CN107059828A - A kind of detachable spud leg - Google Patents

A kind of detachable spud leg Download PDF

Info

Publication number
CN107059828A
CN107059828A CN201710223440.7A CN201710223440A CN107059828A CN 107059828 A CN107059828 A CN 107059828A CN 201710223440 A CN201710223440 A CN 201710223440A CN 107059828 A CN107059828 A CN 107059828A
Authority
CN
China
Prior art keywords
rack
spud leg
clamping plate
pipe
semifocal chord
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710223440.7A
Other languages
Chinese (zh)
Other versions
CN107059828B (en
Inventor
陈佳俊
赵世琏
朱正都
程文池
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Marine Machinery Plant Co Ltd
Original Assignee
Wuhan Marine Machinery Plant Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Marine Machinery Plant Co Ltd filed Critical Wuhan Marine Machinery Plant Co Ltd
Priority to CN201710223440.7A priority Critical patent/CN107059828B/en
Publication of CN107059828A publication Critical patent/CN107059828A/en
Application granted granted Critical
Publication of CN107059828B publication Critical patent/CN107059828B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B17/04Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction
    • E02B17/08Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction for raising or lowering
    • E02B17/0818Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction for raising or lowering with racks actuated by pinions
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0056Platforms with supporting legs

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Details Of Connecting Devices For Male And Female Coupling (AREA)
  • Supports For Pipes And Cables (AREA)

Abstract

The invention discloses a kind of detachable spud leg.The detachable spud leg includes spud leg unit, and spud leg unit includes:First spud leg unit and the second spud leg unit, the first spud leg unit include:First strut of many first rack string pipes of many first rack string pipes and connection, every first rack string pipe includes the first rack and is arranged in the first semifocal chord pipe and the second semifocal chord pipe of the both sides of the first rack, and the second spud leg unit includes:First strut of many second rack string pipes of many second rack string pipes and connection, every second rack string pipe includes the second rack and is arranged in the 3rd semifocal chord pipe and the 4th semifocal chord pipe of the both sides of the second rack, and the 3rd semifocal chord pipe homonymy for being arranged in the first rack corresponding with the first semifocal chord pipe.Detachable spud leg is by setting shearing-resistance blocks to be effective against the shearing that the first spud leg unit and the second spud leg unit are present, and first clamping plate and second clamping plate are respectively clamped shearing-resistance blocks by four wedges, so as to ensure that the stress-bearing capability of detachable spud leg.

Description

A kind of detachable spud leg
Technical field
The present invention relates to the rack-and-pinion elevating mechanism field of self-elevating ocean platform, more particularly to a kind of detachable stake Leg.
Background technology
The elevating mechanism of self-elevating ocean platform includes bolt-type elevating mechanism and rack-and-pinion elevating mechanism.Spud leg is certainly The sole support of operation on lift-type ocean platform, spud leg inserts seabed in ocean operation, is to ensure self-elevating ocean platform peace Full key.
The diversified development serviced with self-elevating ocean platform, either in towage, floading condition lifting or through bridge Etc. in operating mode, being required to spud leg can be dismantled, to adapt to the demand of above-mentioned operating mode.The stake of existing bolt-type elevating mechanism Spud leg is split as generally using between multistage spud leg unit, two sections of adjacent spud leg units by leg when designing demountable structure Flange and the mode of bolt group are attached.
During the present invention is realized, inventor has found that prior art at least has problems with:
Connected mode between existing spud leg unit is only applicable to the spud leg of bolt-type elevating mechanism, due to rack-and-pinion Rack is provided with the spud leg of elevating mechanism, therefore, such connected mode is not particularly suited for the stake of rack-and-pinion elevating mechanism Leg, is attached even with flange and the mode of bolt group, as the connection at rack is built on the sand, and reduces jack up The security of ocean platform.This prevents the spud leg of rack lifting mechanism from dismantling, so that limiting gear rack lifting mechanism Application.
The content of the invention
For the non-detachable problem of the spud leg for solving rack lifting mechanism in the prior art, the embodiments of the invention provide A kind of detachable spud leg.The technical scheme is as follows:
The embodiments of the invention provide a kind of detachable spud leg, the detachable spud leg includes at least two sections spud leg lists Member, at least two sections spud leg units include:First spud leg unit and the second spud leg unit, the first spud leg unit and described Second spud leg unit is two sections of spud leg units of arbitrary neighborhood in the spud leg unit, and the first spud leg unit includes:Many First rack string pipe and the first strut for connecting many first rack string pipes, the every first rack string pipe include first Rack and the first semifocal chord pipe and the second semifocal chord pipe of the both sides for being arranged in first rack, the second spud leg unit include: Many second rack string pipes and the second strut for connecting many second rack string pipes, the every second rack string pipe include Second rack and be arranged in second rack both sides the 3rd semifocal chord pipe and the 4th semifocal chord pipe, and the 3rd semifocal chord pipe with First semifocal chord pipe correspondence, which is arranged on the homonymy of first rack, the middle part of the end face of first rack, offers the The second breach, first breach and the second breach phase are offered on one breach, the middle part of the end face of second rack To arrangement.
The detachable spud leg also includes the connection list for connecting the first spud leg unit and the second spud leg unit Member, the connection unit includes:Shearing-resistance blocks, first clamping plate, second clamping plate, the first locking member, the second locking member, the first wedge With the second wedge, the shearing-resistance blocks are installed in first breach and second breach, and the first of the first clamping plate End is arranged in the cavity that the first semifocal chord pipe is surrounded with first rack, and the second end of the first clamping plate is arranged in institute State in the cavity that the 3rd semifocal chord pipe is surrounded with second rack, and the first end of the first clamping plate and the first clamping plate Second end is the relative two ends of the first clamping plate, and the first end of the second clamping plate is arranged in the second semifocal chord pipe and described In the cavity that first rack is surrounded, the second end of the second clamping plate is arranged in the 4th semifocal chord pipe and second rack encloses Into cavity in, and the second end of the first end of the second clamping plate and the second clamping plate for the second clamping plate it is relative two The position of the correspondence shearing-resistance blocks offers the first groove in end, the first clamping plate, and first wedge is arranged in described First groove is interior and is fixed on first rack or second rack, the correspondence shearing-resistance blocks in the second clamping plate Position offers the second groove, and second wedge is arranged in second groove and is fixed on first rack or institute State on the second rack.
The top sidewall of first groove is provided with the first inclined-plane, first wedge and is provided with and described first The second inclined-plane that inclined-plane is engaged, the top sidewall of second groove, which is provided with the 3rd inclined-plane, second wedge, to be set It is equipped with the 4th inclined-plane being engaged with second inclined-plane.
First locking member is pressed from both sides through the first semifocal chord pipe, the first clamping plate, first rack, described second Plate and the 3rd semifocal chord pipe, and by the first semifocal chord pipe, the first clamping plate, first rack, the second clamping plate Locked with the 3rd semifocal chord pipe.
Second locking member is pressed from both sides through the second semifocal chord pipe, the first clamping plate, second rack, described second Plate is connected with the 4th semifocal chord pipe, and by the second semifocal chord pipe, the first clamping plate, second rack, described second Clamping plate is locked with the 4th semifocal chord pipe.
Specifically, the angle on first inclined-plane and the shaft section of first string pipe rack is 6~30 °, the 3rd inclined-plane Angle with the shaft section of the first string pipe rack is 6~30 °.
Further, the angle of the shaft section of first inclined-plane and first string pipe rack is 11 °, the 3rd inclined-plane with The angle of the shaft section of the first string pipe rack is 11 °.
Specifically, the outer of the first end of the first clamping plate is provided with the first chamfering, the first end of the second clamping plate Outer be provided with the second chamfering.
Specifically, first breach and second breach are semicircle, and the shearing-resistance blocks are and the semicircle The cylinder type matched.
Specifically, first breach and second breach are rectangle, and the shearing-resistance blocks are and the rectangle phase The cubic type matched somebody with somebody.
Specifically, first locking member and second locking member are stud.
Specifically, first wedge includes the first upper block and the first lower block, first upper block The direction of axis with first lower block along the first rack string pipe is arranged side by side, and second inclined-plane is arranged on institute State on the first upper block, first lower block is cubic type, first upper block is fixed on first tooth On bar, first lower block is fixed on second rack;Second wedge includes the second upper block and the The direction of the axis of two lower blocks, second upper block and second lower block along the first rack string pipe is simultaneously Arrangement is put, and the 4th inclined-plane is arranged on second upper block, and second lower block is cubic type, described the Two upper blocks are fixed on first rack, and second lower block is fixed on second rack.
Further, correspondence the first locking member punishment on the outer wall of the first semifocal chord pipe and the second semifocal chord pipe It is not provided with the first reinforcing plate, the outer wall of the 3rd semifocal chord pipe and the 4th semifocal chord pipe at correspondence second locking member It is respectively arranged with the second reinforcing plate.
Specifically, the first sealing plate, second semifocal chord are provided between the first semifocal chord pipe and first rack The second sealing plate is provided between pipe and first rack, the is provided between the 3rd semifocal chord pipe and second rack Three sealing plates, the 4th sealing plate is provided between the 4th semifocal chord pipe and second rack.
The beneficial effect that technical scheme provided in an embodiment of the present invention is brought is:The embodiments of the invention provide one kind is removable Formula spud leg is unloaded, the second breach is offered on the first breach, the end face of the second rack by being offered on the end face of the first rack, Shearing-resistance blocks is installed in the first breach and the second breach, rack is divided into after the first rack and the second rack, in the first tooth There can be shearing on the contact surface of bar and the second rack, shearing-resistance blocks are arranged on and can effectively supported between the first breach and the second breach Anti- horizontal shear between first rack and the second rack, first clamping plate and second clamping plate pass through the first wedge and second respectively Wedge clamps shearing-resistance blocks so that the first spud leg unit and the second spud leg unit are firmly coupled to each other, so as to ensure that The stress-bearing capability of detachable spud leg, meanwhile, inclined-plane is set at the top of the first wedge and the 3rd wedge, can so be protected Card can bear larger pulling force during detachable spud leg pile pulling, so as to ensure that the safety of self-elevating ocean platform Property, expand the application of rack-and-pinion elevating mechanism.
Brief description of the drawings
Technical scheme in order to illustrate the embodiments of the present invention more clearly, makes required in being described below to embodiment Accompanying drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the present invention, for For those of ordinary skill in the art, on the premise of not paying creative work, other can also be obtained according to these accompanying drawings Accompanying drawing.
Fig. 1 is the main structure diagram of detachable spud leg provided in an embodiment of the present invention;
Fig. 2 is Fig. 1 provided in an embodiment of the present invention sectional structure chart;
Fig. 3 is the structural representation of connection unit provided in an embodiment of the present invention and the second spud leg unit matching;
Fig. 4 is the structural representation that connection unit provided in an embodiment of the present invention and the first rack and the second rack coordinate;
Fig. 5 is the structural representation that first clamping plate provided in an embodiment of the present invention is assembled with the first rack;
Fig. 6 is the structural representation of connection unit provided in an embodiment of the present invention;
Fig. 7 is the structural representation of another first wedge and the second wedge provided in an embodiment of the present invention.
Embodiment
To make the object, technical solutions and advantages of the present invention clearer, below in conjunction with accompanying drawing to embodiment party of the present invention Formula is described in further detail.
Embodiment
The embodiments of the invention provide a kind of detachable spud leg, the detachable spud leg includes at least two sections spud leg lists Member.Fig. 1 is the main structure diagram of detachable spud leg provided in an embodiment of the present invention.As shown in figure 1, at least two sections stakes Leg unit includes:First spud leg unit 1 and the second spud leg unit 2, the first spud leg unit 1 and the second spud leg unit 2 are spud leg list Two sections of spud leg units of arbitrary neighborhood in member.
Fig. 2 is the sectional structure chart of detachable spud leg provided in an embodiment of the present invention.As shown in Fig. 2 the first spud leg list Member 1 includes:Many first rack string pipes, the first strut (not shown) of many first rack string pipes of the first rack 3 and connection, Every first rack string pipe includes the first semifocal chord pipe 4 and the second semifocal chord pipe 5 for being arranged in the both sides of the first rack 3.Fig. 3 is this hair The structural representation that the spud leg unit 2 of connection unit 9 and second that bright embodiment is provided coordinates.As shown in figure 3, the second spud leg unit 2 include:Many second rack string pipes, the second struts of many second rack string pipes of the second rack 6 and connection, every second rack String pipe includes the 3rd semifocal chord pipe 7 and the 4th semifocal chord pipe 8 for being arranged in the both sides of the second rack 6, and the 3rd semifocal chord pipe 7 and the first half The correspondence of string pipe 3 is arranged in the homonymy of the first rack 3.Fig. 4 is the first breach 3a provided in an embodiment of the present invention and the second breach 6a Structural representation.As shown in figure 4, offering the first breach 3a, the end of the second rack 6 on the middle part of the end face of the first rack 3 The second breach 6a, the first breach 3a and the second breach 6a is offered on the middle part in face positioned opposite.
The detachable spud leg also includes the connection unit 9 of the first spud leg unit 1 of connection and the second spud leg unit 2, the company Order member 9 includes:Shearing-resistance blocks 10, first clamping plate 11, second clamping plate 12, the first locking member 13, second the 14, first wedge shape of locking member The wedge 16 of block 15 and second, shearing-resistance blocks 10 are installed in the first breach 3a and the second breach 6a.Fig. 5 embodiment of the present invention is provided The rack 3 of first clamping plate 11 and first assembling structural representation.As shown in figure 5, the first end of first clamping plate 11 is arranged in In the cavity that one semifocal chord pipe 4 and the first rack 3 are surrounded, the second end of first clamping plate 11 is arranged in the 3rd semifocal chord pipe 7 and In the cavity that two racks 6 are surrounded, and the first end of first clamping plate 11 is relative for first clamping plate 11 with the second end of first clamping plate 11 Two ends.The first end of second clamping plate 12 is arranged in the cavity that the second semifocal chord pipe 5 and the first rack 3 are surrounded, second clamping plate 12 The second end be arranged in the cavity that the 4th semifocal chord pipe 8 and the second rack 6 are surrounded, and the first end of second clamping plate 12 with second folder Second end of plate 12 is that to offer first recessed for the positions of correspondence shearing-resistance blocks 10 in the relative two ends of second clamping plate 12, first clamping plate 11 Groove 11a.Fig. 6 is the structural representation of connection unit 9 provided in an embodiment of the present invention.As shown in fig. 6, the first wedge 15 is arranged In the first groove 11a and it is fixed on the first rack 3 or the second rack 6, the position of correspondence shearing-resistance blocks 10 in second clamping plate 12 The second groove 12a is offered, the second wedge 16 is arranged in the second groove 12a and is fixed on the first rack 3 or the second rack 6 On.Specifically, in the present embodiment, the first wedge 15 and the second wedge 16 can be installed on the first rack 3.At it In its embodiment, the first wedge 15 and the second wedge 16 can be installed on the second rack 6, or, the first wedge 15 are arranged on the first rack 3, and the second wedge 16 is arranged on the second rack 6.
First groove 11a top sidewall be provided with the first inclined-plane 110a, the first wedge 15 be provided with it is first oblique The second inclined-plane that face 110a is engaged, the second groove 12a top sidewall is provided with the 3rd inclined-plane 120a, the second wedge 16 It is provided with the 4th inclined-plane being engaged with the 3rd inclined-plane 120a.
First locking member 13 passes through the first semifocal chord pipe 4, first clamping plate 11, the first rack 3, the semifocal chord of second clamping plate 12 and the 3rd Pipe 7, and the first semifocal chord pipe 4, first clamping plate 11, the first rack 3, the semifocal chord pipe 7 of second clamping plate 12 and the 3rd are locked.Second locking Part 14 passes through the second semifocal chord pipe 5, first clamping plate 11, the second rack 6, the semifocal chord pipe 8 of second clamping plate 12 and the 4th, and by the second semifocal chord Pipe 5, first clamping plate 11, the second rack 6, second clamping plate 12 are locked with the 4th semifocal chord pipe 8.In the present embodiment, first clamping plate 11 Can be for forging clamping plate with second clamping plate 12, the stress-bearing capability for forging clamping plate is stronger, and in the present embodiment, shearing-resistance blocks 10 can be with Formed by forging.
Specifically, the included angle A of the first inclined-plane 110a and the shaft section of first string pipe rack is 6~30 °, the 3rd inclined-plane 120a Included angle B with the shaft section of first string pipe rack is 6~30 °.Such angle arrangement can be oblique by first in pile pulling operation Force decomposition between face 110a and the second inclined-plane is a less horizontal force and vertical force, and the vertical force can be with second The dynamic balance produced between wedge 15b and the first groove 11a contact surfaces, is passed so as to pull the active of pile pulling in pile pulling process The second spud leg unit 2 is handed to, so connection unit 9 can be avoided to bear larger pulling force.
Preferably, the included angle A of the shaft section of the first inclined-plane 110a and first string pipe rack is 11 °, the 3rd inclined-plane 120a with The included angle B of the shaft section of first string pipe rack is that 11 ° of angles ensure that the pulling force that detachable spud leg is born is maximum.
Specifically, the first end outer of first clamping plate 11 is provided with the first chamfering 11b, the first end outer of second clamping plate 12 It is provided with the second chamfering 12b.First chamfering 11b and the second chamfering 12b are set, facilitate the first spud leg unit 1 and the second spud leg list The docking of member 2.When the second spud leg unit 2 is docked with the first spud leg unit 1, the first chamfering 11b and the second chamfering 12b being capable of profits In being inserted in for the first spud leg unit 1.
Specifically, in the present embodiment, the first breach 3a and the second breach 6a can be rectangle, and shearing-resistance blocks 10 are and square The cubic type that shape matches.Such installation for being arranged such that shearing-resistance blocks 10 is more firm, it is to avoid shearing-resistance blocks 10 are in the first breach Slided in 3a and the second breach 6a.
Specifically, in other embodiments, the first breach 3a and the second breach 6a can be for semicircle, shearing-resistance blocks 10 The cylinder type matched with semicircle.It is arranged so as to cause the installation of shearing-resistance blocks 10 to be more convenient.
Specifically, the first locking member 13 and the second locking member 14 are stud.In the present embodiment, the first locking member 13 include four studs, and the second locking member 14 includes four studs.Due to the first locking member 13 and Two locking members 14 be consumable accessory, it is necessary to often change, and stud using extensively and cost is low, therefore, by the first locking member 13 and second locking member 14 be set to stud and can reduce processing and the use cost of detachable spud leg.
Further, it is respectively arranged with the outer wall of the first semifocal chord pipe 4 and the second semifocal chord pipe 5 at the first locking member 13 of correspondence On the outer wall of first reinforcing plate 21, the 3rd semifocal chord pipe 7 and the 4th semifocal chord pipe 8 second is respectively arranged with the second locking member 14 of correspondence Reinforcing plate 22., it is necessary to the perforate at the outer wall of the first semifocal chord pipe 4 and the second semifocal chord pipe 5, perforate meeting when installing the first locking member 13 Reduce the first semifocal chord pipe 4 and the second semifocal chord pipe 5 by force intensity, set the first reinforcing plate 21 to make up because weakening the perforate One semifocal chord pipe 4 and the second semifocal chord pipe 5 by force intensity so that the first semifocal chord pipe 4 and the second semifocal chord pipe 5 have preferable stress energy Power.Similarly, it is necessary to the perforate at the outer wall of the 3rd semifocal chord pipe 7 and the 4th semifocal chord pipe 8, perforate meeting during the second locking member 14 of installation Reduce the 3rd semifocal chord pipe 7 and the 4th semifocal chord pipe 8 by force intensity, set the second reinforcing plate 22 to make up because weakening the perforate Three semifocal chord pipes 7 and the 4th semifocal chord pipe 8 by force intensity so that the 3rd semifocal chord pipe 7 and the 4th semifocal chord pipe 8 have preferable stress energy Power.
Further, the first plane is provided with the first reinforcing plate 21, the first locking member 13 is installed on the first plane, the The second plane is provided with two reinforcing plates 22, the second locking member 14 is arranged in the second plane.First plane is set and second flat Face is for the ease of the first locking member 13 of installation and the second locking member 14.
Preferably, as shown in fig. 6, as the preferred embodiment of the present embodiment, the first wedge 15 includes the first upper block The side of the axis of 15a and the first lower block 15b, the first upper block 15a and the first lower block 15b along the first rack string pipe To being arranged side by side, the second inclined-plane is arranged on the first upper block 15a, and the first lower block 15b is cubic type, the first top Block 15a is fixed on the first rack 3, and the first lower block 15b is fixed on the second rack 6;Second wedge 16 includes the Two upper block 16a and the second lower block 16b, the second upper block 16a and the second lower block 16b are along the first rack string pipe The direction of axis be arranged side by side, the 4th inclined-plane is arranged on the second upper block 16a, and the second lower block 16b is cube Type, the second upper block 16a is fixed on the first rack 3, and the second lower block 16a is fixed on the second rack 6.Fixed form It can be welding, the first wedge 15 is divided into the first upper block 15a and the first lower block 15b, and by the first top Block 15a and the first lower block 15b are separately fixed on the first rack 3 and the second rack 6, by the second upper block 16a and Second lower block 16b is separately fixed on the first rack 3 and the second rack 6, can so be easy to user to dismantle, install, The bottom of the first spud leg unit 1 after shearing-resistance blocks 10, and dismounting is observed to be more convenient for placing for plane.
Fig. 7 is the structural representation of another wedge 16 of first wedge 15 and second provided in an embodiment of the present invention. As another implementation of the embodiment of the present invention, structure such as Fig. 7 of first wedge 15 and two the second wedges 16 Shown, directions of the first groove 11a along the axis perpendicular to the first rack string pipe extends to first from one side of first clamping plate 11 The another side of clamping plate 11, the first wedge 15 is two, and axial direction of two the first wedges 15 along the first semifocal chord pipe 4 is simultaneously Arrangement is put and is separately fixed on the first rack 3 and the second rack 6, and the first groove 11a bottom sidewall is provided with the 5th inclined-plane 111a, the bottom of the first wedge 15 is provided with the 6th inclined-plane being engaged with the 5th inclined-plane 111a, and the second groove 12a is along vertical The another side of second clamping plate 12, the second wedge shape are extended to from one side of second clamping plate 12 in the direction of the axis of the first rack string pipe Block 16 is two, and axial direction of two the second wedges 16 along the first semifocal chord pipe 4 is arranged side by side and is separately fixed at first On the rack 6 of rack 3 and second, the second groove 12a bottom sidewall is provided with the 7th inclined-plane 121a, the bottom of the second wedge 16 It is provided with the 8th inclined-plane being engaged with the 7th inclined-plane 121a.Set the 5th inclined-plane 111a and the 7th inclined-plane 121a can to act on Power on the 5th inclined-plane 111a and the 7th inclined-plane 121a is decomposed, and is produced for balancing the first inclined-plane 110a and the 3rd inclined-plane 120a Vertical direction power.In addition, mismachining tolerance can be made up by being arranged to inclined-plane, so that the first groove 11a and the first wedge 15 can be closely contacted, and the second groove 12a can be closely contacted with the second wedge 16.
Specifically, the angle C of the 5th inclined-plane 111a and the shaft section of first string pipe rack is 6~30 °, the 7th inclined-plane 121a Angle D with the shaft section of first string pipe rack is 6~30 °.Such angle arrangement can be in pile pulling operation, the 5th inclined-plane Force decomposition between 111a and the 6th inclined-plane is a less horizontal force and vertical force, and the vertical force can be with the second wedge The dynamic balance produced between the groove 11a contact surfaces of shape block 15 and first, is transmitted so as to pull the active of pile pulling in pile pulling process To the second spud leg unit 2, so connection unit 9 can be avoided to bear larger pulling force.
Preferably, the angle C of the shaft section of the 5th inclined-plane 111a and first string pipe rack is 11 °, the 7th inclined-plane 121a with The angle D of the shaft section of first string pipe rack is that 11 ° of angles ensure that the pulling force that detachable spud leg is born is maximum.
Specifically, the outer wall shape of first clamping plate 11 respectively with corresponding first semifocal chord pipe 4 and the inwall of the 3rd semifocal chord pipe 7 Shape is engaged, the inner wall shape of the outer wall shape of second clamping plate 12 respectively with corresponding second semifocal chord pipe 5 and the 4th semifocal chord pipe 8 It is engaged.First clamping plate 11 can be fixed in first semifocal chord pipe 4 and the 3rd semifocal chord pipe 7 by so setting, by second clamping plate 12 It is fixed in the second semifocal chord pipe 5 and the 4th semifocal chord pipe 8, first clamping plate 11 and second clamping plate 12 is preferably fixed the first tooth The rack 6 of bar 3 and second.In the present embodiment, the section of the first semifocal chord pipe 4 and the second semifocal chord pipe 5 can be semicircle, this Outside, in other implement, the first semifocal chord pipe 4 and the second semifocal chord pipe 5 can also be V-arrangement or rectangle.
Specifically, as shown in fig. 6, being provided with the first sealing plate 17 between the first semifocal chord pipe 4 and the first rack 3, the second half The second sealing plate 18 is provided between the rack 3 of string pipe 5 and first, it is close to be provided with the 3rd between the 3rd semifocal chord pipe 7 and the second rack 6 Shrouding 19, the 4th sealing plate 20 is provided between the 4th semifocal chord pipe 8 and the second rack 6.The first sealing plate 17, second is set to seal Plate 18, the 3rd sealing plate 19 and the 4th sealing plate 20 can prevent seawater from entering inside detachable spud leg, it is to avoid because seawater enters Enter and cause connection unit 9 to get rusty, so as to improve the service life of detachable spud leg.Accordingly, first sealing plate 17 The shape in cavity that shape is surrounded with the first semifocal chord pipe 4 with the first rack 3 is engaged, and can be semicircle, triangular form or square Shape;The shape in cavity that the shape of second sealing plate 18 is surrounded with the second semifocal chord pipe 5 with the first rack 3 is engaged, Ke Yiwei Semicircle, triangular form or rectangle;In the cavity that the shape of 3rd sealing plate 19 is surrounded with the 3rd semifocal chord pipe 7 and the second rack 6 Shape is engaged, and can be semicircle, triangular form or rectangle;The shape of 4th sealing plate 20 and the 4th semifocal chord pipe 8 and the second tooth The shape in cavity that bar 6 is surrounded is engaged, and can be semicircle, triangular form or rectangle.In the present embodiment, the first sealing plate 17th, the material of the second sealing plate 18, the 3rd sealing plate 19 and the 4th sealing plate 20 can be identical with the material of the first semifocal chord pipe 4, In the present embodiment, the first semifocal chord pipe 4, the second semifocal chord pipe 5, the 3rd semifocal chord pipe 7 and the 4th semifocal chord pipe 8 can be EH36 steel Material.Meanwhile, the first sealing plate 17, the second sealing plate 18, the 3rd sealing plate 19 and the 4th sealing plate 20 can be using the sides welded Formula is fixed.
It following is a brief introduction of the installation process of detachable spud leg provided in an embodiment of the present invention:
When the first spud leg unit 1 and the second spud leg unit 2 prepare docking, shearing-resistance blocks 10 are arranged in the second breach 6a It is interior, first clamping plate 11 and second clamping plate 12 are arranged in the left and right sides of shearing-resistance blocks 10, and make the first wedge 15a and the second wedge Shape block 15b correspondences are arranged in the first groove 11a, by the position relationship for adjusting the first inclined-plane 110a and the second inclined-plane so that First clamping plate 11 can be pressed on the first wedge 15, install the second locking member 14, and be arranged in the first wedge 15 correspondence In second groove 12a, by the position relationship for adjusting the 3rd inclined-plane 120a and the 4th inclined-plane so that second clamping plate 12 can be pressed in On second wedge 16, eventually through locking the second locking member 14 make the second semifocal chord pipe 5, first clamping plate 11, second clamping plate 12 with 4th semifocal chord pipe 8 clamps the second rack 6 by the second locking member 14, and the first spud leg unit 1 is lifted in place, makes the cloth of shearing-resistance blocks 10 Be placed in the first breach 3a, install the first locking member 13 simultaneously screw the first locking member 13, make the first semifocal chord pipe 4, first clamping plate 11, Second clamping plate 12, the 3rd semifocal chord pipe 7 clamp the first rack 3 respectively by the first locking member 13, while further screwing the first lock The tight locking member 14 of part 13 and second, makes the first locking member 13 and the second locking member 14 locked, so that first clamping plate 11 and second Clamping plate 12 fits the first rack 3 and the second rack 6 is arranged, and then detachable spud leg is had by connection unit 9 Good stress-bearing capability, when detachable spud leg includes two or more spud leg unit, is carried out according to above-mentioned installation process Installation.
The embodiments of the invention provide a kind of detachable spud leg, lacked by offering first on the end face of the first rack Mouthful, the second breach is offered on the end face of the second rack, shearing-resistance blocks is installed in the first breach and the second breach, shearing-resistance blocks energy The shearing that the first spud leg unit and the second spud leg unit are present enough is effective against, first clamping plate and second clamping plate pass through first respectively Wedge and the second wedge clamp shearing-resistance blocks so that the first spud leg unit and the second spud leg unit are us shown firmly attached to one Rise, so that the stress-bearing capability of detachable spud leg is ensure that, meanwhile, set oblique at the top of the first wedge and the 3rd wedge Face, so ensure that can bear larger pulling force during detachable spud leg pile pulling, and also ensure that first is recessed Groove and the first wedge are in close contact, and the second groove and the second wedge are in close contact, so as to ensure that self-elevating ocean platform Security, expand the application of rack-and-pinion elevating mechanism.
The foregoing is only presently preferred embodiments of the present invention, be not intended to limit the invention, it is all the present invention spirit and Within principle, any modification, equivalent substitution and improvements made etc. should be included in the scope of the protection.

Claims (10)

1. a kind of detachable spud leg, the detachable spud leg includes at least two sections spud leg units, at least two sections spud legs Unit includes:First spud leg unit and the second spud leg unit, the first spud leg unit and the second spud leg unit are described Two sections of spud leg units of arbitrary neighborhood in spud leg unit, it is characterised in that
The first spud leg unit includes:Many first rack string pipes and the first support for connecting many first rack string pipes Bar, every first rack string pipe includes the first rack and is arranged in the first semifocal chord pipe and the of the both sides of first rack Two semifocal chord pipes, the second spud leg unit includes:Many second rack string pipes and connect the of many second rack string pipes Two struts, the every second rack string pipe includes the second rack and is arranged in the 3rd semifocal chord pipe of the both sides of second rack With the 4th semifocal chord pipe, and the 3rd semifocal chord pipe homonymy for being arranged in first rack corresponding with the first semifocal chord pipe, institute Offered on the middle part for the end face for stating the first rack offered on the first breach, the middle part of the end face of second rack second lack Mouthful, first breach and second breach are positioned opposite;
The detachable spud leg also includes the connection unit for connecting the first spud leg unit and the second spud leg unit, institute Stating connection unit includes:Shearing-resistance blocks, first clamping plate, second clamping plate, the first locking member, the second locking member, the first wedge and Two wedges, the shearing-resistance blocks are installed in first breach and second breach, the first end cloth of the first clamping plate Put in the cavity surrounded in the first semifocal chord pipe and first rack, the second end of the first clamping plate is arranged in described the In the cavity that three semifocal chord pipes are surrounded with second rack, and the first end of the first clamping plate and the second of the first clamping plate Hold as the relative two ends of the first clamping plate, the first end of the second clamping plate is arranged in the second semifocal chord pipe and described first In the cavity that rack is surrounded, the second end of the second clamping plate is arranged in the 4th semifocal chord pipe and second rack surrounds In cavity, and the second end of the first end of the second clamping plate and the second clamping plate is the relative two ends of the second clamping plate, The position of the correspondence shearing-resistance blocks offers the first groove in the first clamping plate, and first wedge is arranged in described first Groove is interior and is fixed on first rack or second rack, the position of the correspondence shearing-resistance blocks in the second clamping plate Offer the second groove, second wedge is arranged in second groove and is fixed on first rack or described the On two racks;
The top sidewall of first groove is provided with the first inclined-plane, first wedge and is provided with and first inclined-plane The second inclined-plane being engaged, the top sidewall of second groove, which is provided with the 3rd inclined-plane, second wedge, to be provided with The 4th inclined-plane being engaged with second inclined-plane;
First locking member through the first semifocal chord pipe, the first clamping plate, first rack, the second clamping plate with The 3rd semifocal chord pipe, and by the first semifocal chord pipe, the first clamping plate, first rack, the second clamping plate and institute The locking of the 3rd semifocal chord pipe is stated,
Second locking member through the second semifocal chord pipe, the first clamping plate, second rack, the second clamping plate with 4th semifocal chord pipe connection, and by the second semifocal chord pipe, the first clamping plate, second rack, the second clamping plate Locked with the 4th semifocal chord pipe.
2. detachable spud leg according to claim 1, it is characterised in that first inclined-plane and the first string pipe tooth The angle of the shaft section of bar is 6~30 °, the angle of the shaft section of the 3rd inclined-plane and the first string pipe rack is 6~ 30°。
3. detachable spud leg according to claim 2, it is characterised in that first inclined-plane and the first string pipe tooth The angle of the shaft section of bar is 11 °, and the angle on the 3rd inclined-plane and the shaft section of the first string pipe rack is 11 °.
4. detachable spud leg according to claim 1, it is characterised in that the outer of the first end of the first clamping plate is set The first chamfering is equipped with, the outer of the first end of the second clamping plate is provided with the second chamfering.
5. detachable spud leg according to claim 1, it is characterised in that first breach and second breach are equal For semicircle, the shearing-resistance blocks are the cylinder type matched with the semicircle.
6. detachable spud leg according to claim 1, it is characterised in that first breach and second breach are equal For rectangle, the shearing-resistance blocks are the cubic type matched with the rectangle.
7. detachable spud leg according to claim 1, it is characterised in that first locking member and second locking Part is stud.
8. detachable spud leg according to claim 1, it is characterised in that first wedge includes the first upper mass The axis of body and the first lower block, first upper block and first lower block along the first rack string pipe Direction is arranged side by side, and second inclined-plane is arranged on first upper block, and first lower block is cubic type, First upper block is fixed on first rack, and first lower block is fixed on second rack;Institute Stating the second wedge includes the second upper block and the second lower block, second upper block and second lower block It is arranged side by side along the direction of the axis of the first rack string pipe, the 4th inclined-plane is arranged on second upper block, Second lower block is cubic type, and second upper block is fixed on first rack, second bottom Block is fixed on second rack.
9. detachable spud leg according to claim 1, it is characterised in that the first semifocal chord pipe and second semifocal chord On the outer wall of pipe the first reinforcing plate, the 3rd semifocal chord pipe and the described 4th half are respectively arranged with correspondence first locking member On the outer wall of string pipe the second reinforcing plate is respectively arranged with correspondence second locking member.
10. detachable spud leg according to claim 1, it is characterised in that the first semifocal chord pipe and first tooth The first sealing plate is provided between bar, the second sealing plate is provided between the second semifocal chord pipe and first rack, it is described The 3rd sealing plate is provided between 3rd semifocal chord pipe and second rack, between the 4th semifocal chord pipe and second rack It is provided with the 4th sealing plate.
CN201710223440.7A 2017-04-07 2017-04-07 A kind of detachable spud leg Active CN107059828B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710223440.7A CN107059828B (en) 2017-04-07 2017-04-07 A kind of detachable spud leg

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710223440.7A CN107059828B (en) 2017-04-07 2017-04-07 A kind of detachable spud leg

Publications (2)

Publication Number Publication Date
CN107059828A true CN107059828A (en) 2017-08-18
CN107059828B CN107059828B (en) 2019-06-21

Family

ID=59602624

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710223440.7A Active CN107059828B (en) 2017-04-07 2017-04-07 A kind of detachable spud leg

Country Status (1)

Country Link
CN (1) CN107059828B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108360486A (en) * 2018-03-23 2018-08-03 哈尔滨工业大学深圳研究生院 The prefabricated assembled spud leg of self-elevating ocean platform

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3830071A (en) * 1972-10-13 1974-08-20 Ihc Holland Letourneau Marine Jack-up drilling platform
CN201649058U (en) * 2010-05-31 2010-11-24 抚州市临川白勇海洋工程有限公司 Self-lifting platform pile leg locking device
CN103216616A (en) * 2013-04-26 2013-07-24 中国船舶重工集团公司第七○二研究所 Assembling, disassembling and locking mechanism for shear-resistance blocks of ultrahigh pressure large diameter deep sea environment simulating device
CN104912048A (en) * 2015-05-26 2015-09-16 浙江海洋学院 Ocean platform with detachable pile legs
CN105064310A (en) * 2015-07-03 2015-11-18 武汉船用机械有限责任公司 Locking mechanism of rack-and-pinion lifting system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3830071A (en) * 1972-10-13 1974-08-20 Ihc Holland Letourneau Marine Jack-up drilling platform
CN201649058U (en) * 2010-05-31 2010-11-24 抚州市临川白勇海洋工程有限公司 Self-lifting platform pile leg locking device
CN103216616A (en) * 2013-04-26 2013-07-24 中国船舶重工集团公司第七○二研究所 Assembling, disassembling and locking mechanism for shear-resistance blocks of ultrahigh pressure large diameter deep sea environment simulating device
CN104912048A (en) * 2015-05-26 2015-09-16 浙江海洋学院 Ocean platform with detachable pile legs
CN105064310A (en) * 2015-07-03 2015-11-18 武汉船用机械有限责任公司 Locking mechanism of rack-and-pinion lifting system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108360486A (en) * 2018-03-23 2018-08-03 哈尔滨工业大学深圳研究生院 The prefabricated assembled spud leg of self-elevating ocean platform

Also Published As

Publication number Publication date
CN107059828B (en) 2019-06-21

Similar Documents

Publication Publication Date Title
JP2000169084A (en) Assembly device for metal framework member of lattice structure
CN207761278U (en) A kind of mortar leakage prevention building template assembly
CN107059828A (en) A kind of detachable spud leg
CN107217860A (en) A kind of life rope fixed mount
CN207079948U (en) A kind of life rope fixed mount
KR101375346B1 (en) Iron support jig
CN102653991B (en) Raised type turnable concrete bearing part with template function and construction method thereof
CN206800481U (en) Static load pile crown protection device and static loading experiment system
CN101881029A (en) Detachable tower foundation
CN103935881B (en) Turning rack
CN208088668U (en) A kind of full grout sleeve of bar connecting
CN206681017U (en) A kind of steel pipe support tie-rod
CN206360358U (en) A kind of external corner connecting elements
JP2000328557A (en) Joint structure and its execution method for pile
CN211547770U (en) Cofferdam back cover reinforced connection structure and shear connector welding positioning structure
CN103306474A (en) Integrated wood formwork
CN209837661U (en) Building templates convenient to dismouting
CN203582268U (en) Clamp for unloading front-section column of steel structure on site
CN211257343U (en) Connecting and reinforcing device between steel members with circular cross sections
CN110498336B (en) Hoisting tool and hoisting process for side plate of sintering machine trolley
CN215926318U (en) Cast-in-place support crossbeam quick connect connects
CN219298796U (en) Material piling rack and wall construction structure
CN206767423U (en) A kind of shear wall aluminum alloy mould plate fixes hanging apparatus
CN203878972U (en) Scaffold right-angle buckle
CN210942183U (en) Marine hatch cover end beam mounting and positioning auxiliary device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant