CN107143058A - A kind of modular assembly formula wall and its assembly method - Google Patents

A kind of modular assembly formula wall and its assembly method Download PDF

Info

Publication number
CN107143058A
CN107143058A CN201710194550.5A CN201710194550A CN107143058A CN 107143058 A CN107143058 A CN 107143058A CN 201710194550 A CN201710194550 A CN 201710194550A CN 107143058 A CN107143058 A CN 107143058A
Authority
CN
China
Prior art keywords
layer
cement
bar
heat
mat reinforcement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710194550.5A
Other languages
Chinese (zh)
Inventor
姚春胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ren Yuliang
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710194550.5A priority Critical patent/CN107143058A/en
Publication of CN107143058A publication Critical patent/CN107143058A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/56Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B1/00Producing shaped prefabricated articles from the material
    • B28B1/14Producing shaped prefabricated articles from the material by simple casting, the material being neither forcibly fed nor positively compacted
    • B28B1/16Producing shaped prefabricated articles from the material by simple casting, the material being neither forcibly fed nor positively compacted for producing layered articles
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/74Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
    • E04B1/88Insulating elements for both heat and sound
    • E04B1/90Insulating elements for both heat and sound slab-shaped
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/92Protection against other undesired influences or dangers

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Acoustics & Sound (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Building Environments (AREA)

Abstract

The present invention discloses a kind of modular assembly formula wall, including:Cement protective layer, steel wire, the first cement layer, heat-insulation layer, at least one layer of bar-mat reinforcement, the second cement layer, glass fiber mesh, internal decking sheet are arranged in order;Steel wire is connected with bar-mat reinforcement by multiple tie bars, forms the internal stent of support wall;Formwork is installed with the rectangular space of network structure of bar-mat reinforcement, each rectangle space;Heat-insulation layer is clipped between steel wire and bar-mat reinforcement by multiple tie bars;First cement layer is arranged between heat-insulation layer and cement protective layer;Second cement layer is arranged between heat-insulation layer and internal decking sheet.The wall of the present invention can the production of factory lines metaplasia, production is very fast, and easy construction, easily transport, can store, and sound insulation and heat insulation effect are preferable.

Description

A kind of modular assembly formula wall and its assembly method
Technical field
The present invention relates to green building technique field, more particularly to a kind of modular assembly formula wall and its assembly method.
Background technology
In order to reduce building waste and dust pollution, assembled architecture has obtained wideling popularize and supporting for government, existing In technology, assembled wall is typically using live formwork, fixed reinforcing bar, the mode of casting concrete, although so can be certain The pollution of airborne dust is reduced in degree, but its construction is slower, it is impossible to large batch of production, man power and material is wasted, due to existing Construction is more bothered, therefore assembled wall of the prior art is typically branch masterplate and then directly to be irrigated between at the scene Coagulation local soil type is into such wall relatively sinks, and is difficult construction, it is impossible to mobile, and not good without insulation, soundproof effect.
The content of the invention
It is that original vertical production becomes it is an object of the invention to provide a kind of modular assembly formula wall and its assembly method Into the level production in factory, it is to avoid hollowing, fried mould easily occurs in cast in situs, the defect such as be difficult to vibrate, and the present invention passes through Tie bar links together all parts of wall, makes construction more convenient, quick, also easily transport, in addition, bar-mat reinforcement The formwork of middle cavity is provided with space, sound insulation and the heat insulation effect of wall is added, cement consumption and construction weight is reduced.This The wall of invention can the production of factory lines metaplasia, it is ensured that the quality of production, production is very fast, and saves substantial amounts of manpower.
To achieve the above object, the invention provides a kind of modular assembly formula wall, including:Cement protective layer, steel wire Net, the first cement layer, heat-insulation layer, at least one layer of bar-mat reinforcement, the second cement layer, glass fiber mesh, internal decking sheet are arranged in order;Institute State steel wire to be connected by multiple tie bars with the bar-mat reinforcement, form the internal stent of support wall;The bar-mat reinforcement Formwork is installed with the rectangular space of network structure, each described rectangle space;The heat-insulation layer passes through multiple drawknot bars Part is clipped between the steel wire and the bar-mat reinforcement;Wherein, the tie bar is clamped comprising steel wire clamping part, reinforcing bar Portion;First cement layer is filled in the way of irrigating between the heat-insulation layer and cement protective layer;Second cement layer It is filled in mould in the way of perfusion between the heat-insulation layer and the internal decking sheet.
Wherein, the modular assembly formula wall includes multistory reinforced net, passes through the drawknot bar between bar-mat reinforcement two-by-two Part is fixedly connected.
Wherein, heat-insulation layer uses benzene plate, styrofoam, extruded sheet, polystyrene foam plate, hard foam polyurethane, poly- carbon The template insulation materials such as acid esters, phenolic aldehyde, perlite and cement plate, foamed cement board.
Wherein, the cavity body that the formwork is surrounded by upper plate, peripheral side wall, lower plate.
Wherein, filled with light in the cavity body that the formwork is surrounded by upper plate, peripheral side wall, lower plate, the cavity body Matter inserts.
Wherein, the outer surface of the cement protection is provided with the decorative layer with uneven pattern and color.
Wherein, the cement protective layer, the steel wire, first cement layer, the heat-insulation layer are integrally formed.
Wherein, the heat-insulation layer is provided with protective plate close to the one side of internal decking sheet.
Wherein, in second cement layer cement do not stress part be formed as close rib wallboard.
According to another aspect of the present invention, the invention provides a kind of assembly method of modular assembly formula wall, the party Method includes:Heat-insulation layer is fixed on the multiple tie bar by the bar of the multiple tie bar;Multiple tie bars The steel wire is fixed in steel wire blessing portion;The bar-mat reinforcement is fixed in the bar-mat reinforcement blessing portion of multiple tie bars;In the steel Formwork is filled in each grid of muscle net;The glass fiber mesh is fixed together with the internal decking sheet;Cement is protected Layer is fixed with the steel screen layer;Side between cement protective layer and internal decking sheet is sealed with plate;In the heat-insulation layer The cement injection between the cement protective layer, forms the first cement layer.Between the heat-insulation layer and the internal decking sheet Cement injection in space, forms the second cement layer.
Technical solution of the present invention can reach following technique effect:
1) it is simple in construction, can factorial praluction, save substantial amounts of manpower and low cost, save financial resources;
2) wall can reach good insulation and soundproof effect;
3) the prepackage assembly of tie bar and heat-insulation layer is set so that modular assembly formula wall construction more facilitates;
4) insulation layer thickness can increase and decrease according to the actual requirements.
5) heat-insulation layer can increase other function extra plays, such as electric heating, armour plate etc..
Brief description of the drawings
Fig. 1 is a kind of structural representation of modular assembly formula wall of the present invention;
Cement protective layer 1, steel wire 2, the first cement layer 3, heat-insulation layer 4, bar-mat reinforcement 5, the second cement layer 6, glass fibre Net 7, internal decking sheet 8, tie bar 9, formwork 10.
Embodiment
To make the object, technical solutions and advantages of the present invention of greater clarity, with reference to embodiment and join According to accompanying drawing, the present invention is described in more detail.It should be understood that these descriptions are merely illustrative, and it is not intended to limit this hair Bright scope.In addition, in the following description, the description to known features and technology is eliminated, to avoid unnecessarily obscuring this The concept of invention.
Embodiment 1
As illustrated, a kind of modular assembly formula wall includes:Cement protective layer 1, steel wire 2, the first cement layer 3, guarantor Warm layer 4, at least one layer of bar-mat reinforcement 5, the second cement layer 6, glass fiber mesh 7, internal decking sheet 8 are arranged in order.The steel wire 2 with The bar-mat reinforcement 5 is connected by multiple tie bars 9, forms the internal stent of support wall;The network structure of the bar-mat reinforcement 5 Formwork 10 is installed with rectangular space, each described rectangle space;Specifically, bar-mat reinforcement 5 is mutual by a plurality of reinforcing bar It is vertically arranged to form the net with multiple rectangular mesh, formwork 10 is installed in each grid of bar-mat reinforcement 5, the quantity of formwork 10 can To be one, two, four etc., particular number is determined with the size of grid and formwork 10.The present invention is by the middle of bar-mat reinforcement 5 Formwork 10 is accommodated, because formwork 10 is cavity structure, insulation and the soundproof effect of wall are added, similar to double glazing.
Wherein, the heat-insulation layer 4 is clipped between the steel wire 2 and the bar-mat reinforcement 5 by multiple tie bars 9;I.e. Tie bar 9 connects steel wire 2 and the middle part of bar-mat reinforcement 5 is connected by bar, and bar passes through heat-insulation layer 4, and one end is steel wire 2 Bearing, one end is the bearing of bar-mat reinforcement 5, bar-mat reinforcement 5, steel wire 2 and heat-insulation layer 4 is fixed together. During installation, heat-insulation layer and tie bar are by the way of prepackage assembly, so so that construction is more convenient, fast.
When the cement protective layer 1 of the present invention, steel wire 2, heat-insulation layer 4, at least one layer of bar-mat reinforcement 5, glass fiber mesh 7, interior After decorative layer 8 is fixed, cement is filled in the heat-insulation layer 4 in the way of level is irrigated in a mold and protected with cement Layer 1 between form the first cement layer 3, in mould in the way of perfusion by cement be filled in the heat-insulation layer 4 with it is described built-in Adorn between layer 8, form the second cement layer 6.So cement is filled with spaces all inside wall, further strengthens wall Steadiness, on the other hand, because bar-mat reinforcement 5 and steel wire 2 are all network structure, so optimizes knot of the cement inside wall Structure, and the use of formwork 10 and heat-insulation layer 4 further saves the consumption of cement, and effectively serve and be incubated sound insulation Effect.
It should be noted that, the tie bar 9 comprising the clamping part of steel wire 2, reinforcing bar clamping part, be connected to steel wire 2 and press from both sides Hold the bar between portion and reinforcing bar clamping part.
Further, the wall includes multistory reinforced net 5, between the steel wire 2 and at least one layer of bar-mat reinforcement 5 It is fixedly connected by the tie bar 9.Specifically, when needing thicker wall, because the tie bar 9 of the present invention can be with Lengthen, you can a bar is fixedly connected with the position in clamping bar-mat reinforcement 5 originally again, the other end of bar is again provided with clamping steel The structure of muscle net 5, therefore the sustainable extension of this tie bar 9, wall can also design multistory reinforced net 5, when many just mistakes of design During bar-mat reinforcement 5, two-by-two between bar-mat reinforcement 5 can a cement injection, one layer of heat preservation can also be clamped between bar-mat reinforcement 5 two-by-two Plate, then again in gap joints cement.
Further, heat-insulation layer 4 using benzene plate, styrofoam, extruded sheet, polystyrene foam plate, hard foam polyurethane, The template insulation materials such as makrolon, phenolic aldehyde, perlite and cement plate, foamed cement board.
Further, the cavity body that the formwork 10 is surrounded by upper plate, peripheral side wall, lower plate.
Further, filled out in the cavity body that the formwork 10 is surrounded by upper plate, peripheral side wall, lower plate, the cavity body Filled with light filler.
Further, the edge of wall may be configured as uneven solid figure or planar shaped, and concavo-convex three-dimensional edge can Mould one-shot forming is used, and color can be diversified, can so make processing quick, can also increase the attractive in appearance of wall.
Further, the outer surface of the cement protective layer 1 is provided with the decorative layer with uneven pattern and color, It can be used and instead beat ceramic tile and art concrete surface layer technique to design cement protective layer 1.So, wall is practicality, can also be met Requirement of the user to aesthetic feeling.
Further, the cement protective layer 1, the steel wire 2, first cement layer 3, the one of the heat-insulation layer 4 Formed.Specific cement protective layer 1, steel wire 2, the first cement layer 3, heat-insulation layer 4 are integrally formed as the one of insulation and decoration structure Body plate.
Further, the heat-insulation layer 4 is provided with protective plate close to the one side of internal decking sheet 8, and wherein protective plate can be With defense function, such as in a special case, such as chaos caused by war, riot, the protective plate can be armour plate.The protective plate It, with heating or refrigerating function, such as can be radiator, pre-buried can also enter other equipment that can be.
Further, in second cement layer 6 cement do not stress part be formed as close rib wallboard, effectively alleviate structure The weight built.As described above, the present invention is linked together all parts of wall by tie bar, make construction more square Just, fast, also easily transport, in addition, being provided with the formwork of middle cavity at bar-mat reinforcement space, adds the sound insulation and insulation of wall Effect.Reduce cement consumption and construction weight.The wall of the present invention can the production of factory lines metaplasia, production is very fast, and saves Substantial amounts of manpower.
Embodiment 2
The embodiment of the present invention 2 provides a kind of assembly method of modular assembly formula wall, and methods described includes following step Suddenly:
Step S1, heat-insulation layer is fixed on the multiple tie bar by the bar of the multiple tie bar;
Specifically, heat-insulation layer forms prefabricated overall structure with multiple tie bars, wherein heat-insulation layer is near internal decking sheet One side can be set protective plate, wherein protective plate can be with defense function, such as in a special case, such as chaos caused by war, sudden and violent Disorderly etc., the protective plate can be armour plate.It, with heating or refrigerating function, such as can be heating that the protective plate, which can be, Piece etc., pre-buried can also enter other equipment.
The steel wire is fixed in step S2, the steel wire blessing portion of multiple tie bars;
The bar-mat reinforcement is fixed in step S3, the bar-mat reinforcement blessing portion of multiple tie bars;According to above-mentioned steps S1, S2 and S3, steel wire, heat-insulation layer and bar-mat reinforcement are linked together by tie bar.
Wherein step S2 and step S3 interchangeables.
Step S4, formwork is filled in each grid of the bar-mat reinforcement;
Wherein, formwork be the cavity body that is surrounded by upper plate, peripheral side wall, lower plate or by upper plate, peripheral side wall, under Plate surrounds the cavity body filled with light filler.The quantity of filling formwork is big with sizing grid and formwork in each grid in addition Depending on small, generally, the full each grid of formwork filling can so save the consumption of cement, and can effectively increase The insulation of wall and soundproof effect.
Step S5, the glass fiber mesh is fixed together with the internal decking sheet;
Step S6, cement protective layer is fixed with the steel screen layer;
Specifically, shareholder's mode in step S5 and step S6 can also adopt what is be screwed by the way of bonding Mode.
Wherein, step S5 and step S6 interchangeables.
Step S7, the side between cement protective layer and internal decking sheet is sealed with plate;
Step S8, the cement injection between the heat-insulation layer and the cement protective layer forms the first cement layer.
Specifically, first cement layer is filled in mould in the way of level is irrigated.
Cement injection in step S9, the space between the heat-insulation layer and the internal layer, forms the second cement layer.
Specifically, second cement layer is filled in the heat-insulation layer and the interior trim in mould in the way of perfusion Between layer.
Wherein, step S8 and step S9 interchangeables.
The assembly method of the modular assembly formula wall of the present invention, mounting means is simple, can batch production largely produce, efficiency It is higher, it is adapted to most of areas and uses.
It should be appreciated that the above-mentioned embodiment of the present invention is used only for exemplary illustration or explains the present invention's Principle, without being construed as limiting the invention.Therefore, that is done without departing from the spirit and scope of the present invention is any Modification, equivalent substitution, improvement etc., should be included in the scope of the protection.In addition, appended claims purport of the present invention Covering the whole changes fallen into scope and border or this scope and the equivalents on border and repairing Change example.

Claims (10)

1. a kind of modular assembly formula wall, it is characterised in that including:Cement protective layer (1), steel wire (2), the first cement layer (3), heat-insulation layer (4), at least one layer of bar-mat reinforcement (5), the second cement layer (6), glass fiber mesh (7), internal decking sheet (8) are arranged successively Row;
The steel wire (2) is connected with the bar-mat reinforcement (5) by multiple tie bars (9), forms the inside branch of support wall Frame;
Formwork (10) is installed with the rectangular space of network structure of the bar-mat reinforcement (5), each described rectangle space;
The heat-insulation layer (4) is clipped between the steel wire (2) and the bar-mat reinforcement (5) by multiple tie bars (9);Its In, the tie bar (9) includes steel wire (2) clamping part, reinforcing bar clamping part;
First cement layer (3) is arranged between heat-insulation layer (4) and cement protective layer (1), and first cement layer is in mould It is interior to be filled in the way of level is irrigated;
Second cement layer (6) is filled in the heat-insulation layer (4) and the internal decking sheet (8) in mould in the way of perfusion Between.
2. modular assembly formula wall according to claim 1, it is characterised in that the wall includes multistory reinforced net (5);
It is fixedly connected between the steel wire (2) and at least one layer of bar-mat reinforcement (5) by the tie bar (9).
3. according to any described modular assembly formula wall of claim 1 or 2, it is characterised in that heat-insulation layer (4) uses benzene Plate, styrofoam, extruded sheet, polystyrene foam plate, hard foam polyurethane, makrolon, phenolic aldehyde, perlite and cement plate, bubble The template insulation material such as foam cement plate.
4. modular assembly formula wall according to claim 1, it is characterised in that the formwork (10) passes through upper plate, week Enclose side wall, the cavity body that lower plate is surrounded.
5. modular assembly formula wall according to claim 1, it is characterised in that the formwork (10) passes through upper plate, week Enclose side wall, the cavity body that lower plate is surrounded, light filler is filled with the cavity body.
6. modular assembly formula wall according to claim 1, it is characterised in that the appearance of the cement protective layer (1) Face is provided with the decorative layer with uneven pattern and color.
7. modular assembly formula wall according to claim 1, it is characterised in that the cement protective layer (1), the steel Silk screen (2), first cement layer (3), the heat-insulation layer (4) are integrally formed.
8. modular assembly formula wall according to claim 1, it is characterised in that the heat-insulation layer is close to internal decking sheet Simultaneously it is provided with protective plate.
9. modular assembly formula wall according to claim 1, it is characterised in that cement in second cement layer (6) Do not stress and be partly formed as close rib wallboard.
10. a kind of assembly method of modular assembly formula wall, it is characterised in that the described method comprises the following steps:
Heat-insulation layer is fixed on the multiple tie bar by the bar of the multiple tie bar;
The steel wire is fixed in the steel wire blessing portion of multiple tie bars;
The bar-mat reinforcement is fixed in the bar-mat reinforcement blessing portion of multiple tie bars;
Formwork is filled in each grid of the bar-mat reinforcement;
The glass fiber mesh is fixed together with the internal decking sheet;
Cement protective layer is fixed with the steel screen layer;
Side between cement protective layer and internal decking sheet is sealed with plate;
The cement injection between the heat-insulation layer and the cement protective layer, forms the first cement layer.
Cement injection in space between the heat-insulation layer and the internal decking sheet, forms the second cement layer.
CN201710194550.5A 2017-03-29 2017-03-29 A kind of modular assembly formula wall and its assembly method Pending CN107143058A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710194550.5A CN107143058A (en) 2017-03-29 2017-03-29 A kind of modular assembly formula wall and its assembly method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710194550.5A CN107143058A (en) 2017-03-29 2017-03-29 A kind of modular assembly formula wall and its assembly method

Publications (1)

Publication Number Publication Date
CN107143058A true CN107143058A (en) 2017-09-08

Family

ID=59783501

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710194550.5A Pending CN107143058A (en) 2017-03-29 2017-03-29 A kind of modular assembly formula wall and its assembly method

Country Status (1)

Country Link
CN (1) CN107143058A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107975184A (en) * 2017-10-27 2018-05-01 深圳市东深工程有限公司 A kind of assembled architecture integrated wall and its construction method
CN108867892A (en) * 2018-06-27 2018-11-23 东莞唯度电子科技服务有限公司 A kind of building assembly wallboard
CN109235698A (en) * 2018-11-14 2019-01-18 华东建筑设计研究院有限公司 Compound external wall panel
CN109750767A (en) * 2019-02-23 2019-05-14 江苏中森建筑设计有限公司 Assembled heat insulation wall and its construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH627808A5 (en) * 1978-03-09 1982-01-29 Zanoli Zementwaren Ag Prefabricated insulating facade element
WO2010105496A1 (en) * 2009-03-19 2010-09-23 哈尔滨吴淑环建设工程技术研究有限公司 External heat preservation composite wall of exterior wall with support
CN104032870A (en) * 2014-06-06 2014-09-10 中国十七冶集团有限公司 Integrally fabricated box-shaped multi-ribbed composite floor
CN203834730U (en) * 2014-05-16 2014-09-17 湖北宏联众轻钢结构房屋有限公司 Wall
CN206646680U (en) * 2017-03-29 2017-11-17 姚春胜 A kind of modular assembly formula wall

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH627808A5 (en) * 1978-03-09 1982-01-29 Zanoli Zementwaren Ag Prefabricated insulating facade element
WO2010105496A1 (en) * 2009-03-19 2010-09-23 哈尔滨吴淑环建设工程技术研究有限公司 External heat preservation composite wall of exterior wall with support
CN203834730U (en) * 2014-05-16 2014-09-17 湖北宏联众轻钢结构房屋有限公司 Wall
CN104032870A (en) * 2014-06-06 2014-09-10 中国十七冶集团有限公司 Integrally fabricated box-shaped multi-ribbed composite floor
CN206646680U (en) * 2017-03-29 2017-11-17 姚春胜 A kind of modular assembly formula wall

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
于林平: "《图解混凝土工程施工细部做法100讲》", 31 December 2016 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107975184A (en) * 2017-10-27 2018-05-01 深圳市东深工程有限公司 A kind of assembled architecture integrated wall and its construction method
CN108867892A (en) * 2018-06-27 2018-11-23 东莞唯度电子科技服务有限公司 A kind of building assembly wallboard
CN109235698A (en) * 2018-11-14 2019-01-18 华东建筑设计研究院有限公司 Compound external wall panel
CN109750767A (en) * 2019-02-23 2019-05-14 江苏中森建筑设计有限公司 Assembled heat insulation wall and its construction method

Similar Documents

Publication Publication Date Title
CN206646680U (en) A kind of modular assembly formula wall
CN107143058A (en) A kind of modular assembly formula wall and its assembly method
CN106351511B (en) Prefabricated components Assembled surrounding wall and its installation method
CN103452231B (en) Ultrathin heat insulation board prefabricated composite wallboard and prefabricating method thereof
CN201241404Y (en) Reinforced concrete external casting built-in heat preservation heat insulation wall
CN107514074A (en) A kind of wall of assembled architecture for exempting from decoration and preparation method thereof
CN104405097B (en) Heat-insulating decorative template integrated structure and structural wall comprising heat-insulating decorative template integrated structure
CN206521849U (en) A kind of structure and the prefabricated Side fascia of energy saving integrated
CN205502376U (en) Building structure and multi -functional compound mould intergral template that protects thereof
CN103015598B (en) A kind of construction method of energy-conservation close rib cavity floor
CN107806206A (en) Entire body gradual change cement plate and preparation method thereof
CN208072710U (en) A kind of composite filled wall of cast-in-place steel wire net rack
CN210049403U (en) Frame and shear wall core tube combined assembly type structure system
CN201214848Y (en) Steel mesh enhanced high strength baffle wall ribbon board
CN108396905A (en) A kind of insulated compound trabs and its manufacturing method of prefabricated band ceramic tile layer
CN207959690U (en) A kind of assembled architecture wallboard
CN202672410U (en) Novel combination type partition wallboard
CN208455931U (en) A kind of heat preservation assembled wallboard with decorative layer
CN208455933U (en) A kind of insulated compound trabs of prefabricated band ceramic tile layer
CN208267173U (en) Assembled exempts from beam forms enclosure wall shell
CN207660174U (en) Precast concrete complex heat-preservation out-hung panel
CN204781581U (en) Prefabricated wallboard of foam concrete is strengthened to fibre
CN208309976U (en) A kind of northwest extremely frigid zones assembled architecture heat preservation and soundproof hollow filling wall module
CN208455859U (en) A kind of prefabricated thermal insulation combined wall board
CN108301556A (en) A kind of heat preservation assembled wallboard and preparation method thereof with decorative layer

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20200605

Address after: 311200 building a, 236-2 Xiaoqing Avenue, economic and Technological Development Zone, Xiaoshan District, Hangzhou City, Zhejiang Province 2725

Applicant after: Zhejiang Chengding assembly Construction Co.,Ltd.

Address before: 457100 No. 109 Yao village, Haitong Town, Puyang County, Puyang, Henan

Applicant before: Yao Chunsheng

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20220627

Address after: No. 41, Houzhuang group, Qili community, Yiling Town, Jiangdu District, Yangzhou City, Jiangsu Province 225200

Applicant after: Ren Yuliang

Address before: Room 2725, building a, No. 236-2, Xiaoqing Avenue, economic and Technological Development Zone, Xiaoshan District, Hangzhou City, Zhejiang Province, 311200

Applicant before: Zhejiang Chengding assembly Construction Co.,Ltd.

TA01 Transfer of patent application right