CN107143150A - The ruggedized construction of C-type steel/Z-shape steel purlin - Google Patents

The ruggedized construction of C-type steel/Z-shape steel purlin Download PDF

Info

Publication number
CN107143150A
CN107143150A CN201710511589.5A CN201710511589A CN107143150A CN 107143150 A CN107143150 A CN 107143150A CN 201710511589 A CN201710511589 A CN 201710511589A CN 107143150 A CN107143150 A CN 107143150A
Authority
CN
China
Prior art keywords
steel
shape
type
bar
purlin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710511589.5A
Other languages
Chinese (zh)
Inventor
虞建石
陆爱平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Shangfu Equipment Machinery Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710511589.5A priority Critical patent/CN107143150A/en
Publication of CN107143150A publication Critical patent/CN107143150A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218Increasing or restoring the load-bearing capacity of building construction elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention discloses a kind of ruggedized construction of C-type steel/Z-shape steel purlin, including C-type steel/Z-shape steel body, on the intrinsic top of C-type steel/Z-shape steel, set and reinforce steel bar, and reinforce steel bar and fixed by the connecting hole on C-type steel/Z-shape steel with building beam or post, reinforce steel bar and held out against by top-fastening rod and C-type steel/Z-shape steel top.The present invention is rational in infrastructure, can effectively improve C-type steel/Z-shape steel purlin bearing capacity, and it is very convenient, reliable to construct.

Description

The ruggedized construction of C-type steel/Z-shape steel purlin
Technical field
The present invention relates to a kind of ruggedized construction of C-type steel/Z-shape steel purlin.
Background technology
Existing C-type steel/Z-shape steel purlin, in the case where bearing larger pressure, it appears compare thin, Lack of support, The need for large-sized workshop building etc. can not be met.
The content of the invention
It is an object of the invention to provide C-type steel/Z-type that one kind can effectively improve C-type steel/Z-shape steel purlin bearing capacity The ruggedized construction of steel purlin bar.
The present invention technical solution be:
A kind of C-type steel/Z-shape steel(That is C-type steel or Z-shape steel)The ruggedized construction of purlin, including C-type steel/Z-shape steel body, its feature It is:On the intrinsic top of C-type steel/Z-shape steel, set and reinforce steel bar, and reinforce steel bar by C-type steel/Z-shape steel with building The connecting hole of thing beam or post is fixed, and reinforces steel bar by top-fastening rod with being held out against at the top of C-type steel/Z-shape steel.
The reinforcing steel bar is tabular or angle steel.
The top-fastening rod is bolt, and the reinforcing steel bar is one layer, reinforces the bolt hole for setting and coordinating with bolt on steel bar, Bolt is held out against at the top of C-type steel/Z-shape steel through the bolt hole reinforced on steel bar.
The top-fastening rod is bolt, and the reinforcing steel bar is upper and lower two stratified form, and lower floor reinforces on steel bar and set and bolt Upper strata reinforcing steel bar is held out against and is fitted in C-type steel/Z-type by the bolt hole of cooperation, bolt through the bolt hole that lower floor is reinforced on steel bar At the top of steel.
The top-fastening rod is metallic rod, and the reinforcing steel bar is one layer, and metallic rod upper end at the top of C-type steel/Z-shape steel with welding Connect, metallic rod bottom is connected with reinforcing steel bar, set and worn in the construction for installing steel wire rope, steel wire penetrating metallic rod in metallic rod The construction of steel loading cord, the two ends of steel wire rope are connected with steel wire rope stretching device.
The construction of steel wire rope is installed for the perforation in metallic rod or the arc of metallic rod lower end is recessed or metallic rod lower end is connected Downwardly open arc.
The steel wire rope stretching device is Double-ended nut or gaily decorated basket nut, and one end of Double-ended nut or gaily decorated basket nut passes through even Fitting is connected with C-type steel/Z-shape steel(It can be fixed on the connecting hole with building beam or post on C-type steel/Z-shape steel), the other end It is connected with steel wire rope.
The present invention is rational in infrastructure, can effectively improve C-type steel/Z-shape steel purlin bearing capacity, and it is very convenient, reliable to construct.
Brief description of the drawings
The invention will be further described with reference to the accompanying drawings and examples.
Fig. 1 is the structural representation of the embodiment of the present invention 1.
Fig. 2 is Fig. 1 cross-sectional view.
Fig. 3 is the structural representation of embodiment 2.
Fig. 4 is Fig. 3 cross-sectional view.
Fig. 5 is the structural representation of embodiment 3.
Fig. 6 is Fig. 5 cross-sectional view.
Fig. 7 is that embodiment 1 reinforces steel bar using schematic diagram during angle steel.
Fig. 8 is Fig. 7 cross-sectional view.
Fig. 9 is embodiment 1 using schematic diagram during Z-shape steel purlin.
Figure 10 is Fig. 9 cross-sectional view.
Embodiment
Embodiment 1:
A kind of ruggedized construction of C-type steel/Z-shape steel purlin, including C-type steel/Z-shape steel body 1, it is intrinsic in C-type steel/Z-shape steel Top, sets and reinforces steel bar, and reinforces steel bar and fixed by the connecting hole 2 on C-type steel/Z-shape steel with building beam or post, plus Gu steel bar is by top-fastening rod with being held out against at the top of C-type steel/Z-shape steel.
The reinforcing steel bar is tabular(Shown in Fig. 1, Fig. 2)Or angle steel(Shown in Fig. 7, Fig. 8).
The top-fastening rod is bolt 3, and the reinforcing steel bar 4 is one layer, reinforces the bolt for setting and coordinating with bolt on steel bar Hole, bolt is held out against at the top of C-type steel/Z-shape steel through the bolt hole reinforced on steel bar.
Embodiment 2:
The top-fastening rod is bolt 5, and the reinforcing steel bar is upper and lower two stratified form 6,7, and lower floor reinforces on steel bar and set and bolt Upper strata reinforcing steel bar is held out against and is fitted in C-type steel/Z-type by the bolt hole of cooperation, bolt through the bolt hole that lower floor is reinforced on steel bar At the top of steel.
Remaining be the same as Example 1.
Embodiment 3:
The top-fastening rod is metallic rod 8, and the reinforcing steel bar 9 is one layer, and metallic rod upper end is welded with C-type steel/Z-shape steel top, Metallic rod bottom is connected with reinforcing steel bar, is set and is worn in the construction for installing steel wire rope 10, steel wire penetrating metallic rod in metallic rod The construction of steel loading cord, the two ends of steel wire rope are connected with steel wire rope stretching device.
The construction of steel wire rope is installed for the perforation in metallic rod or the arc of metallic rod lower end is recessed or metallic rod lower end is connected Downwardly open arc.
The steel wire rope stretching device is Double-ended nut or gaily decorated basket nut 11, and one end of Double-ended nut or gaily decorated basket nut passes through Connector is connected with C-type steel/Z-shape steel(It can be fixed on the connecting hole with building beam or post on C-type steel/Z-shape steel), it is another End is connected with steel wire rope.By adjusting Double-ended nut or gaily decorated basket nut, steel wire rope is tensioned, and then hold out against top-fastening rod.

Claims (7)

1. a kind of ruggedized construction of C-type steel/Z-shape steel purlin, including C-type steel/Z-shape steel body, it is characterized in that:In C-type steel/Z-type The intrinsic top of steel, sets and reinforces steel bar, and reinforcing steel bar passes through the connection with building beam or post on C-type steel/Z-shape steel Hole is fixed, and reinforces steel bar by top-fastening rod with being held out against at the top of C-type steel/Z-shape steel.
2. the ruggedized construction of C-type steel according to claim 1/Z-shape steel purlin, it is characterized in that:The reinforcing steel bar is plate Shape or angle steel.
3. the ruggedized construction of C-type steel according to claim 1 or 2/Z-shape steel purlin, it is characterized in that:The top-fastening rod is spiral shell Bolt, the reinforcing steel bar is one layer, reinforces the bolt hole for setting and coordinating with bolt on steel bar, and bolt passes through the spiral shell reinforced on steel bar Keyhole is held out against at the top of C-type steel/Z-shape steel.
4. the ruggedized construction of C-type steel according to claim 1 or 2/Z-shape steel purlin, it is characterized in that:The top-fastening rod is spiral shell Bolt, the reinforcing steel bar is upper and lower two stratified form, and lower floor reinforces the bolt hole for setting and coordinating with bolt on steel bar, and bolt is passed through Upper strata reinforcing steel bar is held out against and is fitted in C-type steel/Z-shape steel top by the bolt hole that lower floor is reinforced on steel bar.
5. the ruggedized construction of C-type steel according to claim 1 or 2/Z-shape steel purlin, it is characterized in that:The top-fastening rod is gold Belong to bar, the reinforcing steel bar is one layer, and metallic rod upper end at the top of C-type steel/Z-shape steel with welding, and metallic rod bottom is with reinforcing steel bar The construction that steel wire rope is installed in the construction for installing steel wire rope, steel wire penetrating metallic rod is set in connection, metallic rod, steel wire rope Two ends are connected with steel wire rope stretching device.
6. the ruggedized construction of C-type steel according to claim 5/Z-shape steel purlin, it is characterized in that:Install the construction of steel wire rope Arc for the perforation in metallic rod or metallic rod lower end is recessed or the downwardly open arc of metallic rod lower end connection.
7. the ruggedized construction of C-type steel according to claim 5/Z-shape steel purlin, it is characterized in that:The steel wire tensioning dress It is set to Double-ended nut or gaily decorated basket nut, one end of Double-ended nut or gaily decorated basket nut is connected by connector with C-type steel/Z-shape steel, separately One end is connected with steel wire rope.
CN201710511589.5A 2017-06-29 2017-06-29 The ruggedized construction of C-type steel/Z-shape steel purlin Pending CN107143150A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710511589.5A CN107143150A (en) 2017-06-29 2017-06-29 The ruggedized construction of C-type steel/Z-shape steel purlin

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710511589.5A CN107143150A (en) 2017-06-29 2017-06-29 The ruggedized construction of C-type steel/Z-shape steel purlin

Publications (1)

Publication Number Publication Date
CN107143150A true CN107143150A (en) 2017-09-08

Family

ID=59785196

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710511589.5A Pending CN107143150A (en) 2017-06-29 2017-06-29 The ruggedized construction of C-type steel/Z-shape steel purlin

Country Status (1)

Country Link
CN (1) CN107143150A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108374495A (en) * 2018-03-06 2018-08-07 王新宇 It is a kind of to be connected and fixed device for Z-shaped purlin and crossbeam

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0762610A (en) * 1993-08-23 1995-03-07 Yoshiyuki Ogushi Reinforced girder structure
JPH0849345A (en) * 1994-08-05 1996-02-20 Sekisui House Ltd Member for reinforcing beam
CN104533023A (en) * 2015-01-06 2015-04-22 沈阳建筑大学 Connecting structure of purline, roof panel and steel beam
CN205224412U (en) * 2015-08-13 2016-05-11 光正集团股份有限公司 Improved angle steel purlin support plate structure
CN205654117U (en) * 2016-03-14 2016-10-19 中冶建筑研究总院有限公司 Purlin or wall beam that increase C, Z shaped steel is connected with self -tapping screw
CN205857413U (en) * 2016-08-03 2017-01-04 广东精工钢结构有限公司 Square tube purlin and Z-shaped purline, c-type purlin attachment structure
CN106639348A (en) * 2016-11-02 2017-05-10 北京清华同衡规划设计研究院有限公司 Purline reinforcing structure
CN207092589U (en) * 2017-06-29 2018-03-13 虞建石 The ruggedized construction of C-type steel/Z-shape steel purlin

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0762610A (en) * 1993-08-23 1995-03-07 Yoshiyuki Ogushi Reinforced girder structure
JPH0849345A (en) * 1994-08-05 1996-02-20 Sekisui House Ltd Member for reinforcing beam
CN104533023A (en) * 2015-01-06 2015-04-22 沈阳建筑大学 Connecting structure of purline, roof panel and steel beam
CN205224412U (en) * 2015-08-13 2016-05-11 光正集团股份有限公司 Improved angle steel purlin support plate structure
CN205654117U (en) * 2016-03-14 2016-10-19 中冶建筑研究总院有限公司 Purlin or wall beam that increase C, Z shaped steel is connected with self -tapping screw
CN205857413U (en) * 2016-08-03 2017-01-04 广东精工钢结构有限公司 Square tube purlin and Z-shaped purline, c-type purlin attachment structure
CN106639348A (en) * 2016-11-02 2017-05-10 北京清华同衡规划设计研究院有限公司 Purline reinforcing structure
CN207092589U (en) * 2017-06-29 2018-03-13 虞建石 The ruggedized construction of C-type steel/Z-shape steel purlin

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108374495A (en) * 2018-03-06 2018-08-07 王新宇 It is a kind of to be connected and fixed device for Z-shaped purlin and crossbeam
CN108374495B (en) * 2018-03-06 2019-07-26 徐超 It is a kind of to be connected and fixed device for Z-shaped purlin and crossbeam

Similar Documents

Publication Publication Date Title
CN207211464U (en) A kind of new reinforcing steel bar truss plate
CN112727539B (en) Construction method for filling false roof by using shrinkable mesh material
CN207092589U (en) The ruggedized construction of C-type steel/Z-shape steel purlin
CN103075165A (en) Composite supporting method of vertical beam of coal road
CN107143150A (en) The ruggedized construction of C-type steel/Z-shape steel purlin
CN110985078A (en) High-resistance yielding large-deformation surface supporting system and mounting method thereof
CN203248177U (en) Pressure avoidable type liner plate device
CN202925954U (en) Steel structure factory building assembly
CN107268853A (en) A kind of full bolts assemblies formula steel skeleton light-duty plate and preparation method thereof
CN201546368U (en) Steel-structure column body
CN206737271U (en) A kind of a chain of bar connecting of bolt is buckled
CN207569004U (en) A kind of hanger fixing device of a Preembedded
CN208330412U (en) One kind being used for half-edge coal seam tunnelling supporting metal integral support
CN211777497U (en) Shield constructs section of jurisdiction hole for hoist built-in fitting position arrangement of reinforcement and improves structure
CN204326498U (en) Screw outrigger oblique pull wire rope fixing device
CN209686924U (en) A kind of large volume arc concrete steel lattice supporting framework
CN106812547A (en) Allow and press enhancing supporting mesh
CN203113368U (en) Communication tower valve base
CN203452066U (en) Non-prestressed high-strength centrifugal concrete square pile
CN201292674Y (en) Pull cable head stretching oblique-splicing reaction frame
CN202500589U (en) Ladder beam for anchor rod support
CN206428814U (en) High intensity square tube Roof system
CN220581069U (en) Equal-strength anchor cable and steel bar connecting beam
CN201407060Y (en) Ultrahigh-strength plastic supporting mesh
CN205655092U (en) High strength steel board

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20210413

Address after: Room 349, 3 / F, building 301-2, No. 301, Fute South Road, Pudong New Area pilot Free Trade Zone, Shanghai 200131

Applicant after: Shanghai Shangfu equipment Machinery Co.,Ltd.

Address before: 226200 No. 818 Huashi Road, Huilong Town, Qidong City, Nantong City, Jiangsu Province

Applicant before: Yu Jianshi

Applicant before: Lu Aiping

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170908