CN107152021A - A kind of U-tube stake armor installation tool - Google Patents

A kind of U-tube stake armor installation tool Download PDF

Info

Publication number
CN107152021A
CN107152021A CN201710418413.5A CN201710418413A CN107152021A CN 107152021 A CN107152021 A CN 107152021A CN 201710418413 A CN201710418413 A CN 201710418413A CN 107152021 A CN107152021 A CN 107152021A
Authority
CN
China
Prior art keywords
armor
hole
thick stick
pressure block
guide rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710418413.5A
Other languages
Chinese (zh)
Other versions
CN107152021B (en
Inventor
张田利
李春润
张建护
刘明珠
胡艳华
牛虎理
杨华庆
刘剑
孙勃
何亚章
赵兵杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
CNPC Offshore Engineering Co Ltd
CNPC Engineering Technology Research Institute Co Ltd
Original Assignee
China National Petroleum Corp
CNPC Offshore Engineering Co Ltd
CNPC Engineering Technology Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Petroleum Corp, CNPC Offshore Engineering Co Ltd, CNPC Engineering Technology Research Institute Co Ltd filed Critical China National Petroleum Corp
Priority to CN201710418413.5A priority Critical patent/CN107152021B/en
Publication of CN107152021A publication Critical patent/CN107152021A/en
Application granted granted Critical
Publication of CN107152021B publication Critical patent/CN107152021B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/60Piles with protecting cases

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)
  • Revetment (AREA)

Abstract

The present invention discloses a kind of U-tube stake armor installation tool, including U-shaped frame, top thick stick, top thick stick connecting seat, dynamic pressure block, guide rod, stop screw;The two ends of U-shaped frame are fixed with level pressure block and screw block;Top thick stick is screwed in screw block, and dynamic pressure block is connected by pushing up thick stick connecting seat with top thick stick;Guide rod sequentially passes through the first round tube hole set on dynamic pressure block and the second round tube hole set on level pressure block, stop screw passes through dynamic pressure block and its end is stuck in the long shallow slot in the axial direction of the periphery of guide rod, make guide rod spacing on dynamic pressure block, and then U-tube stake armor installation tool is integrated, torn open with avoiding scene from spelling, its entirety is picked up during construction and leans against armor flange both sides, guide rod is inserted or pulled out armor flange bolt mounting hole, just can integral installation and dismounting, installation effectiveness is high, using easier, and be not in because instrument peace tears caused guide rod open, the overboard damaed cordition of the tiny parts such as movable holddown and nut, be conducive to over-water construction.

Description

A kind of U-tube stake armor installation tool
Technical field
The application is related to pile tube anticorrosive construction field, more particularly to a kind of U-tube stake armor installation tool.
Background technology
After being surface-treated to pile tube, brushing anti-corrosion primer, then buffer zone is wound, finally installed in pile tube outermost layer Armor is protected, is a kind of effective pile tube anticorrosive construction technique waterborne.
Wherein, pile tube outermost layer protects the installation of armor, is the rectangular-shaped flexible high score that two ends are had into threaded plastic flange Sub- material armor, is trapped among on pile tube periphery, and two ends plastics flange is connected with bolt and nut, makes the tight cladding of armor and solid It is scheduled on pile tube.In order to ensure antiseptic effect, armor length is less than pile tube girth, need to be by armor installation tool top pull two ends Threaded plastic flange, to obtain enough pulling force, align the flange of armor two and be adjacent to, so that armor is elongated, tie tight in pipe In stake, make armor and pile tube are sturdy to be adjacent to and fixed.
Existing armor installation tool using the base block by hydraulic hand-pump, equipped with hydraulic cylinder, 2 movable holddowns, 2 The powered hydraulic tool of the guide rod of TBE (threaded both ends) and multiple nuts composition.
Its application method is:By 2 guide rods, through the base block equipped with hydraulic cylinder, a movable holddown is then passed through, then wear 2 groups of armor flange bolt mounting holes are crossed, are then passed through after another movable holddown, 6 nuts are screwed on the screw thread at 2 guide rod two ends, By tool assemble together, and installation tool is positioned on armor, move hydraulic hand-pump, eject hydraulic cylinder, top pressure one Movable holddown, makes 2 movable holddown spacing reductions, so that two separated armor flanges of top pressure, align it and be adjacent to, in activity pressure Installed in armor flange bolt mounting hole at block two ends after flange bolt component, pull down installation tool.
The armor installation tool is disadvantageous in that, the part such as guide rod, movable holddown and nut be with equipped with hydraulic cylinder Base block separation, need to one by one install, and relatively fine, when constructing on the water, have not easy to install, assembling speed is slower, and easily Drop in water, the problem of causing damage and influence efficiency of construction.
The content of the invention
Invention provides a kind of U-tube stake armor installation tool, it can easily be mounted and dismounted, to improve pile tube Armor installation efficiency and quality;Without field erected separation parts, can directly it be used without Assembling, in order to water Upper construction;Cost is lower, can improve construction economy.To solve existing armor installation tool part separation, assembling speed It is relatively slow, and in the water that easily drops, the problem of causing damage and influence efficiency of construction.
In order to solve the above technical problems, the invention provides a kind of U-tube stake armor installation tool, including:
U-shaped frame, top thick stick, top thick stick connecting seat, dynamic pressure block, guide rod, stop screw;
Wherein, the two ends of the U-shaped frame are fixedly installed level pressure block and screw block respectively;
The top thick stick is screwed in the screw block, the top thick stick is connected with the U-shaped frame;
The dynamic pressure block is connected by the top thick stick connecting seat with the top thick stick;The dynamic pressure block is provided with guide rod and installs use The first round tube hole;The level pressure block is provided with the second round tube hole;
The guide rod is sequentially passed through in first round tube hole, second round tube hole;
The stop screw is fixed on the dynamic pressure block, and the end of the stop screw is stuck in the cylinder of the guide rod In the long shallow slot in axial direction on surface, make the guide rod spacing on the dynamic pressure block, and then cause the U-tube stake armor erector Tool is integrated.
It is preferred that, one end riser lower surface of the U-shaped frame, which is provided with the middle part of the screw block, the screw block, One tapped through hole, first tapped through hole is located on longitudinal middle vertical plane of the U-shaped frame;The top thick stick screws in first spiral shell In line through hole, and then the top thick stick is screwed in the screw block;
The two ends of the level pressure block have the centre-to-centre spacing between 2 the second round tube holes, 2 second round tube holes to be equal to armor Flange connecting hole centre-to-centre spacing, the longitudinal middle vertical plane of 2 the second round tube holes based on the U-shaped frame is symmetrical.
It is preferred that, the top thick stick includes spiro rod section, axle platform and small rotating shaft section;
Wherein, the end machining of the spiro rod section is into six square toes;The middle part of the small rotating shaft section is machined with annular spacing groove.
It is preferred that, the top thick stick connecting seat includes bottom plate and is arranged on the round platform at the bottom plate center;
The end center of the round platform, which has, second communicated with the blind axis hole on blind axis hole, the face of cylinder of the round platform Tapped through hole;
It is provided with the middle part of the bottom plate two ends based on the symmetrical insertion circular hole of round platform axis.
It is preferred that, the small rotating shaft section is screwed in the blind axis hole, and the stop screw is screwed into and is fixed on described second In tapped through hole, and the top of the stop screw is positioned in the annular spacing groove, and then the top thick stick connecting seat is spacing On the top thick stick, and can be around the top thick stick rotation.
It is preferred that, soket head cap screw is screwed into the tapped blind hole in the middle part of the dynamic pressure block by the insertion circular hole, will The dynamic pressure block is fixedly connected with the push rod connecting seat.
It is preferred that, the middle part symmetric design of the dynamic pressure block has tapped blind hole, and two ends symmetric design has first circle logical Hole;
Wherein, the centre-to-centre spacing between the centre-to-centre spacing between 2 the first round tube holes and 2 second round tube holes is identical;Institute Stating guide rod can be sequentially inserted into first round tube hole, second round tube hole;
Also symmetric design has 2 the 3rd tapped through holes in the middle part of the dynamic pressure block one side two ends, and 2 the 3rd screw threads lead to The axis in hole intersects vertically with 2 first round tube hole axis respectively.
It is preferred that, the stop screw is tightened in the 3rd tapped through hole, and is caught in the described of the guide rod Axially in long shallow slot.
It is preferred that, there is gear platform one end of the guide rod, and there are chamfering, the middle part circle of the guide rod in another termination of the guide rod There is the long shallow slot in the axial direction on cylinder.
It is preferred that, existing armor installation tool is when unclamping hydraulic cylinder and dismantling the instrument, because two flanges connect spiral shell Plastics flange deformed in tension (into bulge shape) between bolt assembly, and there is thread segment guide rod end, when extracting guide rod, the guide rod end of thread It can be stuck in armor flange bolt mounting hole, it is difficult to extract, so that armor installation tool is difficult to pull down, influence efficiency of construction, And hardness dismounting can also destroy armor flange bolt mounting hole.And the smooth outer surface in the middle part of the guide rod of the application.The end of guide rod Portion can be difficult to the phenomenon extracted, solved using non-threaded design from armor flange screw is stuck in without guide rod screw thread Existing instrument is difficult to dismantle, the problems such as destroying armor flange bolt mounting hole, and can be improved due to the raising of assembling and dissembling speed Efficiency of construction and quality.
Existing armor installation tool is generally 3 sets in construction or 6 sets of instruments constitute 1 group, multigroup to use simultaneously, use The armor installation tool cost of hydraulic power is higher., can with cost-effective and the application does not need hydraulic power.
By one or more technical scheme of the present invention, the invention has the advantages that or advantage:
The invention discloses a kind of U-tube stake armor installation tool, including U-shaped frame, top thick stick, top thick stick connecting seat, dynamic pressure block, Guide rod, stop screw;Wherein, the two ends of the U-shaped frame are fixedly installed level pressure block and screw block respectively;Top thick stick is screwed in described In screw block, the dynamic pressure block is connected by the top thick stick connecting seat with the top thick stick;Guide rod is sequentially passed through and set on dynamic pressure block Guide rod installation the first round tube hole and level pressure block on the second round tube hole for setting, and stop screw is fixed on the dynamic pressure block On, and the end of the stop screw is stuck in the long shallow slot in the axial direction of the periphery of the guide rod, make the guide rod spacing On the dynamic pressure block, and then the U-tube stake armor installation tool is integrated, this kind of structure design subtracts it The scene spelling of instrument in itself when existing instrument is used every time is lacked to tear open, in construction, its entirety has been picked up and leans against armor flange two Side, armor flange bolt mounting hole is inserted or pulled out by guide rod, just can integral installation and dismounting, installation effectiveness is high, and use is simpler And be not in because instrument peace is torn the overboard damaed cordition of the tiny parts such as caused guide rod, movable holddown and nut open and gone out just, It is existing, be conducive to over-water construction.
Brief description of the drawings
Fig. 1 is axle side of the present invention schematic diagram;
Fig. 2 is the axle side schematic diagram of U-shaped frame 1 of the present invention;
Fig. 3 is the axle side schematic diagram of top thick stick 2 of the present invention;
Fig. 4 is the axle side schematic diagram of top thick stick connecting seat 3 of the present invention;
Fig. 5 is the axle side schematic diagram of dynamic pressure block 4 of the present invention;
Fig. 6 is the axle side schematic diagram of guide rod 5 of the present invention;
Fig. 7 A- Fig. 7 B are installation axle side and its close-up schematic views of the present invention.
Description of reference numerals:
1.U shape framves, 2. top thick sticks, 3. top thick stick connecting seats, 4. dynamic pressure blocks, 5. guide rods, 6. stop screws, 7. soket head cap screws;
11. screw block, 12. level pressure blocks, 13. first tapped through holes, 14. second round tube holes;
21. spiro rod section, 22. axle platforms, 23. small rotating shaft sections, 24. stopper slots, 25. 6 square toes;
31. bottom plate, 32. round platforms, 33. blind axis holes, 34. second tapped through holes, 35. insertion circular holes;
41. the first round tube hole, 42. tapped blind holes, 43. the 3rd tapped through holes;
51. platform is kept off, 52. chamferings, the 53. long shallow slots in axial direction;
100.U shape pile tube armor installation tools, 101. pile tubes, 102. armors, 103. armor flange bolt components, 104. armor flange.
Embodiment
In order that the application the technical staff in the technical field is more clearly understood that the application, below in conjunction with the accompanying drawings, Technical scheme is described in detail by specific embodiment.
Referring to Fig. 1, the invention discloses a kind of U-tube stake armor installation tool 100, including:U-shaped frame 1, top thick stick 2, top thick stick Connecting seat 3, dynamic pressure block 4, guide rod 5, stop screw 6.
The annexation of all parts in U-tube stake armor installation tool 100 is introduced first.
Wherein, the two ends of the U-shaped frame 1 are fixedly installed level pressure block 12 and screw block 11 respectively;
The top thick stick 2 is screwed in the screw block 11, the top thick stick 2 is connected with the U-shaped frame 1;
The dynamic pressure block 4 is connected by the top thick stick connecting seat 3 with the top thick stick 2;The dynamic pressure block 4 is provided with guide rod 5 First round tube hole 41 of installation;The level pressure block 12 is provided with the second round tube hole 14;
The guide rod 5 is sequentially passed through in first round tube hole 41, second round tube hole 14;
The stop screw 6 is fixed on the dynamic pressure block 4, and the end of the stop screw 6 is stuck in the guide rod 5 In the long shallow slot 53 in axial direction of periphery, make the guide rod 5 spacing on the dynamic pressure block 4, and then cause the U-tube stake shield First installation tool 100 is integrated.
Said structure can make U-tube stake armor installation tool 100 integrated, pacify and tear easy, reliable and quick open, can improve The efficiency and quality of armor installation;And due to being integrated design, can be without existing without field erected separation parts Field assembling is directly used, and is easy to over-water construction;Manufacturing cost and use cost is lower, can improve the economy of armor installation.
Level pressure block 12 and worm drive screw block 11 are secured in the U-shaped frame 1 of the present invention;Top thick stick 2 is spun on U-shaped frame 1 In screw block 11, top thick stick 2 is set to be connected with U-shaped frame 1;Dynamic pressure block 4 is connected by pushing up thick stick connecting seat 3 with top thick stick 2;Referring to Fig. 1, this hair Exemplified by bright 2 guide rods 5 of use, certainly, a guide rod 5 actually can also.
2 guide rods 5 are respectively inserted in 2 the first round tube holes 41 of dynamic pressure block 4, and 2 stop screws 6, which are fixed, is screwed into dynamic pressure In block 4, its end is stuck in the long shallow slot 53 in the axial direction of 2 peripheries of guide rod 5, makes 2 guide rods 5 spacing in dynamic pressure block 4 On can not depart from, so as to form the integral structure without separately installed parts, this kind of structure design makes to which reduce existing work The scene of instrument in itself, which is spelled, when tool is used every time tears open, in construction, its entirety is picked up and leans against armor flange both sides, 2 are led Bar 5 is inserted or pulled out armor flange bolt mounting hole, just can integral installation and dismounting, installation effectiveness is high, and use is easier, and not Occur that the overboard damaed cordition of the tiny parts such as guide rod 5, movable holddown 4 and nut occurs caused by being torn open due to instrument peace, has Beneficial to over-water construction.
Lower mask body introduces the concrete structure of all parts.
Referring to Fig. 2, for U-shaped frame 1:
One end riser lower surface of U-shaped frame 1 is provided with the screw block 11, and there is the first screw thread at the middle part of the screw block 11 Through hole 13, first tapped through hole 13 is located on longitudinal middle vertical plane of the U-shaped frame 1;The top thick stick 2 screws in first spiral shell It is spirally connected in line through hole 13, and then the top thick stick 2 is screwed in the screw block 11, is fixed the top thick stick 2 and U-shaped frame 1 and connect Connect.By taking the U-tube stake armor installation tool 100 used in certain coal wharf's access bridge pile tube anticorrosive construction as an example, the first tapped through hole 13 be M20 tapped through holes.
There is centre-to-centre spacing between 2 the second round tube holes 14,2 second round tube holes 14 etc. at the two ends of the level pressure block 12 In armor flange connecting hole centre-to-centre spacing (100mm) so that guide rod 5 can be connected through 2 the second round tube holes 14 and armor flange Hole.The longitudinal middle vertical plane of 2 the second round tube holes 14 based on the U-shaped frame 1 is symmetrical.It is worth noting that, the application sets 2 Individual second round tube hole 14 is that, in order to insert two guide rods 5, and in actual applications, the number of actual top guide bar 5 could be arranged to 1 Root, then the second round tube hole 14 can also be correspondingly arranged 1, then miscellaneous part and guide rod 5 have annexation to set For odd number.Can certainly the structure design as the application, the simply use of guide rod 5 one.Lead in a practical situation The number of bar 5 is depending on actual conditions.
Referring to Fig. 3, for top thick stick 2:
Pushing up thick stick 2 includes spiro rod section 21, axle platform 22 and small rotating shaft section 23.For example, top thick stick 2 includes M20 spiro rod sections 21, the axles of φ 25 Platform 22 and the small rotating shafts of φ 16 section 23.
Wherein, the end machining of the spiro rod section 21 is into six square toes 25;The middle part of the small rotating shaft section 23 is machined with annular Stopper slot 24.Spiro rod section 21 is used for screwing in being spirally connected in screw block 11.
Referring to Fig. 4, for top thick stick connecting seat 3:
The top thick stick connecting seat 3 includes bottom plate 31 and is arranged on the round platform 32 at the center of bottom plate 31;
The end center of the round platform 32 has on blind axis hole 33 (φ 16), the face of cylinder of the round platform 32 and had and the blind axle The second tapped through hole 34 that hole 33 is communicated;
The insertion circular hole 35 based on the axisymmetrical of round platform 32 is provided with the middle part of the two ends of bottom plate 31.
The annexation of top thick stick 2 and top thick stick connecting seat 3 is described below.
The small rotating shaft section 23 is screwed in the blind axis hole 33, is screwed into by the stop screw 6 and is fixed on described the In two tapped through holes 34, and the top of the stop screw 6 is positioned in the annular spacing groove 24, and then the top thick stick connection Seat 3 is spacing on the top thick stick 2, and can be rotated around the top thick stick 2.It is worth noting that, the stop screw 6 of the application is not The stop screw 6 of some specific position is refered in particular to, but one is referred to as, the application all employ stop screw 6, example in multiple positions It is spirally connected such as the tapped through hole 34 of stop screw 6 and second, the 3rd tapped through hole 43 of stop screw 6 and dynamic pressure block 4 is spirally connected etc..
Soket head cap screw 7 is screwed into the tapped blind hole 42 at the middle part of dynamic pressure block 4 by the insertion circular hole 35, by institute Dynamic pressure block 4 is stated to be fixedly connected with the push rod connecting seat.
The connection of push rod connecting seat of the top thick stick 2 of the present invention with being fixed with dynamic pressure block 4, using being fixed on push rod connecting seat Stop screw 6 be caught in top thick stick 2 on annular spacing groove 24 design, this design both by push rod connecting seat and top thick stick 2 connect Together, define that it relatively radially and axial movement, can relatively rotate both, when spacing 2 on dynamic pressure block 4 lead again Is limited in 2 groups of bolt mounting holes of the insertion armor flange of bar 5 after dynamic pressure block 4 rotates, push up the screwfeed of thick stick 2 and recess can Push rod connecting seat and dynamic pressure block 4 moving forward and backward along guide rod 5 are converted into, so as to realize dynamic pressure block 4 and level pressure block 12 along guide rod 5 Pushing to the end flanges of armor two and loosen, to complete the installation of armor flange bolt component.The present invention is due to using spiral shell Revolve top pressure and replace the hydraulic top-pressure load mode of existing instrument, therefore it has been lacked hydraulic hand-pump, oil cylinder and hydraulic connecting pipe Deng parts, the manufacturing cost and use cost of inventive article is greatly reduced in this aspect, on the other hand also makes inventive article Overall weight and volume significantly reduce, be more convenient for its in-site installation and using, in addition, screwfeed and stepping back and can use hand Dynamic or 2 kinds of working methods of electric wrench, construct more flexible, it is more met the various construction demand in scene, are pulled using electronic During hand working method, its efficiency of construction is also higher than hydraulic top-pressure load mode, and labor intensity is lower, while also improving armor company The utilization rate of connecting bolt installation electric wrench.
Referring to Fig. 5, for dynamic pressure block 4:
The middle part symmetric design of the dynamic pressure block 4 has tapped blind hole 42, and two ends symmetric design has the first round tube hole 41;
Wherein, the centre-to-centre spacing phase between the centre-to-centre spacing between 2 the first round tube holes 41 and 2 second round tube holes 14 Together;The guide rod 5 can be sequentially inserted into first round tube hole 41, second round tube hole 14;
Also symmetric design has 2 the 3rd tapped through holes 43,2 the 3rd spiral shells in the middle part of the one side two ends of dynamic pressure block 4 The axis of line through hole 43 intersects vertically with 2 the first round tube holes 41 axis respectively.
As a kind of optional embodiment, when guide rod 5 is inserted in the first round tube hole 41 of dynamic pressure block 4, by the limit Position screw 6 is tightened in the 3rd tapped through hole 43, and is caught in the long shallow slot 53 in the axial direction of the guide rod 5.
Referring to Fig. 6, for guide rod 5 (φ 11):
There is gear platform 51 one end of the guide rod 5, and there are chamfering 52, the middle part circle of the guide rod 5 in another termination of the guide rod 5 There is the long shallow slot 53 in the axial direction on cylinder.
If guide rod 5 uses 2, then 2 guide rods 5 are respectively inserted in 2 first round tube holes 41 at the two ends of dynamic pressure block 4,2 Individual stop screw 6 is tightened in 2 the 3rd tapped through holes 43 at the side two ends of dynamic pressure block 4 respectively, 2 stop screws 6 Top is respectively in the long shallow slot 53 in the spacing axial direction in 2 guide rods 5.
It is used as a kind of alternative embodiment, the smooth outer surface at the middle part of guide rod 5.
The present invention is due to using the design for 2 briquettings of top pressure armor flange being fixed or being connected to the inner side of U-shaped frame 1, institute With without with guide rod 5 being that middleware connects and fixes the briquetting of 2 top pressure armor flanges, has hydraulic cylinder as existing instrument The parts such as base block, limitation U-shaped frame 1 is rotated when 2 guide rods 5 only play guide rail and push rod rotation, therefore, the end of guide rod 5 Portion can be difficult to the phenomenon extracted, solved using non-threaded design from armor flange screw is stuck in without the screw thread of guide rod 5 Existing instrument is difficult to dismantle, the problems such as destroying armor flange bolt mounting hole, and can be improved due to the raising of assembling and dissembling speed Efficiency of construction and quality.
Installation and the course of work of this specific implementation of the present invention are sketched, helps to understand the present invention.Refering to Fig. 7 A- figures 7B。
Illustrate by taking installation of the diameter 1m pile tube with width 1m high density polyethylene (HDPE) armors as an example, U-shaped of the present invention is being installed Before pile tube armor installation tool 100, the spacing between the level pressure block 12 in the top adjustment dynamic pressure of thick stick 2 block 4 and U-shaped frame 1 should be rotated, makes it Relaxed more than armor 102 and be trapped among the ultimate range of its two ends armor flange 104 on pile tube 101, drawn back be positioned at dynamic pressure block 4 completely On 2 guide rods 5.
After the relaxation of armor 102 is trapped among on pile tube 101 by workmen, the armor flange 104 at the cocked two ends of armor 102, Device to hole steel rod is inserted respectively in 3 groups of armor flange bolt connecting holes on top, bottom and middle part appropriate location, makes armor 102 The armor flange 104 at two ends and bolt connecting hole thereon is relative erects and align, then adjusts the integral position of armor 102 to standard Helped after true installation site.
1st set of U-tube stake armor installation tool 100 of the present invention is installed in armor upper end, its installation method is:Workmen The middle part transverse arm of U-shaped frame 1 of the present invention is held, the entirety of U-tube of the present invention stake armor installation tool 100 is picked up;By U-shaped of the present invention Pile tube armor installation tool 100 is placed in the upper end installation site for the armor being trapped among on pile tube, and its dynamic pressure block 4 and level pressure block 12 are distinguished Positioned at the both sides of the end flanges of armor two, the bottom side of dynamic pressure block 4 and level pressure block 12 is against the armor surface being trapped among on pile tube;Fine setting The position of U-tube stake armor installation tool 100 of the present invention and posture, are located at after a guide rod 5 of top push-in, can be by right The one group of armor flange bolt connecting hole answered, is inserted into the corresponding installation round tube hole of 12 1 guide rods of level pressure block 5, then with Identical mode inserts underlying another guide rod 5, thus by 2 guide rods 5 by U-tube of the present invention stake armor erector Tool 100 is connected with the two ends armor flange 104 of armor 102;The square toes 25 of top 2 end of thick stick six, dextrorotation are blocked with electric wrench Turn top thick stick 2, push up the screwfeed of thick stick 2, drive dynamic pressure block 4 to be moved to the direction of level pressure block 12, so that 12 points of dynamic pressure block 4 and level pressure block On the armor flange 104 for not being pressed in the two ends of armor 102, and it is opposite along 2 guide rods 5 to oppress the armor flange 104 at the two ends of armor 102 Move and mutually draw close, armor is tied tight on pile tube and (be not adjacent between the armor flange 104 at armor two ends, still there is a spacing From), U-tube stake armor installation tool 100 of the present invention is positioned on the two ends armor flange 104 of armor 102, complete the 1st set The installation of U-tube stake armor installation tool 100 of the present invention.Peace according to the 1st set of U-tube stake armor installation tool 100 of the present invention Dress method completes to reserve 1 group of armor flange bolt between the installation of the 2nd and the 3rd set of present invention, the often set inventive article of installation Connecting hole, makes armor is more uniform about 102 to tie tight on pile tube 101.Screw 3 sets of present invention with electric wrench in turn in order The top thick stick 2 of U-tube stake armor installation tool 100, makes the spacing of armor two ends armor flange 104 synchronously reduce step by step, until two Individual armor flange 104 is mutually adjacent to.Extract out and be inserted in 3 device to hole steel rods in armor flange bolt connecting hole, wherein and peace The connection of armor flange is loaded onto in empty armor flange bolt connecting hole between 3 sets of U-tube stake armor installation tools 100 of the present invention of dress Bolt assembly 103, each armor flange bolt component 103 is tightened with electric wrench, makes each armor flange bolt connection hole Flange face be adjacent to.3 sets of U-tube stake armor installation tools 100 of the present invention of installation are pulled down, its method for dismounting is:Pulled with electronic Hand blocks the square toes 25 of 2 end of top thick stick six of 1 set of U-tube stake armor installation tool 100 of the present invention, and rotate counterclockwise top thick stick 2 pushes up thick stick 2 screw backouts, drive dynamic pressure block 4 to depart from armor flange 104, draw back 2 guide rods 5 of the set inventive article 100, deviate from it Armor flange bolt connecting hole, you can unload the whole series U-tube stake armor installation tool 100 of the present invention from armor flange 104. Armor flange bolt component 103 is loaded onto in each empty armor flange bolt connecting hole, each armor method is tightened with electric wrench Blue connecting bolt component 103, is adjacent to the flange face of each armor flange bolt connection hole, that is, completes peace of the armor on pile tube Dress.
It is worth noting that, the model of the present invention is only illustrated and used.
Show through application, U-tube stake armor installation tool 100 of the invention, simple and practical reliable, peace is torn open easy to be fast Speed, armor is carried out with the instrument and is installed than using the existing instrument saving time more than 50%, does not occur armor flange bolt again Connecting hole destroys situation, and efficiency of construction and quality are largely increased;Integral installation and dismounting of the present invention, do not occur parts and fall Water loss, suitable for over-water construction;The manufacturing cost and use cost of the present invention reduces more than 60% than existing instrument;Invention is reached Purpose.
By one or more embodiment of the present invention, the invention has the advantages that or advantage:
The present invention disclose a kind of U-tube stake armor installation tool, including U-shaped frame, top thick stick, pushes up thick stick connecting seat, dynamic pressure block, leads Bar, stop screw;The two ends of U-shaped frame are fixed with level pressure block and screw block;Top thick stick is screwed in screw block, and dynamic pressure block is by pushing up thick stick Connecting seat is connected with top thick stick;The second circle that guide rod sequentially passes through the first round tube hole set on dynamic pressure block and set on level pressure block is logical Hole, stop screw passes through dynamic pressure block and its end is stuck in the long shallow slot in the axial direction of the periphery of guide rod, makes guide rod spacing dynamic On briquetting, and then U-tube stake armor installation tool is integrated, torn open with avoiding scene from spelling, by its entirety during construction Pick up and lean against armor flange both sides, guide rod is inserted or pulled out armor flange bolt mounting hole, just can integral installation and dismounting, peace Efficiency high is filled, use is easier, and be not in that to tear caused guide rod, movable holddown and nut etc. open tiny zero due to instrument peace The overboard damaed cordition of part, is conducive to over-water construction.
Although having been described for the preferred embodiment of the application, one of ordinary skilled in the art once knows substantially Creative concept, then can make other change and modification to these embodiments.So, appended claims are intended to be construed to bag Include preferred embodiment and fall into having altered and changing for the application scope.
Obviously, those skilled in the art can carry out the essence of various changes and modification without departing from the application to the application God and scope.So, if these modifications and variations of the application belong to the scope of the application claim and its equivalent technologies Within, then the application is also intended to comprising including these changes and modification.

Claims (10)

1. a kind of U-tube stake armor installation tool, it is characterised in that including:
U-shaped frame, top thick stick, top thick stick connecting seat, dynamic pressure block, guide rod, stop screw;
Wherein, the two ends of the U-shaped frame are fixedly installed level pressure block and screw block respectively;
The top thick stick is screwed in the screw block, the top thick stick is connected with the U-shaped frame;
The dynamic pressure block is connected by the top thick stick connecting seat with the top thick stick;The dynamic pressure block is provided with the of guide rod installation One round tube hole;The level pressure block is provided with the second round tube hole;
The guide rod is sequentially passed through in first round tube hole, second round tube hole;
The stop screw is fixed on the dynamic pressure block, and the end of the stop screw is stuck in the periphery of the guide rod The long shallow slot in axial direction in, make the guide rod spacing on the dynamic pressure block, and then make it that U-tube stake armor installation tool is Integral structure.
2. a kind of U-tube stake armor installation tool as claimed in claim 1, it is characterised in that
One end riser lower surface of the U-shaped frame, which is provided with the middle part of the screw block, the screw block, the first tapped through hole, First tapped through hole is located on longitudinal middle vertical plane of the U-shaped frame;The top thick stick is screwed in first tapped through hole, is entered And the top thick stick is screwed in the screw block;
The two ends of the level pressure block have the centre-to-centre spacing between 2 the second round tube holes, 2 second round tube holes to be equal to armor flange Connecting hole centre-to-centre spacing, the longitudinal middle vertical plane of 2 the second round tube holes based on the U-shaped frame is symmetrical.
3. a kind of U-tube stake armor installation tool as claimed in claim 1, it is characterised in that the top thick stick include spiro rod section, Axle platform and small rotating shaft section;
Wherein, the end machining of the spiro rod section is into six square toes;The middle part of the small rotating shaft section is machined with annular spacing groove.
4. a kind of U-tube stake armor installation tool as claimed in claim 3, it is characterised in that the top thick stick connecting seat includes Bottom plate and the round platform for being arranged on the bottom plate center;
The end center of the round platform, which has, the second screw thread communicated with the blind axis hole on blind axis hole, the face of cylinder of the round platform Through hole;
It is provided with the middle part of the bottom plate two ends based on the symmetrical insertion circular hole of round platform axis.
5. a kind of U-tube stake armor installation tool as claimed in claim 4, it is characterised in that
The small rotating shaft section is screwed in the blind axis hole, and the stop screw is screwed into and is fixed in second tapped through hole, And the top of the stop screw is positioned in the annular spacing groove, and then the top thick stick connecting seat is spacing in the top thick stick On, and can be around the top thick stick rotation.
6. a kind of U-tube stake armor installation tool as described in claim 4 or 5, it is characterised in that soket head cap screw passes through institute The tapped blind hole that insertion circular hole is screwed into the middle part of the dynamic pressure block is stated, the dynamic pressure block and the push rod connecting seat are fixed and connected Connect.
7. a kind of U-tube stake armor installation tool as claimed in claim 1, it is characterised in that the middle part of the dynamic pressure block is right Title is designed with tapped blind hole, and two ends symmetric design has first round tube hole;
Wherein, the centre-to-centre spacing between the centre-to-centre spacing between 2 the first round tube holes and 2 second round tube holes is identical;It is described to lead Bar can be sequentially inserted into first round tube hole, second round tube hole;
Also symmetric design has 2 the 3rd tapped through holes in the middle part of the dynamic pressure block one side two ends, 2 the 3rd tapped through holes Axis intersects vertically with 2 first round tube hole axis respectively.
8. a kind of U-tube stake armor installation tool as claimed in claim 7, it is characterised in that
The stop screw is tightened in the 3rd tapped through hole, and is caught in the long shallow slot in the axial direction of the guide rod In.
9. a kind of U-tube stake armor installation tool as claimed in claim 1, it is characterised in that
There is gear platform one end of the guide rod, and another termination of the guide rod has on chamfering, the middle part face of cylinder of the guide rod State axially long shallow slot.
10. a kind of U-tube stake armor installation tool as claimed in claim 1, it is characterised in that
Smooth outer surface in the middle part of the guide rod.
CN201710418413.5A 2017-06-06 2017-06-06 U-shaped pipe pile armour mounting tool Active CN107152021B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710418413.5A CN107152021B (en) 2017-06-06 2017-06-06 U-shaped pipe pile armour mounting tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710418413.5A CN107152021B (en) 2017-06-06 2017-06-06 U-shaped pipe pile armour mounting tool

Publications (2)

Publication Number Publication Date
CN107152021A true CN107152021A (en) 2017-09-12
CN107152021B CN107152021B (en) 2023-03-28

Family

ID=59795040

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710418413.5A Active CN107152021B (en) 2017-06-06 2017-06-06 U-shaped pipe pile armour mounting tool

Country Status (1)

Country Link
CN (1) CN107152021B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR339138A (en) * 1903-10-30 1904-12-02 Joseph Delamarche Tubular reinforced concrete pole for electrical pipelines
CN203808546U (en) * 2014-04-28 2014-09-03 国家电网公司 Reinforcing device for electric pole
CN104120743A (en) * 2014-05-21 2014-10-29 徐州中矿安丰工程科技有限公司 Concrete pile protection method used in marine environment
CN204098030U (en) * 2014-05-21 2015-01-14 徐州工程学院 For the concrete pile structure of marine environment
US20160069099A1 (en) * 2011-01-26 2016-03-10 Wobben Properties Gmbh Method and device for erecting a tower for a wind energy plant
CN106366619A (en) * 2016-08-26 2017-02-01 新疆森泰电力科技有限公司 Anti-corrosion wind-proof protecting armour and machining process thereof
CN207392195U (en) * 2017-06-06 2018-05-22 中国石油天然气集团公司 A kind of U-tube stake armor installation tool

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR339138A (en) * 1903-10-30 1904-12-02 Joseph Delamarche Tubular reinforced concrete pole for electrical pipelines
US20160069099A1 (en) * 2011-01-26 2016-03-10 Wobben Properties Gmbh Method and device for erecting a tower for a wind energy plant
CN203808546U (en) * 2014-04-28 2014-09-03 国家电网公司 Reinforcing device for electric pole
CN104120743A (en) * 2014-05-21 2014-10-29 徐州中矿安丰工程科技有限公司 Concrete pile protection method used in marine environment
CN204098030U (en) * 2014-05-21 2015-01-14 徐州工程学院 For the concrete pile structure of marine environment
CN106366619A (en) * 2016-08-26 2017-02-01 新疆森泰电力科技有限公司 Anti-corrosion wind-proof protecting armour and machining process thereof
CN207392195U (en) * 2017-06-06 2018-05-22 中国石油天然气集团公司 A kind of U-tube stake armor installation tool

Also Published As

Publication number Publication date
CN107152021B (en) 2023-03-28

Similar Documents

Publication Publication Date Title
JP5550584B2 (en) Compressor, insertion / removal device, and insertion / removal method
CN209238724U (en) A kind of material rolling device
CN107628205B (en) A kind of new and effective ice breaker
CN201049853Y (en) Unbinding device for coiled cable
CN106946156A (en) A kind of big assembly method of the megawatt wind gear-box without outer ring cylinder roller bearing
CN101869958B (en) Transverse bar discharge mechanism of reinforcement mesh production line
CN207392195U (en) A kind of U-tube stake armor installation tool
CN106964966A (en) The disassembling fixture of planetary wheel of wind turbine gearbox bearing
CN200989036Y (en) Anchoring device
CN107152021A (en) A kind of U-tube stake armor installation tool
CN202510061U (en) Drill pipe clamping mechanism for horizontal directional drilling rig
CN111645030A (en) Mechanical equipment for automatically taking out damaged bearing from shaft
CN201862975U (en) Sprocket hub detaching tool for final driving box of track traveling mechanism
CN201908310U (en) Adjustable steel support axial force pre-adding device
CN103234817A (en) Detachable and reusable clamping apparatus for tensile test of fiber-reinforced resin based composite mandril
CN206643852U (en) A kind of deep groove ball bearing takes out instrument
CN202134406U (en) Tail base of winding machine
CN206326076U (en) A kind of reinforcing bar discharging device
CN215431342U (en) Steel reinforcement cage forming device
CN207957602U (en) Transmission device used for electric hoist
CN209335502U (en) A kind of adjustable sleeve of electric wrench
CN201711472U (en) Transverse bar arranging mechanism of steel bar mesh production line
CN102128744B (en) Pipe clamping device
CN102117668A (en) Reactor core unloading tool
CN201089632Y (en) Worm-gear self-locking conveying-belt loosening and tightening machine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant