampled, and controlled with phaselocked loop (Phase Locked Loop, PLL).The electric network voltage phase of extraction For θ, the electric current i to flowing through interconnectiona, ibAnd ic, calculate watt current idWith reactive current iq.To the rectifier terminal 242 With the voltage u between the inversion end 243dcBe acquired, and with given voltage stabilizing amplitude udc Make the difference, difference is controlled by PI Voltage stabilizing controlled quentity controlled variable is obtained after device, and the voltage/current signals collected according to the primary side side of phase-shifting transformer 220 are calculated and obtained Reactive-load compensation amount Δ iqcomp, Δ iqcomp is added to reactive current iqFeedback control loop in, carry out reactive-load compensation control System.
Alternatively, the phase-shifting transformer 220 also includes:N group vice-side windings;
The output voltage amplitude of the vice-side winding is equal, and the phase angle of each winding differs a phase shifting angle successively;
The phase shifting angle is 60 °/N.
The phase-shifting transformer 220 is the single-phase electric action produced by one kind of rectifier transformer, fairing, can be drawn The alternating magnetic field wave distortion of phase-shifting transformer 220 is played, but passes through the on high-tension side winding to the phase-shifting transformer 220 Phase shift is carried out, makes phase shift number increase, selects N to be 30 in the distortion degree of alternating magnetic field waveform, the present embodiment so as to reduce, so Phase shifting angle is 2 °.
Alternatively, the inversion end 243 also includes:DC support electric capacity 245 and sub-controller 244;
The DC support electric capacity 245 is used for stable DC voltage;
The sub-controller 244 respectively with DC support electric capacity 245, H-bridge inverter circuit 246 and the master controller 210, Instruction for receiving the master controller 210, and feed back to the master controller 210 status information at the inversion end 243.
The DC support electric capacity 245 has that high voltage withstanding, resistance to high current, Low ESR, low inductance, capacity loss be small, leakage Electricity less, temperature performance is good, charge/discharge rates are fast, service life length, high safety anti-explosive stability the advantages of, can in inverter circuit To carry out smothing filtering to the output voltage of the rectifier terminal 242;Amplitude pulsating current is absorbed, so as to prevent amplitude from pulsing Electric current produces amplitude pulsating volage in impedance, makes the voltage pulsation on dc bus keep in allowed limits;Simultaneously Effectively prevent voltage overshoot and instantaneous voltage to IGBT (Insulated Gate Bipolar Transistor, insulated gate bipolar Transistor npn npn) circuit influence.
As shown in fig. 6, the sub-controller 244 is instructed described straight by receiving the instruction that the master controller 210 is sent Stream Support Capacitor 245 works, so as to provide galvanic current pressure;And the H-bridge inverter circuit 246 is controlled by DC voltage Alternating voltage is converted into, referring to Fig. 8.
Alternatively, each bridge arm of the rectifier terminal 242 is using 2 same model IGBT or IGCT in parallel (Integrated Gate Commutated Thyristors, integrated braised chicken circulation IGCT), each bridge at the inversion end Arm is using 3 IGBT or IGCT in parallel.
The capacity of system has reached MW class, in order to increase current output capability, is three-phase for the rectifier terminal Rectification, has three bridge arms, and each phase bridge arm is in parallel using the IGBT or IGCT of 2 same models, can make the electric current flowed through Put and be twice.But number of parallel can not be excessive, because with the increase of number in parallel, control is more difficult to the balance degree of electric current System, and fault rate can be increased.
The inversion end is single-phase inversion, only two bridge arms, in order to ensure current balance handling capacity, using 3 Individual IGBT or IGCT are in parallel.
Alternatively, the four quadrant convertor 230 is using phase-shifted SPWM (Sinusoidal Pulse Wicth Modulation, pulse width modulation) modulation, the harmonic content for reducing output voltage signal.
The general principle of the phase-shifted SPWM modulation is the single-phase converter constituted to N number of unit module, each list Element module all uses the SPWM modulator approaches of low switching frequency.Each unit uses same modulating wave, with N number of triangle wavelength-division It is not modulated, each triangular carrier has identical frequency and amplitude, but phase differs fixed angle successively, so that each The SPWM pulses of unit output are staggered certain angle, and equivalent switching frequency is greatly increased, the four quadrant convertor after superposition The waveform of final output is the staircase waveform of level more than one.Select suitable phase shifting angle that the harmonic content of output voltage can be made big It is big to reduce.In the present embodiment, the 3-phase power converter being modulated using phase-shifted SPWM technology, three phase sine value is differed successively 120 °, the change per phase each unit carrier wave using unipolarity as it was previously stated, when modulating, can be modulated, 30 carrier wave phase shifts successively The angle of π/30 so that 30 SPWM pulses are staggered certain angle, and equivalent carrier frequency is that (f is single carrier wave frequency to 2 × 30f Rate), output phase voltage be by be 2 × 30+1 level staircase waveform, line voltage is the staircase waveform of 4 × 30+1 level.
Alternatively, the first voltage inductor 221, first current inductor 222, the second voltage inductor 223 and second current inductor 224 connected respectively at the master controller 210 by optical fiber.
Be distributed in due to the power conversion unit of Cascade Topology Structure in different power cabinets, with the master controller distance compared with Far, it is necessary to realize unified indiscriminate control.Optical-fibre communications speed is fast, and apart from remote, is difficult to be disturbed in transmitting procedure, can Phototube Coupling is realized, above-mentioned requirements are disclosure satisfy that.
Alternatively, described device also includes:Input breaker 400;
The input breaker 400 is connected with the disturbance line switching 100, for controlling grid disturbance system safety testing device Power on/off.
As shown in figure 9, the disjunction by controlling the input breaker 400, controls the disturbance power supply
The startup and pause of device 200, reduce the error of manual operation, lifting operation efficiency.
From above technical scheme, this application provides a kind of grid adaptability test device, including:Disturb power supply dress Put 200, disturbance line switching 100 and by-pass switch 300, it is characterised in that the disturbance supply unit 200 includes:Phase shift becomes Depressor 220, four quadrant convertor 230 and master controller 210;The master controller 210 respectively with the phase-shifting transformer 220 and The four quadrant convertor 230 is connected, for producing control instruction and sending to the phase-shifting transformer 220 and the four-quadrant Current transformer 230;The phase-shifting transformer 220 is used for the input terminal for connecting disturbance power network;The phase-shifting transformer 220 includes: The first voltage transformer 221 that is connected respectively with the master controller 210, the first current transformer 222, second voltage mutual inductance The current transformer 224 of device 223 and second, for measuring normal grid and disturbing the input voltage signal and input current letter of power network Number;The four quadrant convertor 230 uses three-phase Cascade Topology Structure structure, and each by 30 240 grades of power conversion units Joint group is into for according to the control instruction, producing perturbation voltage and frequency, and export sine wave;The power conversion list Member 240 includes:Rectifier terminal 242, main control end 241 and inversion end 243;The main control end 241 is used to calculate reactive power to be compensated, And control the output of power conversion unit 240 and the reactive power of the reactive power equivalent to be compensated;The rectifier terminal 242 Ac voltage signal for the phase-shifting transformer 220 to be exported is rectified into d. c. voltage signal;The inversion end 243 is used H bridge type circuit, for the d. c. voltage signal exported by the rectifier terminal to be reverse into ac voltage signal.
In use, disturbance line switching 100 and disturbance supply unit 200 are connected, it is in parallel with by-pass switch 300 to be connected into electricity Net.If necessary to carry out conventionally test to electrical equipment, then the disturbance line switching 100 is disconnected, and closes the bypass and is opened 300 are closed, electrical equipment is introduced directly into power network electric energy;If necessary to carry out perturbation test to electrical equipment, then disconnect described By-pass switch 300, and the disturbance line switching 100 is closed, provide electricity with the disturbance supply unit 200 for electrical equipment Energy.When the electrical equipment access disturbance supply unit 200, finger is sent to phase-shifting transformer 220 by master controller 210 Order, by the first voltage transformer 221 in the phase-shifting transformer 220, the first current transformer 222, second voltage transformer 223 and second current transformer 224 gather respectively from it is described disturbance supply unit 200 output voltage/electric current signal, it is described Output voltage/electric current signal enters four quadrant convertor, then is sent out by 210 pairs of the master controller four quadrant convertor 230 Go out instruction, forcing frequency and voltage waveform are adjusted by the four quadrant convertor 230, and realize simultaneously to the output electricity The reactive-load compensation of pressure/current signal, so as to improve electric energy conversion efficiency, it is ensured that the quality of power supply that disturbance supply unit is provided.
It should be appreciated that the precision architecture that the application is not limited to be described above and is shown in the drawings, and And various modifications and changes can be being carried out without departing from the scope.Scope of the present application is only limited by appended claim.

Claims (7)

1. a kind of grid adaptability test device, including:Disturb supply unit, disturbance line switching and by-pass switch, its feature It is, the disturbance supply unit includes:Phase-shifting transformer, four quadrant convertor and master controller;
The master controller is connected with the phase-shifting transformer and the four quadrant convertor respectively, for producing control instruction simultaneously Send to the phase-shifting transformer and the four quadrant convertor;
The phase-shifting transformer is used for the input terminal for connecting disturbance power network;
The phase-shifting transformer includes:First voltage transformer, the first Current Mutual Inductance being connected respectively with the master controller Device, second voltage transformer and the second current transformer, for measure normal grid and disturb power network input voltage signal and Input current signal;
The four quadrant convertor uses three-phase Cascade Topology Structure structure, and each by 30 power conversion unit cascaded series Into for according to the control instruction, producing perturbation voltage and frequency, and export sine wave;
The power conversion unit includes:Rectifier terminal, main control end and inversion end;
The main control end is used to calculate reactive power to be compensated, and controls the power conversion unit output and the nothing to be compensated The reactive power of work(power equivalent;
The ac voltage signal that the rectifier terminal is used to export the phase-shifting transformer is rectified into d. c. voltage signal;
The inversion end uses H bridge type circuit, for the d. c. voltage signal exported by the rectifier terminal to be reverse into alternating current Press signal.
2. a kind of grid adaptability test device according to claim 1, it is characterised in that the phase-shifting transformer is also wrapped Include:N group vice-side windings;
The output voltage amplitude of the vice-side winding is equal, and the phase angle of each winding differs a phase shifting angle successively;
The phase shifting angle is 60 °/N.
3. a kind of grid adaptability test device according to claim 1, it is characterised in that the inversion end also includes: DC support electric capacity and sub-controller;
The DC support electric capacity is used for stable DC voltage;
The sub-controller respectively with DC support electric capacity, H-bridge inverter circuit and the master controller, for receiving the master control The instruction of device processed, and feed back to the master controller status information at the inversion end.
4. a kind of grid adaptability test device according to claim 1, it is characterised in that each bridge of the rectifier terminal Arm using 2 same model IGBT or IGCT in parallel, each bridge arm at the inversion end using 3 IGBT in parallel or IGCT。
5. a kind of grid adaptability test device according to claim 1, it is characterised in that the four quadrant convertor is adopted Modulated with phase-shifted SPWM, the harmonic content for reducing output voltage signal.
6. a kind of grid adaptability test device according to claim 1, it is characterised in that the first voltage sensing Device, first current inductor, the second voltage inductor and second current inductor are respectively at the main control Device is connected by optical fiber.
7. a kind of grid adaptability test device according to claim 1, it is characterised in that described device also includes:It is defeated Enter breaker;
The input breaker is connected with the disturbance line switching, the power on/off for controlling grid disturbance system safety testing device.
CN201710589782.0A 2017-07-19 2017-07-19 A kind of grid adaptability test device Pending CN107153152A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710589782.0A CN107153152A (en) 2017-07-19 2017-07-19 A kind of grid adaptability test device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710589782.0A CN107153152A (en) 2017-07-19 2017-07-19 A kind of grid adaptability test device

Publications (1)

Publication Number Publication Date
CN107153152A true CN107153152A (en) 2017-09-12

Family

ID=59797349

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710589782.0A Pending CN107153152A (en) 2017-07-19 2017-07-19 A kind of grid adaptability test device

Country Status (1)

Country Link
CN (1) CN107153152A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107894528A (en) * 2017-10-25 2018-04-10 江苏镇安欣润电力科技有限公司 High speed synchronous sample system
CN109103948A (en) * 2018-08-02 2018-12-28 北京千驷驭电气有限公司 Urban track traffic traction substation control method and system
CN110196360A (en) * 2019-04-23 2019-09-03 广州智光电气技术有限公司 At 35kV and 10kV can capacity operation grid adaptability detection device
CN112327075A (en) * 2020-10-20 2021-02-05 云南电网有限责任公司电力科学研究院 Debugging method for power module of frequency modulation test platform of new energy unit
CN115622057A (en) * 2022-12-20 2023-01-17 成都交大光芒科技股份有限公司 Power supply scheduling system power supply topology analysis method and device and electronic equipment

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102064749A (en) * 2011-01-11 2011-05-18 广州智光电气股份有限公司 Motor soft startup device capable of giving consideration to reactive power compensation and control method thereof
CN102158101A (en) * 2011-03-15 2011-08-17 荣信电力电子股份有限公司 H-bridge cascaded multilevel voltage sag generator based on insulated gate bipolar transistor (IGBT)
CN103257314A (en) * 2013-02-27 2013-08-21 中国电力科学研究院 Power grid adaptability testing system of mobile wind turbine generator
CN103454521A (en) * 2013-08-02 2013-12-18 国家电网公司 Wind power plant power grid operation simulator
CN104034982A (en) * 2014-06-19 2014-09-10 国家电网公司 Electric energy quality harmonic disturbance source platform
CN104184410A (en) * 2014-06-30 2014-12-03 国网青海省电力公司电力科学研究院 Mobile detection device for high-altitude photovoltaic power station power grid disturbance simulation test system
CN104953582A (en) * 2015-06-25 2015-09-30 深圳市禾望电气股份有限公司 Three-phase power grid disturbance generating device and control method thereof
CN105717399A (en) * 2016-04-26 2016-06-29 华北电力科学研究院有限责任公司 Test device for power grid adaptability
CN205647274U (en) * 2016-05-24 2016-10-12 韩伟 Single -phase frequency conversion adjustable power device
CN206945888U (en) * 2017-07-19 2018-01-30 云南电网有限责任公司电力科学研究院 A kind of grid adaptability test device

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102064749A (en) * 2011-01-11 2011-05-18 广州智光电气股份有限公司 Motor soft startup device capable of giving consideration to reactive power compensation and control method thereof
CN102158101A (en) * 2011-03-15 2011-08-17 荣信电力电子股份有限公司 H-bridge cascaded multilevel voltage sag generator based on insulated gate bipolar transistor (IGBT)
CN103257314A (en) * 2013-02-27 2013-08-21 中国电力科学研究院 Power grid adaptability testing system of mobile wind turbine generator
CN103454521A (en) * 2013-08-02 2013-12-18 国家电网公司 Wind power plant power grid operation simulator
CN104034982A (en) * 2014-06-19 2014-09-10 国家电网公司 Electric energy quality harmonic disturbance source platform
CN104184410A (en) * 2014-06-30 2014-12-03 国网青海省电力公司电力科学研究院 Mobile detection device for high-altitude photovoltaic power station power grid disturbance simulation test system
CN104953582A (en) * 2015-06-25 2015-09-30 深圳市禾望电气股份有限公司 Three-phase power grid disturbance generating device and control method thereof
CN105717399A (en) * 2016-04-26 2016-06-29 华北电力科学研究院有限责任公司 Test device for power grid adaptability
CN205647274U (en) * 2016-05-24 2016-10-12 韩伟 Single -phase frequency conversion adjustable power device
CN206945888U (en) * 2017-07-19 2018-01-30 云南电网有限责任公司电力科学研究院 A kind of grid adaptability test device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李春来: "高海拔光伏电站电网扰动模拟测试***移动检测平台的设计应用", 《高压电器》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107894528A (en) * 2017-10-25 2018-04-10 江苏镇安欣润电力科技有限公司 High speed synchronous sample system
CN109103948A (en) * 2018-08-02 2018-12-28 北京千驷驭电气有限公司 Urban track traffic traction substation control method and system
CN109103948B (en) * 2018-08-02 2023-11-21 北京千驷驭电气有限公司 Urban rail transit traction substation control method and system
CN110196360A (en) * 2019-04-23 2019-09-03 广州智光电气技术有限公司 At 35kV and 10kV can capacity operation grid adaptability detection device
CN112327075A (en) * 2020-10-20 2021-02-05 云南电网有限责任公司电力科学研究院 Debugging method for power module of frequency modulation test platform of new energy unit
CN112327075B (en) * 2020-10-20 2022-11-29 云南电网有限责任公司电力科学研究院 Debugging method for power module of frequency modulation test platform of new energy unit
CN115622057A (en) * 2022-12-20 2023-01-17 成都交大光芒科技股份有限公司 Power supply scheduling system power supply topology analysis method and device and electronic equipment
CN115622057B (en) * 2022-12-20 2023-03-07 成都交大光芒科技股份有限公司 Power supply scheduling system power supply topology analysis method and device and electronic equipment

Similar Documents

Publication Publication Date Title
CN108832825B (en) High power density's multiport power electronic transformer topology
CN107153152A (en) A kind of grid adaptability test device
CN203405559U (en) Electronic load of electric energy feedback type
CN106972505A (en) The hybrid power electronic transformer and its control method of unified power quality controlling
CN101534063B (en) Cascade connection polyphase converter
CN1949645B (en) Energy feedback power unit
CN107732954B (en) Online input control method and device for voltage source converter unit
CN102142779A (en) Novel transformer test power supply
CN105470958A (en) Alternating current-direct current-alternating current (AC-DC-AC) tractive power supply system with modularized multi-level structure
CN102769291B (en) Active power filter based on multiphase converter structure
CN102064533A (en) Direct-current overvoltage control system of uncontrollable rectification unit of cascade high-voltage transducer
CN105024575A (en) Subway energy feedback apparatus
CN108011379A (en) Advanced Static Var Compensator based on single stage shift module level parallel-type inverter
CN204720981U (en) A kind of three phase network disturbing generating device
CN107800299A (en) Modularized dc transformation system and its control method based on MMC high frequency conversions
CN102437575B (en) Medium-and-high-voltage unified power quality controller (UPQC) without transformer
CN104124694A (en) Convertible static compensator applicable to a plurality of lines
CN206945888U (en) A kind of grid adaptability test device
CN109088410B (en) Phase 360-degree orthogonal direct power flow controller and working method thereof
CN214409146U (en) Power module test platform
CN101507080B (en) DC filter and voltage source converter station comprising such filter
CN104767218B (en) Direct-current power flow controller
CN112014727B (en) Testing device for harmonic current switching capacity of tap switch
Lopes et al. A PWM quadrature-booster phase shifter for AC power transmission
CN107171270B (en) Intensive deicing device constant current, constant pressure modularization dynamic passive compensation component

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170912

RJ01 Rejection of invention patent application after publication