CN107103559A - A kind of cable " price fixing scale " laying system - Google Patents

A kind of cable " price fixing scale " laying system Download PDF

Info

Publication number
CN107103559A
CN107103559A CN201710513385.5A CN201710513385A CN107103559A CN 107103559 A CN107103559 A CN 107103559A CN 201710513385 A CN201710513385 A CN 201710513385A CN 107103559 A CN107103559 A CN 107103559A
Authority
CN
China
Prior art keywords
cable
span structure
crane span
laying
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710513385.5A
Other languages
Chinese (zh)
Inventor
赵海洋
欧恂
彭曙阳
刘颖
张令
杨福生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Datang Guizhou Xingren Power Generation Co Ltd
Original Assignee
Datang Guizhou Xingren Power Generation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Datang Guizhou Xingren Power Generation Co Ltd filed Critical Datang Guizhou Xingren Power Generation Co Ltd
Priority to CN201710513385.5A priority Critical patent/CN107103559A/en
Publication of CN107103559A publication Critical patent/CN107103559A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/24Querying
    • G06F16/245Query processing
    • G06F16/2455Query execution
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0637Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T17/00Three dimensional [3D] modelling, e.g. data description of 3D objects
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/06Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Theoretical Computer Science (AREA)
  • Economics (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Marketing (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Health & Medical Sciences (AREA)
  • Development Economics (AREA)
  • Water Supply & Treatment (AREA)
  • Public Health (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Computer Graphics (AREA)
  • Geometry (AREA)
  • Software Systems (AREA)
  • Computational Linguistics (AREA)
  • Data Mining & Analysis (AREA)
  • Databases & Information Systems (AREA)
  • General Engineering & Computer Science (AREA)
  • Electric Cable Installation (AREA)

Abstract

The invention provides a kind of cable " price fixing scale " laying system, it is characterised in that including:Setup module, import modul configuration module, model building module, the present invention use " price fixing scale " cable laying technology, lay technique and managerial skills are better than same period construction project.Full factory's cable realizes that " Life cycle " is managed by full 3-dimensional digital power plant model technology.The optimum managements such as cable laying " price fixing scale " optimization process emphasized in design type selecting, design flow, design alteration amount, bid amount, manufacturing amount, construction volume, contract order amount, quantity in stock.Real existing record, there is contrast, have summary, realizing individual works not " super general ", being finally reached the control targe that engineering cable and the actual clearing volume of crane span structure are at utmost less than engineering budget estimate of preliminary design.By the supply of material of cable laying " price fixing scale " optimum management promotion cable, storage, construction management, prevent cable actual provision frame hopping, cable laying centre and retain the problems such as hidden joint, cable laying lose more, waste etc..

Description

A kind of cable " price fixing scale " laying system
Technical field
The present invention relates to a kind of cable " price fixing scale " laying system.
Background technology
As power technology is continued to develop, fired power generating unit structure is continued to optimize, and controlled level is improved constantly.Power cable Development and application have also obtained further expansion, and safety and the reliability increasingly people of cable are taken seriously, while also promoting People increasingly pay close attention to the laying technology of cable in the Power Project construction period.
Conventional power cable laying, it lays design and construction follows GB 50217-94《Power engineering cable design is advised Model》Carried out etc. pertinent regulations.Electric Power Design Institute is responsible for planning and designs cable inventory and cable louding, and cable supplier is responsible for pressing Specification supply senior middle school low pressure, control, communication cable, power construction unit are responsible for according to figure construction, in whole cable design to implementation Flow in, impacted factor and link is more.Often carried out the problem of triggering after engineering construction terminates to some cables Summarize and analyze, trace to its source and caused because laying miscarriage, whole cable lays waste in Construction Phase Quite big, the problem of causing unit project cost " super general " is also than more prominent.
The content of the invention
In order to solve the above technical problems, the invention provides a kind of cable " price fixing scale " laying system.
The present invention is achieved by the following technical programs.
A kind of cable " price fixing scale " laying system that the present invention is provided, it is characterised in that including:
Setup module, the relevant parameter such as the model for setting cable laying;
Import modul, for importing three-dimensional crane span structure information and the cable that device location information and Three-dimensional Design Software are set up Inventory information;
Configuration module, for the crane span structure in the three-dimensional crane span structure information to be numbered and the progress of database central bridge type Match somebody with somebody, obtain crane span structure type corresponding with crane span structure numbering;
Model building module, believes for the crane span structure positional information in the three-dimensional crane span structure information, the device location Breath and crane span structure type, set up three-dimensional crane span structure model;
Pathfinding module, for being joined according to the cable inventory, the device location information and cable laying correlation Several and described crane span structure type, in the three-dimensional crane span structure model find cable from point device to terminal equipment most rationally electricity Cable path;Module is laid, for the most reasonable cable trace according to, cable laying is carried out.
The pathfinding module includes:Length computation module, for according to the cable inventory, the device location information with And the crane span structure type, to cable from described point device to the end device the cable laying relevant parameter of meeting Cable trace carries out length computation;The cable trace length according to cable allowance and the calculating is additionally operable to, cable is obtained long Spend information;Selecting module, for selecting the cable trace length most short cable trace for meeting the cable laying relevant parameter For the most reasonable cable trace.
The cable laying relevant parameter includes
The type of cable and the corresponding relation of crane span structure type, type of cable, cable plot ratio, cable allowance, cable face Color, cable specification, crane span structure color, the corresponding relation of cable color and crane span structure color;The cable inventory includes cable number, electricity Cable type, cable specification, cable color and cable start-stop apparatus information;
The path finding module, rises specifically for the type of cable in the cable inventory, the cable Only set the cable volume in information, the cable color, the device location information, the cable laying relevant parameter Rate, the corresponding relation of the type of cable and crane span structure type and the cable color and the corresponding relation of crane span structure color, in institute State the most reasonable cable trace that cable point device equipment to terminal from is found in three-dimensional crane span structure model.
Also include:Inventory formation module, for most reasonable cable trace and the most reasonable cable trace according to Cable length information, formed cable laying inventory.
The beneficial effects of the present invention are:Using " price fixing scale " cable laying technology, lay technique and managerial skills are excellent In same period construction project.Full factory's cable realizes that " Life cycle " is managed by full 3-dimensional digital power plant model technology.Cable is applied " if price fixing scale " optimization process emphasized in design type selecting, design flow, design alteration amount, bid amount, manufacturing amount, construction volume, The optimum managements such as contract order amount, quantity in stock.Real existing record, there is contrast, have summary, realizing individual works not " super general ", most Reach that engineering cable and the actual clearing volume of crane span structure are at utmost less than the control targe of engineering budget estimate of preliminary design eventually.Pass through cable Lay " price fixing scale " optimum management and promote the cable supply of material, storage, construction management, prevent cable actual provision frame hopping, cable and apply If the problems such as hidden joint, cable laying lose more, waste etc. is retained in centre.
Brief description of the drawings
Fig. 1 is the structural representation of the present invention;
Embodiment
Be described further below technical scheme, but claimed scope be not limited to it is described.
A kind of cable " price fixing scale " laying system, it is characterised in that including:
Setup module, the relevant parameter such as the model for setting cable laying;
Import modul, for importing three-dimensional crane span structure information and the cable that device location information and Three-dimensional Design Software are set up Inventory information;
Configuration module, for the crane span structure in the three-dimensional crane span structure information to be numbered and the progress of database central bridge type Match somebody with somebody, obtain crane span structure type corresponding with crane span structure numbering;
Model building module, believes for the crane span structure positional information in the three-dimensional crane span structure information, the device location Breath and crane span structure type, set up three-dimensional crane span structure model;
Pathfinding module, for being joined according to the cable inventory, the device location information and cable laying correlation Several and described crane span structure type, in the three-dimensional crane span structure model find cable from point device to terminal equipment most rationally electricity Cable path;Module is laid, for the most reasonable cable trace according to, cable laying is carried out.
Pathfinding module includes:Length computation module, for according to the cable inventory, the device location information and institute State crane span structure type, to cable from described point device to the end device the cable for meeting the cable laying relevant parameter Path carries out length computation;The cable trace length according to cable allowance and the calculating is additionally operable to, cable length letter is obtained Breath;Selecting module, is institute for selecting the cable trace length most short cable trace for meeting the cable laying relevant parameter State most reasonable cable trace.
The cable laying relevant parameter includes
The type of cable and the corresponding relation of crane span structure type, type of cable, cable plot ratio, cable allowance, cable face Color, cable specification, crane span structure color, the corresponding relation of cable color and crane span structure color;The cable inventory includes cable number, electricity Cable type, cable specification, cable color and cable start-stop apparatus information;
The path finding module, rises specifically for the type of cable in the cable inventory, the cable Only set the cable volume in information, the cable color, the device location information, the cable laying relevant parameter Rate, the corresponding relation of the type of cable and crane span structure type and the cable color and the corresponding relation of crane span structure color, in institute State the most reasonable cable trace that cable point device equipment to terminal from is found in three-dimensional crane span structure model.
Also include:Inventory formation module, for most reasonable cable trace and the most reasonable cable trace according to Cable length information, formed cable laying inventory.
Electric Power Design Institute:Crane span structure layout drawing, cable layout and the cable inventory of offer, with reference to Optimizing Suggestions, are worked out excellent Cable inventory after change, " the scale price fixing " for completing the professional cable of electrically/thermal control is calculated, i.e.,:Positioning put, determine path, be sized, Price fixing number, works out " scale price fixing " shopping list for the professional cable of electrically/thermal control.When there is design alteration, when first Between notify special work group, the adjustment supply of material in time or construct.And the associated construction drawing that upgrades in time.Cooperating equipment portion completes fixed Disk scale《Optimization Work is reported》.
Cable supplier:Shopping list after optimizing according to " price fixing scale " is produced, supplied in full amount, in time, in high quality Each model power cable, control cable.Should there is project information corresponding with cable inventory on every cable, undertake contract promise breaking Responsibility.Send site to represent, be responsible for the construction technology guidance that full factory's cable laying and crane span structure are laid;In detail record cable and The information such as position, quantity in crane span structure work progress.According to " scale price fixing " inventory and quantity in stock after cable inventory and optimization Quantity is received in supervision;Review quantity lack, consumption abnormal conditions, search reason.
Unit in charge of construction:Constructed by the construction drawing after optimization, it is ensured that wave is laid in cable laying technique, quality, reduction Take.
Manufacturing Supervision unit:The examination at random censorship work before and after cable and crane span structure delivery is carried out, and is made a record.Sent in sampling Submitted in time to special work group after the completion of inspection work《Survey report》.When occur design alteration, cable increase and decrease, channel change During caused cable and crane span structure length change, contacted in time with supplier, adjust the specification and quantity of operating supplies.
Supervisor:Participate in the onsite acceptance work after cable and cable testing bridge arrival;Ensure cable hank, cable testing bridge symbol Close national regulation, Datang group cable and crane span structure purchasing management regulation, and cable " scale price fixing " requirement.In quality, enter Spend in control process, any problem to discovery reports without delay special management group, and proposes feasible technology improving suggestions, and Supervision supplier, unit in charge of construction are rectified and improved as requested.The problem of for the construction period may be influenceed, special pipe is notified in time Reason group and coordinate supervisor convene units concerned carry out specialized conference, propose emergency plan.To ensure to the full extent To the quality and construction period of institute's purchased cable and crane span structure.Guidance and supervision unit in charge of construction carries out cable by scale price fixing scheme and applied Facility work, and (the real exploration of length objection progress that such as unit in charge of construction proposes is solved to produced problem in work progress Amount).
Informatization unit:Full factory's three-dimensional digital model and relative application software are designed on request, are carried using designing institute Crane span structure layout drawing, cable layout and the cable inventory of confession, crane span structure trend and design specification to Preliminary design are optimized and revised, Feedback special management group and designing institute are optimized and revised, coordinates establishment to be used for the total amount shopping list for purchasing crane span structure, finally Realize one it is most effective, most simplify, most rational crane span structure design.This scheme should can effectively solve the problem that designing institute carries in construction The problem of crane span structure that the crane span structure layout drawing of confession may occur mutually is collided with pipeline simultaneously can avoid the material (plot ratio of such as crane span structure The occupation rate of not enough and cable is too low) caused by crane span structure wasting phenomenon and the wasting phenomenon of time, make that crane span structure is moved towards and engineering is made Valency tends to be reasonable.
Engineering department:Participate in the onsite acceptance work after cable and cable testing bridge arrival;Ensure cable hank, cable testing bridge meets National regulation, Datang group cable and crane span structure purchasing management regulation, and cable " scale price fixing " requirement.In quality, progress In control process, any problem to discovery reports without delay special management group, and proposes feasible technology improving suggestions, and supervises Supplier, unit in charge of construction is superintended and directed to be rectified and improved as requested.The problem of for the construction period may be influenceed, special management is notified in time Group and coordinate supervisor convene units concerned carry out specialized conference, propose emergency plan.To ensure to the full extent pair The quality and construction period of institute's purchased cable and crane span structure.Guidance and supervision unit in charge of construction carries out cable laying by scale price fixing scheme Construction, and (the length objection that such as unit in charge of construction proposes carries out real exploration amount) is solved to produced problem in work progress.
Equipment portion:According to needed for engineering node, coordinate and complete main auxiliary machine Bidding Invition, coordinate equipment supplier accurate Ground provides control drawing, data, and matching design institute completes cable inventory, Design of Cable Layout.According to full factory's three-dimensional digital model, Carry out laying the secondary check optimization in path in time, (drawing is checked, and real survey in scene checks two ways, and to checking after electricity Cable quantity is undertaken the responsibility), propose optimization opinions and suggestions.The situation of change that on-site cable passage and crane span structure are laid is understood in time, In real-time tracking work progress, cable and crane span structure length change caused by design alteration, cable increase and decrease, channel change are entered in time Row data point reuse, and report special management group;Participate in the onsite acceptance work after cable and cable testing bridge arrival;Ensure cable Disk, cable testing bridge meet national regulation, Datang group cable and crane span structure purchasing management regulation, and cable " scale price fixing " will Ask.After cable and crane span structure Optimization Work terminate, submitted to special work group《Optimization Work is reported》, report, which is included, designs choosing Type, design flow, design alteration amount, bid amount, manufacturing amount, construction volume, contract order amount, quantity in stock service condition etc. pair Than record and economic evaluation.

Claims (4)

1. a kind of cable " price fixing scale " laying system, it is characterised in that including:
Setup module, the relevant parameter such as the model for setting cable laying;
Import modul, for importing three-dimensional crane span structure information and the cable inventory that device location information and Three-dimensional Design Software are set up Information;
Configuration module, for the crane span structure numbering in the three-dimensional crane span structure information to be matched with database central bridge type, is obtained Take crane span structure type corresponding with crane span structure numbering;
Model building module, for the crane span structure positional information in the three-dimensional crane span structure information, the device location information with And crane span structure type, set up three-dimensional crane span structure model;
Pathfinding module, for according to the cable inventory, the device location information and the cable laying relevant parameter with And the crane span structure type, the most reasonable cable road of cable point device equipment to terminal from is found in the three-dimensional crane span structure model Footpath;Module is laid, for the most reasonable cable trace according to, cable laying is carried out.
2. cable " price fixing scale " laying system according to claim 1, it is characterised in that:The pathfinding module includes: Length computation module, for according to the cable inventory, the device location information and the crane span structure type, to cable from institute The cable trace for meeting the cable laying relevant parameter for having stated point device to the end device carries out length computation;Also use In the cable trace length according to cable allowance and the calculating, cable length information is obtained;Selecting module, for selecting electricity The cable path length most short cable trace for meeting the cable laying relevant parameter is the most reasonable cable trace.
3. cable " price fixing scale " laying system according to claim 1, it is characterised in that:The cable laying correlation ginseng Number includes
Corresponding relation, type of cable, cable plot ratio, cable allowance, cable color, the electricity of the type of cable and crane span structure type Cable specification, crane span structure color, the corresponding relation of cable color and crane span structure color;The cable inventory includes cable number, cable class Type, cable specification, cable color and cable start-stop apparatus information;
The path finding module, sets specifically for the type of cable in the cable inventory, the cable start-stop The cable plot ratio, institute in information, the cable color, the device location information, the cable laying relevant parameter The corresponding relation and the cable color and the corresponding relation of crane span structure color of type of cable and crane span structure type are stated, in the three-dimensional The most reasonable cable trace of cable point device equipment to terminal from is found in crane span structure model.
4. cable " price fixing scale " laying system according to claim 2, it is characterised in that:Also include:Inventory formation mould Block, for the cable length information of most reasonable cable trace and the most reasonable cable trace according to, forms cable and applies If inventory.
CN201710513385.5A 2017-06-29 2017-06-29 A kind of cable " price fixing scale " laying system Pending CN107103559A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710513385.5A CN107103559A (en) 2017-06-29 2017-06-29 A kind of cable " price fixing scale " laying system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710513385.5A CN107103559A (en) 2017-06-29 2017-06-29 A kind of cable " price fixing scale " laying system

Publications (1)

Publication Number Publication Date
CN107103559A true CN107103559A (en) 2017-08-29

Family

ID=59664082

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710513385.5A Pending CN107103559A (en) 2017-06-29 2017-06-29 A kind of cable " price fixing scale " laying system

Country Status (1)

Country Link
CN (1) CN107103559A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107818233A (en) * 2017-11-30 2018-03-20 中广核工程有限公司 A kind of nuclear power plant's Design of Cable Layout method for optimizing route and its system
CN109284534A (en) * 2018-08-10 2019-01-29 五冶集团上海有限公司 A kind of method and system that the cable dosage information based on BIM technology accurately counts
CN109858087A (en) * 2018-12-26 2019-06-07 中冶南方都市环保工程技术股份有限公司 A kind of electric pipeline laying collaborative design method
CN110162880A (en) * 2019-05-22 2019-08-23 上海电力设计院有限公司 Optical cable laying method, device, equipment and medium
CN111222600A (en) * 2019-12-25 2020-06-02 国电龙源电力技术工程有限责任公司 Cable measurement monitoring and metering system
CN111400899A (en) * 2020-03-13 2020-07-10 广州轨道交通建设监理有限公司 Processing method, system and storage medium for cable laying modeling
CN112418549A (en) * 2020-12-03 2021-02-26 华能秦煤瑞金发电有限责任公司 Cable in-out management method
CN112561195A (en) * 2020-12-23 2021-03-26 华能秦煤瑞金发电有限责任公司 Refined cable management and control method
CN112685863A (en) * 2020-12-23 2021-04-20 国家电网有限公司 Simulation system for cable laying of transformer substation
CN115189288A (en) * 2021-05-26 2022-10-14 中建三局安装工程有限公司 Cable laying system and method in bridge

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102254056A (en) * 2011-04-08 2011-11-23 中国核电工程有限公司 Method for designing cable path of nuclear power station
CN105005659A (en) * 2015-07-16 2015-10-28 中国能源建设集团广东省电力设计研究院有限公司 Cable laying method and system
CN106096079A (en) * 2016-05-26 2016-11-09 中国能源建设集团广东省电力设计研究院有限公司 Improve method for designing and the system of cable kilometer precision

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102254056A (en) * 2011-04-08 2011-11-23 中国核电工程有限公司 Method for designing cable path of nuclear power station
CN105005659A (en) * 2015-07-16 2015-10-28 中国能源建设集团广东省电力设计研究院有限公司 Cable laying method and system
CN106096079A (en) * 2016-05-26 2016-11-09 中国能源建设集团广东省电力设计研究院有限公司 Improve method for designing and the system of cable kilometer precision

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107818233A (en) * 2017-11-30 2018-03-20 中广核工程有限公司 A kind of nuclear power plant's Design of Cable Layout method for optimizing route and its system
CN109284534A (en) * 2018-08-10 2019-01-29 五冶集团上海有限公司 A kind of method and system that the cable dosage information based on BIM technology accurately counts
CN109858087A (en) * 2018-12-26 2019-06-07 中冶南方都市环保工程技术股份有限公司 A kind of electric pipeline laying collaborative design method
CN109858087B (en) * 2018-12-26 2021-03-26 中冶南方都市环保工程技术股份有限公司 Electrical pipeline laying collaborative design method
CN110162880B (en) * 2019-05-22 2023-05-16 上海电力设计院有限公司 Optical cable laying method, device, equipment and medium
CN110162880A (en) * 2019-05-22 2019-08-23 上海电力设计院有限公司 Optical cable laying method, device, equipment and medium
CN111222600A (en) * 2019-12-25 2020-06-02 国电龙源电力技术工程有限责任公司 Cable measurement monitoring and metering system
CN111400899A (en) * 2020-03-13 2020-07-10 广州轨道交通建设监理有限公司 Processing method, system and storage medium for cable laying modeling
CN111400899B (en) * 2020-03-13 2023-11-28 广州轨道交通建设监理有限公司 Processing method, system and storage medium for cable laying modeling
CN112418549A (en) * 2020-12-03 2021-02-26 华能秦煤瑞金发电有限责任公司 Cable in-out management method
CN112685863A (en) * 2020-12-23 2021-04-20 国家电网有限公司 Simulation system for cable laying of transformer substation
CN112561195A (en) * 2020-12-23 2021-03-26 华能秦煤瑞金发电有限责任公司 Refined cable management and control method
CN115189288A (en) * 2021-05-26 2022-10-14 中建三局安装工程有限公司 Cable laying system and method in bridge

Similar Documents

Publication Publication Date Title
CN107103559A (en) A kind of cable " price fixing scale " laying system
Wang et al. A meta-network-based risk evaluation and control method for industrialized building construction projects
CN111382484B (en) Building pipeline arrangement optimization system based on BIM
Ribas et al. Multi-criteria risk assessment: Case study of a large hydroelectric project
CN107958328A (en) Green assembled architecture digitlization construct platform and its method of work
Hwang et al. Rework and schedule performance: A profile of incidence, impact, causes and solutions
CN109064133A (en) A kind of engineering whole process management system based on BIM+AR
KR101760260B1 (en) BIM omitted
CN110334924A (en) CAD, construction integrated management system and method based on BIM
CN112232683A (en) Comprehensive pipe gallery full-period construction management system based on BIM
Han et al. Construction quality evaluation of asphalt pavement based on BIM and GIS
JP7432602B2 (en) Optimization of distributed and decentralized DER systems
CN113112233A (en) BIM-based intelligent management method and platform for full life cycle of wind power project
CN104934970A (en) Connected micro-grid economic scheduling method based on cooperation gaming dynamic alliance structure dividing
CN107403278A (en) A kind of Engineering Settlement Whole Process Cost dynamic management approach and system
Gama et al. Water distribution network model building, case study: Milano, Italy
Chou et al. Benefit evaluation of implementing BIM in construction projects
Shou et al. Integration of BIM and lean concepts to improve maintenance efficiency: A case study
CN113139290A (en) Inter-provincial electric power spot market operation system and method supporting multi-market coordination
Kesavan et al. Proper project planning in avoiding construction project delays
Guzman et al. BIM application in the operation and maintenance management of a sports infrastructure
He et al. Exploit social distancing in construction scheduling: Visualize and optimize space–time–workforce tradeoff
CN114154280A (en) Online hydraulic modeling system method and system
CN111401789A (en) Building construction intelligent supervision system based on BIM
CN104598698A (en) On-line framework system and water supply pipe network model modeling method based on on-line framework system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170829