CN107086956A - A kind of implementation method of Ethernet pretection switch - Google Patents

A kind of implementation method of Ethernet pretection switch Download PDF

Info

Publication number
CN107086956A
CN107086956A CN201710393656.8A CN201710393656A CN107086956A CN 107086956 A CN107086956 A CN 107086956A CN 201710393656 A CN201710393656 A CN 201710393656A CN 107086956 A CN107086956 A CN 107086956A
Authority
CN
China
Prior art keywords
link
egress
oam
master control
protection module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710393656.8A
Other languages
Chinese (zh)
Inventor
丁浩
邓李力
刘啸
戎听红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fiberhome Telecommunication Technologies Co Ltd
Original Assignee
Fiberhome Telecommunication Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fiberhome Telecommunication Technologies Co Ltd filed Critical Fiberhome Telecommunication Technologies Co Ltd
Priority to CN201710393656.8A priority Critical patent/CN107086956A/en
Publication of CN107086956A publication Critical patent/CN107086956A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L45/00Routing or path finding of packets in data switching networks
    • H04L45/22Alternate routing
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L45/00Routing or path finding of packets in data switching networks
    • H04L45/28Routing or path finding of packets in data switching networks using route fault recovery

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Data Exchanges In Wide-Area Networks (AREA)

Abstract

The invention discloses a kind of method that Ethernet pretection switch is realized, this method includes:S1; the link of two progress business datum configuration distributings is set up between source and egress, one is active link, and another is reserve link; source and egress are equipped with the Ethernet OAM for being respectively equipped with master control protection module, active link and reserve link and realizing the end-to-end OAM intercommunications of link;S2, Ethernet OAM sends OAM message in the way of the FPGA cycles give out a contract for a project, and OAM message includes the OAM CV frames for detecting chain alarming information and the APS frames with cfm id, and the APS frames of wherein active link are not enabled, and the APS frames of reserve link are enabled;S3; master control protection module according to the OAM message of active link and reserve link, judges Link State respectively, if active link failure or recovering the reserve link failure after normal or active link switching; then the master control protection module of source and egress, which is issued, switches order, carries out link switchover.

Description

A kind of implementation method of Ethernet pretection switch
Technical field
The present invention relates to Ethernet pretection switch technical field, and in particular to a kind of realization side of Ethernet pretection switch Method.
Background technology
The actual demand runed according to carrier network, is generally divided into 3 major classes by the management work of network:Operation (Operation), management (Administration), safeguard (Maintenance), i.e. OAM, it is main complete to commodity network and Prediction, planning and configuration work that business is carried out, and the progress such as test to network and its business and fault management Regular job activity.
Protection switch time PST (Protection Switching Time) is defined as, and occurs the moment from networking failure Start to continue up to and be activated across the Protection path corresponding to the operating path of the failure, and position at the time of playing a role A period of time, the protection switch time of light path be actually caused by network failure the light path out-of-service time, in this section In time, all business information of impaired light path carrying will be all lost.
With 4G and it is following can the phase the 5G epoch arrival, the data service of existing optical-fiber network transmission equipment increases fast Speed, and occupy leading, miscellaneous service all develops towards IPization direction, and PTN technologies are arisen at the historic moment.PTN has perfect OAM machines System, while there are a variety of OAM agreements for different scenes.But current PTN device is with Ethernet bearing IPization business When, Ethernet OAM technology and business are not organically combined so that 50ms is protected under the conditions of carrier class protection can not meet linear protection The demand of protective switching.
The content of the invention
For defect present in prior art, realized it is an object of the invention to provide a kind of Ethernet pretection switch Method, under Ethernet cable protection business model, can realize that Ethernet service switching time meets telecom operators and advised Fixed 50ms protection switch time demands.
To achieve the above objectives, the present invention is adopted the technical scheme that:
A kind of method that Ethernet pretection switch is realized, this method includes:
S1, sets up the link of two progress business datum configuration distributings, wherein a link is between source and egress Active link, another link is reserve link, and source and egress are equipped with master control protection module, the active link and standby The Ethernet OAM for realizing the end-to-end OAM intercommunications of link is respectively equipped with link;
S2, Ethernet OAM sends OAM message in the way of the FPGA cycles give out a contract for a project, and the OAM message includes being used to detect chain The APS frames of the OAM CV frames of road warning information and the link identification address cfm id that originated with Ethernet OAM, wherein active link APS frames do not enable, the APS frames of reserve link are enabled;
S3, master control protection module according to the OAM message of active link and reserve link, judges Link State respectively, if main With the master control protection module of the reserve link failure, then source and egress of link failure or recovery normally or after active link switching Issue and switch order, carry out switching for active link and reserve link.
On the basis of above-mentioned technical proposal, if source master control protection module is according to OAM CV frames and the cfm id of APS frames Judge that active link breaks down, then frame is switched in source master control protection module generation, broadcasted to all single-decks of source, carry out source Active link to reserve link switching;Meanwhile,
Source master control protection module generation response frame is sent to egress, and it is concurrent that egress receives generation claim frame after response frame Egress master control protection module is given, frame is switched in the generation of egress master control protection module, is broadcasted to all single-decks of egress, is carried out egress Switching of the active link to reserve link.
On the basis of above-mentioned technical proposal, if source master control protection module is according to OAM CV frames and the cfm id of APS frames Judge that active link recovers normal, then frame is switched in master control protection module generation, broadcasted to all single-decks of source, carry out the standby of source With the switching of link to active link;Meanwhile,
Source master control protection module generation response frame is sent to egress, and it is concurrent that egress receives generation claim frame after response frame Egress master control protection module is given, frame is switched in the generation of egress master control protection module, is broadcasted to all single-decks of egress, is carried out egress Switching of the reserve link to active link.
On the basis of above-mentioned technical proposal, the cycle of giving out a contract for a project of the OAM CV frames is 3.33ms.
On the basis of above-mentioned technical proposal, during the active link failure, the APS frames are sent out soon using 3.33ms as the cycle Three frames.
On the basis of above-mentioned technical proposal, when the active link is normal, the cycle of giving out a contract for a project of the APS frames is 1s.
On the basis of above-mentioned technical proposal, cfm id are generated by the md id of Ethernet OAM, ma id and mep id.
Compared with prior art, the advantage of the invention is that:
The method that a kind of Ethernet pretection switch of the present invention is realized, OAM message is sent in the way of the FPGA cycles give out a contract for a project, OAM message include OAM CV frames and APS frames, no matter active link or reserve link failure, OAM CV frames can be in respective link Upper report and alarm information, and these warning information inform master control protection module by APS frames so that master control protection module is perceived Link failure simultaneously issues and switches order, disclosure satisfy that 50ms protection switch times demand as defined in telecom operators, reduces network Service is influenceed by link terminal.
Brief description of the drawings
Fig. 1 is the flow chart in the embodiment of the present invention.
Embodiment
The present invention is described in further detail below in conjunction with drawings and Examples.
Shown in Figure 1, the embodiment of the present invention provides a kind of method that Ethernet pretection switch is realized, this method includes:
S1, sets up the link of two progress business datum configuration distributings, wherein a link is between source and egress Active link, another link is reserve link, and source and egress are equipped with master control protection module, active link and reserve link On be respectively equipped with the Ethernet OAM for realizing the end-to-end OAM intercommunications of link;
S2, Ethernet OAM sends OAM message in the way of the FPGA cycles give out a contract for a project, and OAM message includes being used to detect that link is accused The APS frames of the OAM CV frames of alert information and the link identification address cfm id that originated with Ethernet OAM, OAM CV frames are given out a contract for a project week Phase is 3.33ms, and the APS frames of wherein active link are not enabled, and the APS frames of reserve link are enabled, and during active link failure, APS Frame three frames of fast hair by the cycle of 3.33ms, when active link is normal, the cycle of giving out a contract for a project of APS frames is 1s;
S3, master control protection module according to the OAM message of active link and reserve link, judges Link State respectively, if main With the master control protection module of the reserve link failure, then source and egress of link failure or recovery normally or after active link switching Issue and switch order, carry out switching for active link and reserve link.
Specific determination methods are as follows:If source master control protection module judges to lead according to the cfm id of OAM CV frames and APS frames Broken down with link, then frame is switched in source master control protection module generation, broadcasted to all single-decks of source, carry out the primary of source Switching of the link to reserve link;Meanwhile, source master control protection module generation response frame is sent to egress, and egress receives response Claim frame is generated after frame and egress master control protection module is sent to, frame is switched in the generation of egress master control protection module, all to egress Single-deck is broadcasted, and carries out the active link of egress to the switching of reserve link.If source master control protection module according to OAM CV frames and The cfm id of APS frames judge that active link recovers normal, then frame is switched in master control protection module generation, wide to all single-decks of source Broadcast, carry out the reserve link of source to the switching of active link;Meanwhile, source master control protection module generation response frame is sent to place End, egress, which is received, to be generated claim frame and is sent to egress master control protection module after response frame, egress master control protection module is generated Frame is switched, is broadcasted to all single-decks of egress, the reserve link of egress is carried out to the switching of active link.
Cfm id are generated by the md id of Ethernet OAM, ma id and mep id.Cfm id are write in APS frames, and passed through Protection module is sent in FPGA modes, realizes that protection module is associated with Ethernet OAM, passes through Ethernet OAM therein source chain Line address is known that active link or reserve link break down, and the link is issued and switches order.
The present invention is not limited to the above-described embodiments, for those skilled in the art, is not departing from On the premise of the principle of the invention, some improvements and modifications can also be made, these improvements and modifications are also considered as the protection of the present invention Within the scope of.The content not being described in detail in this specification belongs to prior art known to professional and technical personnel in the field.

Claims (7)

1. a kind of method that Ethernet pretection switch is realized, it is characterised in that this method includes:
S1, sets up the link of two progress business datum configuration distributings between source and egress, wherein a link is primary Link, another link is reserve link, and source and egress are equipped with master control protection module, the active link and reserve link On be respectively equipped with the Ethernet OAM for realizing the end-to-end OAM intercommunications of link;
S2, Ethernet OAM sends OAM message in the way of the FPGA cycles give out a contract for a project, and the OAM message includes being used to detect that link is accused The APS frames of the OAM CV frames of alert information and the link identification address cfm id that originated with Ethernet OAM, wherein active link APS frames are not enabled, and the APS frames of reserve link are enabled;
S3, master control protection module according to the OAM message of active link and reserve link, judges Link State respectively, if primary chain Road failure recovers the reserve link failure after normal or active link switching, then the master control protection module of source and egress is issued Switch order, carry out switching for active link and reserve link.
2. the method that a kind of Ethernet pretection switch as claimed in claim 1 is realized, it is characterised in that:
If source master control protection module judges that active link breaks down according to the cfm id of OAM CV frames and APS frames, source Frame is switched in the generation of master control protection module, is broadcasted to all single-decks of source, carries out the active link of source to the switching of reserve link; Meanwhile,
Source master control protection module generation response frame is sent to egress, and egress, which is received, to be generated claim frame and be sent to after response frame Frame is switched in egress master control protection module, egress master control protection module generation, is broadcasted to all single-decks of egress, is carried out the primary of egress Switching of the link to reserve link.
3. the method that a kind of Ethernet pretection switch as claimed in claim 2 is realized, it is characterised in that:
If source master control protection module judges that active link recovers normal according to the cfm id of OAM CV frames and APS frames, master control Frame is switched in protection module generation, is broadcasted to all single-decks of source, carries out the reserve link of source to the switching of active link;Together When,
Source master control protection module generation response frame is sent to egress, and egress, which is received, to be generated claim frame and be sent to after response frame Frame is switched in egress master control protection module, egress master control protection module generation, is broadcasted to all single-decks of egress, is carried out the standby of egress Switching of the link to active link.
4. the method that a kind of Ethernet pretection switch as claimed in claim 1 is realized, it is characterised in that:The OAM CV frames The cycle give out a contract for a project for 3.33ms.
5. the method that a kind of Ethernet pretection switch as claimed in claim 1 is realized, it is characterised in that:The active link event During barrier, the APS frames three frames of fast hair by the cycle of 3.33ms.
6. the method that a kind of Ethernet pretection switch as claimed in claim 1 is realized, it is characterised in that:The active link is just Chang Shi, the cycle of giving out a contract for a project of the APS frames is 1s.
7. the method that a kind of Ethernet pretection switch as claimed in claim 1 is realized, it is characterised in that:Cfm id are by Ethernet OAM md id, ma id and mep id generation.
CN201710393656.8A 2017-05-27 2017-05-27 A kind of implementation method of Ethernet pretection switch Pending CN107086956A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710393656.8A CN107086956A (en) 2017-05-27 2017-05-27 A kind of implementation method of Ethernet pretection switch

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710393656.8A CN107086956A (en) 2017-05-27 2017-05-27 A kind of implementation method of Ethernet pretection switch

Publications (1)

Publication Number Publication Date
CN107086956A true CN107086956A (en) 2017-08-22

Family

ID=59607881

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710393656.8A Pending CN107086956A (en) 2017-05-27 2017-05-27 A kind of implementation method of Ethernet pretection switch

Country Status (1)

Country Link
CN (1) CN107086956A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112468394A (en) * 2019-09-09 2021-03-09 ***通信有限公司研究院 Protection switching method, node equipment and storage medium

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1808926A (en) * 2005-01-20 2006-07-26 北京格林威尔科技发展有限公司 Method and apparatus of protective switching at both ends of non-framed 2M communication channel
US20070081465A1 (en) * 2001-12-17 2007-04-12 Puppa Gary J System and method for detecting failures and re-routing connections in a communication network
CN102355363A (en) * 2011-08-12 2012-02-15 中兴通讯股份有限公司 Method and apparatus for automatic protection switching
CN103580886A (en) * 2012-07-25 2014-02-12 中兴通讯股份有限公司 Packet transport network protection switching device and method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070081465A1 (en) * 2001-12-17 2007-04-12 Puppa Gary J System and method for detecting failures and re-routing connections in a communication network
CN1808926A (en) * 2005-01-20 2006-07-26 北京格林威尔科技发展有限公司 Method and apparatus of protective switching at both ends of non-framed 2M communication channel
CN102355363A (en) * 2011-08-12 2012-02-15 中兴通讯股份有限公司 Method and apparatus for automatic protection switching
CN103580886A (en) * 2012-07-25 2014-02-12 中兴通讯股份有限公司 Packet transport network protection switching device and method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112468394A (en) * 2019-09-09 2021-03-09 ***通信有限公司研究院 Protection switching method, node equipment and storage medium

Similar Documents

Publication Publication Date Title
CN102006222B (en) Service link switching method and service link switching device
CN103973359B (en) Automatization test system, method and device are switched in a kind of OTN protection
CN101771610B (en) Transport multiprotocol label switching network (T-MPLS) system and link protection method
CN100359860C (en) Multiprotocol label switching network protection switching method
CN102377605B (en) Method for implementing double-returning protection of packet transport network (PTN) equipment by using combination of multiple protection modes
CN102710466B (en) Standby usage board switches protection system and two-way converting detects seamless switching method and apparatus
CN102571457B (en) A kind of method, bypass equipment changing method and device triggering bypass equipment and switch
CN103368712A (en) Switchover method and device for main equipment and standby equipment
CN102098201A (en) Method for realizing L2TP user access backup and network system
CN103580886A (en) Packet transport network protection switching device and method
CN101083559A (en) Method and system for switching master control module and slave control module
CN104469181B (en) Audio and video matrix switch method based on PIS
CN105634848B (en) A kind of virtual router monitoring method and device
CN106033994B (en) A kind of optical transmission method, device and optical transmission device
CN102480409A (en) Method for realizing rapid ring protection protocol (RRPP) loop shunting uplink, RRPP loop and device
CN101425971B (en) T-MPLS path layer tunnel switching method
CN101790110B (en) Device and method for coordinating and recovering automatic protection switching operation
CN1984045A (en) Method for protecting elastic group circular service
CN100571194C (en) A kind of tag path fast protection switching method and system thereof
CN101159681A (en) Method and node of implementing fast re-routing
CN100421387C (en) Business flow protection method
CN101192990A (en) A method and device and system for quick rerouting in MPLS network
CN107086956A (en) A kind of implementation method of Ethernet pretection switch
CN102857362A (en) Fault processing method, device and system
CN1968159B (en) Network failure detection interlock method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170822

RJ01 Rejection of invention patent application after publication