CN107127051A - A kind of underground coal separation production method and system - Google Patents
A kind of underground coal separation production method and system Download PDFInfo
- Publication number
- CN107127051A CN107127051A CN201710345145.9A CN201710345145A CN107127051A CN 107127051 A CN107127051 A CN 107127051A CN 201710345145 A CN201710345145 A CN 201710345145A CN 107127051 A CN107127051 A CN 107127051A
- Authority
- CN
- China
- Prior art keywords
- coal
- storehouse
- chamber
- ribbon conveyer
- tunnel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B03—SEPARATION OF SOLID MATERIALS USING LIQUIDS OR USING PNEUMATIC TABLES OR JIGS; MAGNETIC OR ELECTROSTATIC SEPARATION OF SOLID MATERIALS FROM SOLID MATERIALS OR FLUIDS; SEPARATION BY HIGH-VOLTAGE ELECTRIC FIELDS
- B03B—SEPARATING SOLID MATERIALS USING LIQUIDS OR USING PNEUMATIC TABLES OR JIGS
- B03B9/00—General arrangement of separating plant, e.g. flow sheets
- B03B9/005—General arrangement of separating plant, e.g. flow sheets specially adapted for coal
Landscapes
- Combined Means For Separation Of Solids (AREA)
Abstract
The invention discloses a kind of underground coal separation production method and system, this method, which integrally builds coal preparation plant, to be risen to spoil after flooring product storehouse, washing by lifting system or Leather Belt Conveyance in multiple product coal behind underground, washing and is directly used in underground filling goaf.Coal preparation technique of the present invention is sorted using lump coal dense-medium shallow-tank, smalls not washing, and coarse slime is reclaimed using thickening and classifying cyclone and high-frequency screen, and fine coal slurry is reclaimed using filter press.Construction of coal preparation plant in underground, is greatlyd save ground industrial sites floor space by the present invention.In addition, washing waste not discharged from mine, reduces invalid lifting and cost of transportation, the actual production capacity of mine is improved, is stacked and processing cost while decreasing ground spoil, reduces environmental hazard.The present invention can meet most of coal preparation plant's washing process, applied widely, for mountain area gully, place be limited or construction of earth clearance area in hardship colliery, solve the problem of plant site selection is difficult.
Description
Technical field
The invention belongs to coal separation technical field, it is related to coal separation production, especially a kind of underground coal preparation plant production method
And system.
Background technology
Traditional Coal Mine Design is in coal mining activity, and raw coal is typically only done after thick tear reason in underground by lifting system or belt
Conveyer transport rises to carries out washing operation again behind ground.Industrial sites coal preparation plant generally requires construction run coal bin, sieving approach
Workshop, main building, press filtration workshop, product storehouse, concentration basin and pump house and related auxiliary equipment.Coal preparation plant covers an area of tens of
Hectare, and construction of coal mine factory site is generally remote country or mountain area gully, for remote country, expropriation of land and difficulty of removing are costly,
For mountain area gully, industrial sites are narrow, cut into a mountain costly with bank protection.To such situation, in surface construction, coal preparation plant runs into
Problem and challenge.
In addition, colliery can produce substantial amounts of solid waste spoil in construction and production process, traditional mode is straight
Connect and be stacked at earth's surface, form hillock.The spoil of accumulation on ground surface brings very big threat and danger to mining area ecological environment and condition
Evil, including appropriation of land, cause pollution of air ambient, water quality and soil etc..With the raising of environmental consciousness, exploited thecoal mine mistake
The environmental standard and related request of journey are increasingly strict, and the negative effect such as environmental pollution is increasingly difficult to be received, or even has influence on
The existence in colliery.
There are many collieries the country by being backfilled under waste shaft as the major measure for reducing spoil discharge at present, cash after washing
Stone is gone into the well backfill by assistant conveyance, and this partial invalidity lifting and transport add production cost, also reduce the reality of mine
Production capacity.Particularly with the mine that ature of coal is poor, spoil content seriously constrains greatly the production capacity in colliery, if reducing carrying for spoil
Rising amount, equivalent to adding mine capacity.
The domestic application for underground discharge refuse technology at present has some examples, and it is generally the pre- discharge refuse operation of raw coal, in Shanxi
Middle energy Xing is eastern, and colliery applies jigging discharge refuse technique, and shallow slot dense medium discharge refuse technique is applied in new river in Shangdong Province Mining Group Ji Yangkuang,
But the case study on implementation in underground is all built without whole coal preparation plant's production system so far.
The content of the invention
It is an object of the invention to the limitation and difficulty for overcoming above-mentioned prior art, there is provided a kind of production of underground coal preparation plant
Method and system, it is integrally built coal preparation plant in underground, mine and the unified consideration of coal preparation plant, and product, which passes through to be lifted, after washing is
System or Leather Belt Conveyance rise to spoil after flooring product storehouse, washing and are directly used in underground filling goaf.
The purpose of the present invention is achieved through the following technical solutions:
Present invention firstly provides a kind of underground coal separation production method:This method is by construction of coal preparation plant in many behind underground, washing
Kind product coal rises to spoil after flooring product storehouse, washing by lifting system or Leather Belt Conveyance and is directly used in underground filling
Goaf.
Further, above coal preparation plant production method is sorted using lump coal dense-medium shallow-tank, smalls not washing, and coarse slime is using dense
Contracting classifying cyclone and high-frequency screen are reclaimed, and fine coal slurry is reclaimed using filter press, and coal preparation plant realizes closed water circuit.
The present invention also proposes a kind of underground coal preparation plant production system for being used to realize the above method:Including run coal bin, screening
Chamber, shallow slot master wash chamber, slime water system chamber, press filtration chamber, mixed coal storehouse, cleaned coal storehouse, main shaft, spoil de-mediated chamber, cash
Ribbon conveyer tunnel between stone storehouse and each storehouse of connection and chamber;It is defeated that the upper end of the run coal bin is connected with run coal bin belt
Machine tunnel is sent, the run coal bin lower end is connected to screening chamber by run coal bin to chamber ribbon conveyer tunnel is sieved;It is described
Screening chamber by sieve chamber to it is main wash chamber ribbon conveyer tunnel and be connected to shallow slot master wash chamber;Screening chamber also passes through
Screening chamber to mixed coal storehouse ribbon conveyer tunnel is connected to mixed coal storehouse;It is defeated by cleaned coal reprinting belt that the shallow slot master washes chamber
The machine tunnel of sending is connected to screening chamber to mixed coal storehouse ribbon conveyer tunnel;The slime water system chamber is connected by press filtration chamber
Screening chamber is connected to mixed coal storehouse ribbon conveyer tunnel.The upper end in the mixed coal storehouse passes through mixed coal storehouse to cleaned coal storehouse belt conveying
Machine tunnel is connected to the upper end of cleaned coal storehouse;The lower end in the mixed coal storehouse is connected under cleaned coal storehouse by Loading conveyer tunnel
End;The upper end of the cleaned coal storehouse is connected to main shaft by coal bunker connection roadway suitable for reading;The lower end Loading conveyer tunnel of cleaned coal storehouse
It is connected to main shaft;The spoil de-mediated chamber is connected to the upper end of waste bin by upper waste bin ribbon conveyer tunnel;It is described
The lower end of waste bin is connected with gangue reprint ribbon conveyer tunnel.
Further, above-mentioned run coal bin, mixed coal storehouse, cleaned coal storehouse and main shaft are in " " a font arrangement, production system of underground coal preparation plant
System and ribbon conveyer tunnel are serially connected in main conveying system side and arranged in " day " font;Wherein, screening chamber is located at main transport
On circuit, it is parallel with it positioned at main transport roadway side that shallow slot master washes chamber and slime water system chamber.
Further, production raw coal is transported to run coal bin by upper run coal bin ribbon conveyer, after run coal bin is stored, raw coal
Screening chamber is transported to through ribbon conveyer under storehouse, the block raw coal after classification is transported to shallow slot master by ribbon conveyer by screening chamber
The cleaned coal washed after chamber, coal slime and washing reprints ribbon conveyer by cleaned coal and returns to screening chamber to mixed coal storehouse ribbon conveyer
Tunnel;Mixed coal storehouse is directly transported to by ribbon conveyer after smalls is mixed with coal slime after classification, cleaned coal then reprint after by mixed coal storehouse
Cleaned coal storehouse is transported to cleaned coal storehouse ribbon conveyer tunnel.
Further, mixed coal and cleaned coal enter after mixed coal storehouse and cleaned coal storehouse buffering respectively through mixed coal and cleaned coal Loading conveyer respectively
Tunnel is transported to after main shaft skip loading pocket, by two sets of skip hoistings to ground;After spoil is by spoil de-mediated chamber after washing
Go after waste bin, buffering to be transported to goaf through gangue reprint ribbon conveyer tunnel again by upper waste bin ribbon conveyer tunnel
Filling.
The present invention has following useful achievement:
(1) present invention greatlys save ground industrial sites floor space by construction of coal preparation plant in underground.For mountain area ditch
Gully, place be limited or construction of earth clearance area in hardship colliery, solves the problem of plant site selection is difficult.
(2) washing spoil of the present invention not gug, directly fills in underground, reduces invalid lifting and cost of transportation, improves
Mine actual production capacity, at the same decrease ground spoil stack and processing cost.
(3) present invention realizes two kinds of product coals while going out well, can meet most of coal preparation plant's washing process, the scope of application
Extensively.
(4) The present invention reduces the stacking of ground solid waste spoil, environmental hazard is reduced, meets national environmental protection political affairs
Plan.
Brief description of the drawings
Fig. 1 is embodiments of the invention underground coal preparation plant process chart;
Fig. 2 is underground coal preparation plant floor plan of the invention;
Fig. 3 is Fig. 2 A-A diagrammatic cross-sections;
Fig. 4 is Fig. 2 B-B diagrammatic cross-sections;
Fig. 5 is Fig. 2 C-C diagrammatic cross-sections;
Fig. 6 is Fig. 2 D-D diagrammatic cross-sections;
Fig. 7 is Fig. 2 E-E diagrammatic cross-sections;
Fig. 8 is Fig. 2 F-F diagrammatic cross-sections.
Wherein:1 is upper run coal bin ribbon conveyer tunnel;2 be run coal bin;3 be that run coal bin extremely sieves chamber belt conveying
Machine tunnel;4 be screening chamber;5 wash chamber ribbon conveyer tunnel for screening chamber to master;6 be that shallow slot master washes chamber;7 be coal
Muddy water system chamber;8 be that cleaned coal reprints ribbon conveyer tunnel;9 be press filtration chamber;10 is defeated to mixed coal storehouse belt for screening chamber
Send machine tunnel;11 be mixed coal storehouse;12 be mixed coal storehouse to cleaned coal storehouse ribbon conveyer tunnel;13 be cleaned coal storehouse;L4 coal bunkers are suitable for reading
Network tunnel;15 be Loading conveyer tunnel;16 be main shaft;17 be spoil de-mediated chamber;18 be upper waste bin ribbon conveyer lane
Road;19 be waste bin;20 be gangue reprint ribbon conveyer tunnel;21 be that run coal bin extremely sieves chamber ribbon conveyer;22 are
Roller picker;23 be upper mixed coal storehouse ribbon conveyer;24 be block raw coal ribbon conveyer;25 be dense-medium shallow-tank separator;26 be essence
Coal sculping screen;27 be that block cleaned coal reprints ribbon conveyer;28 be magnetic separator;29 be swash plate thickener;30 be concentration classification eddy flow
Device;31 be high-frequency screen;32 be that coal slime reprints ribbon conveyer;33 be conjunction Jie pond;34 be dilute Jie pond;35 be tailing pit;36 be to follow
Ring pond;37 be clear water reserviors;38 be filter press;39 be upper cleaned coal storehouse ribbon conveyer;40 be Coal Stone Separation;41 be spoil
Reprint ribbon conveyer.
Embodiment
The present invention underground coal separation production method be:By construction of coal preparation plant under mine, multiple product coal passes through after washing
Lifting system or Leather Belt Conveyance rise to spoil after flooring product storehouse, washing and are directly used in underground filling goaf.
In the method for the invention, coal preparation technique is sorted using lump coal dense-medium shallow-tank, smalls not washing, and coarse slime is using dense
Contracting classifying cyclone and high-frequency screen are reclaimed, and fine coal slurry is reclaimed using filter press;Coal preparation plant realizes closed water circuit.
Fig. 1-8 is the embodiment for realizing above method, and the invention will be further described with reference to the accompanying drawings and examples:
The underground coal preparation plant production system of the present invention washes chamber 6, black water including run coal bin 2, screening chamber 4, shallow slot master
System chamber 7, press filtration chamber 9, mixed coal storehouse 11, cleaned coal storehouse 13, main shaft 16, spoil de-mediated chamber 17, waste bin 19 and connection are each
Ribbon conveyer tunnel between storehouse and chamber;
The upper end of the run coal bin 2 is connected with run coal bin ribbon conveyer tunnel 1, and the lower end of run coal bin 2 passes through original
Coal bunker is connected to screening chamber 4 to chamber ribbon conveyer tunnel 3 is sieved;
The screening chamber 4 by sieve chamber to it is main wash chamber ribbon conveyer tunnel 5 and be connected to shallow slot master wash chamber
6;Screening chamber 4 is also connected to mixed coal storehouse 11 by sieving chamber to mixed coal storehouse ribbon conveyer tunnel 10.
The shallow slot master washes chamber 6 and is connected to screening chamber to mixed coal storehouse band by cleaned coal reprinting ribbon conveyer tunnel 8
Formula conveyer tunnel 10;The slime water system chamber 7 is connected to screening chamber to mixed coal storehouse belt conveying by press filtration chamber 9
Machine tunnel 10.The upper end in the mixed coal storehouse 11 is connected to cleaned coal storehouse 13 by mixed coal storehouse to cleaned coal storehouse ribbon conveyer tunnel 12
Upper end;The lower end in the mixed coal storehouse 11 is connected to the lower end of cleaned coal storehouse 13 by Loading conveyer tunnel 15;
The upper end of the cleaned coal storehouse 13 is connected to main shaft 16 by coal bunker connection roadway 14 suitable for reading;The lower end dress of cleaned coal storehouse 13
Carry conveyer tunnel 15 and be connected to main shaft 16;
The spoil de-mediated chamber 17 is connected to the upper end of waste bin 19 by upper waste bin ribbon conveyer tunnel 18;
The lower end of the waste bin 19 is connected with gangue reprint ribbon conveyer tunnel 20.
The run coal bin 2, mixed coal storehouse 11, cleaned coal storehouse 13 and main shaft 16 are in " " a font arrangement, production system of underground coal preparation plant
System and ribbon conveyer tunnel are serially connected in main conveying system side and arranged in " day " font;Wherein, screening chamber 4 is located at main transport
On circuit, it is parallel with it positioned at main transport roadway side that shallow slot master washes chamber 6 and slime water system chamber 7.
The underground coal preparation plant production process of the present invention is as follows:
Production raw coal is transported to run coal bin 2 by upper run coal bin ribbon conveyer, and after the storage of run coal bin 2, raw coal is through storehouse
Lower ribbon conveyer is transported to screening chamber 4, and the block raw coal after classification is transported to shallow slot master by screening chamber 4 by ribbon conveyer and washed
Cleaned coal after chamber 6, coal slime and washing reprints ribbon conveyer by cleaned coal and returns to screening chamber to mixed coal storehouse ribbon conveyer
Tunnel 10;Mixed coal storehouse 11 is directly transported to by ribbon conveyer after smalls is mixed with coal slime after classification, cleaned coal then reprint after by mixed
Coal bunker to cleaned coal storehouse ribbon conveyer tunnel 12 is transported to cleaned coal storehouse 13.
Mixed coal and cleaned coal enter after mixed coal storehouse 11 and the buffering of cleaned coal storehouse 13 respectively through mixed coal and cleaned coal Loading conveyer lane respectively
Road is transported to after main shaft skip loading pocket, by two sets of skip hoistings to ground;After spoil is by spoil de-mediated chamber 17 after washing
Go after waste bin 19, buffering to transport through gangue reprint ribbon conveyer tunnel 20 again by upper waste bin ribbon conveyer tunnel 18
To goaf filling.
Each chamber arrangement equipment of underground coal preparation plant production system of the present invention is as follows:
The screening chamber 4 arrangement run coal bin extremely sieves chamber ribbon conveyer 21 and roller picker 22;The shallow slot master washes
The arrangement of chamber 6 block raw coal ribbon conveyer 24, dense-medium shallow-tank separator 25, head coal sculpingscreen 26, magnetic separator 28, close Jie pond 33,
Dilute Jie pond 34 and tailing pit 35;The arrangement swash plate of slime water system chamber 7 thickener 29, thickening and classifying cyclone 30, high frequency
Sieve 31, circulating water pool 36 and clear water reserviors 37;The press filtration chamber 9 arranges 2 filter presses 38;The spoil de-mediated chamber 17 is arranged
Coal Stone Separation 40.
The technique joining relation of each equipment of underground coal preparation plant production system of the present invention is as follows:
Production raw coal is fed on roller picker 22 by ribbon conveyer, after coal classification, and the lower smalls of sieve directly goes to mix
Block raw coal, which is transported to shallow slot master by block raw coal ribbon conveyer 24 and washes chamber 6, on coal bunker 11, sieve feeds dense-medium shallow-tank separator 25,
Block cleaned coal after sorting feeds to reprint on block cleaned coal reprinting ribbon conveyer 27 after the dehydration de-mediated of head coal sculpingscreen 26 goes essence
Coal bunker 13, the spoil after sorting directly removes cash after the dehydration de-mediated of Coal Stone Separation 40 by gangue reprint ribbon conveyer 41
Stone storehouse 19.
Head coal sculpingscreen 26 and the lower qualified medium of the sieve of Coal Stone Separation 40, which are returned, closes dilute medium and shunting under Jie pond 33, sieve
Part qualified medium removes magnetic separator 28, and magnetic separation recovery concentrate, which is returned, closes Jie pond 33, and magnetic tailing, which is then raised, delivers to concentration classification eddy flow
Device 30, classifying cyclone underflow reclaims coarse slime by high-frequency screen 31, and classifying cyclone overflow and high-frequency screen backwater then enter
After the concentrating and precipitating of swash plate thickener 29, underflow is pumped directly to the press filtration of filter press 38 and reclaims fine coal slurry, and coarse slime and fine coal slurry are logical
Coal slime is crossed to reprint on the return blending supreme mixed coal storehouse ribbon conveyer 23 of ribbon conveyer 32.Thickener overflow and filter press filtrate
Then reused as recirculated water, coal preparation plant realizes closed water circuit, black water is not outer to be arranged.
Claims (6)
1. a kind of underground coal separation production method, it is characterised in that by construction of coal preparation plant under mine, product coal is by carrying after washing
The system of liter or Leather Belt Conveyance rise to spoil after flooring product storehouse, washing and are directly used in underground filling goaf.
2. coal separation production method in underground according to claim 1, it is characterised in that coal preparation technique uses lump coal dense-medium shallow-tank
Sorting, smalls not washing, coarse slime is reclaimed using thickening and classifying cyclone and high-frequency screen, and fine coal slurry is reclaimed using filter press, choosing
Realize closed water circuit in coal works.
3. a kind of underground coal preparation plant production system for being used to realize the methods described of claim 1 or 2, it is characterised in that including original
Coal bunker (2), screening chamber (4), shallow slot master wash chamber (6), slime water system chamber (7), press filtration chamber (9), mixed coal storehouse (11),
Belt conveying between cleaned coal storehouse (13), main shaft (16), spoil de-mediated chamber (17), waste bin (19) and each storehouse of connection and chamber
Machine tunnel;
The upper end of the run coal bin (2) is connected with run coal bin ribbon conveyer tunnel (1), and run coal bin (2) lower end passes through
Run coal bin is connected to screening chamber (4) to chamber ribbon conveyer tunnel (3) are sieved;
The screening chamber (4) by sieve chamber to it is main wash chamber ribbon conveyer tunnel (5) and be connected to shallow slot master wash chamber
(6);Screening chamber (4) is also connected to mixed coal storehouse (11) by sieving chamber to mixed coal storehouse ribbon conveyer tunnel (10);
The shallow slot master washes chamber (6) and is connected to screening chamber to mixed coal storehouse band by cleaned coal reprinting ribbon conveyer tunnel (8)
Formula conveyer tunnel (10);The slime water system chamber (7) is connected to screening chamber to mixed coal storehouse band by press filtration chamber (9)
Formula conveyer tunnel (10);The upper end of the mixed coal storehouse (11) is connected by mixed coal storehouse to cleaned coal storehouse ribbon conveyer tunnel (12)
To the upper end of cleaned coal storehouse (13);The lower end of the mixed coal storehouse (11) is connected to cleaned coal storehouse (13) by Loading conveyer tunnel (15)
Lower end;
The upper end of the cleaned coal storehouse (13) is connected to main shaft (16) by coal bunker connection roadway suitable for reading (14);Under cleaned coal storehouse (13)
End Loading conveyer tunnel (15) is connected to main shaft (16);
The spoil de-mediated chamber (17) is connected to the upper end of waste bin (19) by upper waste bin ribbon conveyer tunnel (18);
The lower end of the waste bin (19) is connected with gangue reprint ribbon conveyer tunnel (20).
4. underground coal preparation plant according to claim 3 production system, it is characterised in that the run coal bin (2), mixed coal storehouse
(11), cleaned coal storehouse (13) and main shaft (16) are in " " font arrangement, underground coal preparation plant production system and a ribbon conveyer tunnel string
Main conveying system side is connected on to arrange in " day " font;Wherein, screening chamber (4) is located on main transportation route, and shallow slot master washes cave
It is parallel with it that room (6) and slime water system chamber (7) are located at main transport roadway side.
5. underground coal preparation plant according to claim 3 production system, it is characterised in that production raw coal passes through upper run coal bin band
Formula conveyer is transported to run coal bin (2), and after run coal bin (2) storage, raw coal is transported to screening chamber through ribbon conveyer under storehouse
(4), the block raw coal after classification is transported to shallow slot master by screening chamber (4) by ribbon conveyer and washed after chamber (6), coal slime and washing
Cleaned coal pass through cleaned coal and reprint ribbon conveyer and return to screening chamber to mixed coal storehouse ribbon conveyer tunnel (10);Smalls after classification
Mixed coal storehouse (11) is directly transported to by ribbon conveyer after being mixed with coal slime, cleaned coal then reprint after by mixed coal storehouse to cleaned coal storehouse belt
Conveyer tunnel (12) is transported to cleaned coal storehouse (13).
6. underground coal preparation plant according to claim 3 production system, it is characterised in that mixed coal and cleaned coal enter mixed coal storehouse respectively
(11) after and being transported to main shaft skip loading pocket through mixed coal and cleaned coal Loading conveyer tunnel respectively after cleaned coal storehouse (13) buffering, by
Two sets of skip hoistings are to ground;Spoil after spoil de-mediated chamber (17) by passing through upper waste bin ribbon conveyer tunnel after washing
(18) go after waste bin (19), buffering to be transported to goaf filling through gangue reprint ribbon conveyer tunnel (20) again.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710345145.9A CN107127051A (en) | 2017-05-16 | 2017-05-16 | A kind of underground coal separation production method and system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710345145.9A CN107127051A (en) | 2017-05-16 | 2017-05-16 | A kind of underground coal separation production method and system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107127051A true CN107127051A (en) | 2017-09-05 |
Family
ID=59732455
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710345145.9A Pending CN107127051A (en) | 2017-05-16 | 2017-05-16 | A kind of underground coal separation production method and system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107127051A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108465542A (en) * | 2018-03-23 | 2018-08-31 | 合肥工业大学 | A kind of coal downhole intelligent separation system device layout |
CN109794349A (en) * | 2019-03-08 | 2019-05-24 | 中国矿业大学 | A kind of underground coal preparation technique |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1424151A (en) * | 2002-12-31 | 2003-06-18 | 天地科技股份有限公司唐山分公司 | Process for heavy media separation of coarse coal slurry |
CN201500577U (en) * | 2009-09-22 | 2010-06-09 | 王迪业 | Heavy medium shallow slot sorting mine underground refuse discharging system |
CN101905189A (en) * | 2010-08-19 | 2010-12-08 | 刘峰 | Method for realizing underground separation of raw coal |
CN102162364A (en) * | 2011-03-21 | 2011-08-24 | 山东新阳能源有限公司 | Layout method for underground dense-medium shallow-slot coal preparation in coal mine |
CN103623918A (en) * | 2013-12-10 | 2014-03-12 | 煤炭工业济南设计研究院有限公司 | Steam coal washing processing method for easy-to-argillization gangues |
CN203494634U (en) * | 2013-09-26 | 2014-03-26 | 王迪业 | Underground coal mine gangue discharging system using flowing current separation technology |
CN104033153A (en) * | 2014-06-25 | 2014-09-10 | 中国矿业大学 | Coal mine underground mining, dress and filling integral method |
CN104948227A (en) * | 2015-05-29 | 2015-09-30 | 天地科技股份有限公司 | Underground coal mine washing technology dual system arranging method |
CN105983478A (en) * | 2015-02-03 | 2016-10-05 | 山东泰山能源有限责任公司翟镇煤矿 | Underground coal and gangue separation system and coal and gangue separation method |
-
2017
- 2017-05-16 CN CN201710345145.9A patent/CN107127051A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1424151A (en) * | 2002-12-31 | 2003-06-18 | 天地科技股份有限公司唐山分公司 | Process for heavy media separation of coarse coal slurry |
CN201500577U (en) * | 2009-09-22 | 2010-06-09 | 王迪业 | Heavy medium shallow slot sorting mine underground refuse discharging system |
CN101905189A (en) * | 2010-08-19 | 2010-12-08 | 刘峰 | Method for realizing underground separation of raw coal |
CN102162364A (en) * | 2011-03-21 | 2011-08-24 | 山东新阳能源有限公司 | Layout method for underground dense-medium shallow-slot coal preparation in coal mine |
CN203494634U (en) * | 2013-09-26 | 2014-03-26 | 王迪业 | Underground coal mine gangue discharging system using flowing current separation technology |
CN103623918A (en) * | 2013-12-10 | 2014-03-12 | 煤炭工业济南设计研究院有限公司 | Steam coal washing processing method for easy-to-argillization gangues |
CN104033153A (en) * | 2014-06-25 | 2014-09-10 | 中国矿业大学 | Coal mine underground mining, dress and filling integral method |
CN105983478A (en) * | 2015-02-03 | 2016-10-05 | 山东泰山能源有限责任公司翟镇煤矿 | Underground coal and gangue separation system and coal and gangue separation method |
CN104948227A (en) * | 2015-05-29 | 2015-09-30 | 天地科技股份有限公司 | Underground coal mine washing technology dual system arranging method |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108465542A (en) * | 2018-03-23 | 2018-08-31 | 合肥工业大学 | A kind of coal downhole intelligent separation system device layout |
CN108465542B (en) * | 2018-03-23 | 2020-10-09 | 合肥工业大学 | Equipment layout of underground intelligent coal sorting system |
CN109794349A (en) * | 2019-03-08 | 2019-05-24 | 中国矿业大学 | A kind of underground coal preparation technique |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108246490B (en) | Iron-increasing and silicon-reducing beneficiation method for high-iron-silicate lean magnetite ore | |
CN101482005B (en) | Down-hole gross coal dirt-discharging and mine water treating combined process | |
CN109718944B (en) | A kind of aqueous medium underground coal preparation technique | |
CN103240168B (en) | Grading separation and dehydration method for high-ash difficult-separation coal slime | |
CN103480482B (en) | Flowing current separation process coal mine underground gangue dumping system | |
CN105921261B (en) | A kind of super low-grade vanadium titano-magnetite utilization system and its utilize method | |
CN104858048A (en) | Residue soil environmental regenerating retreatment method and equipment by adoption of earth pressure balance shield | |
CN103567056A (en) | Downhole jigging and gangue discharging method | |
CN103240169B (en) | Gravity-flotation combined phosphorite separation process | |
CN210788570U (en) | Building material production system | |
CN107127051A (en) | A kind of underground coal separation production method and system | |
CN107020200B (en) | Blending process of flotation clean coal in full-grain clean coal | |
CN204746555U (en) | Colliery is two washing systems in pit | |
CN215429584U (en) | Shield tunnel composite gravel layer sludge treatment equipment | |
CN113649398A (en) | Harmless disposal system for mine tailings | |
CN201500577U (en) | Heavy medium shallow slot sorting mine underground refuse discharging system | |
CN111841846A (en) | Efficient water-saving type coal resource upgrading process for underground separation and pre-discharge of gangue | |
CN112044927A (en) | Full tailings grading and segmenting multi-way comprehensive utilization method | |
CN104948227B (en) | A kind of underground coal mine washing process dual system method for arranging | |
CN203494634U (en) | Underground coal mine gangue discharging system using flowing current separation technology | |
CN114247560B (en) | Full-size ore pretreatment process and device | |
CN103230831B (en) | Processing and utilizing method for extracting carbon and iron from blast furnace metallurgy dust and sludge | |
CN112403647B (en) | Arrangement method of intelligent dry separation system for underground transfer points | |
CN115445741A (en) | Method for preparing sand by utilizing rock waste high-yield preparation machine | |
CN115318417A (en) | Method and system for preparing sandstone aggregate in TBM excavated material tunnel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170905 |
|
RJ01 | Rejection of invention patent application after publication |