CN107100092A - The quick bridge widening structure and installation method of a kind of uninterrupted traffic - Google Patents

The quick bridge widening structure and installation method of a kind of uninterrupted traffic Download PDF

Info

Publication number
CN107100092A
CN107100092A CN201710360368.2A CN201710360368A CN107100092A CN 107100092 A CN107100092 A CN 107100092A CN 201710360368 A CN201710360368 A CN 201710360368A CN 107100092 A CN107100092 A CN 107100092A
Authority
CN
China
Prior art keywords
bracket
crossbeam
diagonal brace
fixed
web member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710360368.2A
Other languages
Chinese (zh)
Other versions
CN107100092B (en
Inventor
韩波
甄俊杰
李�灿
刘俊华
李研
齐永亮
宋飞
魏伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Province Transport Science Research Institute
Original Assignee
Shanxi Province Transport Science Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Province Transport Science Research Institute filed Critical Shanxi Province Transport Science Research Institute
Priority to CN201710360368.2A priority Critical patent/CN107100092B/en
Publication of CN107100092A publication Critical patent/CN107100092A/en
Application granted granted Critical
Publication of CN107100092B publication Critical patent/CN107100092B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention provides a kind of quick bridge widening structure of uninterrupted traffic, including:Crossbeam, bracket, diagonal brace, web member, beam bottom steel plate, longeron, floorings, the bracket is located on the outside of pontic girder web plate, flange plate bottom, it is outstanding beyond pontic flange plate width, between the bracket and girder, between the bracket and crossbeam, between the bracket and diagonal brace, it is fixed between the diagonal brace and crossbeam;The web member is located between the Liang Yuliang of pontic, and is fixed with the web of beam, intersects web member and is fixed in crosspoint;Beam bottom steel plate is fixedly connected with beam bottom;The longeron is located on crossbeam, fixed floorings above longitudinal and cross beam.The bridge widening structure that the present invention is provided reduces the substructure of newly building bridge, modified difference produces problems of crack to connecting the Effect on Mechanical Properties of armored concrete, connecting portion concrete between avoiding new and old bridge, solves the problems such as work progress need to interrupt existing traffic.

Description

The quick bridge widening structure and installation method of a kind of uninterrupted traffic
Technical field
The present invention relates to road and bridge engineering technical field, more particularly, to a kind of quick bridge widening structure of uninterrupted traffic And installation method, it is adaptable to the volume of traffic is big and is difficult to suspend traffic and is not suitable for increasing the bridge of substructure.
Background technology
At present, with the high speed development of social economy, urban road scale constantly expands, what quite a few early stage built Bridge technology situation does not adapt to new trip demand, and generally existing communication function is weak, the low problem of the traffic capacity, " bottleneck " is formed in urban road network, the unimpeded of urban transportation has been had a strong impact on, it is multiple as traffic jam point and traffic accident Place.With reference to urban infrastructure construction, urgent need undergoes technological transformation to it, rationally utilizes, to meet and adapt to new traffic Development need.
In bridge Reconstruction Project, bridge widening technical sophistication, enforcement difficulty are high, influence big to Modern Traffic, Yi Jiru What ensures to widen the overall good operative performance of back axle girder construction.For such a problem, need badly and use a kind of economical rationality and fast The bridge widening structure of speed.Being set at original beam bottom at steel construction, cantilever sets steel truss to connect, and transverse direction is set up between Liang Yuliang Diagonal brace, horizontal diagonal brace is connected the rigidity for improving cantilever with steel truss, so can not only quickly carry out bridge widening, and do not influence Passed through on bridge and under bridge, also reduce newly building bridge substructure, make full use of the bearing capacity of existing highway bridge.
In recent years, bridge Reconstruction Project is fast-developing, extensive application of the structural steelwork in bridge structure, therefore, Widening and improving is carried out to existing highway bridge by using steel construction, newly building bridge substructure is on the one hand reduced, can quickly apply Work;On the other hand uninterrupted traffic is gone back.So far, there is not yet the structure to be directly applied to the report of bridge widening.
At present, common bridge widening mode is that newly-built superstructure and substructure, newly-built in Yuan Qiao one or both sides Bridge superstructure is connect with former bridging, and substructure is separated with former bridge, and this mode quantities is big, while top and the bottom structure is applied Work, can also on bridge cut-off or traffic under bridge, and newly building bridge and original Bridge Foundation are separated, and differential settlement can cause coupling part Deformation is ftractureed.
The content of the invention
In order to solve present in prior art modified difference between new and old bridge to connecting the mechanical property of armored concrete Influence, connecting portion concrete produce the problems such as problems of crack and work progress interruption existing traffic, the invention provides A kind of quick bridge widening structure of uninterrupted traffic, including:
Crossbeam, bracket, diagonal brace, web member, beam bottom steel plate, longeron, floorings, wherein:
The bracket is located on the outside of pontic girder web plate, and flange plate bottom is outstanding beyond pontic flange plate width, institute State between bracket and girder, between the bracket and crossbeam, between the bracket and diagonal brace, carried out between the diagonal brace and crossbeam It is fixed;The web member is located between the Liang Yuliang of pontic, and is fixed with the web of beam, intersects web member and is fixed in crosspoint;Institute Beam bottom steel plate is stated to be fixedly connected with beam bottom;The longeron is located on crossbeam, fixed floorings above longitudinal and cross beam.
It is preferred that, the bracket is fixedly connected by bar planting with girder, and smearing structure between the bracket and girder Glue.
It is preferred that, between the bracket and crossbeam, between the bracket and diagonal brace, pass through weldering between the diagonal brace and crossbeam Connect fixation.
It is preferred that, the web member is fastened by the web of crab-bolt and end plate and beam, intersects web member logical in crosspoint Cross and be welded and fixed.
It is preferred that, beam bottom steel plate is connected by bar planting with beam bottom, and the smearing structure glue between girder.
It is preferred that, the crossbeam, bracket, diagonal brace, web member, longeron use channel-section steel or i-steel component.
The installation method of the quick bridge widening structure of above-mentioned uninterrupted traffic:
(1) preparation:Take down the old bridge anticollision barrier, and cut the part edge of a wing and mat formation;
(2) drill:Using impact drill in embedded crab-bolt and the position drilling of bar planting, Kong Houyong compressed airs blowout hole is drilled Interior dust, then it is stained with absorbent cotton alcohol or acetone cleans hole inwall;
(3) bar planting:Anchoring adhesive is completely noted in hole, then crab-bolt and bar planting are unidirectionally screwed in;
(4) web member is installed:End plate is inserted in crab-bolt, nut is tightened and fixes, be then welded and fixed web member with end plate;
(5) affixing steel plate:Full coat structure glue, is inserted in bar planting between beam bottom steel plate and beam contact surface, tightens bolt and fixes;
(6) crossbeam and diagonal brace are installed:Bracket, crossbeam and diagonal brace tighten together using being welded to connect, bracket are connect with beam Full coat structure glue between contacting surface, is inserted in bar planting, tightens bolt and fixes, and bracket bottom is fixed together by welding with beam bottom steel plate;
(7) longeron and floorings are installed.
The present invention widens old bridge using steel truss widened structure, with advantages below:
1st, steel truss structure is connected integral with old bridge superstructure, can the new and old common stress of bridge, reduce because of bottom Structure is separated and the sedimentation of generation, deformation.
2nd, when steel truss is constructed, the influence to former bridge traffic can be reduced to greatest extent, and the current of former bridge is not interrupted, Only in old bridge side and bottom construction, it is necessary to which construction space is small.
3rd, steel member can be prefabricated with batch production, and quality guarantee rate is high, eliminates concrete construction formwork supporting plate, ties up reinforcing bar, pours The link such as build and conserve, easy construction, speed is fast.
Brief description of the drawings
Fig. 1 is the side view of steel truss widened structure of the present invention.
Fig. 2 is the plan of widened structure of the present invention.
Fig. 3 is the drawing of affixing steel plate of the present invention.
Fig. 4 is outside diagonal web member Stability Checking Calculation figure.
Description of reference numerals:
Crossbeam -1, bracket -2, diagonal brace -3, web member -4, end plate -5, crab-bolt -6, beam bottom steel plate -7, bar planting -8, longeron -9, Floorings -10, old bridge side bar -11, old bridge central sill -12, widened structure-A, Jiu Qiao-B.
Embodiment
Below by specific embodiment, the present invention will be described, but the invention is not limited in this.
The invention provides a kind of steel truss widened structure for being used to widen old bridge, including crossbeam 1, bracket 2, diagonal brace 3, abdomen Bar 4, end plate 5, crab-bolt 6, beam bottom steel plate 7, bar planting 8, longeron 9, floorings 10 etc..
Bracket 2 is located at old bridge side bar web outside flange plate bottom, and beyond old bridge flange plate width.Bracket 2 is by planting Muscle 8 is connected with beam, and smearing structure glue between bracket 2 and beam, crossbeam 1 is welded and fixed together with bracket 2, diagonal brace 3 and crossbeam 1, Bracket 2 is by being welded and fixed.
Web member 4 between described old bridge and beam is tightened together by crab-bolt 6, end plate 5 with the web of beam, two Passing crosswise between web member is welded and fixed.
Described beam bottom steel plate 7 is connected by bar planting 8 with beam bottom, interstitital texture glue between beam bottom steel plate 7 and beam.
Described longeron 9 is located on crossbeam, installs floorings on beam in length and breadth.
The crossbeam 1, bracket 2, diagonal brace 3, web member 4, longeron 9 can be using shaped steel such as channel-section steel, I-steel.
Structure Calculation is carried out first:
First, primary structure is checked
Due to adding multiple tracks diaphragm, in order to be able to relatively accurately reflect the stressing conditions of practical structures, such knot Structure is reduced to the beam lattice system intersected in length and breadth, is solved by the space structure of system of bars.It is external load by the masterpiece of widened structure It is carried on former bridge.
1st, outside diagonal web member Stability Checking Calculation
Diagonal web member is rigid connection with floorings and web, and when bearing the load of floorings transmission, diagonal web member can be sent out in itself Compression and vertical rod are given birth to deformation.Sudden destruction, that is, de-stabilise destruction can occur when transversely deforming is larger.Ginseng See Fig. 4, depression bar balance differential equation is as follows:
EI μ "=- N μ-F (l-x)-M (1)
EI μ=∫ ∫ (- N μ-F (l-x)-M) d μ d μ+C μ+D (2)
Solve the differential equation and obtain general solution:
Known boundaries condition:X=0 μ=0;X=0 μ=0.Compression is disregarded in end to stable influence, is only included in Depression bar transversely deforming, it can thus be concluded that strut buckling stressing conditions.
2nd, bar planting Strength co-mputation
Outer beams are attached with bracket by bar planting in the present invention, and steel plate and concrete component are realized by shear reinforcement It is common to cooperate.Stress is very multiple in shear connector and its surrounding concrete plate, and connection Ultimate Strength Calculation formula is as follows:
QuIt is ultimate bearing capacity;fcIt is the cubic compressive strength of concrete;f'cIt is concrete cylindrical compression strength;fy It is the yield strength of reinforcing bar;D is hole diameter;dsIt is the diameter of lateral direction penetrating reinforcing bar;
3rd, side bar is checked
Floorings after widening, make mutually what is be hinged with former bridge flange plate, calculate the stress of former bridge side bar cantilever root, Worst loading position is that wheel load centering is arranged in hinged place.
The moment of flexure of every meter of wide lath:
Msp:Mobile load moment of flexure, Msg:Dead load moment of flexure, Ms:Design maximum moment of flexure, a:The effective work width of cantilever slab,
μ:Impact coefficient.
Go out the shearing of every meter of wide lath:
Cantilever slab bearing capacity presses current specifications《Highway reinforced concrete and prestressed concrete bridge contain design specification》JTG D62-2004 opposite side girder cantilever plates are checked.
Multiple tracks diaphragm is added, makes main beam stress evenly, in order to be able to relatively accurately reflect the stress of practical structures Situation, the beam lattice system that this class formation is reduced to intersect in length and breadth, is solved by the space structure of system of bars.By widened structure Masterpiece is that external load is carried on former bridge.The bearing capacity of the former bridge girder of checking computations, meets after current specifications requirement, can use this Structure is widened.
2nd, widened structure is checked
Widened structure stress is mainly born by crab-bolt, is primarily subjected to shearing and moment of flexure, is calculated the shearing of crab-bolt:
V=q1l1+q2h (7)
q1:The horizontal severe per linear meter(lin.m.), q2:The vertical severe per linear meter(lin.m.), l1:The width widened, h:Girder height
Then moment of flexure is calculated
M=V (l1+l0)/2 (8)
Group's anchor carries out forcing checking under shearing and Moment, and according to calculate reasonable structure design crab-bolt bore dia, The parameters such as drilling depth.
Shown according to many Short/Medium Span Bridge result of calculations, on the premise of original bridge meets requirement, this kind of structure Width can accomplish that 2.5m is wide.
Form 1
The widened structure work progress that the present invention is provided is as follows
(1) preparation
Take down the old bridge anticollision barrier, and cut the part edge of a wing and mat formation.This is widened transversary and staggered old bridge diaphragm plate arrangement, According to old bridge size and structure across footpath, arrangement spacing is calculated.Need to carry out repetition measurement to ready-made size before steel construction processing and fabricating, it is ensured that Machining accuracy.
(2) drill
Crab-bolt 6, the drilling of the position of bar planting 8 are buried in steel truss, the impact drilling can be used, girder should be avoided during drilling and in advance should Power muscle and cage bar.It is drilled dust in Kong Houyong compressed airs blowout hole, then is stained with absorbent cotton alcohol or acetone cleans hole inwall.
(3) bar planting
Anchoring adhesive is completely noted in hole, then crab-bolt 6, bar planting 8 are slowly unidirectionally screwed in, can not inversely be inverted halfway, until Reinforcing bar stretches into bottom hole.Crab-bolt 6, bar planting 8 treat that it is fully cured after being implanted into, and can carry out next procedure.
(4) web member is installed
End plate 5 is inserted in crab-bolt 6, nut is tightened and fixes, then lifts web member to correct position, respectively with end plate It is welded and fixed.
(5) affixing steel plate
Beam bottom steel plate answers full coat structure glue with beam contact surface, is inserted in bar planting, tightens bolt and fix.
(6) crossbeam and diagonal brace are installed
Bracket, crossbeam and diagonal brace are tightened together using being welded to connect.Bracket and beam contact surface are answered into full coat structure glue, Bar planting is inserted in, bolt is tightened and fixes.Bracket bottom is fixed together by welding with beam bottom steel plate.
(7) longeron and floorings are installed
Widened structure is installed after stabilization, is carried out loading test and is met after requirement, installs longeron and floorings.
The quick bridge widening structure that the present invention is provided can be constructed in the case of uninterrupted traffic, the bridge widening Structure reduces the substructure of newly building bridge, it is to avoid modified difference is to connecting the mechanical property of armored concrete between new and old bridge It can influence, connecting portion concrete produces problems of crack, solves the problems such as work progress need to interrupt existing traffic.
It is understood that above is in order to illustrate the principle of the present invention and the example of exploitativeness, not office of the invention It is limited to this.For those skilled in the art, without departing from the spirit and substance in the present invention, can be with All variations and modifications are made, these variations and modifications are also considered as protection scope of the present invention.

Claims (7)

1. a kind of quick bridge widening structure of uninterrupted traffic, including:It is crossbeam, bracket, diagonal brace, web member, beam bottom steel plate, vertical Beam, floorings, it is characterised in that:
The bracket is located on the outside of pontic girder web plate, and flange plate bottom is outstanding beyond pontic flange plate width, the support Between frame and girder, between the bracket and crossbeam, between the bracket and diagonal brace, consolidated between the diagonal brace and crossbeam It is fixed;The web member is located between the Liang Yuliang of pontic, and is fixed with the web of beam, intersects web member and is fixed in crosspoint;It is described Beam bottom steel plate is fixedly connected with beam bottom;The longeron is located on crossbeam, fixed floorings above longitudinal and cross beam.
2. the quick bridge widening structure of uninterrupted traffic according to claim 1, it is characterised in that:The bracket passes through Bar planting is fixedly connected with girder, and smearing structure glue between the bracket and girder.
3. the quick bridge widening structure of uninterrupted traffic according to claim 1 or 2, it is characterised in that:The bracket Between crossbeam, between the bracket and diagonal brace, by being welded and fixed between the diagonal brace and crossbeam.
4. the quick bridge widening structure of uninterrupted traffic according to claim 3, it is characterised in that:The web member passes through Crab-bolt and end plate are fastened with web, intersect web member in crosspoint by being welded and fixed.
5. the quick bridge widening structure of uninterrupted traffic according to claim 4, it is characterised in that:Beam bottom steel plate It is connected by bar planting with beam bottom, and the smearing structure glue between beam.
6. the quick bridge widening structure of uninterrupted traffic according to claim 5, it is characterised in that:The crossbeam, support Frame, diagonal brace, web member and longeron use channel-section steel or i-steel component.
7. the installation method of the quick bridge widening structure of uninterrupted traffic described in claim 4, it is characterised in that including following Step:
(1) preparation:Take down the old bridge anticollision barrier, and cut the part edge of a wing and mat formation;
(2) drill:Using impact drill in embedded crab-bolt and the position drilling of bar planting, powder in Kong Houyong compressed airs blowout hole is drilled Dirt, then it is stained with absorbent cotton alcohol or acetone cleans hole inwall;
(3) bar planting:Anchoring adhesive is completely noted in hole, then crab-bolt and bar planting are unidirectionally screwed in;
(4) web member is installed:End plate is inserted in crab-bolt, nut is tightened and fixes, be then welded and fixed web member with end plate;
(5) affixing steel plate:Full coat structure glue, is inserted in bar planting between beam bottom steel plate and beam contact surface, tightens bolt and fixes;
(6) crossbeam and diagonal brace are installed:Bracket, crossbeam and diagonal brace are tightened together, by bracket and beam contact surface using being welded to connect Between full coat structure glue, be inserted in bar planting, tighten bolt and fix, bracket bottom is fixed together by welding with beam bottom steel plate;
(7) longeron and floorings are installed.
CN201710360368.2A 2017-05-21 2017-05-21 A kind of quick bridge widening structure and installation method of uninterrupted traffic Active CN107100092B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710360368.2A CN107100092B (en) 2017-05-21 2017-05-21 A kind of quick bridge widening structure and installation method of uninterrupted traffic

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710360368.2A CN107100092B (en) 2017-05-21 2017-05-21 A kind of quick bridge widening structure and installation method of uninterrupted traffic

Publications (2)

Publication Number Publication Date
CN107100092A true CN107100092A (en) 2017-08-29
CN107100092B CN107100092B (en) 2019-03-01

Family

ID=59669559

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710360368.2A Active CN107100092B (en) 2017-05-21 2017-05-21 A kind of quick bridge widening structure and installation method of uninterrupted traffic

Country Status (1)

Country Link
CN (1) CN107100092B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107916625A (en) * 2017-12-25 2018-04-17 山西省交通规划勘察设计院 A kind of widening structure and its method of width cantilever boxgirder
CN108385547A (en) * 2018-02-07 2018-08-10 大连理工大学 A kind of additional truss reinforcement means of arch bridge floorings
CN110735387A (en) * 2019-11-04 2020-01-31 河南省交通规划设计研究院股份有限公司 Transverse connection device for small box girders of bridge and construction method thereof
CN110804956A (en) * 2019-09-26 2020-02-18 中国一冶集团有限公司 Construction method for replacing special-shaped curve steel box girder support
CN112211116A (en) * 2020-11-04 2021-01-12 广州北环高速公路有限公司 T-shaped rigid frame bridge reinforcing structure and construction method thereof
CN113944112A (en) * 2021-11-15 2022-01-18 广西科技大学 Construction method for rebuilding and expanding bridge
CN114382019A (en) * 2021-12-30 2022-04-22 浙江正方交通建设有限公司 Active service T-beam bridge comprehensive reinforcement structure and construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003193419A (en) * 2001-12-25 2003-07-09 Sato Tekko Co Ltd Reinforcing structure of steel truss bridge
CN101424075A (en) * 2008-11-24 2009-05-06 重庆交通大学 Concrete box girder bridge widening and reinforced structure and construction method thereof
CN104233963A (en) * 2014-09-10 2014-12-24 北京工业大学 Prestress-adjustable steel truss for reinforcing PSC (prestressed concrete) continuous box girder bridge and construction method
CN104372748A (en) * 2014-11-15 2015-02-25 北京市政路桥股份有限公司 Steel truss diaphragm for bridge broadening new-old bridge connecting
CN205975388U (en) * 2016-07-18 2017-02-22 赵启林 Bridge girder reinforcing device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003193419A (en) * 2001-12-25 2003-07-09 Sato Tekko Co Ltd Reinforcing structure of steel truss bridge
CN101424075A (en) * 2008-11-24 2009-05-06 重庆交通大学 Concrete box girder bridge widening and reinforced structure and construction method thereof
CN104233963A (en) * 2014-09-10 2014-12-24 北京工业大学 Prestress-adjustable steel truss for reinforcing PSC (prestressed concrete) continuous box girder bridge and construction method
CN104372748A (en) * 2014-11-15 2015-02-25 北京市政路桥股份有限公司 Steel truss diaphragm for bridge broadening new-old bridge connecting
CN205975388U (en) * 2016-07-18 2017-02-22 赵启林 Bridge girder reinforcing device

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107916625A (en) * 2017-12-25 2018-04-17 山西省交通规划勘察设计院 A kind of widening structure and its method of width cantilever boxgirder
CN107916625B (en) * 2017-12-25 2023-05-05 山西省交通规划勘察设计院有限公司 Widening structure and method for wide cantilever box girder
CN108385547A (en) * 2018-02-07 2018-08-10 大连理工大学 A kind of additional truss reinforcement means of arch bridge floorings
CN110804956A (en) * 2019-09-26 2020-02-18 中国一冶集团有限公司 Construction method for replacing special-shaped curve steel box girder support
CN110804956B (en) * 2019-09-26 2021-10-01 中国一冶集团有限公司 Construction method for replacing special-shaped curve steel box girder support
CN110735387A (en) * 2019-11-04 2020-01-31 河南省交通规划设计研究院股份有限公司 Transverse connection device for small box girders of bridge and construction method thereof
CN112211116A (en) * 2020-11-04 2021-01-12 广州北环高速公路有限公司 T-shaped rigid frame bridge reinforcing structure and construction method thereof
CN113944112A (en) * 2021-11-15 2022-01-18 广西科技大学 Construction method for rebuilding and expanding bridge
CN114382019A (en) * 2021-12-30 2022-04-22 浙江正方交通建设有限公司 Active service T-beam bridge comprehensive reinforcement structure and construction method
CN114382019B (en) * 2021-12-30 2024-05-24 浙江正方交通建设有限公司 Active T-beam bridge comprehensive reinforcement structure and construction method

Also Published As

Publication number Publication date
CN107100092B (en) 2019-03-01

Similar Documents

Publication Publication Date Title
CN107100092A (en) The quick bridge widening structure and installation method of a kind of uninterrupted traffic
CN102587296B (en) Self-balancing external prestressing strengthening method for bridge structure
CN105297641A (en) Highway T beam diaphragm plate prestress reinforcing structure and working method for reinforcement using reinforcing structure
CN103290786A (en) System and method for rapidly reinforcing railway bridge by external prestressing
CN110616631A (en) Longitudinal connection structure suitable for main beam at bridge expansion joint and construction method
CN207130634U (en) A kind of structure for connecting existing T beams and newly-built T beams with reinforcing pull rod using steel plate
CN108060634A (en) Duplexing font ultra-high performance concrete-normal concrete composite beam bridge girder construction and its construction method
CN106320192B (en) A kind of beam section replacing and reinforcing method for large span concrete continuous beam bridge
KR102403925B1 (en) A temporary bridge and construction method for the temporary bridge
CN104372748A (en) Steel truss diaphragm for bridge broadening new-old bridge connecting
CN210066504U (en) Large-span cantilever truss type bent cap support system
CN210827072U (en) Middle seamless telescopic structure of middle and small-span simply-supported highway bridge
CN207828711U (en) A kind of straddle-type monorail composite bridge
CN105603890A (en) Extradosed type external cable reinforced girder bridge
CN215366875U (en) Concrete bridge structure with external vertical prestress
CN104790290A (en) Frame and spring combination type bridge and road transition section structure integrated with bridge abutment
CN214737322U (en) Assembled mound roof beam concreties structure
CN204298749U (en) The new and old bridging of a kind of bridge widening connects uses steel truss diaphragm
CN111827140B (en) Unbonded external transverse prestress reinforced hinge joint cracking damaged plate beam structure and method
CN203583343U (en) Support type frame bridge
CN203684115U (en) Concrete box girder with widened thin wall
CN112982188A (en) Method for rebuilding or adding vertical prestress to active concrete bridge
CN112796201A (en) Assembled mound roof beam concreties structure
CN207933866U (en) Duplexing font ultra-high performance concrete-normal concrete composite beam bridge girder construction
CN105421253A (en) Prestress concrete simply supported beam reinforcing method and reinforcing structure thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant