CN107066639A - Area power grid breakdown loss Consequence calculation method based on topological analysis - Google Patents

Area power grid breakdown loss Consequence calculation method based on topological analysis Download PDF

Info

Publication number
CN107066639A
CN107066639A CN201610985269.9A CN201610985269A CN107066639A CN 107066639 A CN107066639 A CN 107066639A CN 201610985269 A CN201610985269 A CN 201610985269A CN 107066639 A CN107066639 A CN 107066639A
Authority
CN
China
Prior art keywords
load
failure
breakdown loss
loss
power grid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610985269.9A
Other languages
Chinese (zh)
Other versions
CN107066639B (en
Inventor
张容菠
郝丽萍
王飞
唐军沛
雷鸣
宋希静
王斌
朱平
韩珊珊
王伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liupanshui Power Supply Bureau of Guizhou Power Grid Co Ltd
Original Assignee
Liupanshui Power Supply Bureau of Guizhou Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liupanshui Power Supply Bureau of Guizhou Power Grid Co Ltd filed Critical Liupanshui Power Supply Bureau of Guizhou Power Grid Co Ltd
Priority to CN201610985269.9A priority Critical patent/CN107066639B/en
Publication of CN107066639A publication Critical patent/CN107066639A/en
Application granted granted Critical
Publication of CN107066639B publication Critical patent/CN107066639B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/30Circuit design
    • G06F30/36Circuit design at the analogue level
    • G06F30/367Design verification, e.g. using simulation, simulation program with integrated circuit emphasis [SPICE], direct methods or relaxation methods
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Hardware Design (AREA)
  • Physics & Mathematics (AREA)
  • Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Economics (AREA)
  • General Physics & Mathematics (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Primary Health Care (AREA)
  • Public Health (AREA)
  • Microelectronics & Electronic Packaging (AREA)
  • Evolutionary Computation (AREA)
  • Geometry (AREA)
  • General Engineering & Computer Science (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a kind of area power grid breakdown loss Consequence calculation method based on topological analysis, model extension, increase attribute " customer interrupted number ", " power failure responsible consumer number ", " responsible consumer " and " responsible consumer grade " are carried out to " load " of area power grid intelligent control main station system;Area power grid intelligent control main station system preserves data section, and electric network fault equipment is divided into 2 kinds of load and other equipment, no matter which kind of failure, topological analysis and load model can be based on, it is accurate to calculate breakdown loss load, judge power failure equipments, analysis power failure range, count customer interrupted;Using the method for the present invention, the result of calculation of breakdown loss load is more accurate, while there is provided than more rich customer interrupted information and power failure range analytic function, more meeting the technical requirements of intelligent grid, with very high engineering practicability, application prospect is quite varied.

Description

Area power grid breakdown loss Consequence calculation method based on topological analysis
Technical field
The present invention relates to power system automatic field, more particularly to a kind of area power grid failure based on topological analysis is damaged Lose Consequence calculation method.
Background technology
Grid collapses can cause damage, and electric network fault loss consequence is paid much attention to by power grid operation personnel.Power network Breakdown loss consequence includes loss load, power failure equipments and customer interrupted.Wherein:
(1) breakdown loss load=failure removal load+low pressure trip loss load;
(2) power failure equipments include faulty equipment and the miscellaneous equipment having a power failure by this failure, and find out power failure equipments just It is analysis power failure range;
(3) customer interrupted includes customer interrupted number, power failure responsible consumer number, customer interrupted grade (in each customer interrupted most Serious grade) and power failure responsible consumer.
The intelligent control main station system of current each department power network, when calculating breakdown loss consequence, only calculates breakdown loss Load and analysis power failure range, have ignored customer interrupted.Moreover, when calculating breakdown loss load, low pressure trip damage is not calculated Load is lost, and only calculates failure removal load, that is, employs the approximate calculation of " breakdown loss load ≈ failure removals load ".
In summary, it is necessary to a kind of new area power grid breakdown loss Consequence calculation method be found, comprehensively and accurately to count Calculate the loss caused after electric network fault.
The content of the invention
In view of this, it is an object of the invention to provide a kind of area power grid breakdown loss Consequence calculation based on topological analysis Method.When being broken down in power network, it can either calculate failure removal load, and low pressure trip loss load can be calculated again, And then accurate calculating breakdown loss load, it is convenient and reliable.
The purpose of the present invention is achieved through the following technical solutions:
The present invention the area power grid breakdown loss Consequence calculation method based on topological analysis, be grid equipment is divided into it is negative Lotus and the class of other equipment 2, load model extension, increase " number of users ", " important are carried out to area power grid intelligent control main station system Number of users ", " responsible consumer ", " responsible consumer grade " totally 4 attributes, realize precisely classification;
Wherein charge circuit breakdown loss Consequence calculation method is directly to read and count to have a power failure from load extended model User data, according to failure removal load and the relation of equality of breakdown loss load, obtains failure by failure removal load and damages Lose load;
The computational methods of miscellaneous equipment breakdown loss consequence are as follows:
Step one:Based on topological analysis to low-voltage bus bar-active automatic modeling, low-voltage bus bar and step down side are set up Active corresponding relation;
Step 2:Based on topological analysis, power failure equipments are judged, and by the low-voltage bus bar of its association, accumulation calculating failure is damaged Lose load and customer interrupted.
Particularly, in charge circuit breakdown loss Consequence calculation method, area power grid intelligent control main station system is passed through Need to preserve profile data, preserve at intervals of settable.When failure occurs, area power grid intelligent control main station system preserves 0 Moment and the section at 1 moment, choose the 1 moment section nearest from failure 1 and are calculated as ground state section, failure is damaged during calculating Load=failure removal load is lost, takes charge circuit active, currency is subtracted with the value of ground state section.
Particularly, the step of computational methods of miscellaneous equipment breakdown loss consequence two) in, breakdown loss Load Calculation Method It is as follows:
Ploss=P1+P2
Wherein, PlossFor breakdown loss load, P1For failure removal load, P2Load, i.e. failure are lost for low pressure trip to damage It is that failure removal load loses load sum with low pressure trip to lose total load;
Failure removal Load Calculation Method is as follows:
P1=∑ Pbi- ∑s Pci;
Wherein, P1For failure removal load, n is the sum of current all dead electricity low-voltage bus bars, and i spans are [1, n], Pbi is i-th decompression bus ground state section load, and Pci is i-th decompression bus current loads;
The computational methods of low pressure trip loss load are as follows:
P2=∑ Pbj- ∑s Pcj;
Wherein, P2Load is lost for low pressure trip, m is the sum of current all powered low-voltage bus bars, and j span is [1, m], Pbj is the powered low-voltage bus bar ground state section load of j-th strip, and Pcj is the powered low-voltage bus bar current loads of j-th strip.
The beneficial effects of the invention are as follows:By using the present invention method, no matter which kind of failure, can be based on topological analysis With load extended model, accurate calculating breakdown loss load simultaneously counts customer interrupted, moreover it is possible to based on topology band electroanalysis, judge to stop Electric equipment, analyzes power failure range, being accurately calculated for breakdown loss consequence is believed there is provided the customer interrupted compared with horn of plenty Breath, while completely remaining power failure range analytic function, more meets the technical requirements of intelligent grid, with very high Practical Property, application prospect is quite varied.
Other advantages, target and the feature of the present invention will be illustrated in the following description to a certain extent, and And to a certain extent, based on will be apparent to those skilled in the art to investigating hereafter, Huo Zheke To be instructed from the practice of the present invention.The target and other advantages of the present invention can be wanted by following specification and right Book is sought to realize and obtain.
Brief description of the drawings
In order that the object, technical solutions and advantages of the present invention are clearer, below in conjunction with accompanying drawing the present invention is made into The detailed description of one step, wherein:
Fig. 1 is that the profile data of embodiment preserves schematic diagram.
Fig. 2 is low-voltage bus bar and step down side through branch switch connection diagram.
Fig. 3 is low-voltage bus bar and the direct-connected schematic diagram of step down side.
Embodiment
Hereinafter with reference to accompanying drawing, the preferred embodiments of the present invention are described in detail.It should be appreciated that preferred embodiment Only for the explanation present invention, the protection domain being not intended to be limiting of the invention.
Grid equipment of the present invention is divided into load and the class of other equipment 2, and so-called charge circuit refers to that those 10kV (also have few Measure 35kV) directly on-load circuit, first carry out load model extension, because area power grid intelligent control main station system has been Load modeling, in order to calculate and count customer interrupted, it is necessary to extend its model, increase " number of users ", " responsible consumer number ", " weight Want user ", " responsible consumer grade " totally 4 attributes.
One load may correspondingly multiple " responsible consumers " (similarly, corresponding " responsible consumer grade " also has multiple), 5 responsible consumers of reservation and user gradation can be given tacit consent to, the regulation of each grid company of user gradation there may be difference, can be according to reality Border situation is confirmed that in actual applications, these information are static informations, it is necessary to manual entry and maintenance.
Two kinds of computational methods are described in detail below by a specific embodiment:
(1) charge circuit breakdown loss Consequence calculation method
As shown in Figure 1, in order to calculate breakdown loss load, area power grid intelligent control main station system needs to preserve section Data, are preserved at intervals of 30 seconds (settable), and area power grid intelligent control main station system is by a upper moment, a upper moment Data section all preserved, that is, be permanently present the data section at one or two moment:Last moment, upper last moment 's.
When failure 1 occurs, area power grid intelligent control main station system preserves the section at 0 moment and 1 moment, is selected during calculating The 1 moment section nearest from failure 1 is taken to be calculated as ground state section;(just at 2 moment) during the generation of failure 2, server The section at 1 moment and 2 moment is preserved, the section for now still choosing for 1 moment is calculated as ground state section;By that analogy.
Charge circuit breaks down, breakdown loss load=failure removal load, and computational methods are to take charge circuit active, Currency is subtracted with the value of ground state section;Power failure equipments are exactly load itself, without topological analysis;Customer interrupted inquiry load expands The relevant information of exhibition model is calculated.
(2) miscellaneous equipment breakdown loss Consequence calculation method
During miscellaneous equipment failure (especially transformer, bus, the line fault of voltage levels), to power network harm compared with Greatly.Its breakdown loss consequence will be realized by low-voltage bus bar-active model.The foundation and maintenance of low-voltage bus bar-active model It is automatically performed.Area power grid intelligent control main station system obtains low-voltage bus bar (institute by topological analysis using annexation search Bus with all charge circuits of circuit), and its corresponding relation active with step down side is set up, it common are 2 kinds Situation:
A. low-voltage bus bar is connected (as shown in Figure 2) with step down side through branch switch, now, low-voltage bus bar correspondence It is active take the branch switch have work value.
B. low-voltage bus bar and step down side are direct-connected (as shown in Figure 3), now, and low-voltage bus bar is corresponding active to take change Depressor low-pressure side winding has work value.
As shown in Figure 1, after grid collapses, a data section nearest from fault moment is chosen disconnected as ground state Face, after 20 seconds (configurable) at the moment, active to main transformer low-pressure side and its low-pressure side low-voltage bus bar powered situation is carried out Scanning.
All main transformer low-pressure sides are traveled through, according to the powered situation of main transformer low-pressure side correspondence low-voltage bus bar, every bus is had Work(changing value (value after failure occurs 20 seconds subtracts ground state value), is added to failure removal load, low pressure trip loss and bears respectively Lotus and breakdown loss load.
Breakdown loss Load Calculation Method is as follows:
Ploss=P1+P2
Wherein, PlossFor breakdown loss load, P1For failure removal load, P2Load is lost for low pressure trip.I.e.:Failure It is that failure removal load loses load sum with low pressure trip to lose total load.
Failure removal Load Calculation Method is as follows:
P1=∑ Pbi- ∑s Pci;
Wherein, P1For failure removal load, n be current all dead electricity low-voltage bus bars sum (i spans for [1, N]), Pbi is i-th decompression bus ground state section load, and Pci is i-th decompression bus current loads.
I.e.:Failure removal load is that active total add and subtract of the current all dead electricity low-voltage bus bars under ground state section goes to current institute There is dead electricity low-voltage bus bar load always to add.
The computational methods of low pressure trip loss load are as follows:
P2=∑ Pbj- ∑s Pcj;
Wherein, P2Load is lost for low pressure trip, and m is that (j span is for the sums of current all powered low-voltage bus bars [1, m]), Pbj is the powered low-voltage bus bar ground state section load of j-th strip, and Pcj is the powered low-voltage bus bar current loads of j-th strip.
I.e.:Low pressure trip loss load goes current for the total plus-minus of load of the current all non-decompression buses under ground state section All non-decompression bus loads always add.
In addition, power failure range analysis is the judgement of power failure equipments, still using traditional topological powered parser.Have a power failure and use The charge circuit that family is connected based on low-voltage bus bar, counts the information in its corresponding load extended model.
Finally illustrate, the above embodiments are merely illustrative of the technical solutions of the present invention and it is unrestricted, although with reference to compared with The present invention is described in detail good embodiment, it will be understood by those within the art that, can be to skill of the invention Art scheme is modified or equivalent substitution, and without departing from the objective and scope of the technical program, it all should cover in the present invention Right among.

Claims (3)

1. the area power grid breakdown loss Consequence calculation method based on topological analysis, it is characterised in that:Grid equipment is divided into negative Lotus and the class of other equipment 2, load model extension, increase " number of users ", " important are carried out to area power grid intelligent control main station system Number of users ", " responsible consumer ", " responsible consumer grade " totally 4 attributes, realize Accurate Classification;
Wherein charge circuit failure when, power failure equipments be exactly " load " itself, low pressure trip loss load will not be produced, therefore passed through Failure removal load obtains breakdown loss load, then directly reads and count customer interrupted information from load extended model;
The computational methods of miscellaneous equipment breakdown loss consequence are as follows:
Step one:Based on topological analysis to low-voltage bus bar-active automatic modeling, low-voltage bus bar is set up active with step down side Corresponding relation;
Step 2:Based on topological analysis, power failure equipments are judged, and by the low-voltage bus bar of its association, accumulation calculating breakdown loss is born Lotus and customer interrupted.
2. the area power grid breakdown loss Consequence calculation method according to claim 1 based on topological analysis, its feature exists In:In charge circuit breakdown loss Consequence calculation method, need to preserve section by area power grid intelligent control main station system Data, are preserved at intervals of settable, when failure occurs, and area power grid intelligent control main station system preserves 0 moment and 1 moment Section, chooses the 1 moment section nearest from failure 1 and is calculated as ground state section during calculating, according to breakdown loss load= Failure removal load, takes charge circuit active, and currency is subtracted with the value of ground state section.
3. the area power grid breakdown loss Consequence calculation method according to claim 1 based on topological analysis, its feature exists In:Two the step of the computational methods of miscellaneous equipment breakdown loss consequence) in, breakdown loss Load Calculation Method is as follows:
Ploss=P1+P2
Wherein, PlossFor breakdown loss load, P1For failure removal load, P2It is total for low pressure trip loss load, i.e. breakdown loss Load is that failure removal load loses load sum with low pressure trip;
Failure removal Load Calculation Method is as follows:
P1=∑ Pbi- ∑s Pci;
Wherein, P1For failure removal load, n is the sum of current all dead electricity low-voltage bus bars, and i spans are [1, n], and Pbi is I-th decompression bus ground state section load, Pci is i-th decompression bus current loads;
The computational methods of low pressure trip loss load are as follows:
P2=∑ Pbj- ∑s Pcj;
Wherein, P2Lose load for low pressure trip, m is the sum of current all powered low-voltage bus bars, j span be [1, M], Pbj is the powered low-voltage bus bar ground state section load of j-th strip, and Pcj is the powered low-voltage bus bar current loads of j-th strip.
CN201610985269.9A 2016-10-25 2016-10-25 Regional power grid fault loss consequence calculation method based on topology analysis Active CN107066639B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610985269.9A CN107066639B (en) 2016-10-25 2016-10-25 Regional power grid fault loss consequence calculation method based on topology analysis

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610985269.9A CN107066639B (en) 2016-10-25 2016-10-25 Regional power grid fault loss consequence calculation method based on topology analysis

Publications (2)

Publication Number Publication Date
CN107066639A true CN107066639A (en) 2017-08-18
CN107066639B CN107066639B (en) 2020-07-28

Family

ID=59618535

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610985269.9A Active CN107066639B (en) 2016-10-25 2016-10-25 Regional power grid fault loss consequence calculation method based on topology analysis

Country Status (1)

Country Link
CN (1) CN107066639B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108107318A (en) * 2017-11-03 2018-06-01 国网北京市电力公司 The localization method and device of user malfunction
CN108110893A (en) * 2017-11-22 2018-06-01 国电南瑞科技股份有限公司 A kind of electric network fault grade automatic identifying method of transmission & distribution collaboration
CN108879660A (en) * 2018-06-22 2018-11-23 广东电网有限责任公司 A kind of method that electric network fault loss of outage load calculates realization automatically

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101937490A (en) * 2010-08-27 2011-01-05 河北省电力研究院 Planning electric network loss analyzing and computing method
EP2390678A1 (en) * 2010-05-27 2011-11-30 Hella KGaA Hueck & Co. Device for detecting failure of loads connected in parallel
CN104239057A (en) * 2014-09-18 2014-12-24 清华大学 Method for improving power utilization reliability of major user based on active power seeking
US20150161298A1 (en) * 2011-01-25 2015-06-11 Power Analytics Corporation Systems and methods for real-time dc microgrid power analytics for mission-critical power systems
CN105356610A (en) * 2015-11-26 2016-02-24 江苏省电力公司南京供电公司 Configuration method of distribution automation terminal of intelligent power distribution network
CN105958486A (en) * 2016-06-15 2016-09-21 华北电力大学 Power distribution network multi-period dynamic fault recovery method considering DG (Distributed Generation) output curve

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2390678A1 (en) * 2010-05-27 2011-11-30 Hella KGaA Hueck & Co. Device for detecting failure of loads connected in parallel
CN101937490A (en) * 2010-08-27 2011-01-05 河北省电力研究院 Planning electric network loss analyzing and computing method
US20150161298A1 (en) * 2011-01-25 2015-06-11 Power Analytics Corporation Systems and methods for real-time dc microgrid power analytics for mission-critical power systems
CN104239057A (en) * 2014-09-18 2014-12-24 清华大学 Method for improving power utilization reliability of major user based on active power seeking
CN105356610A (en) * 2015-11-26 2016-02-24 江苏省电力公司南京供电公司 Configuration method of distribution automation terminal of intelligent power distribution network
CN105958486A (en) * 2016-06-15 2016-09-21 华北电力大学 Power distribution network multi-period dynamic fault recovery method considering DG (Distributed Generation) output curve

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
术茜: "电网拓扑分析与连锁故障缓和策略", 《电测与仪表》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108107318A (en) * 2017-11-03 2018-06-01 国网北京市电力公司 The localization method and device of user malfunction
CN108107318B (en) * 2017-11-03 2020-08-11 国网北京市电力公司 User fault positioning method and device
CN108110893A (en) * 2017-11-22 2018-06-01 国电南瑞科技股份有限公司 A kind of electric network fault grade automatic identifying method of transmission & distribution collaboration
CN108879660A (en) * 2018-06-22 2018-11-23 广东电网有限责任公司 A kind of method that electric network fault loss of outage load calculates realization automatically

Also Published As

Publication number Publication date
CN107066639B (en) 2020-07-28

Similar Documents

Publication Publication Date Title
Brown Electric power distribution reliability
Moon et al. Assessment of the impact of SFCL on voltage sags in power distribution system
CN108318782B (en) Power distribution network fault area identification method based on network topology and distribution transformer power failure information
CN106021596B (en) A kind of analysis method of electric network fault rush of current topological diagram
Siebert Projects BorWin2 and HelWin1-Large Scale Multilevel Voltage-Sourced Converter Technology for Bundling of Offshore Windpower-V. Hussennether J. Rittiger and A. Barth Siemens AG Germany; D. Worthington G. Dell'Anna and M [J]
Sadeh et al. Effect of distributed generation capacity on the coordination of protection system of distribution network
KR20060085136A (en) A method for calculating power parameters using fuzzy algorithm technology for information visualization of power-receiving/switching boards
CN103236737B (en) A kind of Domestic intelligent distribution box
CN108304613A (en) Closed loop network powered operation methods of risk assessment
CN107066639A (en) Area power grid breakdown loss Consequence calculation method based on topological analysis
CN106451412A (en) Power supply traceability-based important load power protection decision technology and visual display method
CN104538962A (en) Method for evaluating safety risk of power distribution network on basis of average expected value
CN102638027A (en) Switch refusing action fault simulation method for online safety and stability evaluation of electric power system
CN109191006B (en) Method for automatically scanning and analyzing risk of N-1 of 110kV main transformer of power grid
CN113344364B (en) Power failure plan risk analysis method and device, electronic equipment and storage medium
Yun et al. An evaluation method of voltage sag using a risk assessment model in power distribution systems
CN103683231B (en) A kind of power distribution network switchyard with intelligent switchboard
CN104484834B (en) The determination method of distribution line minimum current-carrying value
Pottonen A method for the probabilistic security analysis of transmission grids
CN109412141A (en) A kind of method of power grid 220kV main transformer N-1 risk power grid automatically scanning analysis
Chakravarty et al. A better GIS leads to a better DMS
Pholborisut et al. Evaluating the impact of distributed generation on protection system coordination using protection miscoordination index
Van Casteren et al. A customer oriented approach to the classification of voltage dips
Bouford et al. Many states of distribution
Topić et al. Influence of distributed power generation from renewable energy sources on reliability of distribution networks

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant