CN107083959A - A kind of gob-side entry retaining method - Google Patents

A kind of gob-side entry retaining method Download PDF

Info

Publication number
CN107083959A
CN107083959A CN201710408222.0A CN201710408222A CN107083959A CN 107083959 A CN107083959 A CN 107083959A CN 201710408222 A CN201710408222 A CN 201710408222A CN 107083959 A CN107083959 A CN 107083959A
Authority
CN
China
Prior art keywords
tunnel
stope
gob
entry retaining
side entry
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710408222.0A
Other languages
Chinese (zh)
Inventor
吕华文
付书俊
何杰
程蓬
杨小军
崔千里
杨晓成
冯彦军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tiandi Science and Technology Co Ltd
Yangquan Coal Industry Group Co Ltd
Original Assignee
Tiandi Science and Technology Co Ltd
Yangquan Coal Industry Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tiandi Science and Technology Co Ltd, Yangquan Coal Industry Group Co Ltd filed Critical Tiandi Science and Technology Co Ltd
Priority to CN201710408222.0A priority Critical patent/CN107083959A/en
Publication of CN107083959A publication Critical patent/CN107083959A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/18Methods of underground mining; Layouts therefor for brown or hard coal
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Remote Sensing (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The present invention relates to coal-mining technique field, more particularly to a kind of gob-side entry retaining method, comprise the following steps:S1, the first tunnel is tunneled in the side adjacent with the second stope on the first stope, and supporting is carried out to the first tunnel, while the first tunnel close to the second stope the prefabricated lane side in side;S2, before the first stope back production, precrack is carried out to the top plate of the first stope;S3, the second tunnel is tunneled on the second stope close to the side of lane side, and supporting is carried out to the second tunnel.It is big that the present invention solves conventional gob side entry retaining Tunnel Pressure, stress is high, the problem of concrete wall deformation is serious, during a upper working face is tunneled, prefabricated gob-side entry retaining concrete wall in advance, reduce the complex process degree during working face extraction, improve upper working face extraction speed, the conventional secondary tunnel of gob side entry retaining need to be reprocessed, quantities is big, difficulty is high, and the present invention is subsequent work face Xin Jue tunnels, therefore without repair of laneway.

Description

A kind of gob-side entry retaining method
Technical field
The present invention relates to coal-mining technique field, more particularly to a kind of gob-side entry retaining method.
Background technology
Current thick seam large mining height exploitation difficulty is big, and acutely, edge air gallery technology belongs to no coal column and opened mine pressure phenomenon Technology is adopted, coal face ventilation problem is can effectively solve the problem that, conventional gob-side entry retaining method is in coal-face back production Period carries out precast concrete wall, and Tunnel Pressure is big after being provided using conventional gob side entry retaining, and stress is high, concrete wall deformation Seriously, while prefabricated gob-side entry retaining concrete wall and coal-face back production are synchronously carried out, precast concrete complex process, work Sequence is more, speed is slow, influences the normal back production of coal-face, and coal-face fltting speed is slow, is completed back in a upper working face After adopting, when carrying out next working face extraction operation, tunnel secondary multiplexing, deformation along empty, it is necessary to repair for 2nd time, quantities is big, And the yielding destruction of concrete wall, influence the secondary multiplexing in tunnel.
The content of the invention
(1) technical problem to be solved
The technical problem to be solved in the present invention is to solve the concrete wall destructible change therewith of existing gob-side entry retaining method Shape, and the problem of repair for 2nd time quantities is big is needed during the secondary multiplexing of tunnel.
(2) technical scheme
In order to solve the above-mentioned technical problem, the invention provides a kind of gob-side entry retaining method, comprise the following steps:
S1, the first tunnel is tunneled in the side adjacent with the second stope on the first stope, and to first Tunnel carry out supporting, while the first tunnel close to the second stope the prefabricated lane side in side;
S2, before the first stope back production, while carrying out precrack to the top plate of the first stope;
S3, tunnels the second tunnel, and carry out supporting to the second tunnel on the second stope close to the side of lane side.
Wherein, the lane side is concrete wall.
Wherein, in step sl, supporting is carried out to the first tunnel by anchor shaft anchor cable.
Wherein, in step s 2, drilled by hydraulic fracturing pressure release and prefabricated split is carried out to the top plate of the first stope Line.
Wherein, in step s3, supporting is carried out to the second tunnel by anchor shaft anchor cable.
(3) beneficial effect
The above-mentioned technical proposal of the present invention has the following advantages that:Gob-side entry retaining method of the present invention is in the first adjacent back production work Make to carry out between face and the second stope, during the first tunnelling of the first stope, the first tunnel is carried out Supporting, carries out tunnel to the first tunnel afterwards and expands side, as the lane side of the second tunnelling of the second stope, while Constructed before first stope back production at the top plate in the first tunnel, to top plate depths precrack, make the first back production work Making the delayed top plate of face back production can be caving in time, cut top pressure release, reduce the stress state of lane side, so as to form the edge for unloading branch coupling Kong Liu lanes method, high pre-stress strength support technology is used in tunnel, is effectively protected back rock integrity, is realized high Gas Outburst mine without coal column safety and high efficiency.The present invention solves conventional gob side entry retaining Tunnel Pressure greatly, and stress is high, mixes Coagulate the problem of soil deformation of wall is serious, it is ensured that dash, the safety of pedestrian, new pick tunnel is during tunneling without protrusion-dispelling work Journey, it is possible to increase high gas and outburst mine tunnelling speed, during a upper working face is tunneled, prefabricated gob side entry retaining is mixed in advance Solidifying cob wall body, reduces the complex process degree during working face extraction, improves upper working face extraction speed, commonly uses gob side entry retaining Secondary tunnel need to be reprocessed, and quantities is big, and difficulty is high, and the present invention is subsequent work face Xin Jue tunnels, therefore without repair of laneway.
Except it is described above present invention solves the technical problem that, constitute technical scheme technical characteristic and have this Outside the advantage that the technical characteristic of a little technical schemes is brought, what other technical characteristics of the invention and these technical characteristics were brought Advantage, will be further illustrated with reference to accompanying drawing.
Brief description of the drawings
Fig. 1 is the structural representation of gob-side entry retaining method embodiment of the present invention.
In figure:1:First stope;2:Second stope;3:First tunnel;4:Concrete wall;5:Second Tunnel;6:Hydraulic fracturing pressure release drills;7:Anchor shaft anchor cable.
Embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is A part of embodiment of the present invention, rather than whole embodiments.Based on the embodiment in the present invention, ordinary skill people The every other embodiment that member is obtained on the premise of creative work is not made, belongs to the scope of protection of the invention.
In the description of the invention, it is necessary to illustrate, unless otherwise clearly defined and limited, term " installation ", " phase Even ", " connection " should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected, or be integrally connected;Can To be mechanical connection or electrical connection;Can be joined directly together, can also be indirectly connected to by intermediary, Ke Yishi The connection of two element internals.For the ordinary skill in the art, with concrete condition above-mentioned term can be understood at this Concrete meaning in invention.
In addition, in the description of the invention, unless otherwise indicated, " multiple ", " many ", " multigroup " be meant that two or Two or more, " several ", " some ", " some groups " are meant that one or more.
As shown in figure 1, a kind of provided in an embodiment of the present invention 1, gob-side entry retaining method for unloading branch coupling, it is characterised in that: Comprise the following steps:
S1, the first tunnel 3 is tunneled in the side adjacent with the second stope 2 on the first stope 1, and to the One tunnel 3 carry out supporting, while the first tunnel 3 close to the second stope 2 the prefabricated lane side in side;
S2, before the back production of the first stope 1, while carrying out precrack to the top plate of the first stope 1;
S3, tunnels the second tunnel 5, and the second tunnel 5 is propped up on the second stope 2 close to the side of lane side Shield.
Gob-side entry retaining method of the present invention is carried out between adjacent the first stope and the second stope, and first During first tunnelling of stope, supporting is carried out to the first tunnel, carrying out tunnel to the first tunnel afterwards expands side, makees For the lane side of the second tunnelling of the second stope, while in the first tunnel before the first stope back production Constructed at top plate, to top plate depths precrack, the first delayed top plate of stope back production is caving in time, cut top and let out Pressure, reduces the stress state of lane side, so as to form the gob-side entry retaining method for unloading branch coupling, is propped up in tunnel using high pre-stress strength Shield technology, is effectively protected back rock integrity, realize high gas and outburst mine without coal column safety and high efficiency.This Invention solves conventional gob side entry retaining Tunnel Pressure greatly, and stress is high, the problem of concrete wall deformation is serious, it is ensured that tunnel leads to Wind, the safety of pedestrian, new pick tunnel is during tunneling without protrusion-dispelling engineering, it is possible to increase high gas and outburst mine tunnelling speed Degree, during a upper working face is tunneled, prefabricated gob-side entry retaining concrete wall in advance, the technique during reducing working face extraction is answered Miscellaneous degree, improves upper working face extraction speed, and the conventional secondary tunnel of gob side entry retaining need to be reprocessed, and quantities is big, and difficulty is high, this hair Bright is subsequent work face Xin Jue tunnels, therefore without repair of laneway.
Wherein, the lane side is concrete wall 4.During the first tunnelling, gob side entry retaining is precast in advance and is mixed Solidifying cob wall body, is used as the lane side of the second tunnelling of the second stope.
Wherein, in step sl, supporting is carried out by 7 pair of first tunnel 3 of anchor shaft anchor cable, the of the first stope Before one tunnelling, high pre-stress reinforced anchor rod cable bolting is carried out to the first tunnel, in the top plate in the first tunnel and first time Anchor shaft anchor cable is installed at the coal seam of mining face to fix, back rock integrity is effectively protected, realizes efficient without coal column Safe working.
Wherein, in step s 2, carried out by the top plate of hydraulic fracturing pressure release 6 pair of first stope 1 of drilling prefabricated Crackle.In the construction hydraulic fracturing pressure release drilling of the first back, waterpower pressure is passed through to the coal seam top of the first stope Power precrack, enables the first delayed top plate of stope back production to be caving in time, cuts top pressure release, and release top is pressed in time Power, reduces the stress state of concrete wall.
Wherein, in step s3, supporting is carried out by 7 pair of second tunnel 5 of anchor shaft anchor cable.Simultaneously in the second stope The second tunnelling during high pre-stress reinforced anchor rod cable bolting is carried out to the second tunnel, in the top plate in the second tunnel and the Anchor shaft anchor cable is installed at the coal seam of two stopes to fix, back rock integrity is effectively protected, realizes without coal column Highly effective and safe is exploited.
In summary, gob-side entry retaining method of the present invention is between adjacent the first stope and the second stope Carry out, during the first tunnelling of the first stope, supporting is carried out to the first tunnel, afterwards to the first tunnel carry out lane Road expand side, as the lane side of the second tunnelling of the second stope, at the same before the first stope back production Constructed at the top plate in the first tunnel, to top plate depths precrack, enable the first delayed top plate of stope back production timely It is caving, cuts top pressure release, reduce the stress state of lane side, so that the gob-side entry retaining method for unloading branch coupling is formed, in tunnel using high Prestressing force strength support technology, is effectively protected back rock integrity, realizes pacifying without coal column for high gas and outburst mine Full high-efficiency mining.The present invention solves conventional gob side entry retaining Tunnel Pressure greatly, and stress is high, and concrete wall deformation is serious to ask Topic, it is ensured that dash, the safety of pedestrian, new pick tunnel is during tunneling without protrusion-dispelling engineering, it is possible to increase high methane is protruded Mine laneway driving speed, during a upper working face is tunneled, prefabricated gob-side entry retaining concrete wall, reduces working face and returns in advance Complex process degree during adopting, improves upper working face extraction speed, and the conventional secondary tunnel of gob side entry retaining need to be reprocessed, quantities Greatly, difficulty is high, and the present invention is subsequent work face Xin Jue tunnels, therefore without repair of laneway.
Finally it should be noted that:The above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although The present invention is described in detail with reference to the foregoing embodiments, it will be understood by those within the art that:It still may be used To be modified to the technical scheme described in foregoing embodiments, or equivalent substitution is carried out to which part technical characteristic; And these modification or replace, do not make appropriate technical solution essence depart from various embodiments of the present invention technical scheme spirit and Scope.

Claims (5)

1. a kind of gob-side entry retaining method, it is characterised in that:Comprise the following steps:
S1, the first tunnel is tunneled in the side adjacent with the second stope on the first stope, and to the first tunnel Carry out supporting, while the first tunnel close to the second stope the prefabricated lane side in side;
S2, before the first stope back production, precrack is carried out to the top plate of the first stope;
S3, tunnels the second tunnel, and carry out supporting to the second tunnel on the second stope close to the side of lane side.
2. gob-side entry retaining method according to claim 1, it is characterised in that:The lane side is concrete wall.
3. gob-side entry retaining method according to claim 1, it is characterised in that:In step sl, by anchor shaft anchor cable to One tunnel carries out supporting.
4. gob-side entry retaining method according to claim 1, it is characterised in that:In step s 2, hydraulic fracturing pressure release is passed through Drill and precrack is carried out to the top plate of the first stope.
5. gob-side entry retaining method according to claim 1, it is characterised in that:In step s3, by anchor shaft anchor cable to Two tunnels carry out supporting.
CN201710408222.0A 2017-06-02 2017-06-02 A kind of gob-side entry retaining method Pending CN107083959A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710408222.0A CN107083959A (en) 2017-06-02 2017-06-02 A kind of gob-side entry retaining method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710408222.0A CN107083959A (en) 2017-06-02 2017-06-02 A kind of gob-side entry retaining method

Publications (1)

Publication Number Publication Date
CN107083959A true CN107083959A (en) 2017-08-22

Family

ID=59608231

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710408222.0A Pending CN107083959A (en) 2017-06-02 2017-06-02 A kind of gob-side entry retaining method

Country Status (1)

Country Link
CN (1) CN107083959A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108547653A (en) * 2018-05-10 2018-09-18 天地科技股份有限公司 A kind of Coupled Rigid-flexible roadway supporting system and method
CN109538210A (en) * 2018-10-17 2019-03-29 仝矿伟 A kind of soft extremely irregularcoal seam fully mechanized coal face gob-side entry retaining method of high methane three
CN110344831A (en) * 2019-07-17 2019-10-18 天地科技股份有限公司 Top release is cut without coal column along the sky lane self-contained Xiang Liu method
CN111720119A (en) * 2020-07-22 2020-09-29 天地科技股份有限公司 Coal mine pillar-free wall-reserving mining method
CN113605893A (en) * 2021-08-26 2021-11-05 河南理工大学 Control method for pre-filled completely gob-side entry driving surrounding rock
US11299954B2 (en) * 2018-05-31 2022-04-12 China University Of Mining And Technology Fracturing relief method for stress concentration of remaining ore pillars in overlying goaf

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101649744A (en) * 2009-08-27 2010-02-17 王晓利 Device and method for casting concrete continuous walls along gob-side entry retaining by mining working face
CN101881167A (en) * 2010-06-04 2010-11-10 山东华恒矿业有限公司 Coal face stump mining method
CN102337904A (en) * 2011-09-09 2012-02-01 贾民 Method for retaining gob-side tunnel
CN103089298A (en) * 2013-01-23 2013-05-08 中国矿业大学 Structure and method for building side direction multicolumn gob-side entry retaining filling wall body
CN103321642A (en) * 2013-05-06 2013-09-25 中国矿业大学 Gob-side entry retaining surrounding rock stabilizing method based on lateral rock stratum pre-splitting control
CN104100266A (en) * 2014-08-04 2014-10-15 山东科技大学 Method for preventing gob-side roadway rock burst
WO2016112772A1 (en) * 2015-01-14 2016-07-21 中国矿业大学 Thick coal seam large seam height gob-side retained passageway method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101649744A (en) * 2009-08-27 2010-02-17 王晓利 Device and method for casting concrete continuous walls along gob-side entry retaining by mining working face
CN101881167A (en) * 2010-06-04 2010-11-10 山东华恒矿业有限公司 Coal face stump mining method
CN102337904A (en) * 2011-09-09 2012-02-01 贾民 Method for retaining gob-side tunnel
CN103089298A (en) * 2013-01-23 2013-05-08 中国矿业大学 Structure and method for building side direction multicolumn gob-side entry retaining filling wall body
CN103321642A (en) * 2013-05-06 2013-09-25 中国矿业大学 Gob-side entry retaining surrounding rock stabilizing method based on lateral rock stratum pre-splitting control
CN104100266A (en) * 2014-08-04 2014-10-15 山东科技大学 Method for preventing gob-side roadway rock burst
WO2016112772A1 (en) * 2015-01-14 2016-07-21 中国矿业大学 Thick coal seam large seam height gob-side retained passageway method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108547653A (en) * 2018-05-10 2018-09-18 天地科技股份有限公司 A kind of Coupled Rigid-flexible roadway supporting system and method
US11299954B2 (en) * 2018-05-31 2022-04-12 China University Of Mining And Technology Fracturing relief method for stress concentration of remaining ore pillars in overlying goaf
CN109538210A (en) * 2018-10-17 2019-03-29 仝矿伟 A kind of soft extremely irregularcoal seam fully mechanized coal face gob-side entry retaining method of high methane three
CN110344831A (en) * 2019-07-17 2019-10-18 天地科技股份有限公司 Top release is cut without coal column along the sky lane self-contained Xiang Liu method
CN111720119A (en) * 2020-07-22 2020-09-29 天地科技股份有限公司 Coal mine pillar-free wall-reserving mining method
CN113605893A (en) * 2021-08-26 2021-11-05 河南理工大学 Control method for pre-filled completely gob-side entry driving surrounding rock
CN113605893B (en) * 2021-08-26 2023-11-21 河南理工大学 Control method for pre-filling full gob-side entry driving surrounding rock

Similar Documents

Publication Publication Date Title
CN107083959A (en) A kind of gob-side entry retaining method
CN105240013B (en) Broadwall N00 engineering methods
CN107339104B (en) Security personnel's curtain wall recovery method
CN110130899B (en) Coal mining method without coal pillar, roadway and tunneling in whole mining area
CN103615250B (en) The full Open stope mining afterwards filling of itemize studding works in coordination with mining codes
CN101864956B (en) Sectional coal pillar-free exploitation method
WO2021219131A1 (en) Roof-cutting tunnel-retaining no-pillar mining method
US20230175398A1 (en) Three-Dimensional Ventilation Method And System For Mining By 110 Construction Method In Coal And Gas Outburst Mines
CN104314570B (en) Long thick ore body Wall ore reclaims and the transitional exploitation method of open air trestle
CN102937030A (en) Bolting-grouting integrated support method for zonal disintegration of deep roadway surrounding rock
CN104100292A (en) Regional forced gas extraction method for single low-permeability outburst thick coal seam
CN103032086A (en) Method for filling resin explosive cartridge in drilled hole of tunnel roof anchor rod
CN105952453B (en) Longwell protrusive working face of coal seam mechanization exploits complete set of equipments without lane
CN101881167B (en) Coal face stump mining method
CN207813624U (en) A kind of future small coal pillar comprehensive mechanical coal mining supporting construction
CN107905807A (en) A kind of future small coal pillar comprehensive mechanical coal mining supporting construction and construction method
CN107829740A (en) Mining method of extremely-thin steeply-inclined ore body
CN105275487B (en) Long-wall mining N00 engineering method ventilating systems
CN107191187B (en) A kind of gob side entry retaining cuts top pressure relief method
CN108505999A (en) A kind of high prominent more lane method for arranging of working face of coal seam
CN115749776A (en) Coal pillar recovery method based on fault grouting transformation
CN108457652A (en) A kind of blockette segmentation full blast pressure shortwall even adopts placement method
CN110130898B (en) Design method for non-pillar, non-roadway and non-roadway tunneling mine
CN206592127U (en) Great burying TBM construction tunnel rock burst processing structures
CN207080226U (en) A kind of steeply inclined thin is to the flat ore removal structure of middle strong vein

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170822

RJ01 Rejection of invention patent application after publication