CN107130580A - New independent well point integrate draining combined vacuum ground preloading method and hardened system - Google Patents

New independent well point integrate draining combined vacuum ground preloading method and hardened system Download PDF

Info

Publication number
CN107130580A
CN107130580A CN201710351782.7A CN201710351782A CN107130580A CN 107130580 A CN107130580 A CN 107130580A CN 201710351782 A CN201710351782 A CN 201710351782A CN 107130580 A CN107130580 A CN 107130580A
Authority
CN
China
Prior art keywords
well point
ground
layer
water
well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710351782.7A
Other languages
Chinese (zh)
Inventor
刘连生
闫澍旺
朱红明
林澍
孙青荣
王庆功
马壮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Teng Sheng Construction Engineering Co Ltd
Original Assignee
Tianjin Teng Sheng Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Teng Sheng Construction Engineering Co Ltd filed Critical Tianjin Teng Sheng Construction Engineering Co Ltd
Priority to CN201710351782.7A priority Critical patent/CN107130580A/en
Publication of CN107130580A publication Critical patent/CN107130580A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/10Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention discloses the new independent well point integrate draining combined vacuum ground preloading method of one kind and hardened system, including selection land-based area, vacuum preloading scope is set;Deploy to ensure effective monitoring and control of illegal activities each independent well point and well point interoceptor;Installing submersible pump and air-extractor;Arrange horizontal drain pipe and drain bar;Hermetic barrier:Carry out vacuum preloading, vacuum well-point dewatering and complete the unloading after reinforcing.The beneficial effects of the invention are as follows:Each independent well point and drain bar are organically combined into " linker " using the pervious bed in soil layer, it regard independent well point integrate draining system as the main integrate draining body of deep soil, it is evacuated respectively and drainage works by two sets of separate systems, deep phreatic water in ground is pooled in well point and discharged outside ground, traditional vacuum precompressed is fundamentally solved due to the problem of deep soil consolidation effect is not good caused by defective workmanship, shorten the duration while enhancing consolidation effect, economize on resources and cost, environmental protection and economy.

Description

New independent well point integrate draining combined vacuum ground preloading method and hardened system
Technical field
The present invention relates to civil engineering groundwork and the soft foundation processing technology field on basis, more particularly to a kind of new independent well Point integrate draining combined vacuum ground preloading method and hardened system.
Background technology
At present, vacuum preloading method has been developing progressively as a ripe foundation reinforcement method.For what is naturally occurred For soft soil foundation, vacuum preloading has the effect of highly significant.But for reclaimed ground recently, especially deep hydraulic reclamation Soil, traditional vacuum precompressed is often difficult to the underground water of deep layer being effectively discharged out.Because in the later stage of vacuum preloading, due to ground In water section be discharged, remaining water can not form solid stream of water in draw water pipeline under vacuum, therefore row Often there is a part of water in water plate and drinking-water pipe can not extract out, still there is the water do not discharged in deep soil.Pore water pressure Presence reduce the intergranular effective stress of the soil body, this will cause vacuum pre-press reinforcing effect to be given a discount greatly in deep soil Button, and ground after reinforcing is usually that surface strength is high and not good " crust layer " effect of deep-layer reinforcing effect.Research has shown that, Soil body residual settlement occurs mostly in deep soil after vacuum preloading, therefore, if can discharge this part water, it will from basic After upper solution vacuum preloading the problem of deep reclaimed ground validity period residual settlement, validity period is reduced caused by settlement of foundation Maintenance cost.Simultaneously in ground occluded water presence, have a strong impact on the stability of later stage deep pit digging.
The corrective measure of prior art has aqueous vapor separation method etc..Aqueous vapor separation method, is to utilize a terminal (aqueous vapor Separator) will be evacuated and draw water is carried out respectively with two systems, and the energy that pumping expends is relatively low but is able to maintain that vacuum preloading Required vacuum, and just carried out only when the water in terminal reaches to a certain degree when drawing water.Due in deep soil Water can not be discharged by the method, therefore the above method has primarily served the effect for saving the energy, but not solved fundamentally The certainly hydropexis problem in deep soil.
For reduction deep phreatic water, well-point dewatering method is a kind of ripe technology, by setting well point in ground, is made Free water in ground is pooled among well point under gravity, and well-points dewatering funnel is formed in foundation soil.With well In water be constantly extracted, the water around well is pooled in well step by step, and level of ground water declines therewith.With the row of underground water Go out, therefore the effective stress increase between grogs, foundation soil is reinforced.
According to the operation principle of well-points dewatering, there is good dewatering effect particularly with deep phreatic water, it is pre- in vacuum The defect that well-points dewatering will can overcome the disadvantages that traditional vacuum pre-pressing process is introduced in pressure, therefore attempts vacuum pre-pressed joint well-points dewatering Reinforcement means, such as uses light well point, with same set of evacuation system, is applied simultaneously into foundation soil by well point and drain bar Plus vacuum action.It is the same in the vacuum and drain bar in well point, well point now is only just corresponded in this way The larger drain bar of water-flowing amount, it is substantially little with traditional vacuum precompressed difference.Due to only being created in theory Attempted in new and construction, do not analyse in depth and study the reinforcement mechanism of vacuum pre-pressed joint well-points dewatering and specific behaviour Make method, therefore can not fundamentally solve the defective workmanship of vacuum preloading, it is impossible to significantly increase consolidation effect.Therefore, arrive So far, effect is reinforced in the reinforcement means of the vacuum pre-pressed joint well-points dewatering also progress of not making a breakthrough property, Practical Project Fruit is than vacuum preloading without being remarkably reinforced.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of vacuum preloading based on independent well point collection, drainage system Joint well-points dewatering reinforcing mode, is separated into two sets of separate work systems, fully profit by well point pumping and drainage system Drain bar and well point are combined into " linker " with natural pervious bed in soil, the underground water collected in well point is taken out by immersible pump Go out outside well, the effective stress in increase soil strengthens foundation stabilization effect.
In order to solve the above-mentioned technical problem, the technical solution adopted by the present invention is:A kind of new independent well point integrate draining connection Vacuum pre-press reinforcing method is closed, it is characterized in that, including step is as follows:
Step one, land-based area is selected, vacuum preloading scope is set;Step 2, using pros in the land-based area that step one is selected Shape or triangle projective planum arrange multiple independent well points, and well point bottom is squeezed into or punched in pervious bed;Set multiple parallel with well point Drain bar, and drain bar at the top of be connected with horizontal collector pipe;Shallow-layer, deep layer priming inductor and stopping are set on the borehole wall Three groups of inductors of inductor, control the unlatching of immersible pump, stop;Step 3, installing submersible pump and air-extractor:Each well point bottom Place two immersible pumps in portion;Connect exhaust tube and be evacuated pumping plant with integrated form, when integrated form pumping pumping plant starts pumping, vacuum Effect will be applied in well point;Step 4, arranges horizontal drain pipe:Horizontal collector pipe is arranged at the top of foundation soil, according to row The position of water plate is laid and reticulated, and when having sand bedding course at the top of foundation soil, horizontal collector pipe is embedded in sand bedding course, and connects water Flat collector pipe and drain bar;Step 5, hermetic barrier:Diaphragm seal is laid, by the top pressure closure and well point top pallet with soil Work cloth and diaphragm seal should be covered;In stabilization zone, surrounding arranges impervious clay curtain wall, and press mold trench depth should be met:(1) it is right In the harder soil body, press mold ditch is 2.5~3m deep;(2) for the softer soil body, press mold ditch is 1~2m deep;Step 6, is opened Vaccum-pumping equipment carries out vacuum preloading, and pumping process runs through whole reinforcing process, stops pumping after unloading standard until reaching, takes out Ensure that pressure-reduction level maintains -80~-95kPa during gas;
Step 7, carries out vacuum well-point dewatering:Immersible pump is automatically turned on stopping in the Precipitation Process of well point;Step 8, When foundation strength reaches that the continuous five days Tested settlement speed of unloading standard (1) is less than 1.5~4mm/d, (2) soil solidifying degree reaches After 85%~90%, stop pumping, complete to reinforce.
Multiple independent well points of the step 2, spacing R is 50m~100m.
The drain bar of the step 2, when soil layer middle-shallow layer contains potential pervious bed (silt, silty sand ground etc.), punches this Pervious bed.
Squeeze into or punch permeable layer depth 2~3m deep more than drain bar bottom in the step 2, well point bottom.
The immersible pump of the step 3 efficiency Q that draws water should be met:
In formula, Q is the displacement of immersible pump in the unit time, and unit is m3/s;K is the infiltration system of pervious bed in ground Number, unit is m/s;H is pervious bed thickness, unit m;R is the arrangement spacing of each well point, unit m;H is water level, unit in well point m;Hv is the corresponding height of vacuum, unit m in well point;H is thoroughly pervious bed bottom water level height, unit m;L is the outer water of ground Source is to the horizontal range of immersible pump, unit m.
A kind of reinforcing system for the new independent well point integrate draining combined vacuum ground preloading method realized described in claim 1 System, including:Integrated form pumping pumping plant, exhaust tube, drinking-water pipe, multiple independent well points, from top to bottom positioned at multiple independent well points Pervious bed in geotextiles seal film layer, soft foundation soil layer and ground, the independent well point is provided with and surrounds the telescopic of well top The borehole wall and the permeable borehole wall of the macropore of bottom, well top pressure closure, top pallet, the retaining wall yellow ground filtering layer of borehole wall periphery, the independence Well point well inner aqueous layer provided with sensing buoy, be sequentially provided with the borehole wall shallow-layer draw water priming inductor, deep layer draw water start feeling should Device and the stopping inductor that draws water, bottom are provided with immersible pump, and bottom water layer, the other end are goed deep into described in described drinking-water pipe one end Top pressure closure stretches out, and the exhaust tube is located at outside top pressure closure through described top pressure closure one end is evacuated pumping plant phase with integrated form Connection, the other end are located at lower end in top pressure closure;Horizontal collector pipe is arranged on above the soft foundation soil layer, level connection institute State the borehole wall of independent well point;The soft foundation soil layer is provided with multiple drain bars parallel with the independent well point, described parallel Drain bar top connected with the horizontal collector pipe, the parallel drain bar bottom is squeezed into ground in pervious bed;It is described The telescopic a length of 1~4m of the borehole wall, the aperture D of the permeable borehole wall of macropore is equal to macropore permeable well casing footpath d and twice of thickness of filter bed r Sum.
The soft foundation soil layer is 30cm~50cm provided with sand bedding course thickness.
Geotextiles diaphragm seal is provided between the borehole wall periphery and retaining wall yellow ground filtering layer.
Plane where the shallow-layer priming inductor is located at the 3~4m depths started at by original ground, and the deep layer is opened Plane where dynamic inductor is located at 2~3m higher than drain bar bottom, and the stopping inductor at the top of immersible pump with flushing.
The independent well point collection, the land-based area stabilization zone of drainage system formation are surrounded by impervious clay curtain wall;It is described to stretch A length of 1~the 4m of the contracting formula borehole wall, the aperture D of the permeable borehole wall of macropore be equal to the permeable well casing footpath d of macropore and twice thickness of filter bed r it With.
The beneficial effects of the invention are as follows:The pervious bed in soil layer is made full use of to organically combine each independent well point and drain bar Into " linker ", collection, displacement hull by the use of independent well point collection, drainage system as deep soil mainly are mutually only by two sets Vertical system is evacuated and drainage works respectively, and the deep phreatic water in ground is pooled in well point and discharged outside ground, from Traditional vacuum precompressed is fundamentally solved because the problem of deep soil consolidation effect is not good caused by defective workmanship, effect is reinforced in enhancing Play a part of saving energy while fruit, shorten the duration;Drainage blanket in ground is organic by well-point system and drain bar system " linker " is combined into, each drain bar is turned into several " small well points ", can more effectively improve water collection efficiency, allow more Underground water is pooled in well point under the effect of well point.(reach after certain water level), lead to after the water in well is gathered to a certain extent The startup and stopping of induction system automatic controlled submersible pump are crossed, intermittently, on one's own initiative the water in well point is pumped out outside ground, made Well point funneling effect constantly acts on underground water, energy-conservation and efficiently improves water outlet efficiency, has effect in increase ground Power, so that ground can be reinforced effectively by shallow-layer to deep layer, shortens the duration, economizes on resources and cost, environmental protection and economy.
Brief description of the drawings
Fig. 1 is independent well point elevational schematic view of the invention,
Fig. 2 is independent well point integrate draining combined vacuum ground preloading system elevational schematic view of the invention,
Fig. 3 is independent well point integrate draining combined vacuum ground preloading System planes schematic diagram of the invention.
Wherein:
1st, geotextiles diaphragm seal 2, sand bedding course 3, exhaust tube
4th, drinking-water pipe 5, sealing valve 6, top pressure closure
7th, well point top pallet 8, horizontal collector pipe 9, drain bar
10th, the original soil body or working cushion layer surface 11, the telescopic borehole wall 12, borehole wall jointing
13rd, retaining wall yellow ground filtering layer 14, wrap up in the permeable boreholes wall of macropore of geotextiles outside
15th, soft foundation soil layer 16, shallow-layer draw water priming inductor
17th, deep layer draw water priming inductor 18, Groundwater bit line 19, sensing buoy
20th, draw water stopping inductor 21, water 22, immersible pump
23rd, pervious bed 24, independent well point in ground
25th, potential aqueous pervious bed in impervious clay curtain wall 26, ground
27th, integrated form pumping pumping plant 28, distribution box
Embodiment
The present invention is described in further detail with reference to the accompanying drawings and detailed description:
As shown in Figure 1 to Figure 3, a kind of hardened system of new independent well point integrate draining combined vacuum ground preloading method, Including:Distribution box 28, integrated form pumping pumping plant 27, exhaust tube 3, drinking-water pipe 4, multiple independent well points 24, from top to bottom be located at it is many Pervious bed 23 in the geotextiles seal film layer of individual independent well point 24, soft foundation soil layer 15 and ground, the independent well point 24 is set Have the telescopic borehole wall 11 for surrounding well top and the permeable borehole wall 14 of the macropore of bottom, well top pressure closure 6, top pallet 7, outside the borehole wall The retaining wall yellow ground filtering layer 13 in week, the independent well point well inner aqueous layer is sequentially provided with shallow-layer on the borehole wall and taken out provided with sensing buoy 19 Water priming inductor 16, deep layer draw water priming inductor 17 and draw water stopping inductor 20, bottom be provided with immersible pump 22, it is described The one end of drinking-water pipe 4 is goed deep into bottom water layer, the other end and stretched out in the top pressure closure 6, and the exhaust tube 3 is pushed up through the sealing The one end of lid 6 is positioned at the outside of top pressure closure 6 is connected with integrated form pumping pumping plant 27, the other end is located at lower end in top pressure closure 6;Water Flat collector pipe 8 is arranged on above the soft foundation soil layer 15, and level connects the borehole wall upper end of the independent well point 24;It is described soft Weak foundation soil 15 is provided with multiple drain bars 9 parallel with the independent well point 24, and the parallel top of drain bar 9 is provided with company Connect device to connect with the horizontal collector pipe 8, the parallel bottom of drain bar 9 is squeezed into ground in pervious bed 23.
A kind of new independent well point integrate draining combined vacuum ground preloading method, including step one, select land-based area, and setting is true Empty precompressed scope;Step 2, sets independent well point collection, drainage system and drain bar, using just in the land-based area that step one is selected Square or triangle projective planum arranges multiple independent well points;Its top of multiple drain bars parallel with well point is connected with horizontal collector pipe Connect, bottom is squeezed into pervious bed 23, together constituted " linker " in pervious bed and well point;Shallow-layer, deep layer is set to open on the borehole wall Dynamic inductor and stopping three groups of inductors of inductor, control the unlatching of immersible pump, stop;Step 3, installing submersible pump and pumping Equipment:Two immersible pumps are placed in each well point bottom, and a preparation and a use, the lift of immersible pump 22 should be more than 35m;Connection pumping Pipe is evacuated pumping plant with integrated form, and when integrated form pumping pumping plant starts pumping, vacuum action will be applied in well point;Step Four, arrange horizontal drain pipe:Horizontal collector pipe is laid according to the position of drain bar to be reticulated, and has sand bedding course at the top of foundation soil When, horizontal collector pipe is directly connected with drain bar;Step 5, hermetic barrier:Diaphragm seal is laid, the pumping except reserving well point Outside pipe, the outlet of well point drinking-water pipe, the top pressure closure and well point top pallet should be covered with geotextiles and diaphragm seal, When well point needs to safeguard, after diaphragm seal and geotextiles are removed, open the top pressure closure and carry out well point maintenance;In stabilization zone four Week arranges impervious clay curtain wall, and press mold trench depth should be met:(1) for the harder soil body, press mold ditch is 2.5~3m deep; (2) for the softer soil body, press mold ditch is 1~2m deep;Step 6, opens vaccum-pumping equipment and carries out vacuum preloading, pumping process Through whole reinforcing process, pumping is just stopped after unloading standard until reaching, completes to reinforce, ensures that pressure-reduction level is maintained during pumping In -80~-95kPa;Step 7, carries out vacuum well-point dewatering:Immersible pump is automatically turned on stopping in the Precipitation Process of well point;Step Rapid eight, when foundation strength reaches that the continuous five days Tested settlement speed of unloading standard (1) is less than 1.5~4mm/d, (2) soil solidifying Spend up to after 85%~90%, stop pumping, complete to reinforce.
The thickness of step one medium coarse sand bed course 2 should be 30cm~50cm;Also it can use without sand method vacuum preloading, secondary precompressed All it is applicable Deng, every vacuum preloading scope.
In step 2, well point bottom should be squeezed into pervious bed 23, or is punched pervious bed 23 and entered pervious bed subsoil In body, the deep 2~3m in the bottom of drain bar 9 that its depth at least should be set than after.When in soil layer contain the shallower (powder of pervious bed 26 Soil, silty sand ground etc.) when, well point should punch the pervious bed.
The horizontal layout of well point 24 should be determined using square or triangle, spacing R according to live bailing test.For warp The consideration of Ji property, well point number should not be excessive, therefore spacing R is unsuitable too small, between preferably 50m~100m.
The single structure of independent well point 24 is by top pressure closure 6, top pallet 7, retaining wall yellow ground filtering layer 13, the and of the telescopic borehole wall 11 The permeable borehole wall 14 of macropore is constituted, as shown in Figure 1.Top pallet 7 and top pressure closure 6 are integrally fixed, and prevent the flexible borehole wall 11 from sinking Enter in soft foundation.Top pressure closure 6 is mainly used in sealing well point, will form vacuum in well after pumping.Well point top 1 Shaft wall design, can be as the soil body sinks together when the top layer soil body is settled to be telescopic in the range of~4m.The permeable borehole wall of macropore 14 have water penetration, can effectively collect the underground water of surrounding.Connected between each section borehole wall by joint 12, so can be by well Point is attached in deeper soil.Wrapped up on the outside of the borehole wall with geotextiles, and with the retaining wall of yellow ground filtering layer 13, can play permeable anti-native Effect.
When installing the permeable borehole wall 14 of well point macropore, first in specified location drilling, aperture D should be equal to the permeable well casing footpath d of macropore With twice of thickness r sum of filtering layer 13, i.e. D=d+2r.After pore-forming is finished, the thick yellow ground of 5~10cm first is inserted in bottom hole, then will The permeable borehole wall 14 of macropore that permeable geotextiles are wrapped is put into hole between two parties, then yellow ground is inserted into borehole wall surrounding is used as filtering layer.
Drain bar 9 is plastic material, and design is carried out by related specifications, and its top is connected with horizontal collector pipe 8.Drain bar 9 bottoms are squeezed into pervious bed 23, are together made up of " linker " pervious bed 23 and well point.
When soil layer middle-shallow layer contains potential pervious bed 26 (silt, silty sand ground etc.), drain bar 9 should punch the pervious bed 26.Potential pervious bed 26 can improve water collection efficiency, and more effectively the underground water of shallow-layer is pooled in well point.
In order to realize the automatic start of immersible pump 22 and stopping in pump process, three groups of inductors 16,17 are set on the borehole wall With 20, while placing sensing buoy 19 in well.Wherein, shallow-layer priming inductor 16 and deep layer priming inductor 17 are used to control The unlatching of immersible pump, stops the stopping that inductor 20 is used to control immersible pump.The purpose for setting two groups of priming inductors is, plus Gu initial stage, level of ground water is higher, ground water yield is big, and the priming inductor 16 for setting depth shallower can reduce turn on pump frequency, Economize on resources.The later stage is reinforced, level of ground water is relatively low, set deep layer priming inductor 17 more effectively to extract deeper subsurface Water.
At the initial stage of reinforcing to mid-term, Groundwater bit line 18 is located in soil at shallower position, when water level is higher in well point 24, Using shallow-layer well point draw water priming inductor 16 control immersible pump unlatching.When water level rises to and shallow-layer priming inductor in well point 16 it is equally high when, sensing buoy 19 and the mutual induction of priming inductor 16 and make immersible pump 22 open, immersible pump 22 starts active Ground is extracted out outside ground by the underground water collected in well point.When the water level in well point is down to stopping the grade height of inductor 20, sense Answer buoy 19 to stop immersible pump 22 with stopping the mutual induction of inductor 20, pump process pause, underground water in well point after Continuous accumulation, until sensing buoy 19 is risen at shallow-layer priming inductor 16 with water level, immersible pump 22 is again turned on and taken out Water.So move in circles, up to the reclaimed water potential drop of well point 24 to relatively low position.
Reinforcing the intermediary and later stages, Groundwater bit line 18 is located in soil at deep place, and water level, which is reduced to, in well point 24 compares During low level, the unlatching of immersible pump is controlled using the deep layer well point priming inductor 17 that draws water.When water level rises to and deep in well point When layer priming inductor 17 is equally high, sensing buoy 19 and the mutual induction of priming inductor 17 and make immersible pump 22 open, diving Pump 22 starts on one's own initiative to extract the underground water collected in well point outside ground out.When the water level in well point is down to stopping inductor 20 etc. it is high when, sensing buoy 19 stops immersible pump 22 with stopping the mutual induction of inductor 20, and pump process is suspended, in well point Underground water continue gather, until sensing buoy 19 risen to water level at deep layer priming inductor 17, immersible pump 22 is opened again Open and drawn water.So move in circles, until reinforcing engineering terminates.
In step 3, after well point construction is finished, two immersible pumps 22, a preparation and a use are placed in each well point bottom.It is latent The lift of water pump 22 should be more than 35m, under vacuum conditions still can active, efficiently draining with guarantee.Immersible pump 22 passes through The outlet pipe 4 on a piece extraction ground extracts water out from well, and outlet pipe 4 loads onto water check valve 5 after drawing earth's surface.
The immersible pump 22 of the selection efficiency Q that draws water should meet condition:
In formula, Q is the displacement of immersible pump 22 in the unit time, and unit is m3/s;K is the infiltration of pervious bed 23 in ground Coefficient, unit is m/s;H is the thickness of pervious bed 23, unit m;R is the arrangement spacing of each well point 24, unit m;H is well point reclaimed water Position, unit m;Hv is the corresponding height of vacuum, unit m in well point;H is thoroughly the bottom water level of pervious bed 23 height, unit m;L is The outer water source of ground is to the horizontal range of immersible pump 22, unit m.When the drainage efficiency Q of immersible pump meets above formula, external water source stream The reinforcing of ground will not just be completely interfered with by entering the water in ground, effectively discharge the underground in ground by immersible pump 22. If being unsatisfactory for above-mentioned condition, the water that immersible pump 22 is extracted out is entirely to be flowed into by external water source via pervious bed 23 in well point, Water in ground is remained in ground, and the purpose of reinforcing is not reached completely.
In addition, drawing an exhaust tube 3 from well point top, it is connected with integrated form pumping pumping plant 27.When integrated form pumping When pumping plant 27 starts pumping, vacuum action will be applied in well point.
Horizontal collector pipe 8 in step 4 should be laid according to the position of drain bar to be reticulated, its burial place be divided into Lower two kinds of situations consider:
(1) when having sand bedding course 2 at the top of foundation soil, horizontal collector pipe 4 is embedded in sand bedding course 2;
(2) when at the top of foundation soil without sand bedding course 2, horizontal collector pipe 4 is directly connected with drain bar.
The effect of horizontal collector pipe is to link together the top of drain bar 9 with the top of well point 24, thus that ground is shallow The underground water of layer is collected in well point 24 by drain bar 9 by top.In addition, in the later stage of reinforcing, the top of drain bar 9 and well point 24 tops are connected, and drain bar 9 is combined formation " linker " with well point 24.
In step 5, when paving geotextiles and diaphragm seal 1, in addition to reserving the exhaust tube 3 of well point and exporting, it should also reserve The outlet of well point drinking-water pipe 4, while ensureing that exit good seal is air tight.Geotextiles and diaphragm seal should be by the top pressure closures 6 Covered with well point top pallet 7.When well point needs to safeguard, after diaphragm seal and geotextiles are removed, the sealing can be opened Top cover 6 carries out well point maintenance.
Stabilization zone surrounding should arrange impervious clay curtain wall 25, and press mold trench depth should meet following requirement:
(1) for the harder soil body, press mold ditch should accomplish that 2.5~3m is deep;
(2) for the softer soil body, press mold ditch should accomplish 1.5m or so.
In step 6, after all preparations are carried out, start pumping.Integrated form pumping pumping plant 27 is opened, into ground Applying vacuum load.Pumping process runs through whole reinforcing process, and pumping is just stopped after unloading standard until reaching.Wherein, it is evacuated When ensure that pressure-reduction level maintains -80~-95kPa.
In step 7, immersible pump 22 is automatically turned on stopping in the Precipitation Process of well point, is opened by sensing buoy 19, shallow-layer Dynamic inductor 16, deep layer priming inductor 17 and stopping inductor 20 are realized.
At the initial stage of reinforcing to mid-term, when water level rises to high as shallow-layer priming inductor 16 in well point, buoy is sensed 19 make immersible pump 22 open with the mutual induction of shallow-layer priming inductor 16, and immersible pump 22 starts in well point to collect on one's own initiative Underground water is extracted out outside ground.When the water level in well point is down to stopping the grade height of inductor 20, sensing buoy 19 is felt with stopping Answer the mutual induction of device 20 and stop immersible pump 22, pump process is suspended, the underground water in well point continues to gather, until sensing is floated Mark 19 is risen at shallow-layer priming inductor 16 with water level, and immersible pump 22 is again turned on and drawn water.So move in circles, directly Reduced levels are down to water level.
Mid-term is being reinforced to the later stage, when water level rises to high as deep layer priming inductor 17 in well point, buoy is being sensed 19 make immersible pump 22 open with the mutual induction of deep layer priming inductor 17, and immersible pump 22 starts in well point to collect on one's own initiative Underground water is extracted out outside ground.When the water level in well point is down to stopping the grade height of inductor 20, sensing buoy 19 is felt with stopping Answer the mutual induction of device 20 and stop immersible pump 22, pump process is suspended, the underground water in well point continues to gather, until sensing is floated Mark 19 is risen at deep layer priming inductor 17 with water level, and immersible pump 22 is again turned on and drawn water.So move in circles, directly Terminate to reinforcing engineering.
It is preferred that, the place plane of shallow-layer priming inductor 16 is located at the 3~4m depths started at by original ground, and deep layer is opened The dynamic place plane of inductor 17 is located at 2~3m higher than drain bar bottom, is stopped inductor 20 and is flushed with the top of immersible pump 22.
In step 8, when reinforcing proceeds to following degree, illustrate that foundation strength has met bearing requirements, can stop adding Gu process:
(1) continuous five days Tested settlement speed is less than 1.5~4mm/d;
(2) soil solidifying degree is up to 85%~90%.
Index value of the present invention and non-limitative illustration, can be according to actual conditions and related rule only as recommended value Model is suitably adjusted.In every case equivalent modification or change are done according to present invention and application range, should all belongs to this hair The bright content covered.

Claims (10)

1. a kind of new independent well point integrate draining combined vacuum ground preloading method, it is characterized in that, including step is as follows:
Step one, land-based area is selected, vacuum preloading scope is set;
Step 2, multiple independent well points, well point bottom are arranged in the land-based area that step one is selected using square or triangle projective planum Portion squeezes into or punched in pervious bed;Set and be connected at the top of multiple drain bars parallel with well point, and drain bar with horizontal collector pipe It is logical;Shallow-layer, deep layer priming inductor are set on the borehole wall and stop three groups of inductors of inductor, the unlatching of immersible pump is controlled, stops Only;
Step 3, installing submersible pump and air-extractor:Place two immersible pumps in each well point bottom;Connect exhaust tube with it is integrated Formula is evacuated pumping plant, and when integrated form pumping pumping plant starts pumping, vacuum action will be applied in well point;
Step 4, arranges horizontal drain pipe:Horizontal collector pipe is arranged at the top of foundation soil, and networking is laid according to the position of drain bar Shape, when having sand bedding course at the top of foundation soil, horizontal collector pipe is embedded in sand bedding course, and connected level set water pipe and drain bar;
Step 5, hermetic barrier:Diaphragm seal is laid, should with geotextiles and diaphragm seal by the top pressure closure and well point top pallet Cover;In stabilization zone, surrounding arranges impervious clay curtain wall, and press mold trench depth should be met:(1) for the harder soil body, pressure Film ditch is 2.5~3m deep;(2) for the softer soil body, press mold ditch is 1~2m deep;
Step 6, opens vaccum-pumping equipment and carries out vacuum preloading, pumping process runs through whole reinforcing process, until reaching unloading mark Stop pumping after standard, ensure that pressure-reduction level maintains -80~-95kPa during pumping;
Step 7, carries out vacuum well-point dewatering:Immersible pump is automatically turned on stopping in the Precipitation Process of well point;
Step 8, when foundation strength reaches that the continuous five days Tested settlement speed of unloading standard (1) is less than 1.5~4mm/d, (2) soil The body degree of consolidation stops pumping up to after 85%~90%, completes to reinforce.
2. the new independent well point integrate draining combined vacuum ground preloading method of one kind according to claim 1, it is characterized in that, Multiple independent well points of the step 2, spacing R is 50m~100m.
3. the new independent well point integrate draining combined vacuum ground preloading method of one kind according to claim 1, it is characterized in that, The drain bar of the step 2, when soil layer middle-shallow layer contains potential pervious bed, punches the pervious bed.
4. the new independent well point integrate draining combined vacuum ground preloading method of one kind according to claim 1, it is characterized in that, Squeeze into or punch permeable layer depth 2~3m deep more than drain bar bottom in the step 2, well point bottom.
5. the new independent well point integrate draining combined vacuum ground preloading method of one kind according to claim 1, it is characterized in that, The immersible pump of the step 3 efficiency Q that draws water should be met:
In formula, Q is the displacement of immersible pump in the unit time, and unit is m3/s;K is the infiltration coefficient of pervious bed in ground, single Position is m/s;H is pervious bed thickness, unit m;R is the arrangement spacing of each well point, unit m;H is water level, unit m in well point;Hv For the corresponding height of vacuum in well point, unit m;H is thoroughly pervious bed bottom water level height, unit m;L is that the outer water source of ground is arrived The horizontal range of immersible pump, unit m.
6. a kind of reinforcing system for the new independent well point integrate draining combined vacuum ground preloading method realized described in claim 1 System, including:Integrated form pumping pumping plant (27), exhaust tube (3), drinking-water pipe (4), multiple independent well points (24), from top to bottom it is located at Pervious bed (23), the independence in the geotextiles seal film layers of multiple independent well points (24), soft foundation soil layer (15) and ground Well point (24) be provided with the telescopic borehole wall (11) and the permeable borehole wall of macropore (14) of bottom that surround well top, well top pressure closure (6), Top pallet (7), the retaining wall yellow ground filtering layer (13) of borehole wall periphery, it is characterized in that:
The independent well point well inner aqueous layer is sequentially provided with shallow-layer provided with sensing buoy (19), on the borehole wall and drawn water priming inductor (16), deep layer draw water priming inductor (17) and draw water stopping inductor (20), bottom be provided with immersible pump (22), it is described to draw water Pipe (4) one end is goed deep into bottom water layer, the other end and stretched out in the top pressure closure (6), and the exhaust tube (3) passes through the sealing Top cover (6) one end is positioned at top pressure closure (6) outside is connected with integrated form pumping pumping plant (27), the other end is located at top pressure closure (6) interior lower end;
Horizontal collector pipe (8) is arranged on the soft foundation soil layer (15) above, and level connects the well of the independent well point (24) Wall;
The soft foundation soil layer (15) is provided with multiple drain bars (9) parallel with the independent well point (24), described parallel Drain bar (9) top is connected with the horizontal collector pipe (8), and pervious bed in ground is squeezed into described parallel drain bar (9) bottom (23) in.
7. the hardened system of new independent well point integrate draining combined vacuum ground preloading method according to claim 6, its It is characterized in:The soft foundation soil layer (15) is provided with sand bedding course (2), and thickness is 30cm~50cm.
8. a kind of reinforcing system of new independent well point integrate draining combined vacuum ground preloading method according to claim 6 System, it is characterized in that:Geotextiles diaphragm seal (1) is provided between the borehole wall periphery and retaining wall yellow ground filtering layer (13).
9. a kind of reinforcing system of new independent well point integrate draining combined vacuum ground preloading method according to claim 6 System, it is characterized in that:Plane where the shallow-layer priming inductor (16) is located at the 3~4m depths started at by original ground, institute Plane where stating deep layer priming inductor (17) is located at 2~3m higher than drain bar bottom, and the stopping inductor (20) is with diving Flushed at the top of water pump (22).
10. a kind of new independent well point integrate draining combined vacuum ground preloading method according to any one of claim 6 to 9 Hardened system, it is characterized in that:The independent well point collection, the land-based area stabilization zone of drainage system formation are surrounded by impervious clay curtain Curtain wall (25);A length of 1~the 4m of the telescopic borehole wall (11), the aperture D of the permeable borehole wall of macropore (14) is permeable equal to macropore Well casing footpath d and twice of filtering layer (13) thickness r sum.
CN201710351782.7A 2017-05-18 2017-05-18 New independent well point integrate draining combined vacuum ground preloading method and hardened system Pending CN107130580A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710351782.7A CN107130580A (en) 2017-05-18 2017-05-18 New independent well point integrate draining combined vacuum ground preloading method and hardened system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710351782.7A CN107130580A (en) 2017-05-18 2017-05-18 New independent well point integrate draining combined vacuum ground preloading method and hardened system

Publications (1)

Publication Number Publication Date
CN107130580A true CN107130580A (en) 2017-09-05

Family

ID=59732954

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710351782.7A Pending CN107130580A (en) 2017-05-18 2017-05-18 New independent well point integrate draining combined vacuum ground preloading method and hardened system

Country Status (1)

Country Link
CN (1) CN107130580A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019056474A1 (en) * 2017-09-22 2019-03-28 广州市盛洲地基基础工程有限公司 Enhanced catchment drainage pipe structure for soft soil foundation reinforcement treatment
CN111535293A (en) * 2020-03-05 2020-08-14 东南大学 Method and system for reinforcing deep soft foundation by combining low-level water-lowering vacuum with surcharge preloading
CN113279388A (en) * 2021-05-26 2021-08-20 上海勘察设计研究院(集团)有限公司 Foundation treatment system adopting combination of cyclic pressurization, pressure relief and dewatering grouting and construction method thereof
CN114991191A (en) * 2022-05-30 2022-09-02 中建生态环境集团有限公司 Compound vacuum negative-pressure dewatering and water pumping integrated well pipe
CN115434301A (en) * 2022-08-03 2022-12-06 上海渊丰地下工程技术有限公司 Vacuum preloading drainage system and foundation treatment method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006057294A (en) * 2004-08-18 2006-03-02 Asahi Techno:Kk Drainage method of small well using together with large depth vacuum drainage-consolidation groundwater discharge method
CN202730744U (en) * 2012-08-24 2013-02-13 南京瑞迪建设科技有限公司 Vacuum preloading and well-point dewatering combined system for reclamation treatment for shallow sludge layers
CN103031837A (en) * 2013-01-10 2013-04-10 中交四航工程研究院有限公司 Method for reinforcing deep and soft soil foundation by combining well-points dewatering with preloading
CN103352458A (en) * 2013-07-02 2013-10-16 南京瑞迪建设科技有限公司 Method for efficiently absorbing water and solidifying under films through controllable vacuum negative pressure well
CN104141295A (en) * 2013-05-07 2014-11-12 上海交通建设总承包有限公司 Soft soil foundation combined treatment method
CN204959779U (en) * 2015-08-21 2016-01-13 北京城建二建设工程有限公司 Automatic precipitation system of heavy -calibre engineering precipitation well time control
CN105421331A (en) * 2015-11-27 2016-03-23 淮海工学院 Anti-bending drainage channel for soft soil drainage consolidation

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006057294A (en) * 2004-08-18 2006-03-02 Asahi Techno:Kk Drainage method of small well using together with large depth vacuum drainage-consolidation groundwater discharge method
CN202730744U (en) * 2012-08-24 2013-02-13 南京瑞迪建设科技有限公司 Vacuum preloading and well-point dewatering combined system for reclamation treatment for shallow sludge layers
CN103031837A (en) * 2013-01-10 2013-04-10 中交四航工程研究院有限公司 Method for reinforcing deep and soft soil foundation by combining well-points dewatering with preloading
CN104141295A (en) * 2013-05-07 2014-11-12 上海交通建设总承包有限公司 Soft soil foundation combined treatment method
CN103352458A (en) * 2013-07-02 2013-10-16 南京瑞迪建设科技有限公司 Method for efficiently absorbing water and solidifying under films through controllable vacuum negative pressure well
CN204959779U (en) * 2015-08-21 2016-01-13 北京城建二建设工程有限公司 Automatic precipitation system of heavy -calibre engineering precipitation well time control
CN105421331A (en) * 2015-11-27 2016-03-23 淮海工学院 Anti-bending drainage channel for soft soil drainage consolidation

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
饶勃等: "《施工技术 上》", 31 July 1996, 同济大学出版社 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019056474A1 (en) * 2017-09-22 2019-03-28 广州市盛洲地基基础工程有限公司 Enhanced catchment drainage pipe structure for soft soil foundation reinforcement treatment
CN111535293A (en) * 2020-03-05 2020-08-14 东南大学 Method and system for reinforcing deep soft foundation by combining low-level water-lowering vacuum with surcharge preloading
CN113279388A (en) * 2021-05-26 2021-08-20 上海勘察设计研究院(集团)有限公司 Foundation treatment system adopting combination of cyclic pressurization, pressure relief and dewatering grouting and construction method thereof
CN114991191A (en) * 2022-05-30 2022-09-02 中建生态环境集团有限公司 Compound vacuum negative-pressure dewatering and water pumping integrated well pipe
CN115434301A (en) * 2022-08-03 2022-12-06 上海渊丰地下工程技术有限公司 Vacuum preloading drainage system and foundation treatment method

Similar Documents

Publication Publication Date Title
CN107130580A (en) New independent well point integrate draining combined vacuum ground preloading method and hardened system
CN104047280B (en) Soft foundation sharp separation compacting method
CN206721904U (en) A kind of integrated precipitation pumping system
CN206971199U (en) A kind of new independent well point integrate draining combined vacuum ground preloading system
CN212772427U (en) Building construction foundation ditch drainage device
CN106939610A (en) A kind of integrated precipitation pumping system
CN110670613B (en) Foundation pit elevator shaft water seepage prevention structure and construction method thereof
CN107268364A (en) The construction method that mud bag builds road is filled on reclaimed ground
CN105002883B (en) Soft foundation is classified relay-type draining concretion method indirectly
CN105926577B (en) Vacuum preloading seepage consolidation method
CN105970909B (en) Well point plastic strip vacuum preloading seepage consolidation joint precipitating, pre-pressing dynamic consolidation method
CN205917685U (en) Integral type well dotted arranges vacuum system
CN105862716B (en) Integral type well point plastic strip pipe
CN106013046B (en) Varying stress path well point plastic strip vacuum preloading seepage consolidation hierarchical loading method
CN205917709U (en) Integral type well dotted arranges house steward vacuum system
CN205348204U (en) Light well point precipitation system
CN207227978U (en) A kind of landfill yard guide french drain pipeline configuration
CN108625402A (en) Foundation pit fertilizer slot ponding processing method
CN203462480U (en) Device for lowering underground water level by using home-made small tube wells
CN203213129U (en) Controllable non-return drainer
CN205917683U (en) Soft soil foundation covers water type integral type well dotted arranges vacuum system
CN214993990U (en) Precipitation system
CN205917684U (en) Integral type well dotted calandria
CN205917682U (en) Soft soil foundation integral type well dotted arranges vacuum system
CN206157748U (en) Release of stress type stirrup cage sand well foundation pit dewatering device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170905

WD01 Invention patent application deemed withdrawn after publication