CN107131356A - A kind of minimally invasive small-bore pipe-jacking project construction method - Google Patents
A kind of minimally invasive small-bore pipe-jacking project construction method Download PDFInfo
- Publication number
- CN107131356A CN107131356A CN201610111229.1A CN201610111229A CN107131356A CN 107131356 A CN107131356 A CN 107131356A CN 201610111229 A CN201610111229 A CN 201610111229A CN 107131356 A CN107131356 A CN 107131356A
- Authority
- CN
- China
- Prior art keywords
- return
- construction
- drilling
- drag
- jacking
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L1/00—Laying or reclaiming pipes; Repairing or joining pipes on or under water
- F16L1/024—Laying or reclaiming pipes on land, e.g. above the ground
- F16L1/028—Laying or reclaiming pipes on land, e.g. above the ground in the ground
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Earth Drilling (AREA)
Abstract
The invention discloses the minimally invasive small-bore pipe-jacking project construction method of one kind, comprise the following steps:(1) active well and received well are excavated respectively first;(2) horizontal directional drilling machine is mounted in active well, specific implementation is carried out from active well to received well, implementation steps include laser guide, return and drag drilling, return and drag borehole cleaning, the road master operation composition of jacking construction four.The present invention is small to original ground failure, improves operating efficiency, it is ensured that construction quality;The pressure that passed through to social passage is considerably reduced during use, construction noise is reduced, almost without airborne dust;Especially in region constructions such as urban road, limited construction site, underground utilities complexity and environmental requirement height, work efficiency substantially, has the advantages that construction area area is small, the construction period is short, original road is not destroyed, construction site periphery structures and high-efficiency environment friendly is not influenceed.
Description
Technical field
It is specifically a kind of minimally invasive small-bore pipe-jacking project construction method the present invention relates to construction project field.
Background technology
In construction project, there is small-bore pipeline heavy traffic, underground utilities are intensive, earth's surface has barrier, ground not
Allow large stretch of excavation, the non-excavating construction problem in the narrow and small limited location in construction site;There is pollution problem in small-bore pipeline construction;
Accurate control and the pipeline pipe-jacking technology of being oriented to of small-bore pipeline construction falls behind, and traditional small-bore pipeline work progress, ground is broken
Bad big, operating efficiency is low, and construction quality is poor, and social passage is passed through, and pressure is big, and construction noise is big, and airborne dust is serious, especially
It is obvious in region constructions such as urban road, limited construction site, underground utilities complexity and environmental requirement height.
By using and summarizing to minimally invasive small-bore pipe-jacking project engineering method, progressively amendment and the perfect content of engineering method, at present
The operation sequence of engineering method, method and Con trolling index are ripe day by day, successfully receive for Nanjing civic building market.First
Afterwards the minimally invasive small-bore pipe-jacking project of Jianning road sewage conduct pipe-jacking project, He Yanlu, Guo Jia hill paths sewage are participated in using the engineering method
Pipeline pipe-jacking project, Jinsha jiang River East Street pipe-jacking project, Hanzhong door street pipe-jacking project, the minimally invasive pipe-jacking project in Beiwei Lu, crow
The pipeline engineering jacking constructions such as the minimally invasive pipe-jacking project in mountain villa, with construction area area is small, the construction period is short, do not destroy original
Road, the advantages of do not influence construction site periphery structures and high-efficiency environment friendly, also have in municipal public engineering construction from now on
Wide market prospects.
The content of the invention
It is an object of the invention to provide the minimally invasive small-bore pipe-jacking project construction method of one kind, to solve to carry in above-mentioned background technology
The problem of going out.
To achieve the above object, the present invention provides following technical scheme:
A kind of minimally invasive small-bore pipe-jacking project construction method, comprises the following steps:
(1) active well and received well are excavated respectively first;
(2) horizontal directional drilling machine is mounted in active well, specific implementation is carried out from active well to received well, implemented
Step includes laser guide, returns and drag drilling, return and drag borehole cleaning, the road master operation composition of jacking construction four:
A. laser guide:First rig is positioned in active well, then laser-guided systems, laser-guided systems peace are progressively installed
Debug examination to complete, the laser that total powerstation is sent is projected on display screen, control to be oriented to jacking direction by light target;Lead
To during construction, guide rod drilling, the laser spot positions indicated according to display screen, by being rotatably connected on are promoted by rig
The direction of guide rod front end starter reaches the direction of advance of adjustment guide rod, it is ensured that guide rod is in a predetermined direction
Reach received well position;
B. return and drag drilling:Drilling tool heads are installed on the guide rod at received well position, along guide direction in active well
Return when rotating and drag drilling tool heads, return that earthwork when dragging in hole is cut to smash, and be fabricated to the sposh of half flow regime;
Return and drag drilling tool heads to return the reserved jointed rod of afterbody when dragging;
C. return and drag borehole cleaning:Reserve to install back on drilling rod at received well position after the completion of drilling and drag borehole cleaning ball, the edge in active well
Guide direction is returned when rotating and drags borehole cleaning ball, and mud is conveyed into back by rig by guide rod during time dragging drags borehole cleaning
Ball, then constantly spray into from borehole cleaning ball to surrounding hole wall the bentonite slurry of modulation;
D. jacking construction:Return after the completion of dragging borehole cleaning, the drilling equipment Removal on horizontal directional drilling machine be subjected to push pipe operation,
In tubing front end installation tool head tube cap during push pipe.
It is used as further scheme of the invention:The laser-guided systems include total powerstation, starter, guide rod, aobvious
Display screen, light target and support, total powerstation are arranged on support, and starter is installed in the front end of guide rod.
It is used as further scheme of the invention:The final deviation of guide rod is no more than ± 3cm in step a.
It is used as further scheme of the invention:Drilling tool heads are the towed equipment with cone bucket type guide head in step b.
It is used as further scheme of the invention:Returning in step c drags borehole cleaning ball to return support Counterboring apparatus with centralizer.
Compared with prior art, the beneficial effects of the invention are as follows:Solve small-bore pipeline close in heavy traffic, underground utilities
Collection, earth's surface have barrier, ground not to allow large stretch of excavation, the non-excavating construction problem in the narrow and small limited location in construction site;Solution
Small-bore pipeline of having determined construction is accurate to be oriented to control and pipeline pipe-jacking technology;Solve the problems, such as small-bore pipeline construction pollution;This hair
The bright technology for expanding the construction of no-dig technique small-bore pipeline uses space, small to original ground failure, improves operating efficiency, protects
Construction quality is demonstrate,proved;The pressure that passed through to social passage is considerably reduced during use, construction noise is reduced, does not almost have
Airborne dust;The work efficiency especially in region constructions such as urban road, limited construction site, underground utilities complexity and environmental requirement height
Substantially, with good social benefit, it is on the leading domestic level;With construction area area is small, the construction period is short, no
The advantages of destroying original road, do not influence construction site periphery structures and high-efficiency environment friendly, the municipal public engineering from now on is built
If in also have wide market prospects.
Brief description of the drawings
Fig. 1 is the laser-guided systems schematic diagram in minimally invasive small-bore pipe-jacking project construction method.
Fig. 2 is laser guide schematic diagram in minimally invasive small-bore pipe-jacking project construction method.
Fig. 3 drags drilling schematic diagram to be returned in minimally invasive small-bore pipe-jacking project construction method.
Fig. 4 is jacking construction schematic diagram in minimally invasive small-bore pipe-jacking project construction method.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clearly and completely
Description, it is clear that described embodiment only instrument is a part of embodiment of the invention, rather than whole embodiments.Based on this
Embodiment in invention, the every other reality that those of ordinary skill in the art are obtained under the premise of creative work is not made
Example is applied, the scope of protection of the invention is belonged to.
Refer in Fig. 1~4, the embodiment of the present invention, a kind of minimally invasive small-bore pipe-jacking project construction method excavates work first
Well and each one of received well, then horizontal directional drilling machine is mounted in active well, specific implementation is from active well to received well
Carry out, implementation steps include laser guide, return and drag drilling, return and drag borehole cleaning, the road master operation composition of jacking construction four.
The laser guide:First rig is positioned in active well, then the laser-guided systems of independent research, institute are progressively installed
Stating laser-guided systems includes total powerstation 1, starter 2, guide rod 3, display screen 4, light target 5 and support 6, swashs
The installation and debugging of light directing system are completed, and the laser that total powerstation 1 is sent is projected on display screen 4, controlled by light target 5
System is oriented to jacking direction;When being oriented to construction, guide rod 3 is promoted to creep into by rig, the laser light indicated according to display screen 4
Point position, the advance side of adjustment guide rod 3 is reached by being rotatably connected on the direction of the front end starter 2 of guide rod 3
To, it is ensured that guide rod 3 reaches received well position in a predetermined direction, and the final deviation of guide rod 3 is no more than ± 3cm.
Drag drilling described time:Drilling tool heads are installed on the guide rod 3 at received well position and (carry cone bucket type guide head
Towed equipment), returned in active well along guide direction when rotating and drag drilling tool heads, returned earthwork when dragging in hole and cut
Cut and smash, and be fabricated to the sposh of half flow regime;Return and drag drilling tool heads to return afterbody when dragging need to reserve jointed rod.
Drag borehole cleaning described time:Reserving to install back on drilling rod at received well position after the completion of drilling drags borehole cleaning ball (to carry centralizer
Return support Counterboring apparatus), return when rotating along guide direction in active well and drag borehole cleaning ball, mud is by rig during time dragging
It is conveyed into back by guide rod 3 and drags borehole cleaning ball, then constantly sprays into from borehole cleaning ball to surrounding hole wall the bentonite slurry of modulation.
The bentonite slurry of penetrating and return drag borehole cleaning ball collective effect, the soil body in duct is constantly stirred first, the soil body is become more
It is dilute it is thick be easy to flowing;Secondly, the hole wall periphery soil body is extruded so that the hole wall periphery soil body has more stablized retaining wall effect.
Simultaneously because the lubrication of bentonite slurry in itself, is that next step jacking pipeline plays lubrication and retaining wall effect
The jacking construction:Return after the completion of dragging borehole cleaning, the drilling equipment Removal on horizontal directional drilling machine be subjected to push pipe operation,
Must be in tubing front end installation tool head tube cap during push pipe.
The characteristics of present invention has that construction speed is fast, it is small to be influenceed on surrounding enviroment, only excavated on a small quantity to original ground, relies on
It uses high-performance mechanical technology and advanced construction technology, the φ 400- φ 800 municipal drainage pipe below 3 meters of buried depth
Carried out in road engineering it is a number of use, this engineering method construction cost is moderate, and the use low engineering cost in full of constructing is in urban road
Pipe laying construction use construction costs in full is excavated, construction quality is secure, is presented preferably in the construction of municipal public use underground pipe network
Economic benefit.
The present invention carries out construction effects of energy saving and emission reduction substantially using novel high-performance machinery, and the bentonite slurry of construction injection is nothing
The material of poison, depending on mud pit, pulping amount are not provided with the construction field (site) according to usage amount, the mixing shape soil ejected during push pipe is
Sposh, construction site is transported after the final desiccation of sposh, rather than mud is transported, and reduces environmental pollution.Construction area area is small,
Construction noise is small, the pressure that passed through to social passage is considerably reduced compared with excavating pipe laying, reduces construction noise, does not almost have
There is airborne dust, the work especially in region constructions such as urban road, limited construction site, underground utilities complexity and environmental requirement height
Effect is obvious, there is good social benefit.
It is obvious to a person skilled in the art that the invention is not restricted to the details of above-mentioned one exemplary embodiment, and do not carrying on the back
In the case of spirit or essential attributes from the present invention, the present invention can be realized in other specific forms.Therefore, no matter from
From the point of view of which point, embodiment all should be regarded as exemplary, and be nonrestrictive, the scope of the present invention is by appended power
Profit is required rather than described above is limited, it is intended that all in the implication and scope of the equivalency of claim by falling
Change is included in the present invention.Any reference in claim should not be considered as to the claim involved by limitation.
Moreover, it will be appreciated that although the present specification is described in terms of embodiments, not each embodiment is only included
One independent technical scheme, this narrating mode of specification is only that for clarity, those skilled in the art should be by
Specification is as an entirety, and the technical solutions in the various embodiments may also be suitably combined, and forming those skilled in the art can
With the other embodiment of understanding.
Claims (5)
1. a kind of minimally invasive small-bore pipe-jacking project construction method, it is characterised in that comprise the following steps:
(1) active well and received well are excavated respectively first;
(2) horizontal directional drilling machine is mounted in active well, specific implementation is carried out from active well to received well, implemented
Step includes laser guide, returns and drag drilling, return and drag borehole cleaning, the road master operation composition of jacking construction four:
A. laser guide:First rig is positioned in active well, then laser-guided systems, laser-guided systems peace are progressively installed
Debug examination to complete, the laser that total powerstation is sent is projected on display screen, control to be oriented to jacking direction by light target;Lead
To during construction, guide rod drilling, the laser spot positions indicated according to display screen, by being rotatably connected on are promoted by rig
The direction of guide rod front end starter reaches the direction of advance of adjustment guide rod, it is ensured that guide rod is in a predetermined direction
Reach received well position;
B. return and drag drilling:Drilling tool heads are installed on the guide rod at received well position, along guide direction in active well
Return when rotating and drag drilling tool heads, return that earthwork when dragging in hole is cut to smash, and be fabricated to the sposh of half flow regime;
Return and drag drilling tool heads to return the reserved jointed rod of afterbody when dragging;
C. return and drag borehole cleaning:Reserve to install back on drilling rod at received well position after the completion of drilling and drag borehole cleaning ball, the edge in active well
Guide direction is returned when rotating and drags borehole cleaning ball, and mud is conveyed into back by rig by guide rod during time dragging drags borehole cleaning
Ball, then constantly spray into from borehole cleaning ball to surrounding hole wall the bentonite slurry of modulation;
D. jacking construction:Return after the completion of dragging borehole cleaning, the drilling equipment Removal on horizontal directional drilling machine be subjected to push pipe operation,
In tubing front end installation tool head tube cap during push pipe.
2. minimally invasive small-bore pipe-jacking project construction method according to claim 1, it is characterised in that the laser is led
To system include total powerstation (1), starter (2), guide rod (3), display screen (4), light target (5) and
Support (6), total powerstation (1) is arranged on support (6), and starter (2) is installed in the front end of guide rod (3).
3. minimally invasive small-bore pipe-jacking project construction method according to claim 1, it is characterised in that led in step a
± 3cm is no more than to the final deviation of drilling rod.
4. minimally invasive small-bore pipe-jacking project construction method according to claim 1, it is characterised in that made in step b
Hole tool heads are the towed equipment with cone bucket type guide head.
5. minimally invasive small-bore pipe-jacking project construction method according to claim 1, it is characterised in that in step c
Return and drag borehole cleaning ball to return support Counterboring apparatus with centralizer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610111229.1A CN107131356A (en) | 2016-02-29 | 2016-02-29 | A kind of minimally invasive small-bore pipe-jacking project construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610111229.1A CN107131356A (en) | 2016-02-29 | 2016-02-29 | A kind of minimally invasive small-bore pipe-jacking project construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107131356A true CN107131356A (en) | 2017-09-05 |
Family
ID=59721168
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610111229.1A Pending CN107131356A (en) | 2016-02-29 | 2016-02-29 | A kind of minimally invasive small-bore pipe-jacking project construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107131356A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109798069A (en) * | 2019-01-22 | 2019-05-24 | 福建亿钻机械有限公司 | Deep basal pit small-bore pipeline repairs complete set of equipments and construction method |
WO2020049473A1 (en) | 2018-09-06 | 2020-03-12 | Geohidroterv Kft. | Jet-system pipe laying procedure and device for implementing the procedure |
CN111306360A (en) * | 2020-02-24 | 2020-06-19 | 广东省第四建筑工程有限公司 | Trenchless pipeline jacking and laying construction method |
CN112943281A (en) * | 2021-02-07 | 2021-06-11 | 福建亿钻机械有限公司 | Horizontal guide type top-pulling drilling machine complete equipment and construction method |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003328680A (en) * | 2002-05-14 | 2003-11-19 | Hitachi Constr Mach Co Ltd | Pipe jacking machine and pipe jacking method |
CN2758701Y (en) * | 2004-03-10 | 2006-02-15 | 中国石油天然气管道局 | Three-light beam guiding measuring system for push bench |
CN103398215A (en) * | 2013-08-20 | 2013-11-20 | 江苏沃迪建设工程有限公司 | Minimally-invasive non-excavation pipe jacking and pull technology |
CN104236484A (en) * | 2014-09-12 | 2014-12-24 | 上海市政建设有限公司 | Device and method for monitoring tube push bench head deviation in real time |
CN104251688A (en) * | 2014-09-25 | 2014-12-31 | 陕西华山路桥工程有限公司 | Method for linear directional measurement by utilizing laser in pipe jacking engineering |
CN204533813U (en) * | 2015-03-31 | 2015-08-05 | 苏州群业建筑工程有限公司 | A kind of slurry-water balance type push pipe system |
-
2016
- 2016-02-29 CN CN201610111229.1A patent/CN107131356A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003328680A (en) * | 2002-05-14 | 2003-11-19 | Hitachi Constr Mach Co Ltd | Pipe jacking machine and pipe jacking method |
CN2758701Y (en) * | 2004-03-10 | 2006-02-15 | 中国石油天然气管道局 | Three-light beam guiding measuring system for push bench |
CN103398215A (en) * | 2013-08-20 | 2013-11-20 | 江苏沃迪建设工程有限公司 | Minimally-invasive non-excavation pipe jacking and pull technology |
CN104236484A (en) * | 2014-09-12 | 2014-12-24 | 上海市政建设有限公司 | Device and method for monitoring tube push bench head deviation in real time |
CN104251688A (en) * | 2014-09-25 | 2014-12-31 | 陕西华山路桥工程有限公司 | Method for linear directional measurement by utilizing laser in pipe jacking engineering |
CN204533813U (en) * | 2015-03-31 | 2015-08-05 | 苏州群业建筑工程有限公司 | A kind of slurry-water balance type push pipe system |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2020049473A1 (en) | 2018-09-06 | 2020-03-12 | Geohidroterv Kft. | Jet-system pipe laying procedure and device for implementing the procedure |
CN109798069A (en) * | 2019-01-22 | 2019-05-24 | 福建亿钻机械有限公司 | Deep basal pit small-bore pipeline repairs complete set of equipments and construction method |
CN111306360A (en) * | 2020-02-24 | 2020-06-19 | 广东省第四建筑工程有限公司 | Trenchless pipeline jacking and laying construction method |
CN112943281A (en) * | 2021-02-07 | 2021-06-11 | 福建亿钻机械有限公司 | Horizontal guide type top-pulling drilling machine complete equipment and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107131356A (en) | A kind of minimally invasive small-bore pipe-jacking project construction method | |
CN108678130A (en) | A kind of non-digging drag pipe construction method | |
CN103234076B (en) | Device for exchanging underground pipelines without trenching and application method thereof | |
CN110219654A (en) | The leading construction method of mud stone multiple-arch tunnel side pilot tunnel | |
CN106088099B (en) | A kind of subway foundation pit anchor cable processing method | |
CN109027420A (en) | A kind of municipal pipeline no-dig technique Directional Drilling construction method | |
CN106759282B (en) | A kind of mechanical hole building method of super-large diameter hard rock bored concrete pile half | |
CN103398215A (en) | Minimally-invasive non-excavation pipe jacking and pull technology | |
CN106481881B (en) | A kind of original pipe position no-dig technique splits the construction method that pipe repairs underground piping | |
CN107191675A (en) | Rail yard electrified sectionses pipeline laying construction engineering method | |
CN108150101B (en) | A kind of pipeline three-dimensional construction method for crossing | |
CN108361466A (en) | A kind of municipal pipeline maintenance construction technique | |
CN108952570A (en) | The compound non-excavating construction method of technology is bored based on accurate pointing | |
CN104453705A (en) | Secondary forming method for large-hole-diameter cast-in-place pile rotary drilling rig | |
CN106436776A (en) | Method for applying horizontal directional drilling to refuse landfill leachate drainage | |
CN109469066A (en) | Earthmoving machinery combines excavation construction method and system with hydraulic tunneling boring solid | |
CN108119150B (en) | The method of dark-excavated passageway in weak soil | |
CN214403592U (en) | Large-diameter concealed pipe system and pipe pulling construction system thereof | |
CN108755694A (en) | Grout stopping device and complete opening grouting method for multiple solution cavities | |
CN208486829U (en) | A kind of drill bit guidance system | |
CN113863279A (en) | Method for vertically controlling soil deformation through real-time dynamic repeatable reversible grouting | |
CN108533270A (en) | A kind of method that underground deep layer flexible pipe line is removed in rich water soft soil layer | |
CN110409453A (en) | A method of the construction foundation pit below underground pipe gallery | |
Swartz | “Underground, under Where?” How Many Communities Are Turning to Trenchless Applications to Solve Their Challenges | |
Linde-Arias et al. | Depressurisation for the excavation of Stepney Green cavern |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20170905 |