CN107142960A - A kind of city piping lane construction method - Google Patents

A kind of city piping lane construction method Download PDF

Info

Publication number
CN107142960A
CN107142960A CN201710342575.5A CN201710342575A CN107142960A CN 107142960 A CN107142960 A CN 107142960A CN 201710342575 A CN201710342575 A CN 201710342575A CN 107142960 A CN107142960 A CN 107142960A
Authority
CN
China
Prior art keywords
pipe gallery
piping lane
internal model
mobile formwork
template
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710342575.5A
Other languages
Chinese (zh)
Inventor
吴赟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN201710342575.5A priority Critical patent/CN107142960A/en
Publication of CN107142960A publication Critical patent/CN107142960A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The present invention discloses a kind of city piping lane construction method, first pours piping lane bottom plate and 50 ± 10cm side walls;Secondly, after the completion of first time concreting, concrete strength is reached after design strength 80 ± 5%, and piping lane mobile formwork track is laid on piping lane bottom plate;Then pipe gallery main body, is set up on above-mentioned pipe gallery mobile formwork track;Side wall remainder and piping lane concrete roof are poured in above-mentioned pipe gallery main body, after concrete strength reaches the 80 ± 5% of design strength, jackscrew is turned down, removes split bolt;When internal model side template is naturally drooped under gravity, above-mentioned pipe gallery mobile formwork structure row is driven to next station, realizes synchronous reach;Exterior sheathing is finally suspended in midair using crane, next station is moved to along lower section slide rail;The whole city integrated piping lane of the completion that repeats the above steps is built.The method that the present invention provides the mould bases framework pipe gallery of a kind of repeatable utilization and automatically walk, reduces repeated support body and template construction.

Description

A kind of city piping lane construction method
Technical field
The present invention relates to public utility technical field, more particularly to a kind of city piping lane construction method.
Background technology
City integrated piping lane be built in Urban Underground be used for accommodate the two classes and structures of above municipal engineering pipeline and attached Facility.Pipe gallery is that underground urban duct integrates corridor.A tunnel space is built in Urban Underground, by electric power, communication, combustion The various utilities pipelines such as gas, heat supply, plumbing are integrated in one, provided with special access hole, hoisting port and monitoring system, implement system One planning, Uniting, the unified important infrastructure and " lifeline " built and managed, be guarantee city operations.It is real Apply unified planning, design, construction and safeguard, be built in the public utility that Urban Underground is used to lay municipal public use pipeline.
Pipe gallery belongs to an important component of Hai Yudong line improvement projects, in national highway G223 the reconstruction scopes Longhai City Road (i.e. pile No. K1+755) to this engineering builds terminal seashore main road (i.e. pile No. K9+424.4) and lays pipe gallery, total length For 7669.4 meters, the wide 5.45m of standard paragraphs, high 5m (clear span 4.55m, clear height 4.0m), reinforced concrete structure.Pipe gallery is taken Section construction, section length is not more than 30m, and the structure composition form of pipe gallery includes:Standard paragraphs, end well, dog-house, row Ventilating shaft, cable exit, sinking section equal section, wherein most is standard paragraphs, and physical dimension is completely the same.Traditional construction technique Long in time limit and artificial and material cost constantly increases with the construction period.
The content of the invention
It is an object of the invention to overcome the deficiencies of the prior art and provide a kind of city piping lane construction method.
The technical scheme is that a kind of a kind of city piping lane construction method of city piping lane construction method, using integrated pipe Corridor mobile formwork structure, the pipe gallery mobile formwork includes mobile formwork running gear, stress supporting construction and template; The mobile formwork running gear includes walking truss and movable motor;The stress supporting construction is fixed on the walking truss On;The template includes inner template and exterior sheathing, and the inner template is by the internal model backform on top, the internal model side form of both sides and company The internal model corner mould for connecing the internal model backform and the internal model side form is constituted, and the internal model side form passes through connector and the walking Truss is connected, and the surface of internal model side form is provided with back cord described in both sides;The inner template is erected at the stress by jackscrew In supporting construction;The side of the inner template and the side of the exterior sheathing are connected by split bolt;This method includes Following steps:
(1), pipe gallery concrete is poured in two times, first pours piping lane bottom plate and 50 ± 10cm side walls;
(2), after the completion of first time concreting, treat that concrete strength reaches the 80 ± 5% of design strength, at piping lane bottom Pipe gallery mobile formwork track is laid on plate;
(3) pipe gallery main body, is set up on above-mentioned steps (2) pipe gallery mobile formwork track:Using above-mentioned synthesis Piping lane mobile formwork structure;
(4), in above-mentioned steps (3) pipe gallery main body, side wall remainder and piping lane concrete roof are poured;
(5), after the completion of second of concreting, treat that concrete strength reaches the 80 ± 5% of design strength, turn down top Silk, removes split bolt;
(6) when, internal model side template is naturally drooped under gravity, by running gear, above-mentioned steps (3) pipe gallery is driven Main body, mobile formwork structure row to next station realizes synchronous reach;
(7) exterior sheathing, is suspended in midair using crane, next station is moved to along lower section slide rail;
(8), repeat the above steps (1) to (7), completes whole pipe gallery and builds.
The long 30m of step (3) the pipe gallery mobile formwork, longitudinal whole sections of merogenesis 6m mono-, a whole section uses 3 × 2m mono- Trifle, when standard paragraphs are constructed, using overall vertical shift to next station;During by non-standard segment, mode is dismounted using merogenesis, often 6m mono- saves vertical shift to next station.
The template by stainless steel composite plate texture into.
Beneficial effect
1st, the present invention provides a kind of utilization simple to operate, safe and reliable, repeatable and the mould bases framework of automatically walk is integrated The method of piping lane, reduces the repeated support body of standard paragraphs and template construction, accelerates construction speed, with traditional all round victory construction work Skill is compared, and each section of (about 30m) construction period saves 2 days, saves 10000 yuan of material and labour cost.
2nd, the structural steel amount that uses of the present invention is light, saves Material Cost, Quick Release support can iterative cycles utilize, it is convenient easy Operation, saves human and material resources, saves man-hour, and concrete formation is good, belongs to high-capacity environment-protecting building materials, is adapted to popularization and application.
Brief description of the drawings
Fig. 1 is the front view of pipe gallery mobile formwork structure of the present invention.
Fig. 2 is the side view of pipe gallery mobile formwork structure of the present invention.
Fig. 3 inserts disk buckle scaffold structural representation soon for the present invention's:
(a) vertical rod and terminal pad connection figure;(b) horizon bar and latch connection figure;(c) terminal pad connection figure;(d) brace With latch connection figure.
Fig. 4 is the structural representation after form removal of the present invention:
(a) mobile formwork structural representation;(b) it is internal model backform and the partial enlarged drawing of internal model corner mould junction; (c) internal model side form and the partial enlarged drawing of walking truss junction.
Fig. 5 is view before the exterior sheathing suspention after the running gear reach of the present invention.
Reference:1- walking truss, 2- movable motors, 3- inner templates, 4- exterior sheathings, tri- sections of water-proof bolts of 5-, 6- pairs Pull bar, 7- inserts disk buckle scaffold, 8- terminal pads, 9- vertical rods, 10- horizon bars, 11- braces, 12- latches, 13- back cords, 14- soon Internal model backform, 15- internal model side forms, 16- internal model corner moulds, 17- jackscrews, the joint of 18- changing angles, 19- rotary shafts, 20- Supporting leg, 21- pulleys, 22- conduits.
Embodiment
Below by specific embodiments and the drawings, the present invention is further illustrated.Embodiments of the invention are in order to more Those skilled in the art is more fully understood the present invention well, any limitation is not made to the present invention.
Embodiment:A kind of city piping lane construction method of the present invention, is built using pipe gallery mobile formwork structure, is such as schemed Shown in 1 and Fig. 2, the pipe gallery mobile formwork is arranged at the track on piping lane bottom plate, including mobile formwork running gear, Stress supporting construction and template;The mobile formwork running gear includes walking truss 1 and movable motor 2;The stress branch Support structure, which is adopted, to be bolted on the walking truss 1;The template includes inner template 3 and exterior sheathing 4, and the template is not by Plastics composite plate texture of becoming rusty into, the inner template 3 and exterior sheathing 4 by stainless steel composite plate texture into, the inner template 3 by The internal model backform 14 on top, the internal model side form 15 of both sides and connect the interior of the internal model backform 14 and the internal model side form 15 Mould corner mould 16 is constituted, and the internal model backform 14 is connected with the internal model corner mould 16 by rotary shaft 19, the internal model side form 15 are connected with the walking truss 2 by supporting leg 20;The inner template 3 is erected at the stress supporting construction by jackscrew 17 On, the side of the inner template 3 and the side of the exterior sheathing 4 are connected by split bolt, internal model described in the present embodiment The side of plate 3 is connected with the side of the exterior sheathing 4 using three sections of water-proof bolts 5, the top both sides use pair of the exterior sheathing 4 Pull bar 6 is supported;The surface of internal model side form 15 is provided with back cord 13 described in both sides, and the inner side back of side form 15 is pushed down by back cord 13, Three sections of sealing up screw 5 are passed through out of back cord 12, and power when to drawing is acted on back cord 13, are stablized between two sealing up screw 5 Template, prevent the mould that rises;The bottom of the exterior sheathing 4 as shown in Figure 5 is provided with pulley 21, coordinates reality with the conduit 22 on track Now slide, be easy to traction crane suspention, the present embodiment pulley 21 is arranged at the bottom right side of the exterior sheathing 4, can also use two Side bottom sets pulley mode;Stress supporting construction described in the present embodiment is described as shown in Figure 3 using slotting disk buckle scaffold 7 soon Slotting disk buckle scaffold 7 passes through terminal pad 8, vertical rod 9, horizon bar 10, brace 11 and latch 12, the joint 18 of changing angle soon Combination installation is formed, and vertical rod 9, horizon bar 10 and brace 11 have good stability, and quick for installation, simple, efficiency high is realized Stable support.Movable motor 2 described in the present embodiment uses threephase asynchronous, power 3KW, electric current 6.8A, rotating speed 1420r/ Min, voltage 380V.
The present invention's comprises the following steps that:First, pouring synthetic piping lane concrete in two times:First pour piping lane bottom plate and 50 ± 10cm side walls;After the completion of first time concreting, treat that concrete strength reaches the 80 ± 5% of design strength, at piping lane bottom Pipe gallery mobile formwork track is laid on plate;Then pipe gallery master, is set up on above-mentioned pipe gallery mobile formwork track Body:Set up using above-mentioned pipe gallery mobile formwork structure;In above-mentioned pipe gallery main body, side wall remainder and pipe are poured Corridor concrete roof;After the completion of second of concreting, treat that concrete strength reaches the 80 ± 5% of design strength, turn down top Silk, removes split bolt;Internal model side form as shown in Figure 4 is naturally drooped under gravity, and above-mentioned integrated pipe is driven by running gear Corridor main body, mobile formwork structure row to next station realizes synchronous reach;Exterior sheathing is finally suspended in midair using crane, along lower section Slide rail moves to next station;Repeat the above steps, complete the structure of city integrated piping lane.
The long 30m of pipe gallery mobile formwork described in the present embodiment, longitudinal whole sections of merogenesis 6m mono-, a whole section uses 3 × 2m mono- Trifle, when standard paragraphs are constructed, using overall vertical shift to next station;During by non-standard segment, mode is dismounted using merogenesis, often 6m mono- saves vertical shift to next station.
It should be appreciated that embodiment and example discussed herein simply to illustrate that, to those skilled in the art For, it can be improved or be converted, and all these modifications and variations should all belong to the protection of appended claims of the present invention Scope.

Claims (3)

1. a kind of city piping lane construction method, it is characterised in that use pipe gallery mobile formwork structure, the pipe gallery is moved Dynamic model frame includes mobile formwork running gear, stress supporting construction and template;The mobile formwork running gear includes walking Truss and movable motor;The stress supporting construction is fixed on the walking truss;The template includes inner template and external mold Plate, the inner template is by the internal model backform on top, the internal model side form of both sides and connects the internal model backform and the internal model side The internal model corner mould of mould is constituted, and the internal model side form is connected by connector with the walking truss, internal model side form described in both sides Surface be provided with back cord;The inner template is erected in the stress supporting construction by jackscrew;The side of the inner template Face and the side of the exterior sheathing are connected by split bolt;This method comprises the following steps:
(1), pipe gallery concrete is poured in two times, first pours piping lane bottom plate and 50 ± 10cm side walls;
(2), after the completion of first time concreting, treat that concrete strength reaches the 80 ± 5% of design strength, on piping lane bottom plate Lay pipe gallery mobile formwork track;
(3) pipe gallery main body, is set up on above-mentioned steps (2) pipe gallery mobile formwork track:Using above-mentioned pipe gallery Mobile formwork structure;
(4), in above-mentioned steps (3) pipe gallery main body, side wall remainder and piping lane concrete roof are poured;
(5), after the completion of second of concreting, treat that concrete strength reaches the 80 ± 5% of design strength, turn down jackscrew, tear open Except split bolt;
(6), internal model side form is naturally drooped under gravity, and above-mentioned steps (3) pipe gallery main body is driven by running gear, mobile Die carrier structure row realizes synchronous reach to next station;
(7) exterior sheathing, is suspended in midair using crane, next station is moved to along lower section slide rail;
(8), repeat the above steps (1) to (7), completes whole pipe gallery and builds.
2. according to the method described in claim 1, it is characterised in that step (3) the long 30m of pipe gallery mobile formwork, indulge To the whole sections of merogenesis 6m mono-, a whole section uses the trifles of 3 × 2m mono-, when standard paragraphs are constructed, using overall vertical shift to next station;It is logical When crossing non-standard segment, mode is dismounted using merogenesis, vertical shift is saved per 6m mono- to next station.
3. according to the method described in claim 1, it is characterised in that the template by stainless steel composite plate texture into.
CN201710342575.5A 2017-05-16 2017-05-16 A kind of city piping lane construction method Pending CN107142960A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710342575.5A CN107142960A (en) 2017-05-16 2017-05-16 A kind of city piping lane construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710342575.5A CN107142960A (en) 2017-05-16 2017-05-16 A kind of city piping lane construction method

Publications (1)

Publication Number Publication Date
CN107142960A true CN107142960A (en) 2017-09-08

Family

ID=59778073

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710342575.5A Pending CN107142960A (en) 2017-05-16 2017-05-16 A kind of city piping lane construction method

Country Status (1)

Country Link
CN (1) CN107142960A (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107905254A (en) * 2017-11-16 2018-04-13 中铁四局集团有限公司 The construction method of mould trolley in a kind of pipe gallery formwork integrated hydraulic
CN107905258A (en) * 2017-11-28 2018-04-13 中国冶集团有限公司 Pipe gallery exterior wall concrete construction method
CN108060682A (en) * 2017-12-05 2018-05-22 合迪科技江苏有限公司 Piping lane top die board mounting structure, piping lane model sheetinstallat system and its construction method
CN108098978A (en) * 2017-11-17 2018-06-01 九州职业技术学院 A kind of assembled underground pipe gallery epimere producing device and production method
CN108487307A (en) * 2018-05-16 2018-09-04 *** A kind of five in one construction method of pipe gallery construction
CN108571011A (en) * 2018-05-31 2018-09-25 山东建筑大学 A kind of casting system and casting method of fit drawing die plate minitype underground pipe gallery
CN108589773A (en) * 2018-05-03 2018-09-28 上海宝冶集团有限公司 A kind of construction system and form of construction work of piping lane engineering
CN108612127A (en) * 2018-05-07 2018-10-02 杨树军 A kind of construction method of pipe gallery construction
CN108951699A (en) * 2018-06-14 2018-12-07 上海二十冶建设有限公司 A kind of mobile internal model of the sectional type of pipe gallery and bracket and its application method
CN110528579A (en) * 2019-08-13 2019-12-03 中交第四航务工程局有限公司 Immersed tube tunnel template running gear, system and immersed tube tunnel template implementation method
CN110777659A (en) * 2019-10-17 2020-02-11 闫相明 Construction method of box culvert template system
CN111622263A (en) * 2020-04-22 2020-09-04 上海二十冶建设有限公司 Comprehensive pipe gallery construction method based on composite material combined type template system
CN112779929A (en) * 2021-02-08 2021-05-11 北京场道市政工程集团有限公司 Pouring and installing method of comprehensive pipe gallery
CN113818483A (en) * 2021-10-27 2021-12-21 中国十九冶集团有限公司 A template system for utility tunnel concrete placement
CN113846693A (en) * 2021-10-27 2021-12-28 中国十九冶集团有限公司 Construction method for pouring underground concrete comprehensive pipe gallery

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102966121A (en) * 2012-12-14 2013-03-13 中铁二十三局集团有限公司 Integrally movable mould frame for pipe rack cast-in-site construction

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102966121A (en) * 2012-12-14 2013-03-13 中铁二十三局集团有限公司 Integrally movable mould frame for pipe rack cast-in-site construction

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107905254A (en) * 2017-11-16 2018-04-13 中铁四局集团有限公司 The construction method of mould trolley in a kind of pipe gallery formwork integrated hydraulic
CN108098978A (en) * 2017-11-17 2018-06-01 九州职业技术学院 A kind of assembled underground pipe gallery epimere producing device and production method
CN107905258A (en) * 2017-11-28 2018-04-13 中国冶集团有限公司 Pipe gallery exterior wall concrete construction method
CN108060682A (en) * 2017-12-05 2018-05-22 合迪科技江苏有限公司 Piping lane top die board mounting structure, piping lane model sheetinstallat system and its construction method
CN108589773A (en) * 2018-05-03 2018-09-28 上海宝冶集团有限公司 A kind of construction system and form of construction work of piping lane engineering
CN108612127A (en) * 2018-05-07 2018-10-02 杨树军 A kind of construction method of pipe gallery construction
CN108487307B (en) * 2018-05-16 2021-01-12 *** Five-in-one construction method for comprehensive pipe gallery construction
CN108487307A (en) * 2018-05-16 2018-09-04 *** A kind of five in one construction method of pipe gallery construction
CN108571011A (en) * 2018-05-31 2018-09-25 山东建筑大学 A kind of casting system and casting method of fit drawing die plate minitype underground pipe gallery
CN108951699A (en) * 2018-06-14 2018-12-07 上海二十冶建设有限公司 A kind of mobile internal model of the sectional type of pipe gallery and bracket and its application method
CN108951699B (en) * 2018-06-14 2021-09-21 上海二十冶建设有限公司 Festival segmentation removal centre form and support of utility tunnel
CN110528579A (en) * 2019-08-13 2019-12-03 中交第四航务工程局有限公司 Immersed tube tunnel template running gear, system and immersed tube tunnel template implementation method
CN110777659A (en) * 2019-10-17 2020-02-11 闫相明 Construction method of box culvert template system
CN111622263A (en) * 2020-04-22 2020-09-04 上海二十冶建设有限公司 Comprehensive pipe gallery construction method based on composite material combined type template system
CN112779929A (en) * 2021-02-08 2021-05-11 北京场道市政工程集团有限公司 Pouring and installing method of comprehensive pipe gallery
CN113818483A (en) * 2021-10-27 2021-12-21 中国十九冶集团有限公司 A template system for utility tunnel concrete placement
CN113846693A (en) * 2021-10-27 2021-12-28 中国十九冶集团有限公司 Construction method for pouring underground concrete comprehensive pipe gallery
CN113846693B (en) * 2021-10-27 2023-02-28 中国十九冶集团有限公司 Construction method for pouring underground concrete comprehensive pipe gallery
CN113818483B (en) * 2021-10-27 2023-03-14 中国十九冶集团有限公司 A template system for utility tunnel concrete placement

Similar Documents

Publication Publication Date Title
CN107142960A (en) A kind of city piping lane construction method
CN208363127U (en) A kind of retaining wall structure of combined type high-speed rail platform
CN205530344U (en) Utility tunnel is pour to split type no mould
CN111365017B (en) Construction method of underground intercommunication tunnel
CN106759478B (en) A kind of prefabricated piping lane construction method
CN107419743A (en) A kind of new city pipe gallery mobile formwork
CN109610509A (en) A kind of the adjustable die system and construction method of pipe gallery automatic control section
CN212656260U (en) Assembled rail top air duct structure of underground station
CN103669400A (en) Typical construction method for prefabricated tube bank
CN206768865U (en) A kind of new city pipe gallery mobile formwork
CN206448293U (en) A kind of reverse construction ground prop structure
CN209603182U (en) A kind of adjustable die system of pipe gallery automatic control section
CN206195316U (en) Cable pit block and adopt cable pit that this cable pit block made
CN214798668U (en) Electric concealed piping mounting structure suitable for assembly type building construction
CN109137984A (en) Assembled integral mixes prefabricated pipe gallery
CN114875969A (en) Integrated construction method for open-cut cast-in-place underground comprehensive pipe gallery movable bench formwork
CN106013234B (en) The construction method of underground pipe gallery
CN113339003A (en) Construction method of tunnel integrated arch sheathing trolley
CN210483012U (en) Construction device for hyperboloid arc-shaped concrete wall
CN206721692U (en) A kind of hybrid structure of arch and beam continuous rigid frame bridge button hangs branch convolution constructing device
CN210341509U (en) Concrete rigid short circuit foundation structure of steep high-speed railway
CN209798708U (en) Half-and-half prefabricated corridor structure
CN208782449U (en) A kind of cable duct bank
CN111535361A (en) Assembled rail top air duct structure of underground station and construction method thereof
CN207244659U (en) A kind of Urban Underground pipe gallery scene rapidform machine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170908

WD01 Invention patent application deemed withdrawn after publication