CN107128794A - Prefabricated superimposed sheet hanging method - Google Patents

Prefabricated superimposed sheet hanging method Download PDF

Info

Publication number
CN107128794A
CN107128794A CN201710454462.4A CN201710454462A CN107128794A CN 107128794 A CN107128794 A CN 107128794A CN 201710454462 A CN201710454462 A CN 201710454462A CN 107128794 A CN107128794 A CN 107128794A
Authority
CN
China
Prior art keywords
superimposed sheet
piece
profile steel
lug
rigging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710454462.4A
Other languages
Chinese (zh)
Inventor
刘树茂
王振波
张业军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN201710454462.4A priority Critical patent/CN107128794A/en
Publication of CN107128794A publication Critical patent/CN107128794A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/12Slings comprising chains, wires, ropes, or bands; Nets

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Load-Engaging Elements For Cranes (AREA)

Abstract

The present invention relates to a kind of prefabricated superimposed sheet hanging method, including superimposed sheet hoisting beam, the connection hanger for connecting tower crane and superimposed sheet hoisting beam is provided with the top of superimposed sheet hoisting beam;The H profile steel bottom position corresponding with connection hanger is provided with inside lug;Outside lug is provided with the outside of inside lug;Connection hanger is connected by rigging with the suspension hook of tower crane;First piece of superimposed sheet is connected with H profile steel;Second piece of superimposed sheet is connected with H profile steel;Second piece of superimposed sheet is reached with regard to site, rigging is extractd and is connected with second piece of superimposed sheet, first piece of superimposed sheet being reached to, extract rigging with regard to site is connected with first piece of superimposed sheet.The prefabricated superimposed sheet hanging method of the present invention, superimposed sheet is lifted using special hanger, and highly versatile is hardly damaged, it can be used for a long time, reduce the lifting time, improve the service efficiency of tower crane, improve superimposed sheet installation effectiveness, accelerate site operation speed, reduce artificial, reduction engineering cost.

Description

Prefabricated superimposed sheet hanging method
Technical field
It is to be related to a kind of prefabricated superimposed sheet hanging method specifically the present invention relates to a kind of construction techniques.
Background technology
In assembled-type house construction, during traditional prefabricated superimposed sheet lifting, suspension centre is done using the girder rib on superimposed sheet, altogether Set at 4 points, the steel wire rope hook connection of steel wire rope one end and tower crane, the other end is hooked on the suspension centre of girder rib, and tower crane is each only One piece can be lifted, especially in 10 to 30 layers of building of civil high storey, slower during because of tower crane operation, floor is got over high tower crane operation and existed Holding time is more long in lifting process, and tower crane will also lift the materials such as reinforcing bar, template, flitch, the lifting of in-situ precast superimposed sheet, Installation rate is slow, low construction efficiency.
The content of the invention
For above-mentioned deficiency of the prior art, the present invention provides a kind of simple in construction, easy to operate, safe and reliable, carries The prefabricated superimposed sheet hanging method of high efficiency of construction.
The technical solution used in the present invention is:
A kind of prefabricated superimposed sheet hanging method,
Including superimposed sheet hoisting beam, superimposed sheet hoisting beam is H profile steel;
The connection hanger for connecting tower crane and superimposed sheet hoisting beam is provided with the top of the H profile steel;
The H profile steel bottom position corresponding with connection hanger is provided with inside lug;It is provided with the outside of inside lug outer Side hanger;
Inside lug and outside lug are used to connect superimposed sheet;
Specific lifting step is as follows:
Connection hanger is connected by rigging with the suspension hook of tower crane first;
First piece of superimposed sheet is connected with H profile steel;
The inside lug of the inside lug of H profile steel left end and right-hand member is connected by rigging with superimposed sheet lifting point respectively;
The distance of the inside lug of H profile steel left end and the inside lug of right-hand member is equal to lifting point and right side on the left of first piece of superimposed sheet Lifting point distance;
Second piece of superimposed sheet is connected with H profile steel;
First piece of superimposed sheet is risen and is raised to 1 meter of height and moves to square upstairs to second piece of overlapping;
The outside lug of the outside lug of H profile steel left end and right-hand member is connected by rigging with second piece of superimposed sheet lifting point respectively Connect;
The distance of the outside lug of H profile steel left end and the outside lug of right-hand member is more than lifting point and right side on the left of second piece of superimposed sheet Lifting point distance;
Superimposed sheet departs from H profile steel step:
Second piece of superimposed sheet is reached with regard to site, after second piece of superimposed sheet is in place, rigging is extractd and is connected with second piece of superimposed sheet, and Rigging is put into first piece of superimposed sheet top;
First piece of superimposed sheet is reached with regard to site, first piece of superimposed sheet is extractd rigging and be connected with first piece of superimposed sheet afterwards in place.
First piece of superimposed sheet hoisting rig is 1.5 meters * 4, and second piece of superimposed sheet hoisting rig is the iron of 3 meters * 4 Chain.
The superimposed sheet left side lifting point and right side lifting point are two.
Right side hoisting rig phase of the left side hoisting rig of first piece of superimposed sheet of the lifting with lifting first piece of superimposed sheet It is mutually parallel.
Lift the right side hoisting rig and H types of second piece of superimposed sheet of left side hoisting rig and lifting of second piece of superimposed sheet Steel and superimposed sheet constitute an isosceles trapezoid.
The connection hanger is separately positioned on the inner side at H profile steel two ends;It is described connection hanger be to the distance of H profile steel distal end To 4-5 times of near-end distance.
The beneficial effect of the present invention compared with the prior art:
The prefabricated superimposed sheet hanging method of the present invention, superimposed sheet is lifted using special hanger, and highly versatile is hardly damaged, can be long-term Use, reduce the lifting time, improve the service efficiency of tower crane, improve superimposed sheet installation effectiveness, accelerate site operation speed, subtract It is few artificial, reduce engineering cost.
Brief description of the drawings
Fig. 1 is the superimposed sheet hoisting structure schematic diagram of prefabricated superimposed sheet hanging method of the invention;
Fig. 2 is first piece of superimposed sheet overlooking the structure diagram of prefabricated superimposed sheet hanging method of the invention;
Fig. 3 is the superimposed sheet lifting dimensional structure diagram of prefabricated superimposed sheet hanging method of the invention.
Embodiment
Referring to the drawings and embodiment the present invention will be described in detail:
Knowable to accompanying drawing 1-3, a kind of prefabricated superimposed sheet hanging method,
Including superimposed sheet hoisting beam 1, superimposed sheet hoisting beam 1 is H profile steel;
The connection hanger 2 for connecting tower crane and superimposed sheet hoisting beam is provided with the top of the H profile steel;
The H profile steel bottom position corresponding with connection hanger 2 is provided with inside lug 3;It is provided with the outside of inside lug Outside lug 4;
Inside lug 3 and outside lug 4 are used to connect superimposed sheet;
Specific lifting step is as follows:
Connection hanger 2 is connected by rigging with the suspension hook of tower crane first;
First piece of superimposed sheet 5 is connected with H profile steel;
The inside lug of the inside lug of H profile steel left end and right-hand member is connected by rigging with superimposed sheet lifting point respectively;
The distance of the inside lug of H profile steel left end and the inside lug of right-hand member is equal to first piece of left side lifting point 7 of superimposed sheet 5 and the right side The distance of side lifting point 8;
Second piece of superimposed sheet 6 is connected with H profile steel;
First piece of superimposed sheet 5 is raised to 1 meter of height and moved to second piece of top of superimposed sheet 6;
The outside lug 4 of the outside lug 4 of H profile steel left end and right-hand member is passed through into rigging and second piece of lifting point of superimposed sheet 6 respectively It is connected;
The distance of the outside lug of H profile steel left end and the outside lug of right-hand member is more than on the left of second piece of superimposed sheet lifting point 10 and the The distance of lifting point 11 on the right side of two pieces of superimposed sheets;
Superimposed sheet departs from H profile steel step:
Second piece of superimposed sheet 6 is reached with regard to site, after second piece of superimposed sheet 6 is in place, rigging 9 is extractd and connects with second piece of superimposed sheet 6 Connect, and rigging is put into first piece of top of superimposed sheet 5;
First piece of superimposed sheet 5 is reached with regard to site, extract rigging 9 after first piece of superimposed sheet 5 is in place connects with first piece of superimposed sheet 5 Connect.
First piece of superimposed sheet hoisting rig is 1.5 meters * 4, and second piece of superimposed sheet hoisting rig is the iron of 3 meters * 4 Chain.
The superimposed sheet left side lifting point and right side lifting point are two.
Right side hoisting rig phase of the left side hoisting rig of first piece of superimposed sheet of the lifting with lifting first piece of superimposed sheet It is mutually parallel.
The right side hoisting rig of second piece of superimposed sheet of the left side hoisting rig of second piece of superimposed sheet of the lifting and lifting is in V Font;
Lift second piece of superimposed sheet of left side hoisting rig and lifting of second piece of superimposed sheet right side hoisting rig and H profile steel and Superimposed sheet constitutes an isosceles trapezoid.
The connection hanger is separately positioned on the inner side at H profile steel two ends;It is described connection hanger be to the distance of H profile steel distal end To 4-5 times of near-end distance.
The making of superimposed sheet hoisting appliance:
It is 4 meters that the main body of suspender pricks H profile steel 200*200*8*12 length from heat, is being set at the top of H profile steel at two ends 1/3 at two Hanger(From 12mm*140mm*110mm), this hanger is that tower crane is connected hanger with suspender.At H profile steel bottom two ends 1/3 and end Hanger everywhere is set at the inside 200mm in portion(From 10mm*140mm*110mm), this hanger is that superimposed sheet is connected hanger with suspender; Have to set at hanger in H profile steel and strengthen strength, strengthen strength and use 10mm steel plates.
The prefabricated superimposed sheet hanging method of the present invention, the position for connecting tower crane and the connection hanger of superimposed sheet hoisting beam can To be arranged between inside lug and outside lug;Connection hanger quantity can increase to 3 as needed, and what is once lifted is folded Plywood quantity can increase to 3-6 blocks, and therefore the length of corresponding H profile steel lengthen.
The prefabricated superimposed sheet hanging method of the present invention, superimposed sheet is lifted using special hanger, and highly versatile is hardly damaged, can It is used for a long time, reduces the lifting time, improve the service efficiency of tower crane, improve superimposed sheet installation effectiveness, accelerates site operation speed Degree, reduces artificial, reduction engineering cost.
The above described is only a preferred embodiment of the present invention, not making any formal to the structure of the present invention Limitation.Any simple modification, equivalent variations and modification that every technical spirit according to the present invention is made to above example, Belong in the range of technical scheme.

Claims (6)

1. a kind of prefabricated superimposed sheet hanging method, it is characterised in that
Including superimposed sheet hoisting beam, superimposed sheet hoisting beam is H profile steel;
The connection hanger for connecting tower crane and superimposed sheet hoisting beam is provided with the top of the H profile steel;
The H profile steel bottom position corresponding with connection hanger is provided with inside lug;It is provided with the outside of inside lug outer Side hanger;
Inside lug and outside lug are used to connect superimposed sheet;
Specific lifting step is as follows:
Connection hanger is connected by rigging with the suspension hook of tower crane first;
First piece of superimposed sheet is connected with H profile steel;
The inside lug of the inside lug of H profile steel left end and right-hand member is connected by rigging with superimposed sheet lifting point respectively;
The distance of the inside lug of H profile steel left end and the inside lug of right-hand member is equal to lifting point and right side on the left of first piece of superimposed sheet Lifting point distance;
Second piece of superimposed sheet is connected with H profile steel;
First piece of superimposed sheet is risen and is raised to 1 meter of height and moves to square upstairs to second piece of overlapping;
The outside lug of the outside lug of H profile steel left end and right-hand member is connected by rigging with second piece of superimposed sheet lifting point respectively Connect;
The distance of the outside lug of H profile steel left end and the outside lug of right-hand member is more than lifting point and right side on the left of second piece of superimposed sheet Lifting point distance;
Superimposed sheet departs from H profile steel step:
Second piece of superimposed sheet is reached with regard to site, after second piece of superimposed sheet is in place, rigging is extractd and is connected with second piece of superimposed sheet, and Rigging is put into first piece of superimposed sheet top;
First piece of superimposed sheet is reached with regard to site, first piece of superimposed sheet is extractd rigging and be connected with first piece of superimposed sheet afterwards in place.
2. prefabricated superimposed sheet hanging method according to claim 1, it is characterised in that:First piece of superimposed sheet hoisting rig For 1.5 meters * 4, second piece of superimposed sheet hoisting rig is the iron chains of 3 meters * 4.
3. prefabricated superimposed sheet hanging method according to claim 1, it is characterised in that:Lifting point and the right side on the left of the superimposed sheet Side lifting point is two.
4. prefabricated superimposed sheet hanging method according to claim 1, it is characterised in that:A left side for first piece of superimposed sheet of the lifting Side hoisting rig is parallel to each other with lifting the right side hoisting rig of first piece of superimposed sheet.
5. prefabricated superimposed sheet hanging method according to claim 1, it is characterised in that:Hung on the left of second piece of superimposed sheet of lifting The right side hoisting rig and H profile steel and superimposed sheet for filling second piece of superimposed sheet of rigging and lifting constitute an isosceles trapezoid.
6. prefabricated superimposed sheet hanging method according to claim 1, it is characterised in that:The connection hanger is separately positioned on H The inner side at shaped steel two ends;The connection hanger to the distance of H profile steel distal end be to 4-5 times of near-end distance.
CN201710454462.4A 2017-06-16 2017-06-16 Prefabricated superimposed sheet hanging method Pending CN107128794A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710454462.4A CN107128794A (en) 2017-06-16 2017-06-16 Prefabricated superimposed sheet hanging method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710454462.4A CN107128794A (en) 2017-06-16 2017-06-16 Prefabricated superimposed sheet hanging method

Publications (1)

Publication Number Publication Date
CN107128794A true CN107128794A (en) 2017-09-05

Family

ID=59733986

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710454462.4A Pending CN107128794A (en) 2017-06-16 2017-06-16 Prefabricated superimposed sheet hanging method

Country Status (1)

Country Link
CN (1) CN107128794A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108643431A (en) * 2018-05-23 2018-10-12 中国矿业大学 A kind of fire-resistance hollow superimposed sheet and floor plates
CN109083268A (en) * 2018-10-29 2018-12-25 中国冶集团有限公司 Narrow more barrier zone bilayer differing tilt angles vestibules once lift installation method
CN113264443A (en) * 2021-05-11 2021-08-17 中铁二局集团有限公司 Tandem type hoisting method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4327944A (en) * 1978-12-08 1982-05-04 Charles Langloy Tongs designed to lift and handle metal sheets and similar materials
KR20110037676A (en) * 2009-10-07 2011-04-13 고려대학교 산학협력단 Jig for lifting wall and column pre-fabricated steel bar and lifting method using jig
CN203333139U (en) * 2013-06-25 2013-12-11 中国十七冶集团有限公司 Retractable balance hanging rod device of superposed sheets
CN203754229U (en) * 2014-03-05 2014-08-06 曾福英 Building concrete prefabricated superimposed sheet hanger
CN204588444U (en) * 2015-03-16 2015-08-26 邯郸市曙光新型建材科技有限公司 Prefabricated superimposed sheet special hanger
CN205527291U (en) * 2015-11-25 2016-08-31 中天建设集团有限公司 A frame type frame for hoisting two superimposed sheets
CN205838325U (en) * 2016-07-28 2016-12-28 龙信建设集团有限公司 Fabricated construction superimposed sheet string hangs construction special hanger
CN106429793A (en) * 2016-11-18 2017-02-22 成都建工工业化建筑有限公司 Hoisting balance beam provided with pulley device

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4327944A (en) * 1978-12-08 1982-05-04 Charles Langloy Tongs designed to lift and handle metal sheets and similar materials
KR20110037676A (en) * 2009-10-07 2011-04-13 고려대학교 산학협력단 Jig for lifting wall and column pre-fabricated steel bar and lifting method using jig
CN203333139U (en) * 2013-06-25 2013-12-11 中国十七冶集团有限公司 Retractable balance hanging rod device of superposed sheets
CN203754229U (en) * 2014-03-05 2014-08-06 曾福英 Building concrete prefabricated superimposed sheet hanger
CN204588444U (en) * 2015-03-16 2015-08-26 邯郸市曙光新型建材科技有限公司 Prefabricated superimposed sheet special hanger
CN205527291U (en) * 2015-11-25 2016-08-31 中天建设集团有限公司 A frame type frame for hoisting two superimposed sheets
CN205838325U (en) * 2016-07-28 2016-12-28 龙信建设集团有限公司 Fabricated construction superimposed sheet string hangs construction special hanger
CN106429793A (en) * 2016-11-18 2017-02-22 成都建工工业化建筑有限公司 Hoisting balance beam provided with pulley device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108643431A (en) * 2018-05-23 2018-10-12 中国矿业大学 A kind of fire-resistance hollow superimposed sheet and floor plates
CN109083268A (en) * 2018-10-29 2018-12-25 中国冶集团有限公司 Narrow more barrier zone bilayer differing tilt angles vestibules once lift installation method
CN113264443A (en) * 2021-05-11 2021-08-17 中铁二局集团有限公司 Tandem type hoisting method

Similar Documents

Publication Publication Date Title
CN102070071B (en) Steel reinforcement cage hoisting method
CN105129602B (en) Grow up vertical reinforcement monoblock type raising suspender
CN202080812U (en) Dedicated sling system for large-scaled reinforcing cage
CN205955236U (en) Container formula of taking pulley platform of unloading of encorbelmenting
CN107128794A (en) Prefabricated superimposed sheet hanging method
CN101324146A (en) Construction method for hanging wide span arcuated open-web beam
CN208883341U (en) Underground pipe gallery large-diameter pipeline transport device
CN109095343A (en) Assembled hanger
CN210858024U (en) Discharging platform with liftable hole part
CN204626998U (en) A kind of attached lift scaffold discharging platform
CN202575670U (en) Prefabricated member hoisting tool type lifting beam
CN201770406U (en) Simple hoist fixing device
CN204983692U (en) Concrete panel's hoist device
CN106088431B (en) Laminated floor slab and laminated floor slab construction method for hanging
CN207632359U (en) Rack slot machine shoulder pole girder deflects in the air turns over transposer
CN206346500U (en) Compact simplified arm extending type straddle truck
CN103291078B (en) A kind of steel girder erection equipment
CN205114861U (en) Hoist and mount lacing device
CN202390077U (en) Lifting appliance for conveying tower crane
CN206768858U (en) Assembled external application construction elevator base steel plinth
CN205045702U (en) Heavy -calibre cement pipe material hoist of area upset function
CN208948679U (en) Assembled hanger
CN208054770U (en) A kind of adjustable hoisting balance beam device of light-duty center of gravity
CN203755153U (en) Simply supported plate bridge bottom plate maintenance construction moving operation platform
CN108059088B (en) Method and device for deflection turning and transposition of carrying pole Liang Kongzhong of slot erecting machine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170905

RJ01 Rejection of invention patent application after publication