CN107101621B - A kind of supervision control method of high-rise building engineering survey - Google Patents

A kind of supervision control method of high-rise building engineering survey Download PDF

Info

Publication number
CN107101621B
CN107101621B CN201710167369.5A CN201710167369A CN107101621B CN 107101621 B CN107101621 B CN 107101621B CN 201710167369 A CN201710167369 A CN 201710167369A CN 107101621 B CN107101621 B CN 107101621B
Authority
CN
China
Prior art keywords
point
control
management
net
supervision
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710167369.5A
Other languages
Chinese (zh)
Other versions
CN107101621A (en
Inventor
张向党
蔡志新
朱锦辉
范辉明
谢文
李佳铭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Pearl River Construction Supervision Co Ltd
Original Assignee
Guangzhou Pearl River Construction Supervision Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Pearl River Construction Supervision Co Ltd filed Critical Guangzhou Pearl River Construction Supervision Co Ltd
Priority to CN201710167369.5A priority Critical patent/CN107101621B/en
Publication of CN107101621A publication Critical patent/CN107101621A/en
Application granted granted Critical
Publication of CN107101621B publication Critical patent/CN107101621B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C15/00Surveying instruments or accessories not provided for in groups G01C1/00 - G01C13/00
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C15/00Surveying instruments or accessories not provided for in groups G01C1/00 - G01C13/00
    • G01C15/10Plumb lines
    • G01C15/105Optical plumbing
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C15/00Surveying instruments or accessories not provided for in groups G01C1/00 - G01C13/00
    • G01C15/12Instruments for setting out fixed angles, e.g. right angles

Landscapes

  • Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Remote Sensing (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of supervision control methods of high-rise building engineering survey, carry out vertical point transmission using laser plummet apparatus and measure Supervision to covering the method that mutual translocation review is netted in control more using total powerstation.Pass through the analysis to previous engineering, supervision office, which is taken, to carry out vertical point transmission using laser plummet apparatus and measures management to covering the method that mutual translocation review is netted in control more using total powerstation, Super High measuring technique Supervision normative document is eventually formed, realizes quality, safe and efficient requirement.

Description

A kind of supervision control method of high-rise building engineering survey
Technical field
It is that for high-rise building engineering, management is used one kind in the construction process the present invention relates to construction account technology Control measure method.
Background technology
Construction control network is that entire measurement work is able to the basis carried out.This engineering construction range is wide, construction Survey Control Region is big.Construction control network lay it is fine or not, rationally whether, precision controlling direct relation in the vertical transmittance process of control net in building To the entire success or failure for measuring construction.
Can be encountered in the process of construction of high-rise building horizontal control network vertically transmit can there is measure accumulated error, And single set of control net the problem of being difficult to check.
Invention content
To solve the above-mentioned problems, the present invention provides a kind of Supervision of building engineering survey, it is intended to guidance scene prison Reason personnel are to surpassing the monitoring of the precision, verticality, plane positioning of 500 meters or more building construction measurement processes.
Foundation《Building engineering survey specification》, vertical point transmission is carried out and using total powerstation to more using laser plummet apparatus The method that mutual translocation review is netted in set control measures Supervision.
By the analysis to previous engineering, supervision office is taken carries out vertical point transmission and using entirely using laser plummet apparatus Instrument of standing measures management more to covering the method that mutual translocation review is netted in control, eventually forms Super High measuring technique Supervision Normative document realizes quality, safe and efficient requirement.
The principle that work follows " part after first entirety " is measured, management guiding construction unit faces side on building site periphery at three High-precision Red chief Delicious" apple is arranged in building roof, then lays a Two-stage control net down, is laid into king-tower building Internal control net, management check data using total powerstation to control net whole process supervisions at different levels.
Specific steps are as follows:
The measurement of step (1), primary control point
High-precision is measured with the three point GPS that construction unit provides, management supervises Red chief Delicious" apple overall process using total powerstation Control review data;
The survey supervision of step (2), horizontal control network at different levels
Chopped-off head measures control point site setting, good through inspection of the scene of a crime phase intercommunication video, and point uses and installs steel on parapet Structure platform and forced centering apparatus, to ensure the stabilization of point and measurement accuracy.Then I and II is laid down measures control Net processed, wherein KS2, KS3 are that level-one controls net, and KN1, KN2 are Two-stage control net, and management measures I and II using total powerstation Control net whole process supervision check data, since meet construction site surveying setting-out needs;
The vertical transmission management of step (3), horizontal control network
Management is taken to be carried out using laser plummet apparatus, and vertical point external control net (ZL1-ZL4) and internal control net (ZL5- is arranged ZL8), whole process supervision is transmitted by the elevation of point and checks data;
One measures conversion layer is set every one section of height, and periodically translocation external control net is checked, conversion layer and conversion Independent operation between layer, error are not transmitted.To ensure the verticality of the vertical directrix in high building control point, and approach construction to greatest extent Area measures the conversion of platform, respectively by 21 layers of floor, 40 layers, 59 layers, 82 layers, 107 layers of conduct stage transfer layer, and Transfer layer is closed control net, and adjustment point data ensure positional accuracy.Ensure that the precision that laser point captures is drawn with segmentation is reduced The accumulation for surveying error need to meet angular deviation and be not more than 5 〃, and relative distance deviation is not more than 1/20000 required precision, that is, makees Datum mark is surveyed for the throwing of the stage floor.If error in point measurement is larger, it should throw again and survey laser controlling point;
It is first that the point of throwing survey laser controlling point, which takes middle method, and capturing first by plastic tab intermediate void swashs Luminous point is on receiving target, and second, vertical instrument is rotated, decibel is at 0 degree, 90 degree, and 180 degree and 270 degree of four position captures are to four Laser point, third, it is that this point for throwing survey takes middle position to take the geometric center of four laser points;
Step (4), more set controls net mutual translocation review and check management
Management takes total powerstation to net mutual translocation to covering control more;
Internal control net (ZL5-ZL8) and external control net (ZL1-ZL4) to each layer carry out translocation review.Including:Triangle closes It closes, error, internal control net and external control net position coordinate between point, measures control point conversion etc.;
Step (5), super high rise structure interlayer compressive deformation compensation management
Simulation, observation and compensation to Super High high building compressive deformation, compression need compensation 90mm in total, and simple inside and outside every layer Datum line raises 1.5mm, and often completes 10 layers and check reduced overall so that Core Walls Structure absolute altitude, steel construction absolute altitude, curtain Wall, fine fitment absolute altitude reach unified;
Step (6), super high steel structure component surveying setting-out management
Component is positioned to design position according to the requirement of design, mounting axis positioning is controlled with absolute altitude, and management is taken entirely Instrument of standing checks data to the three dimensions Point Measurement unwrapping wire whole process supervision of each thin portion component;
To before Member Welding, after welding, the three dimensions point that pours before and after concrete carries out whole process supervision and checks number respectively According to, eliminate accumulated error, eliminate component in hoisting process because deformation that dead weight generates, collapse caused by the temperature difference deformation, because Error accumulation caused by welding generates contraction distortion etc., makes the spatial position of installation component meet design requirement.
Using above-mentioned technical proposal, the beneficial effects of the invention are as follows:
Most of high-rise buildings are still to continue to use previous traditional measurement method in construction survey now, such as in building external The measurement control stake of one group of four point of ground configuration is needed for all the construction line-puttings.But continuous with building height increases, Management, which is taken, to be carried out vertical point transmission using laser plummet apparatus and nets mutual translocation review to covering control more using total powerstation Method measures management, solves the problems, such as high-rise building measurement accuracy, verticality, plane positioning.
Description of the drawings
The attached drawing for constituting the part of the present invention is used to provide further understanding of the present invention, schematic reality of the invention Example and its explanation are applied for explaining the present invention, is not constituted improper limitations of the present invention.In the accompanying drawings:
Fig. 1 is the schematic diagram of I and II SURVEYING CONTROL NETWORK
Fig. 2 is the schematic diagram of three dimensions Point Measurement unwrapping wire
Specific implementation mode
It should be noted that in the absence of conflict, the feature in embodiment and embodiment in the present invention can phase Mutually combination.The present invention will be described in detail below with reference to the accompanying drawings and embodiments.
It elaborates below in conjunction with the accompanying drawings to the embodiment of the present invention.
The present invention provides a kind of Supervision of building engineering survey, measures the original that work follows " part after first entirety " Then, management guiding construction unit faces building roof setting high-precision Red chief Delicious" apple in side at three on building site periphery, then A Two-stage control net is laid down, and internal control net is laid into king-tower building, takes total powerstation to controls at different levels in supervision process Net whole process supervision checks data, specific steps are as follows:
The measurement of step (1), primary control point
High-precision is measured with the three point GPS that construction unit provides, management supervises Red chief Delicious" apple overall process using total powerstation Control review data;
The survey supervision of step (2), horizontal control network at different levels
Chopped-off head measures control point site setting, good through inspection of the scene of a crime phase intercommunication video, and point uses and installs steel on parapet Structure platform and forced centering apparatus, to ensure the stabilization of point and measurement accuracy.Then I and II is laid down measures control Net processed, wherein KS2, KS3 are that level-one controls net, and KN1, KN2 are Two-stage control net, and management measures I and II using total powerstation Control net whole process supervision check data, since meet construction site surveying setting-out needs;
The vertical transmission management of step (3), horizontal control network
Management is taken to be carried out using laser plummet apparatus, and vertical point external control net (ZL1-ZL4) and internal control net (ZL5- is arranged ZL8), whole process supervision is transmitted by the elevation of point and checks data;
One measures conversion layer is set every one section of height, and periodically translocation external control net is checked, conversion layer and conversion Independent operation between layer, error are not transmitted.To ensure the verticality of the vertical directrix in high building control point, and approach construction to greatest extent Area measures the conversion of platform, respectively by 21 layers of floor, 40 layers, 59 layers, 82 layers, 107 layers of conduct stage transfer layer, and Transfer layer is closed control net, and adjustment point data ensure positional accuracy.Ensure that the precision that laser point captures is drawn with segmentation is reduced The accumulation for surveying error need to meet angular deviation and be not more than 5 〃, and relative distance deviation is not more than 1/20000 required precision, that is, makees Datum mark is surveyed for the throwing of the stage floor.If error in point measurement is larger, it should throw again and survey laser controlling point;
It is first that the point of throwing survey laser controlling point, which takes middle method, and capturing first by plastic tab intermediate void swashs Luminous point is on receiving target, and second, vertical instrument is rotated, decibel is at 0 degree, 90 degree, and 180 degree and 270 degree of four position captures are to four Laser point, third, it is that this point for throwing survey takes middle position to take the geometric center of four laser points;
Step (4), more set controls net mutual translocation review and check management
Management takes total powerstation to net mutual translocation to covering control more;
Internal control net (ZL5-ZL8) and external control net (ZL1-ZL4) to each layer carry out translocation review.Including:Triangle closes It closes, error, internal control net and external control net position coordinate between point, measures control point conversion etc.;
Step (5), super high rise structure interlayer compressive deformation compensation management
Simulation, observation and compensation to Super High high building compressive deformation, compression need compensation 90mm in total, and simple inside and outside every layer Datum line raises 1.5mm, and often completes 10 layers and check reduced overall so that Core Walls Structure absolute altitude, steel construction absolute altitude, curtain Wall, fine fitment absolute altitude reach unified;
Step (6), super high steel structure component surveying setting-out management
Component is positioned to design position according to the requirement of design, mounting axis positioning is controlled with absolute altitude, and management is taken entirely Instrument of standing checks data to the three dimensions Point Measurement unwrapping wire whole process supervision of each thin portion component;
To before Member Welding, after welding, the three dimensions point that pours before and after concrete carries out whole process supervision and checks number respectively According to, eliminate accumulated error, eliminate component in hoisting process because deformation that dead weight generates, collapse caused by the temperature difference deformation, because Error accumulation caused by welding generates contraction distortion etc., makes the spatial position of installation component meet design requirement.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention With within principle, any modification, equivalent replacement, improvement and so on should all be included in the protection scope of the present invention god.

Claims (1)

1. a kind of supervision control method of high-rise building engineering survey measures the principle that work follows " part after first entirety ", Management guiding construction unit faces side building roof at three on building site periphery and high-precision Red chief Delicious" apple is arranged, then down A Two-stage control net is laid, internal control net is laid into king-tower building, supervision process is netted controls at different levels using total powerstation and carried out Whole process supervision, and data are checked, which is characterized in that specific steps are as follows:
The measurement of step (1), chopped-off head control point
With the three high-precision chopped-off head control points of point GPS control point surveies that construction unit provides, management is using total powerstation to chopped-off head Control net carries out whole process supervision, and checks data;
The survey supervision of step (2), horizontal control network at different levels
Chopped-off head measures control point site setting, good through inspection of the scene of a crime phase intercommunication video, and point uses and installs steel construction on parapet Then platform and forced centering apparatus lay I and II and control net down to ensure the stabilization of point and measurement accuracy, In, KS2, KS3 are that level-one controls net, and KN1, KN2 are Two-stage control net, and management controls net to I and II using total powerstation and carries out Whole process supervision, and data are checked, since meet construction site surveying setting-out needs;
The vertical transmission management of step (3), horizontal control network
Management is taken to be carried out using laser plummet apparatus, and vertical point external control net (ZL1-ZL4) and internal control net (ZL5-ZL8) is arranged, Whole process supervision, which is transmitted, by the elevation of point checks data;
One measures conversion layer is set every one section of height, and periodically translocation external control net is checked, conversion layer and conversion layer it Between independent operation, error do not transmit, to ensure that high building control point is hung down the verticality of directrix, and approach construction area to greatest extent, into The conversion of row measuring table, respectively by 21 layers of floor, 40 layers, 59 layers, 82 layers, 107 layers of conduct stage transfer layer, and in transfer layer It is closed control net, adjustment point data ensure positional accuracy, ensure precision and reduce segmentation pilot measurement error that laser point captures Accumulation, need to meet angular deviation be not more than 5 〃, relative distance deviation be not more than 1/20000 required precision, that is, be used as the rank Datum mark is surveyed in the throwing of section floor, if error in point measurement is larger, should be thrown again and be surveyed laser controlling point;
It is first that the point of throwing survey laser controlling point, which takes middle method, passes through plastic tab intermediate void and captures first laser point On receiving target, second, vertical instrument is rotated, respectively at 0 degree, 90 degree, 180 degree and 270 degree of four position captures to four laser Point, third, it is that this point for throwing survey takes middle position to take the geometric center of four laser points;
Step (4), more set controls net mutual translocation review and check management
Management carries out mutual translocation more using total powerstation to covering control net;
Internal control net (ZL5-ZL8) and external control net (ZL1-ZL4) to each layer carry out translocation review, including:Triangular closed, point Between error, internal control net and external control net position coordinate, measure control point conversion etc.;
Step (5), super high rise structure interlayer compressive deformation compensation management
Simulation, observation and compensation to Super High high building compressive deformation, compression needs compensation 90mm in total, and simple radical is accurate inside and outside every layer Line raises 1.5mm, and often completes 10 layers and check reduced overall so that Core Walls Structure absolute altitude, steel construction absolute altitude, and curtain wall, Fine fitment absolute altitude reaches unified;
Step (6), super high steel structure component surveying setting-out management
Component is positioned to design position according to the requirement of design, mounting axis positioning is controlled with absolute altitude, and total powerstation is taken in management Whole process supervision is carried out to the three dimensions Point Measurement unwrapping wire of each thin portion component, and data are checked;
To before Member Welding, after welding, the three dimensions point that pours before and after concrete carry out whole process supervision respectively, and to data into Row review, eliminate accumulated error, eliminate component in hoisting process because dead weight generate deformation, change is collapsed caused by the temperature difference Shape, the error accumulation caused by welding generates contraction distortion etc., make the spatial position of installation component meet design requirement.
CN201710167369.5A 2017-03-20 2017-03-20 A kind of supervision control method of high-rise building engineering survey Active CN107101621B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710167369.5A CN107101621B (en) 2017-03-20 2017-03-20 A kind of supervision control method of high-rise building engineering survey

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710167369.5A CN107101621B (en) 2017-03-20 2017-03-20 A kind of supervision control method of high-rise building engineering survey

Publications (2)

Publication Number Publication Date
CN107101621A CN107101621A (en) 2017-08-29
CN107101621B true CN107101621B (en) 2018-11-06

Family

ID=59675362

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710167369.5A Active CN107101621B (en) 2017-03-20 2017-03-20 A kind of supervision control method of high-rise building engineering survey

Country Status (1)

Country Link
CN (1) CN107101621B (en)

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107478190A (en) * 2017-08-31 2017-12-15 苏州麦喆思科电子有限公司 A kind of ancient tower deformation detecting device
CN107588751A (en) * 2017-08-31 2018-01-16 苏州麦喆思科电子有限公司 A kind of ancient turriform becomes, inclined degree detection computational methods
CN108661185A (en) * 2018-04-02 2018-10-16 中国十七冶集团有限公司 A kind of Tall Buildings space cantilever closes up the construction method of measurement
CN109296211B (en) * 2018-09-30 2021-10-22 辽宁工程技术大学 Mounting deviation control method for assembly type steel structure building component
CN109470222B (en) * 2018-12-13 2021-08-10 潍坊科技学院 Supervision control method for super high-rise building engineering measurement
CN110057348B (en) * 2019-04-22 2024-05-28 上海建工一建集团有限公司 Super high-rise building axis vertical projection method and measuring point rotation platform system thereof
CN110306811B (en) * 2019-04-30 2021-02-26 中国二十二冶集团有限公司 Super high-rise core tube radiation beam embedded part measuring and positioning method
CN110806194A (en) * 2019-12-04 2020-02-18 中国十七冶集团有限公司 Steel truss deformation monitoring and measuring method
CN111288977B (en) * 2020-03-25 2022-02-11 广东海外建设咨询有限公司 Supervision method for measuring and controlling super high-rise building engineering
CN113155109B (en) * 2021-03-25 2022-09-30 浙江南方工程咨询管理有限公司 Supervision control method, system, equipment and medium for super high-rise building engineering measurement
CN114136226B (en) * 2021-11-05 2024-01-30 北京建工国际建设工程有限责任公司 High-precision measurement method for vertical compression deformation of super high-rise building
CN114413863A (en) * 2021-12-31 2022-04-29 惠州市建设集团工程建设监理有限公司 Supervision control method for super high-rise building engineering measurement
CN114892863A (en) * 2022-06-22 2022-08-12 中建八局第三建设有限公司 Overhanging inward-retreating type structural unit type energy-saving curtain wall system and construction method thereof

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030145535A1 (en) * 2002-02-06 2003-08-07 Dibiase Joseph J. Lead-in bumper for a loading dock
CN201327389Y (en) * 2008-12-15 2009-10-14 上海建浩工程顾问有限公司 Super high-rise building plane surveying control network vertical transmitting and segmenting system
CN101915567B (en) * 2010-07-30 2012-07-25 陕西建工集团机械施工有限公司 Method for measuring and positioning inclined structure of high-rise building
ES2394825B2 (en) * 2011-06-10 2013-05-24 Universidade De Vigo FOLDING AUXILIARY CROSSING WITH LEVELING SYSTEM FOR RECTIFICATION IN BASIC INSPECTION PROCEDURES OF FACTORY BRIDGES.
CN103512549A (en) * 2013-09-27 2014-01-15 杭州果果松信息科技有限公司 High-rise building oscillating automatic monitoring system based on measurement robot
CN105841629A (en) * 2016-05-24 2016-08-10 上海建为历保工程科技股份有限公司 Photogrammetry monitoring system for monitoring inclination and sedimentation of cultural building relics

Also Published As

Publication number Publication date
CN107101621A (en) 2017-08-29

Similar Documents

Publication Publication Date Title
CN107101621B (en) A kind of supervision control method of high-rise building engineering survey
CN105698776A (en) Two-dimensional benchmark vertical transmission device and measurement method thereof
CN106223623B (en) Steel construction box arched roof truss installation method
CN102943565A (en) Construction method of large-sized arc-shaped wall
CN102251476A (en) Measurement control method for field installation of steel tube lattice pier
CN104674665B (en) Large-spatial structures vestibule bridge installation method
CN109470222A (en) A kind of supervision control method of super high-rise building engineering survey
CN109443327A (en) A kind of distribution method of SURVEYING CONTROL NETWORK
CN208721064U (en) Real-time monitoring system across existing subway tunnel on a kind of city tunnel
CN106813590A (en) External floating roof tank deformation detection method
CN105587127A (en) Method for locating outer wall prefabricated hanging plate based on laser line marking instrument
CN111914317A (en) Construction site high-precision monitoring system and method based on Beidou/GNSS and dynamic BIM
CN115387221A (en) High pier line type control method for high altitude area
CN110243355A (en) A kind of method of short distance calibration laser plummet apparatus
CN201391091Y (en) Super high-rise building giant steel member mounting measurement pre-control and correcting system
KR101177889B1 (en) Measuring the vertical management of high-rise buildings
CN112525177A (en) Verticality swing centering construction measurement method for super high-rise building
CN205482963U (en) Two dimension benchmark vertical transmission device
CN115354750A (en) Construction and installation method for large-span overweight special-shaped arch truss
CN115077486B (en) Template measuring device for vertical ship lift construction and application method thereof
CN110487504A (en) Consider the shelter bridge wind load air tunnel testing device of bridge floor and water surface distance
CN202692985U (en) Transition point marking plate structure for intermediate floor
CN104183168B (en) Construction 4D distant test systems
CN209802368U (en) Rotating platform system for measuring point by vertically projecting axis of super high-rise building
KR102359081B1 (en) Method of perpendicularity supervising survey

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant