CN107127051A - A kind of underground coal separation production method and system - Google Patents

A kind of underground coal separation production method and system Download PDF

Info

Publication number
CN107127051A
CN107127051A CN201710345145.9A CN201710345145A CN107127051A CN 107127051 A CN107127051 A CN 107127051A CN 201710345145 A CN201710345145 A CN 201710345145A CN 107127051 A CN107127051 A CN 107127051A
Authority
CN
China
Prior art keywords
coal
storehouse
chamber
ribbon conveyer
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710345145.9A
Other languages
Chinese (zh)
Inventor
申斌学
郑忠友
白霄
柳东徽
宋立平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Coal Energy Research Institute Co Ltd
Original Assignee
China Coal Energy Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Coal Energy Research Institute Co Ltd filed Critical China Coal Energy Research Institute Co Ltd
Priority to CN201710345145.9A priority Critical patent/CN107127051A/en
Publication of CN107127051A publication Critical patent/CN107127051A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B03SEPARATION OF SOLID MATERIALS USING LIQUIDS OR USING PNEUMATIC TABLES OR JIGS; MAGNETIC OR ELECTROSTATIC SEPARATION OF SOLID MATERIALS FROM SOLID MATERIALS OR FLUIDS; SEPARATION BY HIGH-VOLTAGE ELECTRIC FIELDS
    • B03BSEPARATING SOLID MATERIALS USING LIQUIDS OR USING PNEUMATIC TABLES OR JIGS
    • B03B9/00General arrangement of separating plant, e.g. flow sheets
    • B03B9/005General arrangement of separating plant, e.g. flow sheets specially adapted for coal

Landscapes

  • Combined Means For Separation Of Solids (AREA)

Abstract

The invention discloses a kind of underground coal separation production method and system, this method, which integrally builds coal preparation plant, to be risen to spoil after flooring product storehouse, washing by lifting system or Leather Belt Conveyance in multiple product coal behind underground, washing and is directly used in underground filling goaf.Coal preparation technique of the present invention is sorted using lump coal dense-medium shallow-tank, smalls not washing, and coarse slime is reclaimed using thickening and classifying cyclone and high-frequency screen, and fine coal slurry is reclaimed using filter press.Construction of coal preparation plant in underground, is greatlyd save ground industrial sites floor space by the present invention.In addition, washing waste not discharged from mine, reduces invalid lifting and cost of transportation, the actual production capacity of mine is improved, is stacked and processing cost while decreasing ground spoil, reduces environmental hazard.The present invention can meet most of coal preparation plant's washing process, applied widely, for mountain area gully, place be limited or construction of earth clearance area in hardship colliery, solve the problem of plant site selection is difficult.

Description

A kind of underground coal separation production method and system
Technical field
The invention belongs to coal separation technical field, it is related to coal separation production, especially a kind of underground coal preparation plant production method And system.
Background technology
Traditional Coal Mine Design is in coal mining activity, and raw coal is typically only done after thick tear reason in underground by lifting system or belt Conveyer transport rises to carries out washing operation again behind ground.Industrial sites coal preparation plant generally requires construction run coal bin, sieving approach Workshop, main building, press filtration workshop, product storehouse, concentration basin and pump house and related auxiliary equipment.Coal preparation plant covers an area of tens of Hectare, and construction of coal mine factory site is generally remote country or mountain area gully, for remote country, expropriation of land and difficulty of removing are costly, For mountain area gully, industrial sites are narrow, cut into a mountain costly with bank protection.To such situation, in surface construction, coal preparation plant runs into Problem and challenge.
In addition, colliery can produce substantial amounts of solid waste spoil in construction and production process, traditional mode is straight Connect and be stacked at earth's surface, form hillock.The spoil of accumulation on ground surface brings very big threat and danger to mining area ecological environment and condition Evil, including appropriation of land, cause pollution of air ambient, water quality and soil etc..With the raising of environmental consciousness, exploited thecoal mine mistake The environmental standard and related request of journey are increasingly strict, and the negative effect such as environmental pollution is increasingly difficult to be received, or even has influence on The existence in colliery.
There are many collieries the country by being backfilled under waste shaft as the major measure for reducing spoil discharge at present, cash after washing Stone is gone into the well backfill by assistant conveyance, and this partial invalidity lifting and transport add production cost, also reduce the reality of mine Production capacity.Particularly with the mine that ature of coal is poor, spoil content seriously constrains greatly the production capacity in colliery, if reducing carrying for spoil Rising amount, equivalent to adding mine capacity.
The domestic application for underground discharge refuse technology at present has some examples, and it is generally the pre- discharge refuse operation of raw coal, in Shanxi Middle energy Xing is eastern, and colliery applies jigging discharge refuse technique, and shallow slot dense medium discharge refuse technique is applied in new river in Shangdong Province Mining Group Ji Yangkuang, But the case study on implementation in underground is all built without whole coal preparation plant's production system so far.
The content of the invention
It is an object of the invention to the limitation and difficulty for overcoming above-mentioned prior art, there is provided a kind of production of underground coal preparation plant Method and system, it is integrally built coal preparation plant in underground, mine and the unified consideration of coal preparation plant, and product, which passes through to be lifted, after washing is System or Leather Belt Conveyance rise to spoil after flooring product storehouse, washing and are directly used in underground filling goaf.
The purpose of the present invention is achieved through the following technical solutions:
Present invention firstly provides a kind of underground coal separation production method:This method is by construction of coal preparation plant in many behind underground, washing Kind product coal rises to spoil after flooring product storehouse, washing by lifting system or Leather Belt Conveyance and is directly used in underground filling Goaf.
Further, above coal preparation plant production method is sorted using lump coal dense-medium shallow-tank, smalls not washing, and coarse slime is using dense Contracting classifying cyclone and high-frequency screen are reclaimed, and fine coal slurry is reclaimed using filter press, and coal preparation plant realizes closed water circuit.
The present invention also proposes a kind of underground coal preparation plant production system for being used to realize the above method:Including run coal bin, screening Chamber, shallow slot master wash chamber, slime water system chamber, press filtration chamber, mixed coal storehouse, cleaned coal storehouse, main shaft, spoil de-mediated chamber, cash Ribbon conveyer tunnel between stone storehouse and each storehouse of connection and chamber;It is defeated that the upper end of the run coal bin is connected with run coal bin belt Machine tunnel is sent, the run coal bin lower end is connected to screening chamber by run coal bin to chamber ribbon conveyer tunnel is sieved;It is described Screening chamber by sieve chamber to it is main wash chamber ribbon conveyer tunnel and be connected to shallow slot master wash chamber;Screening chamber also passes through Screening chamber to mixed coal storehouse ribbon conveyer tunnel is connected to mixed coal storehouse;It is defeated by cleaned coal reprinting belt that the shallow slot master washes chamber The machine tunnel of sending is connected to screening chamber to mixed coal storehouse ribbon conveyer tunnel;The slime water system chamber is connected by press filtration chamber Screening chamber is connected to mixed coal storehouse ribbon conveyer tunnel.The upper end in the mixed coal storehouse passes through mixed coal storehouse to cleaned coal storehouse belt conveying Machine tunnel is connected to the upper end of cleaned coal storehouse;The lower end in the mixed coal storehouse is connected under cleaned coal storehouse by Loading conveyer tunnel End;The upper end of the cleaned coal storehouse is connected to main shaft by coal bunker connection roadway suitable for reading;The lower end Loading conveyer tunnel of cleaned coal storehouse It is connected to main shaft;The spoil de-mediated chamber is connected to the upper end of waste bin by upper waste bin ribbon conveyer tunnel;It is described The lower end of waste bin is connected with gangue reprint ribbon conveyer tunnel.
Further, above-mentioned run coal bin, mixed coal storehouse, cleaned coal storehouse and main shaft are in " " a font arrangement, production system of underground coal preparation plant System and ribbon conveyer tunnel are serially connected in main conveying system side and arranged in " day " font;Wherein, screening chamber is located at main transport On circuit, it is parallel with it positioned at main transport roadway side that shallow slot master washes chamber and slime water system chamber.
Further, production raw coal is transported to run coal bin by upper run coal bin ribbon conveyer, after run coal bin is stored, raw coal Screening chamber is transported to through ribbon conveyer under storehouse, the block raw coal after classification is transported to shallow slot master by ribbon conveyer by screening chamber The cleaned coal washed after chamber, coal slime and washing reprints ribbon conveyer by cleaned coal and returns to screening chamber to mixed coal storehouse ribbon conveyer Tunnel;Mixed coal storehouse is directly transported to by ribbon conveyer after smalls is mixed with coal slime after classification, cleaned coal then reprint after by mixed coal storehouse Cleaned coal storehouse is transported to cleaned coal storehouse ribbon conveyer tunnel.
Further, mixed coal and cleaned coal enter after mixed coal storehouse and cleaned coal storehouse buffering respectively through mixed coal and cleaned coal Loading conveyer respectively Tunnel is transported to after main shaft skip loading pocket, by two sets of skip hoistings to ground;After spoil is by spoil de-mediated chamber after washing Go after waste bin, buffering to be transported to goaf through gangue reprint ribbon conveyer tunnel again by upper waste bin ribbon conveyer tunnel Filling.
The present invention has following useful achievement:
(1) present invention greatlys save ground industrial sites floor space by construction of coal preparation plant in underground.For mountain area ditch Gully, place be limited or construction of earth clearance area in hardship colliery, solves the problem of plant site selection is difficult.
(2) washing spoil of the present invention not gug, directly fills in underground, reduces invalid lifting and cost of transportation, improves Mine actual production capacity, at the same decrease ground spoil stack and processing cost.
(3) present invention realizes two kinds of product coals while going out well, can meet most of coal preparation plant's washing process, the scope of application Extensively.
(4) The present invention reduces the stacking of ground solid waste spoil, environmental hazard is reduced, meets national environmental protection political affairs Plan.
Brief description of the drawings
Fig. 1 is embodiments of the invention underground coal preparation plant process chart;
Fig. 2 is underground coal preparation plant floor plan of the invention;
Fig. 3 is Fig. 2 A-A diagrammatic cross-sections;
Fig. 4 is Fig. 2 B-B diagrammatic cross-sections;
Fig. 5 is Fig. 2 C-C diagrammatic cross-sections;
Fig. 6 is Fig. 2 D-D diagrammatic cross-sections;
Fig. 7 is Fig. 2 E-E diagrammatic cross-sections;
Fig. 8 is Fig. 2 F-F diagrammatic cross-sections.
Wherein:1 is upper run coal bin ribbon conveyer tunnel;2 be run coal bin;3 be that run coal bin extremely sieves chamber belt conveying Machine tunnel;4 be screening chamber;5 wash chamber ribbon conveyer tunnel for screening chamber to master;6 be that shallow slot master washes chamber;7 be coal Muddy water system chamber;8 be that cleaned coal reprints ribbon conveyer tunnel;9 be press filtration chamber;10 is defeated to mixed coal storehouse belt for screening chamber Send machine tunnel;11 be mixed coal storehouse;12 be mixed coal storehouse to cleaned coal storehouse ribbon conveyer tunnel;13 be cleaned coal storehouse;L4 coal bunkers are suitable for reading Network tunnel;15 be Loading conveyer tunnel;16 be main shaft;17 be spoil de-mediated chamber;18 be upper waste bin ribbon conveyer lane Road;19 be waste bin;20 be gangue reprint ribbon conveyer tunnel;21 be that run coal bin extremely sieves chamber ribbon conveyer;22 are Roller picker;23 be upper mixed coal storehouse ribbon conveyer;24 be block raw coal ribbon conveyer;25 be dense-medium shallow-tank separator;26 be essence Coal sculping screen;27 be that block cleaned coal reprints ribbon conveyer;28 be magnetic separator;29 be swash plate thickener;30 be concentration classification eddy flow Device;31 be high-frequency screen;32 be that coal slime reprints ribbon conveyer;33 be conjunction Jie pond;34 be dilute Jie pond;35 be tailing pit;36 be to follow Ring pond;37 be clear water reserviors;38 be filter press;39 be upper cleaned coal storehouse ribbon conveyer;40 be Coal Stone Separation;41 be spoil Reprint ribbon conveyer.
Embodiment
The present invention underground coal separation production method be:By construction of coal preparation plant under mine, multiple product coal passes through after washing Lifting system or Leather Belt Conveyance rise to spoil after flooring product storehouse, washing and are directly used in underground filling goaf.
In the method for the invention, coal preparation technique is sorted using lump coal dense-medium shallow-tank, smalls not washing, and coarse slime is using dense Contracting classifying cyclone and high-frequency screen are reclaimed, and fine coal slurry is reclaimed using filter press;Coal preparation plant realizes closed water circuit.
Fig. 1-8 is the embodiment for realizing above method, and the invention will be further described with reference to the accompanying drawings and examples:
The underground coal preparation plant production system of the present invention washes chamber 6, black water including run coal bin 2, screening chamber 4, shallow slot master System chamber 7, press filtration chamber 9, mixed coal storehouse 11, cleaned coal storehouse 13, main shaft 16, spoil de-mediated chamber 17, waste bin 19 and connection are each Ribbon conveyer tunnel between storehouse and chamber;
The upper end of the run coal bin 2 is connected with run coal bin ribbon conveyer tunnel 1, and the lower end of run coal bin 2 passes through original Coal bunker is connected to screening chamber 4 to chamber ribbon conveyer tunnel 3 is sieved;
The screening chamber 4 by sieve chamber to it is main wash chamber ribbon conveyer tunnel 5 and be connected to shallow slot master wash chamber 6;Screening chamber 4 is also connected to mixed coal storehouse 11 by sieving chamber to mixed coal storehouse ribbon conveyer tunnel 10.
The shallow slot master washes chamber 6 and is connected to screening chamber to mixed coal storehouse band by cleaned coal reprinting ribbon conveyer tunnel 8 Formula conveyer tunnel 10;The slime water system chamber 7 is connected to screening chamber to mixed coal storehouse belt conveying by press filtration chamber 9 Machine tunnel 10.The upper end in the mixed coal storehouse 11 is connected to cleaned coal storehouse 13 by mixed coal storehouse to cleaned coal storehouse ribbon conveyer tunnel 12 Upper end;The lower end in the mixed coal storehouse 11 is connected to the lower end of cleaned coal storehouse 13 by Loading conveyer tunnel 15;
The upper end of the cleaned coal storehouse 13 is connected to main shaft 16 by coal bunker connection roadway 14 suitable for reading;The lower end dress of cleaned coal storehouse 13 Carry conveyer tunnel 15 and be connected to main shaft 16;
The spoil de-mediated chamber 17 is connected to the upper end of waste bin 19 by upper waste bin ribbon conveyer tunnel 18; The lower end of the waste bin 19 is connected with gangue reprint ribbon conveyer tunnel 20.
The run coal bin 2, mixed coal storehouse 11, cleaned coal storehouse 13 and main shaft 16 are in " " a font arrangement, production system of underground coal preparation plant System and ribbon conveyer tunnel are serially connected in main conveying system side and arranged in " day " font;Wherein, screening chamber 4 is located at main transport On circuit, it is parallel with it positioned at main transport roadway side that shallow slot master washes chamber 6 and slime water system chamber 7.
The underground coal preparation plant production process of the present invention is as follows:
Production raw coal is transported to run coal bin 2 by upper run coal bin ribbon conveyer, and after the storage of run coal bin 2, raw coal is through storehouse Lower ribbon conveyer is transported to screening chamber 4, and the block raw coal after classification is transported to shallow slot master by screening chamber 4 by ribbon conveyer and washed Cleaned coal after chamber 6, coal slime and washing reprints ribbon conveyer by cleaned coal and returns to screening chamber to mixed coal storehouse ribbon conveyer Tunnel 10;Mixed coal storehouse 11 is directly transported to by ribbon conveyer after smalls is mixed with coal slime after classification, cleaned coal then reprint after by mixed Coal bunker to cleaned coal storehouse ribbon conveyer tunnel 12 is transported to cleaned coal storehouse 13.
Mixed coal and cleaned coal enter after mixed coal storehouse 11 and the buffering of cleaned coal storehouse 13 respectively through mixed coal and cleaned coal Loading conveyer lane respectively Road is transported to after main shaft skip loading pocket, by two sets of skip hoistings to ground;After spoil is by spoil de-mediated chamber 17 after washing Go after waste bin 19, buffering to transport through gangue reprint ribbon conveyer tunnel 20 again by upper waste bin ribbon conveyer tunnel 18 To goaf filling.
Each chamber arrangement equipment of underground coal preparation plant production system of the present invention is as follows:
The screening chamber 4 arrangement run coal bin extremely sieves chamber ribbon conveyer 21 and roller picker 22;The shallow slot master washes The arrangement of chamber 6 block raw coal ribbon conveyer 24, dense-medium shallow-tank separator 25, head coal sculpingscreen 26, magnetic separator 28, close Jie pond 33, Dilute Jie pond 34 and tailing pit 35;The arrangement swash plate of slime water system chamber 7 thickener 29, thickening and classifying cyclone 30, high frequency Sieve 31, circulating water pool 36 and clear water reserviors 37;The press filtration chamber 9 arranges 2 filter presses 38;The spoil de-mediated chamber 17 is arranged Coal Stone Separation 40.
The technique joining relation of each equipment of underground coal preparation plant production system of the present invention is as follows:
Production raw coal is fed on roller picker 22 by ribbon conveyer, after coal classification, and the lower smalls of sieve directly goes to mix Block raw coal, which is transported to shallow slot master by block raw coal ribbon conveyer 24 and washes chamber 6, on coal bunker 11, sieve feeds dense-medium shallow-tank separator 25, Block cleaned coal after sorting feeds to reprint on block cleaned coal reprinting ribbon conveyer 27 after the dehydration de-mediated of head coal sculpingscreen 26 goes essence Coal bunker 13, the spoil after sorting directly removes cash after the dehydration de-mediated of Coal Stone Separation 40 by gangue reprint ribbon conveyer 41 Stone storehouse 19.
Head coal sculpingscreen 26 and the lower qualified medium of the sieve of Coal Stone Separation 40, which are returned, closes dilute medium and shunting under Jie pond 33, sieve Part qualified medium removes magnetic separator 28, and magnetic separation recovery concentrate, which is returned, closes Jie pond 33, and magnetic tailing, which is then raised, delivers to concentration classification eddy flow Device 30, classifying cyclone underflow reclaims coarse slime by high-frequency screen 31, and classifying cyclone overflow and high-frequency screen backwater then enter After the concentrating and precipitating of swash plate thickener 29, underflow is pumped directly to the press filtration of filter press 38 and reclaims fine coal slurry, and coarse slime and fine coal slurry are logical Coal slime is crossed to reprint on the return blending supreme mixed coal storehouse ribbon conveyer 23 of ribbon conveyer 32.Thickener overflow and filter press filtrate Then reused as recirculated water, coal preparation plant realizes closed water circuit, black water is not outer to be arranged.

Claims (6)

1. a kind of underground coal separation production method, it is characterised in that by construction of coal preparation plant under mine, product coal is by carrying after washing The system of liter or Leather Belt Conveyance rise to spoil after flooring product storehouse, washing and are directly used in underground filling goaf.
2. coal separation production method in underground according to claim 1, it is characterised in that coal preparation technique uses lump coal dense-medium shallow-tank Sorting, smalls not washing, coarse slime is reclaimed using thickening and classifying cyclone and high-frequency screen, and fine coal slurry is reclaimed using filter press, choosing Realize closed water circuit in coal works.
3. a kind of underground coal preparation plant production system for being used to realize the methods described of claim 1 or 2, it is characterised in that including original Coal bunker (2), screening chamber (4), shallow slot master wash chamber (6), slime water system chamber (7), press filtration chamber (9), mixed coal storehouse (11), Belt conveying between cleaned coal storehouse (13), main shaft (16), spoil de-mediated chamber (17), waste bin (19) and each storehouse of connection and chamber Machine tunnel;
The upper end of the run coal bin (2) is connected with run coal bin ribbon conveyer tunnel (1), and run coal bin (2) lower end passes through Run coal bin is connected to screening chamber (4) to chamber ribbon conveyer tunnel (3) are sieved;
The screening chamber (4) by sieve chamber to it is main wash chamber ribbon conveyer tunnel (5) and be connected to shallow slot master wash chamber (6);Screening chamber (4) is also connected to mixed coal storehouse (11) by sieving chamber to mixed coal storehouse ribbon conveyer tunnel (10);
The shallow slot master washes chamber (6) and is connected to screening chamber to mixed coal storehouse band by cleaned coal reprinting ribbon conveyer tunnel (8) Formula conveyer tunnel (10);The slime water system chamber (7) is connected to screening chamber to mixed coal storehouse band by press filtration chamber (9) Formula conveyer tunnel (10);The upper end of the mixed coal storehouse (11) is connected by mixed coal storehouse to cleaned coal storehouse ribbon conveyer tunnel (12) To the upper end of cleaned coal storehouse (13);The lower end of the mixed coal storehouse (11) is connected to cleaned coal storehouse (13) by Loading conveyer tunnel (15) Lower end;
The upper end of the cleaned coal storehouse (13) is connected to main shaft (16) by coal bunker connection roadway suitable for reading (14);Under cleaned coal storehouse (13) End Loading conveyer tunnel (15) is connected to main shaft (16);
The spoil de-mediated chamber (17) is connected to the upper end of waste bin (19) by upper waste bin ribbon conveyer tunnel (18); The lower end of the waste bin (19) is connected with gangue reprint ribbon conveyer tunnel (20).
4. underground coal preparation plant according to claim 3 production system, it is characterised in that the run coal bin (2), mixed coal storehouse (11), cleaned coal storehouse (13) and main shaft (16) are in " " font arrangement, underground coal preparation plant production system and a ribbon conveyer tunnel string Main conveying system side is connected on to arrange in " day " font;Wherein, screening chamber (4) is located on main transportation route, and shallow slot master washes cave It is parallel with it that room (6) and slime water system chamber (7) are located at main transport roadway side.
5. underground coal preparation plant according to claim 3 production system, it is characterised in that production raw coal passes through upper run coal bin band Formula conveyer is transported to run coal bin (2), and after run coal bin (2) storage, raw coal is transported to screening chamber through ribbon conveyer under storehouse (4), the block raw coal after classification is transported to shallow slot master by screening chamber (4) by ribbon conveyer and washed after chamber (6), coal slime and washing Cleaned coal pass through cleaned coal and reprint ribbon conveyer and return to screening chamber to mixed coal storehouse ribbon conveyer tunnel (10);Smalls after classification Mixed coal storehouse (11) is directly transported to by ribbon conveyer after being mixed with coal slime, cleaned coal then reprint after by mixed coal storehouse to cleaned coal storehouse belt Conveyer tunnel (12) is transported to cleaned coal storehouse (13).
6. underground coal preparation plant according to claim 3 production system, it is characterised in that mixed coal and cleaned coal enter mixed coal storehouse respectively (11) after and being transported to main shaft skip loading pocket through mixed coal and cleaned coal Loading conveyer tunnel respectively after cleaned coal storehouse (13) buffering, by Two sets of skip hoistings are to ground;Spoil after spoil de-mediated chamber (17) by passing through upper waste bin ribbon conveyer tunnel after washing (18) go after waste bin (19), buffering to be transported to goaf filling through gangue reprint ribbon conveyer tunnel (20) again.
CN201710345145.9A 2017-05-16 2017-05-16 A kind of underground coal separation production method and system Pending CN107127051A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710345145.9A CN107127051A (en) 2017-05-16 2017-05-16 A kind of underground coal separation production method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710345145.9A CN107127051A (en) 2017-05-16 2017-05-16 A kind of underground coal separation production method and system

Publications (1)

Publication Number Publication Date
CN107127051A true CN107127051A (en) 2017-09-05

Family

ID=59732455

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710345145.9A Pending CN107127051A (en) 2017-05-16 2017-05-16 A kind of underground coal separation production method and system

Country Status (1)

Country Link
CN (1) CN107127051A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108465542A (en) * 2018-03-23 2018-08-31 合肥工业大学 A kind of coal downhole intelligent separation system device layout
CN109794349A (en) * 2019-03-08 2019-05-24 中国矿业大学 A kind of underground coal preparation technique

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1424151A (en) * 2002-12-31 2003-06-18 天地科技股份有限公司唐山分公司 Process for heavy media separation of coarse coal slurry
CN201500577U (en) * 2009-09-22 2010-06-09 王迪业 Heavy medium shallow slot sorting mine underground refuse discharging system
CN101905189A (en) * 2010-08-19 2010-12-08 刘峰 Method for realizing underground separation of raw coal
CN102162364A (en) * 2011-03-21 2011-08-24 山东新阳能源有限公司 Layout method for underground dense-medium shallow-slot coal preparation in coal mine
CN103623918A (en) * 2013-12-10 2014-03-12 煤炭工业济南设计研究院有限公司 Steam coal washing processing method for easy-to-argillization gangues
CN203494634U (en) * 2013-09-26 2014-03-26 王迪业 Underground coal mine gangue discharging system using flowing current separation technology
CN104033153A (en) * 2014-06-25 2014-09-10 中国矿业大学 Coal mine underground mining, dress and filling integral method
CN104948227A (en) * 2015-05-29 2015-09-30 天地科技股份有限公司 Underground coal mine washing technology dual system arranging method
CN105983478A (en) * 2015-02-03 2016-10-05 山东泰山能源有限责任公司翟镇煤矿 Underground coal and gangue separation system and coal and gangue separation method

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1424151A (en) * 2002-12-31 2003-06-18 天地科技股份有限公司唐山分公司 Process for heavy media separation of coarse coal slurry
CN201500577U (en) * 2009-09-22 2010-06-09 王迪业 Heavy medium shallow slot sorting mine underground refuse discharging system
CN101905189A (en) * 2010-08-19 2010-12-08 刘峰 Method for realizing underground separation of raw coal
CN102162364A (en) * 2011-03-21 2011-08-24 山东新阳能源有限公司 Layout method for underground dense-medium shallow-slot coal preparation in coal mine
CN203494634U (en) * 2013-09-26 2014-03-26 王迪业 Underground coal mine gangue discharging system using flowing current separation technology
CN103623918A (en) * 2013-12-10 2014-03-12 煤炭工业济南设计研究院有限公司 Steam coal washing processing method for easy-to-argillization gangues
CN104033153A (en) * 2014-06-25 2014-09-10 中国矿业大学 Coal mine underground mining, dress and filling integral method
CN105983478A (en) * 2015-02-03 2016-10-05 山东泰山能源有限责任公司翟镇煤矿 Underground coal and gangue separation system and coal and gangue separation method
CN104948227A (en) * 2015-05-29 2015-09-30 天地科技股份有限公司 Underground coal mine washing technology dual system arranging method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108465542A (en) * 2018-03-23 2018-08-31 合肥工业大学 A kind of coal downhole intelligent separation system device layout
CN108465542B (en) * 2018-03-23 2020-10-09 合肥工业大学 Equipment layout of underground intelligent coal sorting system
CN109794349A (en) * 2019-03-08 2019-05-24 中国矿业大学 A kind of underground coal preparation technique

Similar Documents

Publication Publication Date Title
CN108246490B (en) Iron-increasing and silicon-reducing beneficiation method for high-iron-silicate lean magnetite ore
CN101482005B (en) Down-hole gross coal dirt-discharging and mine water treating combined process
CN109718944B (en) A kind of aqueous medium underground coal preparation technique
CN103240168B (en) Grading separation and dehydration method for high-ash difficult-separation coal slime
CN103480482B (en) Flowing current separation process coal mine underground gangue dumping system
CN105921261B (en) A kind of super low-grade vanadium titano-magnetite utilization system and its utilize method
CN104858048A (en) Residue soil environmental regenerating retreatment method and equipment by adoption of earth pressure balance shield
CN103567056A (en) Downhole jigging and gangue discharging method
CN103240169B (en) Gravity-flotation combined phosphorite separation process
CN210788570U (en) Building material production system
CN107127051A (en) A kind of underground coal separation production method and system
CN107020200B (en) Blending process of flotation clean coal in full-grain clean coal
CN204746555U (en) Colliery is two washing systems in pit
CN215429584U (en) Shield tunnel composite gravel layer sludge treatment equipment
CN113649398A (en) Harmless disposal system for mine tailings
CN201500577U (en) Heavy medium shallow slot sorting mine underground refuse discharging system
CN111841846A (en) Efficient water-saving type coal resource upgrading process for underground separation and pre-discharge of gangue
CN112044927A (en) Full tailings grading and segmenting multi-way comprehensive utilization method
CN104948227B (en) A kind of underground coal mine washing process dual system method for arranging
CN203494634U (en) Underground coal mine gangue discharging system using flowing current separation technology
CN114247560B (en) Full-size ore pretreatment process and device
CN103230831B (en) Processing and utilizing method for extracting carbon and iron from blast furnace metallurgy dust and sludge
CN112403647B (en) Arrangement method of intelligent dry separation system for underground transfer points
CN115445741A (en) Method for preparing sand by utilizing rock waste high-yield preparation machine
CN115318417A (en) Method and system for preparing sandstone aggregate in TBM excavated material tunnel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170905

RJ01 Rejection of invention patent application after publication