CN107083775B - Rock slope fracture surface replacement treatment method - Google Patents

Rock slope fracture surface replacement treatment method Download PDF

Info

Publication number
CN107083775B
CN107083775B CN201710366591.8A CN201710366591A CN107083775B CN 107083775 B CN107083775 B CN 107083775B CN 201710366591 A CN201710366591 A CN 201710366591A CN 107083775 B CN107083775 B CN 107083775B
Authority
CN
China
Prior art keywords
side slope
plane
fracture
angle
cement mortar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201710366591.8A
Other languages
Chinese (zh)
Other versions
CN107083775A (en
Inventor
周云涛
石胜伟
张勇
蔡强
梁炯
程英建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Institute of Exploration Technology Chinese Academy of Geological Sciences
Original Assignee
Institute of Exploration Technology Chinese Academy of Geological Sciences
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Institute of Exploration Technology Chinese Academy of Geological Sciences filed Critical Institute of Exploration Technology Chinese Academy of Geological Sciences
Priority to CN201710366591.8A priority Critical patent/CN107083775B/en
Publication of CN107083775A publication Critical patent/CN107083775A/en
Application granted granted Critical
Publication of CN107083775B publication Critical patent/CN107083775B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention discloses a rock slope fracture surface replacement treatment method, which comprises the following steps: and taking out the softened interlayer in the slope fracture surface in a punching mode, and replacing the softened interlayer with cement mortar with higher strength parameters. The method can improve the stability of the high and steep slope, has the characteristics of short construction period, small economic investment, obvious reinforcing effect, environmental protection and the like, and has the property of disaster prevention and reduction.

Description

Rock side slope plane of fracture displacement administering method
Technical field
The present invention relates to a kind of high precipitous rock slope plane of fracture displacement administering methods, belong to mountain highway, national defence cave depot road Road, the geological disaster of city pedestrian passage, Slope Prevention and disease structural strengthening field.
Background technique
China is the country on mountain more than one, and mountain and hill accounts for 2/3 of territory total area or more, is high precipitous rock side in the world One of the country that slope disaster is developed the most, the especially west areas such as Sichuan, Chongqing, Qinghai, Tibet, Gansu, the main line of communication, mine There are millions of high precipitous rock slopes with severe compromise in mountain and downtown areas, the formation of the plane of fracture and run through It is the basic reason that high precipitous rock slope destroys.
High precipitous rock slope is often developed in valley area, by the souring of river earth history, is sent out in river valley two sides High precipitous rock slope is educated, and through off-load slacking, is bordering on the upright rear plane of fracture in the generation of side slope rear, and administers such The key of side slope is the improvement of plane of fracture intensive parameter.Currently, high precipitous rock slope Treatment process is not yet mature, it is especially broken The remedial technology of broken face is still weak link.The high precipitous rocks such as slip casting, support, anchoring, removing, the lattice anchor cable researched and developed so far Slope Prevention technology relies on the plane of fracture to carry out, and the stronger technology of specific aim only has grouting method.Slip casting is attached in structural plane Nearly punching, is then injected into a kind of plane of fracture Treatment process of cement mortar.
With the development of engineering technology, slurry injection technique problem is highlighted, and three aspects is mainly manifested in, first is that structural plane is difficult to Exact position is obtained, the method more punched is generallyd use and carries out, destroy the globality of rock mass, exacerbate the risk of side slope; Second is that most structural planes are enclosed construction face, and structural plane is tiny, and existing cement mortar is difficult to inject wherein;Third is that spillage Problem, field engineering discovery, most structural planes have the characteristics that deep, wide, extension farther out, and cement mortar injection wherein often flows into In other structures face, the effect of grouting and reinforcing structural plane is not had.Therefore, for the remedial technology of the high precipitous rock slope plane of fracture Still immature, technical aspect still relatively falls behind.
Summary of the invention
It is an object of the invention to overcome the above problem of the existing technology, a kind of rock side slope plane of fracture displacement is provided Administering method.Stability of the high and steep slope is capable of increasing using the present invention, has that short construction period, economic input be small, consolidation effect Significantly, the features such as environmentally friendly, and there is attribute of preventing and reducing natural disasters.
To achieve the above object, the technical solution adopted by the present invention is as follows:
A kind of rock side slope plane of fracture displacement administering method, it is characterised in that:Side Slope crack face is taken out using hole knockout Interior softening interlayer replaces it with the higher cement mortar of intensive parameter.
The method specifically comprises the following steps:
A, it is directed to specific rock side slope, Side Slope crack face depth is determined by site inspectionl, Side Slope crack face areaS、 Side Slope crack face maximum width and plane of fracture inclination angleβ, Side Slope crack face depthlAs drilling depthl, plane of fracture inclination angleβAs Dip angle of holeβ, and known to plane of fracture shear strength parameter, cement mortar shear strength parameter;
B, safety coefficient is determined according to rock side slope degree of protectionF s , calculate angle of equivalent internal frictionφ s With equivalent cohesivec s Between relationship, and according to angle of equivalent internal frictionφ s And equivalent cohesivec s It is anti-in plane of fracture shear strength parameter and cement mortar The principle chosen between intensive parameter is cut, determines final angle of equivalent internal frictionφ s With equivalent cohesivec s
C, pass through determining angle of equivalent internal frictionφ s And equivalent cohesivec s , in conjunction with plane of fracture shear strength parameter and cement Shear Strength Parameters of Mortar calculates Side Slope crack face replacement raten, and by Side Slope crack face areaS, obtain side slope replacement areanS
D, suitable bore diameter is chosen according to 1.2 ~ 1.5 times of Side Slope crack face maximum widthsd, in conjunction with side slope replacement areanS, Side Slope crack face depthl, calculate drilling hole amountN
E, by Side Slope crack face areaS, Side Slope crack face replacement raten, drilling hole amountN、Side Slope crack face depthlAnd drilling Diameterd, determine the spacing of wellsa
F, according to side slope replacement areanS, drilling depthl, dip angle of holeβ, drilling hole amountN, bore diameterdBetween drilling Away froma, punch the softening interlayer taken out in Side Slope crack face and replace it with the higher cement mortar of intensive parameter.
In the step a, plane of fracture shear strength parameter includes plane of fracture cohesive forcec 0With plane of fracture internal friction angleφ 0, water Cement mortar shear strength parameter includes cement mortar cohesive forcec 1With cement mortar internal friction angleφ 1
In the step b, angle of equivalent internal frictionφ s With equivalent cohesivec s Between relationship pass through following formula determine:
(1)
Wherein,F s For safety coefficient, determined by side slope safety grade;GFor side slope gravity, unit kN;βFor Side Slope crack face Inclination angle, unit °;φ s For angle of equivalent internal friction, unit °;c s For equivalent cohesive, unit kPa.
In the step b, by angle of equivalent internal frictionφ s In plane of fracture internal friction angleφ 0With cement mortar internal friction angleφ 1 Between arbitrarily choose after, pass through formula(1)Equivalent cohesive is calculatedc s
In the step b, by equivalent cohesivec s In plane of fracture cohesive forcec 0With cement mortar cohesive forcec 1Between arbitrarily select After taking, pass through formula(1)Angle of equivalent internal friction is calculatedφ s
In the step c, replacement ratenIt is calculated by following formula:
(2).
In the step d, the quantity of drillingNIt is calculated by following formula:
(3).
In the step e, the spacing of wellsaIt is determined by following formula:
(4).
In the step e, concrete construction method is as follows:
1)The artificial surface surface dust removed at the top of side slope near the plane of fracture, prevents in surface dust access aperture;
2)It for fixed Side Slope crack face, is punched from two side of Side Slope crack face to centre, using the side of segmentation punching Formula carries out, and cement mortar is injected after the completion of punching, avoids the disturbance of slope rock mass in drill process as far as possible;
3)After completing one section of punching slip casting, carried out again after waiting this section of cement mortar sufficiently to solidify bonding with the plane of fracture next The drilling operation of segmentation;
4)After the completion of bored grouting solidification, at the top of surface dust covering side slope.
The grade of cement mortar is M15 or M20, and gravel size is less than 0.5mm.
Using the advantage of the invention is that:
The present invention is suitable for the high precipitous rock slope reinforcing engineering that the more smooth rear in top has the obvious plane of fracture, using beating Hole takes out weak intercalated layer in the plane of fracture and replaces it with the higher cement mortar of intensity, increases stability of the high and steep slope with this, has The features such as short construction period, economic input are small, consolidation effect is significant, environmental protection has attribute of preventing and reducing natural disasters.
Detailed description of the invention
Fig. 1 is rock side slope schematic diagram;
Fig. 2 is well cementing displacement plane of fracture diagrammatic cross-section;
Fig. 3 is well cementing displacement plane of fracture elevation;
Fig. 4 is well cementing displacement plane of fracture top view.
Specific embodiment
Embodiment 1
A kind of rock side slope plane of fracture displacement administering method, including:It is taken out using hole knockout soft in Side Slope crack face Change interlayer, replaces it with the higher cement mortar of intensive parameter.
The method specifically comprises the following steps:
A, it is directed to specific high precipitous rock slope, Side Slope crack face depth is determined by site inspectionl, Side Slope crack face face ProductS, Side Slope crack face maximum width and plane of fracture inclination angleβ, Side Slope crack face depthlAs drilling depthl, plane of fracture inclination angleβ As dip angle of holeβ, and known to plane of fracture shear strength parameter, cement mortar shear strength parameter;
B, safety coefficient is determined according to high precipitous rock slope degree of protectionF s , calculate angle of equivalent internal frictionφ s With equivalent bonding Powerc s Between relationship, and according to angle of equivalent internal frictionφ s And equivalent cohesivec s In plane of fracture shear strength parameter and cement bonded sand The principle chosen between slurry shear strength parameter, determines final angle of equivalent internal frictionφ s With equivalent cohesivec s
C, pass through determining angle of equivalent internal frictionφ s And equivalent cohesivec s , in conjunction with plane of fracture shear strength parameter and cement Shear Strength Parameters of Mortar calculates Side Slope crack face replacement raten, and by Side Slope crack face areaS, obtain side slope replacement areanS
D, suitable bore diameter is chosen according to 1.2 ~ 1.5 times of Side Slope crack face maximum widthsd, in conjunction with side slope replacement areanS, Side Slope crack face depthl, calculate drilling hole amountN
E, by Side Slope crack face areaS, Side Slope crack face replacement raten, drilling hole amountN、Side Slope crack face depthlAnd drilling Diameterd, determine the spacing of wellsa
F, according to side slope replacement areanS, drilling depthl, dip angle of holeβ, drilling hole amountN, bore diameterdBetween drilling Away froma, punch the softening interlayer taken out in Side Slope crack face and replace it with the higher cement mortar of intensive parameter.
In the step a, plane of fracture shear strength parameter includes plane of fracture cohesive forcec 0With plane of fracture internal friction angleφ 0, water Cement mortar shear strength parameter includes cement mortar cohesive forcec 1With cement mortar internal friction angleφ 1
In the step b, angle of equivalent internal frictionφ s With equivalent cohesivec s Between relationship pass through following formula determine:
(1)
Wherein,F s For safety coefficient, determined by side slope safety grade;GFor side slope gravity, unit kN;βFor Side Slope crack face Inclination angle, unit °;φ s For angle of equivalent internal friction, unit °;c s For equivalent cohesive, unit kPa.
In the step b, by angle of equivalent internal frictionφ s In plane of fracture internal friction angleφ 0With cement mortar internal friction angleφ 1 Between arbitrarily choose after, pass through formula(1)Equivalent cohesive is calculatedc s
In the step b, by equivalent cohesivec s In plane of fracture cohesive forcec 0With cement mortar cohesive forcec 1Between arbitrarily select After taking, pass through formula(1)Angle of equivalent internal friction is calculatedφ s
In the step c, replacement ratenIt is calculated by following formula:
(2).
In the step d, the quantity of drillingNIt is calculated by following formula:
(3).
In the step e, the spacing of wellsaIt is determined by following formula:
(4).
In the step e, concrete construction method is as follows:
1)The artificial surface surface dust removed at the top of side slope near the plane of fracture, prevents in surface dust access aperture;
2)It is beaten according to the related data of acquisition from two side of Side Slope crack face to centre for fixed Side Slope crack face Hole, is carried out by the way of segmentation punching, is injection cement mortar after the completion of punching, is avoided slope rock mass as far as possible in drill process Disturbance;
3)After completing one section of punching slip casting, carried out again after waiting this section of cement mortar sufficiently to solidify bonding with the plane of fracture next The drilling operation of segmentation;
4)After the completion of bored grouting solidification, at the top of surface dust covering side slope, good environment protecting can be obtained.
The grade of cement mortar is M15 or M20, and gravel size is less than 0.5mm.
Embodiment 2
The present invention will be further described for the present embodiment combination attached drawing.
High precipitous rock slope forms initial stage, since Unloading Effect is bordering on the upright plane of fracture in rear generation, by long-term The physical mechanics slacking plane of fracture is converted into softening interlayer, and plane of fracture shearing strength reduces, and stability of slope coefficient reduces, with Further decreasing for Side Slope crack face parameter will lead to high gradient slope along the sudden destruction of rear plane of fracture generation.
In the side slope rear plane of fracture using the softening interlayer in hole knockout taking-up Side Slope crack face, intensity ginseng is replaced it with The higher cement mortar of number, can increase plane of fracture overall mechanical properties, to increase stability of slope coefficient, reach the high steep rock of improvement The effect of matter side slope.
The present invention is suitable for the more smooth medium-sized or large-scale high precipitous rock slope containing the vertical plane of fracture of side slope rear and administers work Journey, such as Fig. 1.Control fissure, that is, plane of fracture in the figure.
The invention is related in plane of fracture internal drilling and injects the arrangement of cement mortar displacement high precipitous rock slope Weak face Method and its engineering design and construction method, as shown in Fig. 2 ~ Fig. 4.
In the plane along plane of fracture top layout, dip angle of hole is the drilling injection cement mortar displacement plane of fractureβ, length isl, as shown in Figure 1.It can be determined by plane of fracture depth, bore diameter isd, spacing isa, as shown in Fig. 3 ~ Fig. 4.
The preferred embodiment of the present embodiment is that grade of cement mortar is M15 or M20 in drilling, and gravel size is less than 0.5mm。
In the present embodiment, angle of equivalent internal frictionφ s With equivalent cohesivec s Between relationship by following formula(1)It determines:
(1)
Wherein,F s It for safety coefficient, is determined by side slope safety grade, is executed by existing standard;GFor side slope gravity(kN);β For Side Slope crack face inclination angle(°);φ s For angle of equivalent internal friction(°);c s For equivalent cohesive(kPa);Angle of equivalent internal frictionφ s With Equivalent cohesivec s It can be chosen between Side Slope crack surface intensity parameter and strength of cement mortar parameter.
Side Slope crack face areaSIt is known that replacement rate isn, then replacement area benS, replacement ratenBy following formula(2)It calculates:
(2)
In formula,c 0Withc 1The respectively plane of fracture and cement mortar cohesive force(kPa);φ 0Withφ 1The respectively plane of fracture and water Cement mortar internal friction angle(°), other physical significances are same as above.
Bore diameterdGenerally 1.2 ~ 1.5 times of Side Slope crack face maximum width, the quantity of drillingNBy following formula(3)Meter It calculates:
(3).
The spacing of wells is by following formula(4)It determines:
(4).
Above-mentioned specific embodiment limits the invention to illustrate the present invention, of the invention In spirit and scope of protection of the claims, to any modifications and changes that the present invention makes, protection of the invention should be all fallen into Range.

Claims (9)

1. a kind of rock side slope plane of fracture displacement administering method, it is characterised in that:It is taken out in Side Slope crack face using hole knockout Softening interlayer, replace it with the higher cement mortar of intensive parameter;
The method specifically comprises the following steps:
A, it is directed to specific rock side slope, Side Slope crack face depth is determined by site inspectionl, Side Slope crack face areaS, side slope Plane of fracture maximum width and plane of fracture inclination angleβ, Side Slope crack face depthlAs drilling depthl, plane of fracture inclination angleβAs drill Inclination angleβ, and known to plane of fracture shear strength parameter, cement mortar shear strength parameter;
B, safety coefficient is determined according to rock side slope degree of protectionF s , calculate angle of equivalent internal frictionφ s With equivalent cohesivec s Between Relationship, and according to angle of equivalent internal frictionφ s And equivalent cohesivec s It is strong in plane of fracture shear strength parameter and cement mortar shearing resistance The principle chosen between degree parameter, determines final angle of equivalent internal frictionφ s With equivalent cohesivec s
C, pass through determining angle of equivalent internal frictionφ s And equivalent cohesivec s , in conjunction with plane of fracture shear strength parameter and cement mortar Shear strength parameter calculates Side Slope crack face replacement raten, and by Side Slope crack face areaS, obtain side slope replacement areanS
D, suitable bore diameter is chosen according to 1.2 ~ 1.5 times of Side Slope crack face maximum widthsd, in conjunction with side slope replacement areanS、 Side Slope crack face depthl, calculate drilling hole amountN
E, by Side Slope crack face areaS, Side Slope crack face replacement raten, drilling hole amountN、Side Slope crack face depthlAnd bore diameterd, determine the spacing of wellsa
F, according to side slope replacement areanS, drilling depthl, dip angle of holeβ, drilling hole amountN, bore diameterdAnd the spacing of wellsa, The softening interlayer that punching is taken out in Side Slope crack face replaces it with the higher cement mortar of intensive parameter.
2. rock side slope plane of fracture displacement administering method according to claim 1, it is characterised in that:In the step a, break Broken face shear strength parameter includes plane of fracture cohesive forcec 0With plane of fracture internal friction angleφ 0, cement mortar shear strength parameter includes Cement mortar cohesive forcec 1With cement mortar internal friction angleφ 1
3. rock side slope plane of fracture displacement administering method according to claim 2, it is characterised in that:In the step b, etc. Imitate internal friction angleφ s With equivalent cohesivec s Between relationship pass through following formula determine:
(1)
Wherein,F s For safety coefficient, determined by side slope safety grade;GFor side slope gravity, unit kN;βFor Side Slope crack face inclination angle, Unit °;φ s For angle of equivalent internal friction, unit °;c s For equivalent cohesive, unit kPa.
4. rock side slope plane of fracture displacement administering method according to claim 3, it is characterised in that:It, will in the step b Angle of equivalent internal frictionφ s In plane of fracture internal friction angleφ 0With cement mortar internal friction angleφ 1Between arbitrarily choose after, pass through formula (1)Equivalent cohesive is calculatedc s
5. rock side slope plane of fracture displacement administering method according to claim 3, it is characterised in that:It, will in the step b Equivalent cohesivec s In plane of fracture cohesive forcec 0With cement mortar cohesive forcec 1Between arbitrarily choose after, pass through formula(1)It is calculated Angle of equivalent internal frictionφ s
6. rock side slope plane of fracture displacement administering method according to claim 4 or 5, it is characterised in that:The step c In, replacement ratenIt is calculated by following formula:
(2).
7. rock side slope plane of fracture displacement administering method according to claim 6, it is characterised in that:In the step d, bore The quantity in holeNIt is calculated by following formula:
(3).
8. rock side slope plane of fracture displacement administering method according to claim 7, it is characterised in that:In the step e, bore Pitch of holesaIt is determined by following formula:
(4).
9. rock side slope plane of fracture displacement administering method according to claim 8, it is characterised in that:In the step e, tool Body construction method is as follows:
1)The artificial surface surface dust removed at the top of side slope near the plane of fracture, prevents in surface dust access aperture;
2)For fixed Side Slope crack face, punched from two side of Side Slope crack face to centre, by the way of segmentation punching into Row injects cement mortar, avoids the disturbance of slope rock mass in drill process as far as possible after the completion of punching;
3)After completing one section of punching slip casting, next segmentation is carried out again after waiting this section of cement mortar and the plane of fracture sufficiently to solidify bonding Drilling operation;
4)After the completion of bored grouting solidification, at the top of surface dust covering side slope.
CN201710366591.8A 2017-05-23 2017-05-23 Rock slope fracture surface replacement treatment method Expired - Fee Related CN107083775B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710366591.8A CN107083775B (en) 2017-05-23 2017-05-23 Rock slope fracture surface replacement treatment method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710366591.8A CN107083775B (en) 2017-05-23 2017-05-23 Rock slope fracture surface replacement treatment method

Publications (2)

Publication Number Publication Date
CN107083775A CN107083775A (en) 2017-08-22
CN107083775B true CN107083775B (en) 2018-11-30

Family

ID=59608858

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710366591.8A Expired - Fee Related CN107083775B (en) 2017-05-23 2017-05-23 Rock slope fracture surface replacement treatment method

Country Status (1)

Country Link
CN (1) CN107083775B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109975523B (en) * 2019-04-29 2021-06-29 华侨大学 Method for predicting engineering property of explosive silt-squeezing mixed layer
CN114541425A (en) * 2022-02-10 2022-05-27 中煤科工集团沈阳设计研究院有限公司 Method for replacing and reinforcing potential weak surface or sliding surface of side slope

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11100816A (en) * 1997-09-27 1999-04-13 Kensetsu Kiso Eng Co Ltd Slope landslide preventing construction method
RU2449088C2 (en) * 2010-04-28 2012-04-27 Государственное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный институт имени Г.В. Плеханова (технический университет)" Method to strengthen landslide-hazardous boards of opencast mines
CN102979103A (en) * 2012-12-13 2013-03-20 中国水电顾问集团成都勘测设计研究院 Step type excavating method for large unloading loose rocky side slope
CN104005417A (en) * 2014-06-09 2014-08-27 中交一公局第一工程有限公司 Construction method for high side slope of loosen and calaclastic rock
CN105649092A (en) * 2016-01-18 2016-06-08 中国水利水电第八工程局有限公司 Slope supporting method for crumbly strata

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11100816A (en) * 1997-09-27 1999-04-13 Kensetsu Kiso Eng Co Ltd Slope landslide preventing construction method
RU2449088C2 (en) * 2010-04-28 2012-04-27 Государственное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный институт имени Г.В. Плеханова (технический университет)" Method to strengthen landslide-hazardous boards of opencast mines
CN102979103A (en) * 2012-12-13 2013-03-20 中国水电顾问集团成都勘测设计研究院 Step type excavating method for large unloading loose rocky side slope
CN104005417A (en) * 2014-06-09 2014-08-27 中交一公局第一工程有限公司 Construction method for high side slope of loosen and calaclastic rock
CN105649092A (en) * 2016-01-18 2016-06-08 中国水利水电第八工程局有限公司 Slope supporting method for crumbly strata

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
考虑弱层置换的岩石边坡稳定性分析;徐奴文等;《岩土力学》;20110430;第32卷;第499页 *

Also Published As

Publication number Publication date
CN107083775A (en) 2017-08-22

Similar Documents

Publication Publication Date Title
CN104453913B (en) A kind of Shaft Stopes front pre-grouting method
CN104533467B (en) A kind of high artesian, the method for protecting support in fault disruption zone tunnel
CN103422469B (en) Artificial retaining dam for coal mine underground reservoir and connecting method of artificial retaining dam and coal pillar dam bodies as well as surrounding rocks
Guo et al. Mechanisms of rock burst in hard and thick upper strata and rock-burst controlling technology
CN109236297B (en) Coal mining method for remaining coal seam in residual mining area of cracking and filling combined ascending re-mining cutter column
CN103993594B (en) A kind of micro-nano bubble process can liquefied foundation device and working method
CN206174963U (en) Cross shallow undercut tunnel supporting construction of burying of ground fissure crushed zone
CN109487804A (en) The low disturbance reinforcement protection system of red soft rock cut slope and construction method
CN103352477A (en) Vertical pres-stressed anchor rod gravity-type composite retaining wall and method for designing and constructing retaining wall
CN104612130A (en) Method for processing grouting position of hidden cave at bottom of tunnel
Barton Reducing risk in long deep tunnels by using TBM and drill-and-blast methods in the same project–the hybrid solution
CN102888795A (en) Karst roadbed grouting process
CN107083775B (en) Rock slope fracture surface replacement treatment method
CN105735345A (en) Composite type supporting and retaining structure and construction method adopting supporting and retaining structure
CN107152309B (en) A kind of coal seam is the high water level and high-speed drainage water damage control method of Main aquifer
CN102767353B (en) Comprehensive mining technology of drowned well
CN109707349A (en) The exploitation of shale flour sand hydrate multiple-limb hole is drilled well integral method
CN105781552A (en) Novel high-gas outburst coal seam stereoscopic punching crosscut coal uncovering method
CN106907152A (en) A kind of soil type inlet well arrangement and grouting method
CN106761532A (en) Leak drilling sealing aggregate filter cuts the application method of device
CN108179757A (en) The pile foundation structure and construction method of high gradient slope containing study on weak faults
CN209555945U (en) The low disturbance reinforcement protection system of red soft rock cut slope
CN205400758U (en) Temporary support system convenient to undercut tunnel passes through fast and invades limit pipeline region
CN208900045U (en) A kind of energy conservation reinforced concrete pipe pile
CN105714752B (en) A kind of urban road surfaces static sounding construction technology

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181130

Termination date: 20190523