CN107130622A - Pool Bridge cushion cap foundation ditch subregion vacuum precipitation system and precipitation method - Google Patents

Pool Bridge cushion cap foundation ditch subregion vacuum precipitation system and precipitation method Download PDF

Info

Publication number
CN107130622A
CN107130622A CN201710401674.6A CN201710401674A CN107130622A CN 107130622 A CN107130622 A CN 107130622A CN 201710401674 A CN201710401674 A CN 201710401674A CN 107130622 A CN107130622 A CN 107130622A
Authority
CN
China
Prior art keywords
inner ring
precipitation
outer ring
precipitation hole
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710401674.6A
Other languages
Chinese (zh)
Inventor
乔安文
李官政
邹卫东
孙增军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sixth Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd
Original Assignee
Sixth Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sixth Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd filed Critical Sixth Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd
Priority to CN201710401674.6A priority Critical patent/CN107130622A/en
Publication of CN107130622A publication Critical patent/CN107130622A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/10Restraining of underground water by lowering level of ground water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Hydrology & Water Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention discloses a kind of pool Bridge cushion cap foundation ditch subregion vacuum precipitation system and precipitation method, solve the conventional precipitation method in pool under the conditions of gushing sandy ground matter and there is the problem of dewatering effect is poor.It is included in pool(1)Lower section be provided with chiltern geological stratification(10), in pool(1)In be backfilled with rectangle soil property and build island(2), island is built in rectangle soil property(2)Center be provided with pre- digging foundation ditch(12), built in the rectangle soil property dug in advance around foundation ditch and spaced apart inner ring precipitation hole be respectively arranged with island(11)With spaced apart outer ring precipitation hole, inner ring precipitation hole is rectangular to be laid, and outer ring precipitation hole is also rectangular to be laid, and PPR plastics downcomers are plugged with each precipitation hole(3), vacuum self priming pump is connected with downcomer, by taking height Interleaved control downcomer bottom absolute altitude and the inside and outside hole position that is equidistantly laid staggeredly to realize omnibearing stereo precipitation.It is particularly suitable for the foundation ditch that area is smaller, digging depth is shallower and tighter the duration to perform.

Description

Pool Bridge cushion cap foundation ditch subregion vacuum precipitation system and precipitation method
Technical field
The present invention relates to a kind of precipitation system, more particularly to one kind gushes pool Bridge cushion cap foundation ditch point under the conditions of sandy ground matter Area's vacuum precipitation system and precipitation method.
Background technology
In Bridge Construction, bridge line alignment is frequently necessary to pass through pool, and pool understratum is present sometimes Layer of sand, category gushes sand geological conditions, in the pool of this geological conditions during construction bridges cushion cap, before cushion cap excavation of foundation pit, typically Be that cofferdam is carried out to the pre- foundation ditch that digs using steel sheet pile, then draw water, excavate the earthwork in cofferdam, after the completion of carry out cushion cap and perform, this The method of kind can expend substantial amounts of steel, and need large-scale special-purpose steel sheet pile to beat order equipment construction, and cost is very high.Also have in site operation Using well-point dewatering method, multiple precipitation well points are set around foundation ditch, level of ground water are down to below excavation absolute altitude, in order to keep away Exempt from deep foundation pit slope to cave in, excavation slope is needed to carry out combined bolting and shotcrete, then carries out cheating interior basic operation, this Foundation treatment Method is relatively more suitable for super large and deeper foundation ditch, is not suitable for that bridge bearing platform homalographic is smaller and the shallower foundation ditch of cutting depth; Because the bridge bearing platform foundation ditch activity duration is shorter, using the method for conventional base pit dewatering, there is precipitation speed slowly, cost is high, week Phase length and to the high defect of vavuum pump power requirement of drawing water;Particularly in pool under the conditions of gushing sandy ground matter, conventional precipitation method There can be Short-term Precipitation effect poor, the problem of required vavuum pump power requirement that draws water is big.
The content of the invention
The invention provides a kind of pool Bridge cushion cap foundation ditch subregion vacuum precipitation system and precipitation method, solve Gush under the conditions of sandy ground matter that conventional precipitation method has the technical problem of dewatering effect difference in a short time in pool.
The present invention is to solve above technical problem by the following technical programs:
A kind of bridge bearing platform foundation ditch subregion vacuum precipitation system in pool, including pool, are provided with chiltern below pool Geological stratification, rectangle soil property is backfilled with pool and builds island, and the center for building island in rectangle soil property is provided with pre- digging foundation ditch, and base is being dug in advance Rectangle soil property around hole, which is built, is respectively arranged with staggeredly spaced apart inner ring precipitation hole and spaced apart outer ring precipitation on island Hole, inner ring precipitation hole is rectangular to lay, and outer ring precipitation hole is also rectangular to lay, and inner ring precipitation hole is that interval is handed over outer ring precipitation hole What mistake was laid, the PPR plastics drop of grafting in PPR plastics downcomers, left bank inner ring precipitation hole is plugged with each precipitation hole The PPR plastics downcomer of grafting is connected together with inner ring lower-left communicating pipe in water pipe and lower row's inner ring precipitation hole, in inner ring Inner ring lower-left fairlead is connected with the communicating pipe of lower-left, the other end and the inner ring lower-left vacuum self priming pump of inner ring lower-left fairlead connect Lead to together;In right row's inner ring precipitation hole in the PPR plastics downcomer of grafting and upper row's inner ring precipitation hole grafting PPR plastics drop Water pipe is connected together with inner ring upper right communicating pipe, and inner ring upper right communicating pipe is connected together with inner ring upper right fairlead, interior The other end of circle upper right fairlead is connected together with inner ring upper right vacuum self priming pump;The PPR of grafting in the precipitation hole of left bank outer ring The PPR plastics downcomer of grafting is connected together with outer ring upper left communicating pipe in plastics downcomer and upper exclusive circle precipitation hole, Outer ring upper left communicating pipe is connected together with outer ring upper left fairlead, the other end and the outer ring upper left vacuum of outer ring upper left fairlead Self priming pump is connected together;The PPR plastics downcomer of grafting grafting in exclusive circle precipitation hole with in right exclusive circle precipitation hole PPR plastics downcomer is connected together with outer ring bottom right communicating pipe, and outer ring bottom right communicating pipe connects with outer ring bottom right fairlead Together, the other end of outer ring bottom right fairlead is connected together with outer ring bottom right vacuum self priming pump;The bottom of PPR plastics downcomers Port is arranged on the lower section of chiltern geological stratification, and closing cap is provided with the bottom nozzle of PPR plastics downcomers, in PPR plastics drop Inlet opening is provided with the tube wall of water pipe bottom, screen pack is provided with inlet opening.
PPR plastics downcomers are inserted into the depth depth 2-3 that the depth ratio that rectangle soil property built in the soil layer on island digs foundation ditch in advance Rice;On the tube wall of PPR plastics downcomers for passing through chiltern geological stratification, the water inlet of encryption is provided with.
The bottom of each PPR plastics downcomer is laid staggeredly in height, and difference of height is 1.5-2.0 meters.
A kind of bridge bearing platform foundation ditch subregion vacuum precipitation method in pool, comprises the following steps:
The first step, carry out construction with artificial island in pool, form rectangle soil property and build island, build to release on island in rectangle soil property and pre- dig foundation ditch Excavation line;;
Second step, in advance dig foundation ditch around, precipitation hole is performed with iron pipe, is concretely comprised the following steps:The top ports of iron pipe are passed through into pressure Power water pipe is connected together with water pump, opens water pump, water with pressure is injected into by iron pipe in the precipitation hole performed, make iron pipe pipe The soil layer particle at bottom is loosened, and is shoved upwards along the outside tube wall of iron pipe, and iron pipe is pushed by the handle on iron pipe top, until deep Degree reaches the precipitation depth of design, extracts iron pipe, completes performing for precipitation hole, and PPR modelings are then inserted in the precipitation hole of completion Expect downcomer;
3rd step, the rectangle soil property around digging foundation ditch in advance are built and spaced apart inner ring precipitation hole are set on island and spaced apart Outer ring precipitation hole, inner ring precipitation hole is laid with outer ring precipitation hole interleaved, and inserts in each precipitation hole a PPR modeling Expect downcomer;
4th step, the PPR modelings by grafting in the PPR plastics downcomer of grafting in left bank inner ring precipitation hole and lower row's inner ring precipitation hole Material downcomer is connected together with inner ring lower-left communicating pipe, and inner ring lower-left vacuum self priming pump is connected on the communicating pipe of inner ring lower-left, Start inner ring lower-left vacuum self priming pump, carry out uninterrupted operation of drawing water;
5th step, the PPR modelings by grafting in the PPR plastics downcomer of grafting in right row's inner ring precipitation hole and upper row's inner ring precipitation hole Material downcomer is connected together with inner ring upper right communicating pipe, and inner ring upper right vacuum self priming pump is connected on inner ring upper right communicating pipe, Start inner ring upper right vacuum self priming pump, carry out uninterrupted operation of drawing water;
6th step, the PPR modelings by grafting in the PPR plastics downcomer of grafting in the precipitation hole of left bank outer ring and upper exclusive circle precipitation hole Material downcomer is connected together with outer ring upper left communicating pipe, and outer ring upper left vacuum self priming pump is connected on the communicating pipe of outer ring upper left, Start outer ring upper left vacuum self priming pump, carry out uninterrupted operation of drawing water;
7th step, by the PPR plastics downcomer of grafting in right exclusive circle precipitation hole and under in exclusive circle precipitation hole the PPR of grafting mould Material downcomer is connected together with outer ring bottom right communicating pipe, and outer ring bottom right vacuum self priming pump is connected on the communicating pipe of outer ring bottom right, Start outer ring bottom right vacuum self priming pump, carry out uninterrupted operation of drawing water;
8th step, when precipitation is to design attitude, excavate it is pre- dig foundation ditch, carry out bridge bearing platform and pier shaft performed, in cushion cap and pier During body is performed, outer ring upper left vacuum self priming pump and outer ring bottom right vacuum self priming pump stop pumping operation, inner ring lower-left vacuum Self priming pump and inner ring upper right vacuum self priming pump still provide for operation of uninterruptedly drawing water;
9th step, remove when pier body formwork, pre- to dig after the completion of foundation ditch backfill, inner ring lower-left vacuum self priming pump and inner ring upper right vacuum Self priming pump stops pumping operation.
Scene materials of the invention are easy, easy to operate, and it is short to perform the cycle, are particularly suitable for that area is smaller, dig deep shallower and work Phase tighter foundation ditch is performed.
Brief description of the drawings
Fig. 1 is the structural representation of the present invention;
Fig. 2 is the structural representation that precipitation hole 11 is performed with iron pipe 6 of the present invention.
Embodiment
The present invention is described in detail below in conjunction with the accompanying drawings:
A kind of bridge bearing platform foundation ditch subregion vacuum precipitation system in pool, including pool 1, sand is provided with the lower section in pool 1 Matter geological stratification 10, rectangle soil property is backfilled with pool 1 and builds island 2, and the center for building island 2 in rectangle soil property is provided with pre- digging foundation ditch 12, built in the rectangle soil property dug in advance around foundation ditch 12 and spaced apart inner ring precipitation hole 11 and interval cloth are respectively arranged with island 2 The outer ring precipitation hole put, inner ring precipitation hole 11 is rectangular to lay, and outer ring precipitation hole is also rectangular to lay, inner ring precipitation hole 11 with it is outer Circle precipitation hole is that interleaved is laid, and PPR plastics downcomer 3, left bank inner ring precipitation hole are plugged with each precipitation hole In the PPR plastics downcomer of interior grafting and lower row's inner ring precipitation hole the PPR plastics downcomer of grafting with inner ring lower-left communicating pipe 4 It is connected together, inner ring lower-left fairlead 13, the other end of inner ring lower-left fairlead 13 is connected with inner ring lower-left communicating pipe 4 It is connected together with inner ring lower-left vacuum self priming pump 5;The PPR plastics downcomer and upper row's inner ring of grafting in right row's inner ring precipitation hole The PPR plastics downcomer of grafting in precipitation hole is connected together with inner ring upper right communicating pipe 22, inner ring upper right communicating pipe 22 with Inner ring upper right fairlead 18 is connected together, and the other end of inner ring upper right fairlead 18 is connected with inner ring upper right vacuum self priming pump 19 Together;The PPR plastics downcomer of grafting and the upper exclusive PPR plastics precipitation for enclosing grafting in precipitation hole in the precipitation hole of left bank outer ring Guan Junyu outer rings upper left communicating pipe 20 is connected together, and outer ring upper left communicating pipe 20 is connected one with outer ring upper left fairlead 14 Rise, the other end and the outer ring upper left vacuum self priming pump 15 of outer ring upper left fairlead 14 are connected together;In right exclusive circle precipitation hole The PPR plastics downcomer of grafting and under in exclusive circle precipitation hole grafting PPR plastics downcomer with outer ring bottom right communicating pipe 21 Be connected together, outer ring bottom right communicating pipe 21 is connected together with outer ring bottom right fairlead 16, outer ring bottom right fairlead 16 it is another One end is connected together with outer ring bottom right vacuum self priming pump 17;The bottom nozzle of PPR plastics downcomer 3 is arranged on chiltern geological stratification 10 Lower section, be provided with closing cap on the bottom nozzle of PPR plastics downcomer 3, set on the tube wall of the bottom of PPR plastics downcomer 3 Inlet opening is equipped with, screen pack is provided with inlet opening.
PPR plastics downcomer 3 be inserted into the depth ratio that rectangle soil property built in the soil layer on island 2 dig in advance foundation ditch 12 depth it is deep 2-3 meters;On the tube wall of PPR plastics downcomer 3 for passing through chiltern geological stratification 10, the water inlet of encryption is provided with.
The bottom of each PPR plastics downcomer 3 is laid staggeredly in height, and difference of height is 1.5-2.0 meters.
A kind of bridge bearing platform foundation ditch subregion vacuum precipitation method in pool, comprises the following steps:
The first step, carry out construction with artificial island in pool 1, form rectangle soil property and build island 2, built in rectangle soil property and pre- dig is released on island 2 The excavation line of foundation ditch 12;
Second step, in advance dig foundation ditch 12 around, perform precipitation hole 11 with iron pipe 6, concretely comprise the following steps:By the top ports of iron pipe 6 It is connected together by penstocks 8 with water pump 9, opens water pump 9, water with pressure is injected into the precipitation hole performed by iron pipe 6 In 11, the soil layer particle of the ttom of pipe of iron pipe 6 is loosened, and shoved upwards along the outside tube wall of iron pipe 6, pass through the handle on the top of iron pipe 6 Hand 7 pushes iron pipe 6, until depth reaches the precipitation depth of design, extracts iron pipe 6, performing for precipitation hole 11 is completed, then complete Into precipitation hole 11 in insertion PPR plastics downcomer 3;
3rd step, the rectangle soil property around digging foundation ditch 12 in advance, which are built, sets spaced apart inner ring precipitation hole and interval cloth on island 2 The outer ring precipitation hole put, inner ring precipitation hole is laid with outer ring precipitation hole interleaved, and inserts one in each precipitation hole PPR plastics downcomer 3;
4th step, by grafting in the PPR plastics downcomer 3 of grafting in left bank inner ring precipitation hole 11 and lower row's inner ring precipitation hole PPR plastics downcomer 3 is connected together with inner ring lower-left communicating pipe 4, and inner ring lower-left vacuum is connected on inner ring lower-left communicating pipe 4 Self priming pump 5, starts inner ring lower-left vacuum self priming pump 5, carries out uninterrupted operation of drawing water;
5th step, the PPR modelings by grafting in the PPR plastics downcomer of grafting in right row's inner ring precipitation hole and upper row's inner ring precipitation hole Material downcomer is connected together with inner ring upper right communicating pipe 18, and inner ring upper right vacuum self-priming is connected on inner ring upper right communicating pipe 18 Pump 19, starts inner ring upper right vacuum self priming pump 19, carries out uninterrupted operation of drawing water;
6th step, the PPR modelings by grafting in the PPR plastics downcomer of grafting in the precipitation hole of left bank outer ring and upper exclusive circle precipitation hole Material downcomer is connected together with outer ring upper left communicating pipe 20, and outer ring upper left vacuum self-priming is connected on outer ring upper left communicating pipe 20 Pump 15, starts outer ring upper left vacuum self priming pump 15, carries out uninterrupted operation of drawing water;
7th step, by the PPR plastics downcomer of grafting in right exclusive circle precipitation hole and under in exclusive circle precipitation hole the PPR of grafting mould Material downcomer is connected together with outer ring bottom right communicating pipe 21, and outer ring bottom right vacuum self-priming is connected on outer ring bottom right communicating pipe 21 Pump 17, starts outer ring bottom right vacuum self priming pump 17, carries out uninterrupted operation of drawing water;
8th step, when precipitation is to design attitude, excavate it is pre- dig foundation ditch 12, carry out bridge bearing platform and pier shaft performed, in cushion cap and During pier shaft is performed, outer ring upper left vacuum self priming pump 15 and outer ring bottom right vacuum self priming pump 17 stop pumping operation, and inner ring is left Lower vacuum self priming pump 5 and inner ring upper right vacuum self priming pump 19 still provide for operation of uninterruptedly drawing water;
9th step, remove when pier body formwork, pre- to dig after the completion of foundation ditch 12 backfills, inner ring lower-left vacuum self priming pump 5 and inner ring upper right Vacuum self priming pump 19 stops pumping operation.
The present invention is solved gush sandy ground matter under the conditions of pool Bridge cushion cap foundation ditch it is easy due to gushing sand in digging process The problem of causing slope failure, during whole cushion cap is performed, it is ensured that stability of groundwater level passes through below sand seam geology Using cheap PPR plastics downcomers, the dewatering construction of Ultra Low Cost is realized, scene materials are easy, easy to operate, perform week Phase is short, by carrying out subregion to precipitation region, the requirement to the vacuum pump power that draws water is effectively reduced, by taking height to hand over Mistake control downcomer bottom absolute altitude and the inside and outside hole position that is equidistantly laid staggeredly can realize omnibearing stereo precipitation, by encrypting precipitation The quantity of inlet opening in the range of pipe layer of sand, substantially increases precipitation speed.

Claims (4)

1. the bridge bearing platform foundation ditch subregion vacuum precipitation system in a kind of pool, including pool(1), in pool(1)Lower section set It is equipped with chiltern geological stratification(10), in pool(1)In be backfilled with rectangle soil property and build island(2), island is built in rectangle soil property(2)Center set It is equipped with pre- digging foundation ditch(12), it is characterised in that foundation ditch is being dug in advance(12)The rectangle soil property of surrounding builds island(2)On be respectively arranged between Every the inner ring precipitation hole of arrangement(11)With spaced apart outer ring precipitation hole, inner ring precipitation hole(11)It is rectangular to lay, outer ring drop Water hole is also rectangular to lay, inner ring precipitation hole(11)It is that interleaved is laid with outer ring precipitation hole, in each precipitation hole It is plugged with PPR plastics downcomers(3), in left bank inner ring precipitation hole in the PPR plastics downcomer and lower row's inner ring precipitation hole of grafting The PPR plastics downcomer of grafting with inner ring lower-left communicating pipe(4)It is connected together, in inner ring lower-left communicating pipe(4)Upper connection There is inner ring lower-left fairlead(13), inner ring lower-left fairlead(13)The other end and inner ring lower-left vacuum self priming pump(5)Connection exists Together;In right row's inner ring precipitation hole in the PPR plastics downcomer of grafting and upper row's inner ring precipitation hole grafting PPR plastics downcomers With inner ring upper right communicating pipe(22)It is connected together, inner ring upper right communicating pipe(22)With inner ring upper right fairlead(18)Connection exists Together, inner ring upper right fairlead(18)The other end and inner ring upper right vacuum self priming pump(19)It is connected together;Left bank outer ring drops The PPR plastics downcomer of grafting connects with outer ring upper left in the PPR plastics downcomer of grafting in water hole and upper exclusive circle precipitation hole Siphunculus(20)It is connected together, outer ring upper left communicating pipe(20)With outer ring upper left fairlead(14)It is connected together, outer ring upper left Fairlead(14)The other end and outer ring upper left vacuum self priming pump(15)It is connected together;Grafting in right exclusive circle precipitation hole PPR plastics downcomer and under in exclusive circle precipitation hole grafting PPR plastics downcomer with outer ring bottom right communicating pipe(21)Connection Together, outer ring bottom right communicating pipe(21)With outer ring bottom right fairlead(16)It is connected together, outer ring bottom right fairlead(16)'s The other end and outer ring bottom right vacuum self priming pump(17)It is connected together;PPR plastics downcomers(3)Bottom nozzle with being arranged on chiltern Matter layer(10)Lower section, in PPR plastics downcomers(3)Bottom nozzle on be provided with closing cap, in PPR plastics downcomers(3)Bottom Inlet opening is provided with the tube wall in portion, screen pack is provided with inlet opening.
2. a kind of pool Bridge cushion cap foundation ditch subregion vacuum precipitation system according to claim 1, it is characterised in that PPR plastics downcomers(3)It is inserted into rectangle soil property and builds island(2)Soil layer in depth ratio dig foundation ditch in advance(12)Depth depth 2-3 Rice;Passing through chiltern geological stratification(10)PPR plastics downcomers(3)Tube wall on, be provided with the water inlet of encryption.
3. a kind of pool Bridge cushion cap foundation ditch subregion vacuum precipitation system according to claim 1, it is characterised in that each PPR plastics downcomers(3)Bottom in height be laid staggeredly, difference of height be 1.5-2.0 meters.
4. the bridge bearing platform foundation ditch subregion vacuum precipitation method in a kind of pool, comprises the following steps:
The first step, in pool(1)Middle carry out construction with artificial island, forms rectangle soil property and builds island(2), island is built in rectangle soil property(2)On put Go out pre- digging foundation ditch(12)Excavation line;
Second step, in advance dig foundation ditch(12)Around, use iron pipe(6)Perform precipitation hole(11), concretely comprise the following steps:By iron pipe(6) Top ports pass through penstocks(8)With water pump(9)It is connected together, opens water pump(9), water with pressure is passed through iron pipe(6)Note Enter to the precipitation hole performed(11)In, make iron pipe(6)The soil layer particle of ttom of pipe loosens, and along iron pipe(6)Outside tube wall it is upward Shove, pass through iron pipe(6)The handle on top(7)Push iron pipe(6), until depth reaches the precipitation depth of design, extract iron pipe (6), complete precipitation hole(11)Perform, then in the precipitation hole of completion(11)Middle insertion PPR plastics downcomers(3);
3rd step, in advance dig foundation ditch(12)The rectangle soil property of surrounding builds island(2)It is upper set spaced apart inner ring precipitation hole and Every the outer ring precipitation hole of arrangement, inner ring precipitation hole is laid with outer ring precipitation hole interleaved, and is inserted in each precipitation hole A piece PPR plastics downcomer(3);
4th step, by left bank inner ring precipitation hole(11)The PPR plastics downcomers of interior grafting(3)With grafting in lower row's inner ring precipitation hole PPR plastics downcomers(3)With inner ring lower-left communicating pipe(4)It is connected together, in inner ring lower-left communicating pipe(4)Upper connection inner ring Lower-left vacuum self priming pump(5), start inner ring lower-left vacuum self priming pump(5), carry out uninterrupted operation of drawing water;
5th step, the PPR modelings by grafting in the PPR plastics downcomer of grafting in right row's inner ring precipitation hole and upper row's inner ring precipitation hole Expect downcomer and inner ring upper right communicating pipe(18)It is connected together, in inner ring upper right communicating pipe(18)Upper connection inner ring upper right vacuum Self priming pump(19), start inner ring upper right vacuum self priming pump(19), carry out uninterrupted operation of drawing water;
6th step, the PPR modelings by grafting in the PPR plastics downcomer of grafting in the precipitation hole of left bank outer ring and upper exclusive circle precipitation hole Expect downcomer and outer ring upper left communicating pipe(20)It is connected together, in outer ring upper left communicating pipe(20)Upper connection outer ring upper left vacuum Self priming pump(15), start outer ring upper left vacuum self priming pump(15), carry out uninterrupted operation of drawing water;
7th step, by the PPR plastics downcomer of grafting in right exclusive circle precipitation hole and under in exclusive circle precipitation hole the PPR of grafting mould Expect downcomer and outer ring bottom right communicating pipe(21)It is connected together, in outer ring bottom right communicating pipe(21)Upper connection outer ring bottom right vacuum Self priming pump(17), start outer ring bottom right vacuum self priming pump(17), carry out uninterrupted operation of drawing water;
8th step, when precipitation is to design attitude, excavate and pre- dig foundation ditch(12), carry out bridge bearing platform and pier shaft performed, in cushion cap During being performed with pier shaft, outer ring upper left vacuum self priming pump(15)With outer ring bottom right vacuum self priming pump(17)Stop pumping operation, Inner ring lower-left vacuum self priming pump(5)With inner ring upper right vacuum self priming pump(19)Still provide for operation of uninterruptedly drawing water;
9th step, when pier body formwork remove, foundation ditch is dug in advance(12)After the completion of backfill, inner ring lower-left vacuum self priming pump(5)And inner ring Upper right vacuum self priming pump(19)Stop pumping operation.
CN201710401674.6A 2017-05-31 2017-05-31 Pool Bridge cushion cap foundation ditch subregion vacuum precipitation system and precipitation method Pending CN107130622A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710401674.6A CN107130622A (en) 2017-05-31 2017-05-31 Pool Bridge cushion cap foundation ditch subregion vacuum precipitation system and precipitation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710401674.6A CN107130622A (en) 2017-05-31 2017-05-31 Pool Bridge cushion cap foundation ditch subregion vacuum precipitation system and precipitation method

Publications (1)

Publication Number Publication Date
CN107130622A true CN107130622A (en) 2017-09-05

Family

ID=59734883

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710401674.6A Pending CN107130622A (en) 2017-05-31 2017-05-31 Pool Bridge cushion cap foundation ditch subregion vacuum precipitation system and precipitation method

Country Status (1)

Country Link
CN (1) CN107130622A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115492141A (en) * 2022-10-21 2022-12-20 中铁二院工程集团有限责任公司 Steel suspension box cofferdam structure and bottom plate and construction method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005002659A (en) * 2003-06-11 2005-01-06 East Japan Railway Co Groundwater circulation system in excavation of ground, and construction method for measure against groundwater in excavation of ground
CN101487266A (en) * 2009-02-18 2009-07-22 路桥集团国际建设股份有限公司 Earth-steel combined cofferdam construction method for underwater pile cap of bridge
CN101851929A (en) * 2010-05-17 2010-10-06 中铁二十局集团有限公司 Multi-stage light well point dewatering construction process for Yellow River flood plain bearing platform construction
CN203924083U (en) * 2014-06-27 2014-11-05 中国水利水电第十三工程局有限公司 Cushion cap excavation of foundation pit well-points dewatering device
CN104452734A (en) * 2014-11-12 2015-03-25 叶吉 Rapid soft foundation separation preloading method
CN205713979U (en) * 2016-02-29 2016-11-23 中国建筑土木建设有限公司 Light-duty precipitation well drilling equipment
CN207079608U (en) * 2017-05-31 2018-03-09 中铁二十一局集团第六工程有限公司 Pool Bridge cushion cap foundation ditch subregion vacuum precipitation system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005002659A (en) * 2003-06-11 2005-01-06 East Japan Railway Co Groundwater circulation system in excavation of ground, and construction method for measure against groundwater in excavation of ground
CN101487266A (en) * 2009-02-18 2009-07-22 路桥集团国际建设股份有限公司 Earth-steel combined cofferdam construction method for underwater pile cap of bridge
CN101851929A (en) * 2010-05-17 2010-10-06 中铁二十局集团有限公司 Multi-stage light well point dewatering construction process for Yellow River flood plain bearing platform construction
CN203924083U (en) * 2014-06-27 2014-11-05 中国水利水电第十三工程局有限公司 Cushion cap excavation of foundation pit well-points dewatering device
CN104452734A (en) * 2014-11-12 2015-03-25 叶吉 Rapid soft foundation separation preloading method
CN205713979U (en) * 2016-02-29 2016-11-23 中国建筑土木建设有限公司 Light-duty precipitation well drilling equipment
CN207079608U (en) * 2017-05-31 2018-03-09 中铁二十一局集团第六工程有限公司 Pool Bridge cushion cap foundation ditch subregion vacuum precipitation system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115492141A (en) * 2022-10-21 2022-12-20 中铁二院工程集团有限责任公司 Steel suspension box cofferdam structure and bottom plate and construction method thereof
CN115492141B (en) * 2022-10-21 2024-01-30 中铁二院工程集团有限责任公司 Steel suspended box cofferdam structure, bottom plate thereof and construction method

Similar Documents

Publication Publication Date Title
CN104131575B (en) A kind of karst height grows the leak stopping water discharge method of the stratum dam foundation
CN102094425B (en) Foundation pit construction method adopting shallow buried depth Larsen steel plate pile as protective cofferdam
CN104499479B (en) It is a kind of to pass through the dug pile construction method that sand gravel backfills layer
CN106049532B (en) A kind of pipe gallery open-cut branch blocking means and its construction method
CN105863648B (en) A kind of tunneling is shallow to cover large-section tunnel construction method
CN103924987B (en) A kind of SMW engineering method stake tunnel shielding portal seepage-proof structure and construction method thereof
CN105756091B (en) A kind of Metro station excavation construction method of control adjacent building composition deformation
CN110318410A (en) A kind of deep basal pit chance artesian water is prominent to gush decompression drought stress construction method
CN107023026A (en) A kind of sealing bottom type caisson wall and construction method
CN108532586A (en) A kind of construction method of garage parking diaphram wall
CN202194149U (en) Water-proof curtain
CN105064383A (en) Pipe-inserting negative pressure air jet deep-well dewatering device
CN108867673A (en) A kind of underwater prevention method in the foundation pit based on the curtain that draws water
CN206448286U (en) It is a kind of to be used to reduce the radial system of grey field dam seepage line
CN105714748A (en) Excavating construction method for surge shaft in gravel and sandy soil layer
CN105909262B (en) A kind of bored tunnel driving method
JP2007070820A (en) Landfill reinforcing method and landfill
CN105350575B (en) A kind of reversed construction method of diaphram wall
CN110080169A (en) A kind of construction method reclaimed fields from the sea utilized based on basement
CN207079608U (en) Pool Bridge cushion cap foundation ditch subregion vacuum precipitation system
CN206800431U (en) A kind of sealing bottom type caisson wall
CN105040705A (en) Ground foundation treatment construction technology under multi-karst-cave geological conditions
CN107130622A (en) Pool Bridge cushion cap foundation ditch subregion vacuum precipitation system and precipitation method
CN108277815A (en) The cofferdam structure and its construction method constructed for water intaking header structure in river
CN111779022A (en) Novel structure of underground comprehensive pipe gallery in anti-settling and anti-inclining soft soil foundation and construction method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170905

WD01 Invention patent application deemed withdrawn after publication