CN107144730A - Power consumption prediction system for electric equipment - Google Patents

Power consumption prediction system for electric equipment Download PDF

Info

Publication number
CN107144730A
CN107144730A CN201710443772.6A CN201710443772A CN107144730A CN 107144730 A CN107144730 A CN 107144730A CN 201710443772 A CN201710443772 A CN 201710443772A CN 107144730 A CN107144730 A CN 107144730A
Authority
CN
China
Prior art keywords
electrical equipment
power consumption
turns
consumption
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710443772.6A
Other languages
Chinese (zh)
Other versions
CN107144730B (en
Inventor
邵柳东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Sanxing Medical and Electric Co Ltd
Original Assignee
Ningbo Sanxing Medical and Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Sanxing Medical and Electric Co Ltd filed Critical Ningbo Sanxing Medical and Electric Co Ltd
Priority to CN201710443772.6A priority Critical patent/CN107144730B/en
Publication of CN107144730A publication Critical patent/CN107144730A/en
Application granted granted Critical
Publication of CN107144730B publication Critical patent/CN107144730B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R22/00Arrangements for measuring time integral of electric power or current, e.g. electricity meters

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to a power consumption prediction system of electric equipment, which comprises a local processing system, wherein the local processing system comprises a power consumption measuring system, a power consumption recording system and a power consumption prediction processing system; the power consumption measuring system is connected with the electric equipment and is used for measuring the electric quantity value consumed by the electric equipment; the power consumption recording system is connected with the power consumption measuring system and is used for recording the power consumption value of the electric equipment; the power consumption prediction processing system is connected with the power consumption recording system and predicts the power consumption value of the electric equipment consumed in a specific period of time in the future according to the data recorded by the power consumption recording system. The power consumption prediction processing system provides certain data reference for the amount of the pre-paid electric charge of the user; and the safety verification is carried out when the electric appliance information storage processing system and the remote service system carry out data transmission, so that data is prevented from being illegally transmitted or illegally accessed.

Description

A kind of electrical equipment power consumption forecasting system
Technical field
The present invention relates to a kind of electrical equipment power consumption forecasting system.
Background technology
Intelligent electric meter is used after first paying tariff in advance in existing power network, and excessively frequently electricity payment is for a user Cumbersome, the electricity charge for certain number that prestores are more convenient for a user, but not many for paying in the prior art The more rational technical scheme of few electricity charge.In the prior art some technical sides are provided for measuring the consumption electricity of each electrical equipment Method.In the prior art, the method and apparatus of the energy expenditure of measurement electronic equipment, the consumption to electricity in certain time is carried out Measurement is not recorded in detail to the type, use time and electric quantity consumption of electronic equipment.The present invention passes through one The fix time type of inner electronic equipment, use pattern, electric quantity consumption is recorded in detail, and on the basis of the recording according to some Particular case is predicted to following certain time inner electronic equipment consumed energy, provides certain to the number that user pays tariff in advance Data reference.
In order to solve this problem, the present invention is proposed hereby.
The content of the invention
The purpose of the present invention, is to provide a kind of electrical equipment power consumption forecasting system.
In order to realize these purposes, adopt the following technical scheme that:
A kind of electrical equipment power consumption forecasting system, including processing locality system, processing locality system include power consumption and measure system System, electricity consumption consumption record system and power consumption prediction processing system;Wherein, power consumption measuring system is connected with electrical equipment, uses To measure the charge value of electrical equipment consumption;
Electricity consumption consumption record system is connected with power consumption measuring system, for recording the charge value of electrical equipment consumption;Consumption Electricity prediction processing system is connected with electricity consumption consumption record system, according to the data prediction of electricity consumption consumption record system record in the future Specific a period of time in electrical equipment consumption charge value.
Preferably, the electrical equipment power consumption forecasting system also includes long distance service system, and long distance service system includes remote Journey communication module and remote storage modules, the processing locality system also include Local Communication Module, and long distance service system passes through Remote communication module, Local Communication Module are connected with processing locality system.
Further, the processing locality system also includes appliance information storage processing system and electrical equipment access safety verification System;Wherein, during electrical equipment access processing locality system, electrical equipment access security authentication systems are entered to electrical equipment essential information Row identification, after success, appliance information storage processing system is stored to the essential information of electrical equipment.
Preferably, the user carries out registration login method, letter by the information storage system of the processing locality system Breath storage system shows login interface in interactive module,
Specific registration login method is as follows:
S01:Into login system;
S02:Judge whether automated log on, judged result is yes, turn S08, judged result is no, turns S03;
S03:User judges whether to register, and judged result is yes, turns S07, and judged result is no, turns S04;
S04:User's input handset number is reminded, remote server returns to mobile phone dynamic password in the form of short message, dynamic Password can turn S05 with Reusability;
S05:Remote server turns S06 to the unique numbering of power consumption measuring system distribution in processing locality system;
S06:Processing locality system is by the information record and the net of Local Communication Module of all electrical equipments collected Network terminal address existence information is transmitted to remote server while storing processing system, and remote server is by network terminal address etc. Level is registered, and by the remote storage modules of network terminal address;
S07:Into login page, turn S08;
S08:Whether the electrical equipment that detecting has access system has variation, and judged result turns to add electrical equipment S09, judged result turns S10 to reduce electrical equipment;
S09:The information of the equipment newly increased is stored in information storage system, while the information newly increased is informed far Journey server, turns S11;
S10:The equipment of reduction is deleted from information storage system, and the numbering of the electrical equipment of new reduction is informed far Journey server;
S11:Terminate.
Further, in the step S08, whether the electrical equipment that detecting has access system has the flow of variation as follows:
S081:The equipment of all access power consumption measuring systems of scanning, turns S082;
S082:Made comparisons with all devices information recorded in information storage system.
A kind of processing locality system enters safe verification method during row data communication with long distance service system,
Comprise the following steps:
S21:Transmission is encrypted in the network terminal address of Local Communication Module by processing locality system together with as essential information Remote server is sent to as connectivity request message, the response message to be confirmed such as afterwards, turns S22;
S22:Remote server receives connectivity request message and parsed, and parses network terminal address and determines network End message, turns S23;
S23:Long distance service system judges whether network terminal information registered, and judged result is yes, turns S25, judges knot Fruit is no, turns S24;
S24:Long distance service system sends the warning message without registration illegal connection information to processing locality system;
S25:Long distance service system sends the confirmation response message that connection is set up to processing locality system, turns S26;
S26:User terminal unique number is encrypted and transmitted by processing locality system as additional information together with information to be transmitted, is turned S27;
S27:Long distance service system decrypts additional information, turns S28;
S28:Judge whether user terminal unique number is legal, judged result is yes, turn S30, judged result is no, turns S29;
S29:The illegal warning message of user terminal unique number is sent to processing locality system;
S30:Judge user terminal unique number whether with network terminal addresses match, judged result is yes, turns S31, sentences Disconnected result is no, turns S32;
S31:Remote server sends the response message of transmission success to processing locality system;
S32:User terminal unique number and the warning message of network terminal addresses match are sent to processing locality system.
Further, in the step S23, the determination methods whether network terminal information registered are in remote server Middle Network Search terminal address information, Query Result is registered for presence, and lookup result is that nothing is then not register;
In the step S26, information to be transmitted includes the network terminal that processing locality system is transferred to long distance service system Address, processing locality system are transferred to the information and processing locality system of the electrical equipment of long distance service system to remote service The details for the electrical equipment transmitted in system;
In the step S28, determination methods are whether user terminal unique number is the distribution of the medium-long range service system of embodiment 2 To processing locality system, in order to be further ensured that the security of transmission, judge user terminal unique number whether with user mobile phone It is number corresponding.
A kind of electrical equipment power consumption Forecasting Methodology, is comprised the following steps that:
S50:The beginning and ending time section that user selects to pay tariff in advance by interactive module, turns S51;
S51:Power consumption prediction module obtains the beginning and ending time that user fills in interactive module, turns S52;
S52:Power consumption prediction module is carried out by information storage module to electrical equipment all in all existing systems Detection classification, turns S53;
S53:Equipment is divided into by seasonal effect with not by the electrical equipment of seasonal effect by power consumption prediction module, turns S54;
S54:Judge whether the same day has the electrical equipment newly added, judged result is yes, turn S56, judged result is no, is turned S55;
S55:By using electric consumption record system calculate not by seasonal effect electrical equipment consumption electricity;
S56:The electricity of electrical equipment consumption is set by general standard with the equipment newly added.
Further, in the step S55, the computational methods are that it is daily that electricity consumption consumption record system have recorded user Electricity is consumed, total consumption electricity is calculated by consuming electricity daily, total consumption electricity is divided equally by using number of days, Calculate average per daily consumption electricity, the effective number of days every daily consumption electricity being multiplied by between initial time and deadline is calculated Not by seasonal effect electrical equipment consumption electricity.
Further, judge whether the same day has the method for the electrical equipment newly added to be to scan all access power consumption measurements The equipment of system, makes comparisons with the facility information stored before the today recorded in information storage system, sees if there is increased Equipment.
Beneficial effect:1. set up power consumption prediction processing system and electricity consumption consumption record system, power consumption prediction processing system with Electricity consumption consumption record system is connected, the specific a period of time in the data prediction future recorded according to electricity consumption consumption record system The charge value of interior electrical equipment consumption, certain data reference is provided for the number that user pays tariff in advance.
2. processing locality system, which includes appliance information, stores processing system and electrical equipment access security authentication systems;Electrical equipment When accessing processing locality system, electrical equipment essential information is identified electrical equipment access security authentication systems, prevents unknown set Standby access system, appliance information storage processing system carries out safety verification when carrying out data transmission with long distance service system, prevents Illegal transmissions data or data are tampered.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is the accompanying drawing used required in technology description to be briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can be with Other accompanying drawings are obtained according to these accompanying drawings.
Fig. 1 is processing locality system architecture diagram of the present invention.
Fig. 2 is the another structured flowchart of processing locality system of the present invention.
Fig. 3 is power consumption measuring system structured flowchart of the present invention.
Fig. 4 is power consumption acquisition module of the present invention and measuring circuit structure chart.
Fig. 5 is the interactive module login page of system of the present invention.
Fig. 6 is registration login method flow chart of the present invention.
Fig. 7 is the flow chart whether electrical equipment of the present invention for detecting access system changes.
Fig. 8 is safe verification method flow chart of the present invention.
Fig. 9 is the flow chart of the embodiment of the present invention 1.
Figure 10 is the another flow chart of the embodiment of the present invention 1.
Figure 11 is the pre- page of paying tariff of the present invention.
Figure 12 is electrical equipment power consumption Forecasting Methodology flow chart of the present invention.
Figure 13 is the user's registration page of the present invention.
Embodiment
Here exemplary embodiment will be illustrated in detail, its example is illustrated in the accompanying drawings.Following description is related to During accompanying drawing, unless otherwise indicated, the same numbers in different accompanying drawings represent same or analogous key element.Following exemplary embodiment Described in embodiment do not represent and the consistent all embodiments of the present invention.On the contrary, they be only with it is such as appended The example of the consistent apparatus and method of some aspects be described in detail in claims, the present invention.
It is the purpose only merely for description specific embodiment in terminology used in the present invention, and is not intended to be limiting the present invention. " one kind ", " described " and "the" of singulative used in the present invention and appended claims are also intended to including majority Form, unless context clearly shows that other implications.It is also understood that term "and/or" used herein refers to and wrapped It may be combined containing one or more associated any or all of project listed.
It will be appreciated that though various information, but this may be described using term first, second, third, etc. in the present invention A little information should not necessarily be limited by these terms.These terms are only used for same type of information being distinguished from each other out.For example, not departing from In the case of the scope of the invention, the first information can also be referred to as the second information, similarly, and the second information can also be referred to as One information.Depending on linguistic context, word as used in this " if " can be construed to " ... when " or " when ... When " or " in response to determining ".
The present invention will be described in detail by way of examples below.
Reference picture 1, a kind of electrical equipment power consumption forecasting system, including processing locality system, processing locality system include consumption Electrical measuring systems, electricity consumption consumption record system and power consumption prediction processing system;Wherein, power consumption measuring system and electrical equipment phase Connection, for measuring the charge value of electrical equipment consumption;Electricity consumption consumption record system is connected with power consumption measuring system, for remembering Employ the charge value of electric equipment consumption;Power consumption prediction processing system is connected with electricity consumption consumption record system, according to electric consumption The charge value of electrical equipment consumption in the specific a period of time in data prediction future of record system record.
Wherein, processing locality system be central processing unit or other realize the singlechip chip of its function.
Reference picture 2, it is preferred that electrical equipment power consumption forecasting system also includes long distance service system, long distance service system bag Remote communication module and remote storage modules are included, the processing locality system also includes Local Communication Module, long distance service system It is connected by remote communication module, Local Communication Module with processing locality system.
Specifically, the processing locality system, which also includes appliance information, stores processing system and electrical equipment access safety verification system System;Wherein, during electrical equipment access processing locality system, electrical equipment accesses security authentication systems and electrical equipment essential information is carried out Identification, after success, appliance information storage processing system is stored to the essential information of electrical equipment.
Reference picture 3, the power consumption measuring system includes power consumption acquisition module and some measuring circuits.Measuring circuit and electricity consumption Equipment is corresponding, for measuring the electricity consumed in electrical equipment unit interval.Specifically, measuring circuit is located at power supply unit Between electrical equipment, the electric current by measurement Jing Guo electrical equipment can calculate the electricity that electrical equipment is consumed.Measurement electricity Road is also connected with power consumption acquisition module, and the electrical equipment that power consumption acquisition module is used for recording corresponding to several measuring circuits disappears The electricity of consumption, and it is passed along electricity consumption consumption record system.
Reference picture 4, power system provides alternating electromotive force, the circuit between electrical equipment 1 and power system to electrical equipment 1 On be connected with measuring circuit, power consumption acquisition module is connected with measuring circuit, the specific measuring circuit include filter circuit, Coil 1, power supply circuit and sensor circuit, power supply circuit, filter circuit, coil 1 are sequentially located at power system On circuit between electrical equipment 1, sensor circuit is connected with coil 1, and power consumption acquisition module is connected with sensor circuit Connect, the other end of power consumption acquisition module is connected with power supply circuit.
Electrical equipment 1 receives the alternating electromotive force from power system.Filter circuit removes the electric power that electrical equipment 1 is received In the noise contribution that includes.Coil 1 detects the magnitude of current flowing to electrical equipment 1.Specifically, the output of coil 1 is with flowing to and using The proportional electric current of the magnitude of current of electric equipment 1.
In sensor circuit, electric current is inputted from coil 1.Sensor circuit generates sensor signal, sensor letter Number represent to flow to the magnitude of current of electrical equipment 1, and the sensor signal is input to power consumption acquisition module.Power consumption acquisition module (calculating) power consumption can be measured based on the voltage in the magnitude of current and power supply circuit represented by sensor signal Amount.
The display module is the interface of the system and user mutual, can there is user mobile phone in the form of client In app.
Embodiment 1
Reference picture 9, how accessing power consumption measuring system by electrical equipment, the present invention is described in detail.
In operation, electrical equipment 1 is accessed after power consumption measuring system system of the present invention by measuring circuit, and power consumption is adopted The information that electrical equipment enters power consumption measuring system is informed processing locality system by collection module, and processing locality system is adopted by power consumption Collect the type and model of module automatic detection electrical equipment, if detected successfully, power consumption acquisition module detects electrical equipment Type and type information, electrical equipment 1 and measuring circuit set up successful connection, and processing module is by electrical equipment according to class Type, model carry out classifying and numbering and labeled as the details of electrical equipment, and the details of electrical equipment are passed through into information Storage processing system is stored, while being uploaded to by Local Communication Module in long distance service system, long distance service system will Details are stored in remote storage modules.The class that processing locality system passes through power consumption acquisition module automatic detection electrical equipment Type and model, if detection is unsuccessful, power consumption acquisition module does not detect the type and type information of electrical equipment, this Ground processing system will be prompted to information by user interactive module:Electrical equipment information is not detected, electricity consumption please be manually entered and set Standby producer, type information.Processing locality system obtains the producer for the electrical equipment that user is manually entered, type by interactive module Number information.The information of electrical equipment is numbered processing locality system according to turn-on time order, the letter that each equipment includes Breath has:Device numbering, device type, manufacturer and model.
Reference picture 5, the information table of electrical equipment represents that user has 5 electrical equipments of access, is respectively:Device numbering:1, Device type:Air-conditioning, manufacturer:A, model:K;
Device numbering:2, device type:Water dispenser, manufacturer:B, model:K1;
Device numbering:3, device type:Refrigerator, manufacturer:C, model:K2;
Device numbering:4, device type:Air-conditioning, manufacturer:D, model:K3;
Device numbering:5, device type:Computer, manufacturer:E, model:K4.
It is as follows how electrical equipment accesses power consumption measuring system idiographic flow:
S41:Electrical equipment accesses power consumption measuring system, turns S02;
S42:Power consumption acquisition module informs that processing locality system electrical equipment accesses power consumption measuring system, turns S43;
S43:Judge whether processing locality system can detect device type, manufacturer, the model of electrical equipment, judge As a result it is yes, turns S44;Judged result is no, turns S47;
S44:Electrical equipment 1 sets up successful connection with measuring circuit, turns S45;
S45:Electrical equipment is carried out classifying and numbering according to device type, manufacturer, model and marked by processing locality system The details of electrical equipment are designated as, turn S46;
S46:The details of electrical equipment are stored processing system by information and stored by processing locality system, simultaneously Uploaded to by Local Communication Module in long distance service system, details are stored in remote storage modules by long distance service system In.
S47:Processing locality system will be prompted to information by user interactive module:Electrical equipment information is not detected, please Device type, manufacturer, the model of electrical equipment are manually entered, turns S48;
S48:Processing locality system obtains the device type for the electrical equipment that user is manually entered, production by interactive module Producer, model, turn S46.
Embodiment 2
In the present embodiment, information storage system includes login system, and login system is in the form of login page in mutual dynamic model Shown in block.
Preferably, interactive module is mobile phone, and described information storage system has the cell phone customer of user in the form of APP End, user is logged in or registered and communicated with long distance service system by the login page in information storage system.
Reference picture 5, is the login interface of information storage system presentation on the display system, this login interface can be with client The form at end is present in user mobile phone.The interface includes user mobile phone number, and password and button log in, register and forget close Three options of code.User mobile phone number, password need user to be manually filling information.
User opens login page, if user is not to first switch on login page and once registered and stepped on The recorded log-on message excessively of webpage was recorded, user understands automated log on success.If without automated log on success, reference picture 5 is used Family can select registration button, and enrollment page is presented, and enrollment page reference picture 13 clicks on submitting button, it is necessary to insert after cell-phone number Registered.Remote server is received after the cell-phone number that user inputs, it is necessary to be used as unique major key to insert data cell-phone number In, while judging whether this cell-phone number registered, chartered information was informed into user if registered, points out whether to carry out Password resets or changed cell-phone number and re-registers;If this cell-phone number was not registered, remote server is in the form of short message Mobile phone dynamic password is returned to, dynamic password can also be modified with Reusability, and remote server gives processing locality system In the unique numbering of power consumption measuring system distribution, processing locality system passes through information and stores processing system storage numbering;Locally The information record of all electrical equipments collected is transmitted to remote service by processing system while information stores processing system Device.Processing locality system gathers the information of electrical equipment by power consumption measuring system, and specific acquisition method is with reference to embodiment 1.
If user's automated log on or user are logged in by login page, shown in login page reference picture 5, in log in page In face, after user's input handset number and password, click on login button and logged in, information storage system is measured by power consumption is Whether the electrical equipment that system detection access detection has access system has variation, and testing result, will be newly-increased to add electrical equipment Plus the information of equipment be stored in information storage system, while the information newly increased is informed into remote server;Testing result To reduce electrical equipment, the equipment of reduction is deleted from information storage system, and by the numbering of the electrical equipment of new reduction Inform remote server.Here whether the electrical equipment of detection access system has variation again, is to prevent in whole system The access device accessed in the state of closing in new equipment, embodiment 1 is to access completion in real time when whole system is opened 's.
Reference picture 6, idiographic flow is as follows:
S01:Into login system, turn S02.
S02:Judge whether automated log on, judged result is yes, turn S08, judged result is no, turns S03.
S03:User judges whether to register, and judged result is yes, turns S07, and judged result is no, turns S04.
S04:User's input handset number is reminded, remote server returns to mobile phone dynamic password in the form of short message, dynamic Password can turn S05 with Reusability.
S05:Remote server turns S06 to the unique numbering of power consumption measuring system distribution in processing locality system.
S06:Processing locality system is by the information record and the net of Local Communication Module of all electrical equipments collected Network terminal address existence information is transmitted to remote server while storing processing system, and remote server is by network terminal address etc. Level is registered, and by the remote storage modules of network terminal address.
S07:Into login page, turn S08.
S08:Whether the electrical equipment that detecting has access system has variation, and judged result turns to add electrical equipment S09, judged result turns S10 to reduce electrical equipment.
S09:The information of the equipment newly increased is stored in information storage system, while the information newly increased is informed far Journey server, turns S11.
S10:The equipment of reduction is deleted from information storage system, and the numbering of the electrical equipment of new reduction is informed far Journey server.
S11:Terminate.
Whether have variation, with reference to below scheme if how to detect the electrical equipment of access system,
S081:The equipment of all access power consumption measuring systems of scanning, turns S082.
S082:Made comparisons with all devices information recorded in information storage system.
Embodiment 3
The present invention will be described for safety verification when entering row data communication with processing locality system and long distance service system.
User after long distance service system is registered, obtains distribution numbering, afterwards processing locality system by interactive module System is communicated with long distance service system or progress safety verification is needed during data transfer.Prevent illegal processing locality system visitor Family terminates into long distance service system or carries out invalid data transmission.
Reference picture 8, specific checking flow is as follows:
S21:Transmission is encrypted in the network terminal address of Local Communication Module by processing locality system together with as essential information Remote server is sent to as connectivity request message, the response message to be confirmed such as afterwards, the network of Local Communication Module is whole End address refers generally to the physical address of network interface card, what network interface card uniquely confirmed after dispatching from the factory, immutable, turns S22.
S22:Remote server receives connectivity request message and parsed, and parses network terminal address and determines network End message, turns S23.
S23:Long distance service system judges whether network terminal information registered, and determination methods are to be looked into remote server Network terminal address information is looked for, Query Result is registered for presence, and lookup result is that nothing is then not register, and judged result is It is to turn S25, judged result is no, turns S24.
S24:Long distance service system sends the warning message without registration illegal connection information to processing locality system.
S25:Long distance service system sends the confirmation response message that connection is set up to processing locality system, turns S26.
S26:User terminal unique number is encrypted and transmitted by processing locality system as additional information together with information to be transmitted, excellent Choosing, transport packet includes the network terminal that processing locality system in the step S06 of embodiment 2 is transferred to long distance service system Processing locality system is transferred to the electrical equipment of long distance service system in location, the transmission information also step S06 including embodiment 2 Details of the processing locality system to the electrical equipment transmitted in long distance service system, turn S27 in information and embodiment 1.
S27:Long distance service system decrypts additional information, turns S28.
S28:Judge whether user terminal unique number is legal, determination methods are whether user terminal unique number is embodiment 2 Medium-long range service system distributes to processing locality system, in order to be further ensured that the security of transmission, judges that user terminal is unique Whether numbering is corresponding with user mobile phone number, and judged result is yes, turns S30, and judged result is no, turns S29.
S29:The illegal warning message of user terminal unique number is sent to processing locality system.
S30:Judge user terminal unique number whether with network terminal addresses match, judged result is yes, turns S31, sentences Disconnected result is no, turns S32.
S31:Remote server sends the response message of transmission success to processing locality system.
S32:User terminal unique number and the warning message of network terminal addresses match are sent to processing locality system.
Embodiment 4:A kind of electrical equipment power consumption Forecasting Methodology is carried out in detail to instruct user to pay tariff in advance to the present invention Explanation.
Existing most of electricity systems need user shift to an earlier date it is pre- pay tariff, but do not appoint for how many electricity charge pre-payed in advance What constructive guiding opinion, this implementation is directed to this problem, it is proposed that solution.
Reference picture 11, opens pre- pay tariff by interactive module and instructs interface.In interface, when display please select pre- pay tariff Between section printed words, and selected including initial time and deadline for user.After user completes, confirming button is clicked on, power consumption is pre- Survey module and receive initial time and the deadline that user fills in, pass through all use of the information storage module to system operation Electric equipment carries out detection classification, equipment is divided into by seasonal effect and not by the electrical equipment of seasonal effect, and reference picture 5 is false If one has five electrical equipments, respectively two air-conditionings, water dispenser, refrigerator, computer.Air-conditioning belongs to be set by seasonal effect Standby, generally, some more, the water dispenser of winter summer grade, refrigerator, computer belongs to electrical equipment not by seasonal effect.Power consumption is pre- Survey module and pass through detection module
S50:The beginning and ending time section that user selects to pay tariff in advance by interactive module, turns S51.
S51:Power consumption prediction module obtains the beginning and ending time that user fills in interactive module, turns S52.
S52:Power consumption prediction module is carried out by information storage module to electrical equipment all in all existing systems Detection classification, turns S53.
S53:Equipment is divided into by seasonal effect with not by the electrical equipment of seasonal effect by power consumption prediction module, turns S54.
S54:Judge whether the same day has the electrical equipment newly added, determination methods are to scan all access power consumption measurement systems The equipment of system, makes comparisons with the facility information stored before the today recorded in information storage system, sees if there is increased set It is standby;Judged result is yes, turns S56, and judged result is no, turns S55.
S55:By using electric consumption record system calculate not by seasonal effect electrical equipment consumption electricity;Computational methods For electricity consumption consumption record system have recorded user and consume electricity daily, and total consumption electricity is calculated by consuming electricity daily, will Total consumption electricity is divided equally by using number of days, calculates average per daily consumption electricity, will be multiplied by starting per daily consumption electricity Effective number of days between time and deadline calculates the consumption electricity of electrical equipment not by seasonal effect.
By the electrical equipment reference the previous year same season consumption electricity of seasonal effect, if searched less than relative recording Value, then set power consumption according to general standard, and this general standard is on the books in long distance service system, people in the art Member can set in long distance service system, and it is an object of the invention to provide locate general consumption electric quantity data to user to join According to so as long as data value precisely need not less go against accepted conventions, electricity consumption consumption record system can be according in long distance service system Record update the data.Preferably, air-conditioning winter and summer use time are longer, set the electricity consumed daily as 10-20 degree Electricity, spring and fall use time is shorter or without using the electricity for setting consumption is electric as 5-10 degree.
S56:The equipment that the same day newly adds can not find record in electricity consumption consumption record system, with the equipment newly added The electricity of electrical equipment consumption is set by general standard.This general standard is on the books in long distance service system, art technology Personnel can set in long distance service system, and it is an object of the invention to provide locate general consumption electric quantity data to user to join According to so as long as data value precisely need not less go against accepted conventions, electricity consumption consumption record system can be according in long distance service system Record update the data.Preferably, air-conditioning belongs to the electrical equipment by seasonal effect, and winter and summer use time are longer, if The fixed electricity consumed daily is 10-20 degree electricity, and spring and fall use time is shorter or without using set the electricity consumed as 5- 10 degree of electricity.Not by the electrical equipment of seasonal effect, such as water dispenser consumes 1-1.5 degree electricity daily;Refrigerator can be set daily to disappear Consume 1-1.2 degree electricity;Computer consumes 3-5 degree electricity daily.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention God is with principle, and any modification, equivalent substitution and improvements done etc. should be included within the scope of protection of the invention.

Claims (10)

1. a kind of electrical equipment power consumption forecasting system, it is characterised in that including processing locality system, processing locality system includes consumption Electrical measuring systems, electricity consumption consumption record system and power consumption prediction processing system;Wherein, power consumption measuring system and electrical equipment phase Connection, for measuring the charge value of electrical equipment consumption;
Electricity consumption consumption record system is connected with power consumption measuring system, for recording the charge value of electrical equipment consumption;Power consumption is pre- Survey processing system with electricity consumption consumption record system to be connected, according to the spy in data prediction future of electricity consumption consumption record system record The charge value that electrical equipment is consumed in fixed a period of time.
2. electrical equipment power consumption forecasting system according to claim 1, it is characterised in that also including long distance service system, Long distance service system includes remote communication module and remote storage modules, and the processing locality system also includes local communication mould Block, long distance service system is connected by remote communication module, Local Communication Module with processing locality system.
3. electrical equipment power consumption forecasting system according to claim 1, it is characterised in that the processing locality system is also wrapped Include appliance information storage processing system and electrical equipment access security authentication systems;Wherein, during electrical equipment access processing locality system, Electrical equipment essential information is identified electrical equipment access security authentication systems, after success, appliance information storage processing system pair The essential information of electrical equipment is stored.
4. a kind of registration login method of use processing locality system user, it is characterised in that the user passes through described local The information storage system of processing system carries out registration login method, and information storage system shows login interface in interactive module,
Specific registration login method is as follows:
S01:Into login system;
S02:Judge whether automated log on, judged result is yes, turn S08, judged result is no, turns S03;
S03:User judges whether to register, and judged result is yes, turns S07, and judged result is no, turns S04;
S04:User's input handset number is reminded, remote server returns to mobile phone dynamic password, dynamic password in the form of short message S05 can be turned with Reusability;
S05:Remote server turns S06 to the unique numbering of power consumption measuring system distribution in processing locality system;
S06:Processing locality system is whole by the network of the information record of all electrical equipments collected and Local Communication Module Remote server is transmitted to while the address existence information storage processing system of end, network terminal address rank is by remote server It is registered, and by the remote storage modules of network terminal address;
S07:Into login page, turn S08;
S08:Whether the electrical equipment that detecting has access system has variation, and judged result turns S09, sentenced to add electrical equipment Disconnected result turns S10 to reduce electrical equipment;
S09:The information of the equipment newly increased is stored in information storage system, while the information newly increased is informed into long-range clothes Business device, turns S11;
S10:The equipment of reduction is deleted from information storage system, and the numbering of the electrical equipment of new reduction is informed into long-range clothes Business device;
S11:Terminate.
5. registration login method according to claim 4, it is characterised in that in the step S08, detection has access system Electrical equipment whether have the flow of variation as follows:
S081:The equipment of all access power consumption measuring systems of scanning, turns S082;
S082:Made comparisons with all devices information recorded in information storage system.
6. a kind of processing locality system enters safe verification method during row data communication with long distance service system, it is characterised in that
The safe verification method comprises the following steps:
S21:Processing locality system using the network terminal address of Local Communication Module together with as essential information encryption send as Connectivity request message is sent to remote server, the response message to be confirmed such as afterwards, turns S22;
S22:Remote server receives connectivity request message and parsed, and parses network terminal address and determines the network terminal Information, turns S23;
S23:Long distance service system judges whether network terminal information registered, and judged result is yes, turns S25, and judged result is It is no, turn S24;
S24:Long distance service system sends the warning message without registration illegal connection information to processing locality system;
S25:Long distance service system sends the confirmation response message that connection is set up to processing locality system, turns S26;
S26:User terminal unique number is encrypted and transmitted by processing locality system as additional information together with information to be transmitted, turns S27;
S27:Long distance service system decrypts additional information, turns S28;
S28:Judge whether user terminal unique number is legal, judged result is yes, turn S30, judged result is no, turns S29;
S29:The illegal warning message of user terminal unique number is sent to processing locality system;
S30:Judge user terminal unique number whether with network terminal addresses match, judged result is yes, turns S31, judges knot Fruit is no, turns S32;
S31:Remote server sends the response message of transmission success to processing locality system;
S32:User terminal unique number and the warning message of network terminal addresses match are sent to processing locality system.
7. safe verification method according to claim 6, it is characterised in that
In the step S23, the determination methods whether network terminal information registered are that Network Search is whole in remote server Address information is held, Query Result is registered for presence, and lookup result is that nothing is then not register;
In the step S26, information to be transmitted include processing locality system be transferred to long distance service system network terminal address, Processing locality system is transferred to the information and processing locality system of the electrical equipment of long distance service system to long distance service system The details of the electrical equipment of middle transmission;
In the step S28, determination methods are whether user terminal unique number is that the medium-long range service system of embodiment 2 distributes to this Ground processing system, in order to be further ensured that the security of transmission, judge user terminal unique number whether with user mobile phone number phase Correspondence.
8. a kind of electrical equipment power consumption Forecasting Methodology, it is characterised in that the Forecasting Methodology is comprised the following steps that:
S50:The beginning and ending time section that user selects to pay tariff in advance by interactive module, turns S51;
S51:Power consumption prediction module obtains the beginning and ending time that user fills in interactive module, turns S52;
S52:Power consumption prediction module is detected by information storage module to electrical equipment all in all existing systems Classification, turns S53;
S53:Equipment is divided into by seasonal effect with not by the electrical equipment of seasonal effect by power consumption prediction module, turns S54;
S54:Judge whether the same day has the electrical equipment newly added, judged result is yes, turns S56, and judged result is no, turns S55;
S55:By using electric consumption record system calculate not by seasonal effect electrical equipment consumption electricity;
S56:The electricity of electrical equipment consumption is set by general standard with the equipment newly added.
9. Forecasting Methodology according to claim 8, it is characterised in that in the step S55, the computational methods are to use Electric consumption record system have recorded user and consume electricity daily, and total consumption electricity is calculated by consuming electricity daily, will be total Consumption electricity is divided equally by using number of days, calculates average per daily consumption electricity, will be multiplied by initial time per daily consumption electricity Effective number of days between deadline calculates the consumption electricity of electrical equipment not by seasonal effect.
10. Forecasting Methodology according to claim 8, it is characterised in that
Judge whether the same day has the method for the electrical equipment newly added to be the equipment for scanning all access power consumption measuring systems, with The facility information stored before the today recorded in information storage system is made comparisons, and sees if there is increased equipment.
CN201710443772.6A 2017-06-13 2017-06-13 Power consumption prediction system for electric equipment Active CN107144730B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710443772.6A CN107144730B (en) 2017-06-13 2017-06-13 Power consumption prediction system for electric equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710443772.6A CN107144730B (en) 2017-06-13 2017-06-13 Power consumption prediction system for electric equipment

Publications (2)

Publication Number Publication Date
CN107144730A true CN107144730A (en) 2017-09-08
CN107144730B CN107144730B (en) 2022-05-13

Family

ID=59782616

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710443772.6A Active CN107144730B (en) 2017-06-13 2017-06-13 Power consumption prediction system for electric equipment

Country Status (1)

Country Link
CN (1) CN107144730B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114148175A (en) * 2021-11-22 2022-03-08 山西三友和智慧信息技术股份有限公司 Vehicle-mounted intelligent current consumption control system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101614776A (en) * 2009-04-25 2009-12-30 安徽海圣电气有限公司 Electric equipment intelligent recognition methods and device
CN102142062A (en) * 2010-02-02 2011-08-03 三星电子株式会社 Method and apparatus for controlling operations of devices based on information about power consumption of the devices
JP2015035883A (en) * 2013-08-08 2015-02-19 株式会社トーク Consumption power amount prediction system, consumption power amount prediction device, consumption power amount prediction method, and program
CN106357751A (en) * 2016-08-31 2017-01-25 国网山东省电力公司阳信县供电公司 Client browser electric charge payment system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101614776A (en) * 2009-04-25 2009-12-30 安徽海圣电气有限公司 Electric equipment intelligent recognition methods and device
CN102142062A (en) * 2010-02-02 2011-08-03 三星电子株式会社 Method and apparatus for controlling operations of devices based on information about power consumption of the devices
JP2015035883A (en) * 2013-08-08 2015-02-19 株式会社トーク Consumption power amount prediction system, consumption power amount prediction device, consumption power amount prediction method, and program
CN106357751A (en) * 2016-08-31 2017-01-25 国网山东省电力公司阳信县供电公司 Client browser electric charge payment system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114148175A (en) * 2021-11-22 2022-03-08 山西三友和智慧信息技术股份有限公司 Vehicle-mounted intelligent current consumption control system

Also Published As

Publication number Publication date
CN107144730B (en) 2022-05-13

Similar Documents

Publication Publication Date Title
CN105590371B (en) The Subscriber Management System of portable water cleaning systems and portable water cleaning systems
CN106097590B (en) Electric bicycle rental system and control method
US20140278839A1 (en) Location Based Payment System
CN207523456U (en) Shared electric bicycle charging system
CN106375326B (en) A kind of mobile phone bi-directional verification terminal and method
CN205680202U (en) A kind of gas station automatic payment apparatus
CN106297030A (en) A kind of charging service intelligent realization method based on terminal, device
CN102110994A (en) Electric car charging station management system and charging method
CN107705470A (en) Shopping settlement method, smart shopper equipment and intelligent supermarket system
CN108711206A (en) Gate control method, relevant device, system and storage medium
BRPI1103808A2 (en) Intelligent charging system and method for use in a parking lot
CN107025733A (en) article access method and article access system
SE515047C2 (en) Method and system for verification of service order
CN105550924A (en) Security management system for rented house
CN106447458A (en) Bicycle renting system based on App and bluetooth communication and bicycle renting method thereof
CN107610352A (en) A kind of shared bicycle management system
CN107539147A (en) Shared electric bicycle charging system and its charging method
CN108055234A (en) The shared lease platform of one kind
CN107154676A (en) A kind of electrical equipment electricity monitoring system and the method for power consumption feedback analysis processing
CN107527442A (en) A kind of article shared system and sharing method
US20150287007A1 (en) System and method for adapted vending solutions
CN109062745A (en) A kind of test terminal with testing service device hardware temperatures
CN107483408A (en) A kind of energy-saving monitoring system of electrical equipment
CN106570795A (en) Hotel room changing service system and method in client stay period
CN106504346A (en) Sell ticket checking method and system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant