CN107046260A - A kind of sectional cable line sink bridge frame - Google Patents

A kind of sectional cable line sink bridge frame Download PDF

Info

Publication number
CN107046260A
CN107046260A CN201710422999.2A CN201710422999A CN107046260A CN 107046260 A CN107046260 A CN 107046260A CN 201710422999 A CN201710422999 A CN 201710422999A CN 107046260 A CN107046260 A CN 107046260A
Authority
CN
China
Prior art keywords
side plate
installed part
crane span
span structure
connector
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710422999.2A
Other languages
Chinese (zh)
Other versions
CN107046260B (en
Inventor
马松涛
马纪财
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Wanqi Electric Appliance Group Xuyi Co ltd
Jiangsu Wanqi Electric Appliance Group Xuyi Co.,Ltd.
Original Assignee
JIANGSU WANQI ELECTRICAL APPLIANCE GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU WANQI ELECTRICAL APPLIANCE GROUP CO Ltd filed Critical JIANGSU WANQI ELECTRICAL APPLIANCE GROUP CO Ltd
Priority to CN201710422999.2A priority Critical patent/CN107046260B/en
Publication of CN107046260A publication Critical patent/CN107046260A/en
Application granted granted Critical
Publication of CN107046260B publication Critical patent/CN107046260B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G3/00Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
    • H02G3/02Details
    • H02G3/04Protective tubing or conduits, e.g. cable ladders or cable troughs

Abstract

The present invention relates to a kind of sectional cable line sink bridge frame, including the first crane span structure, the second crane span structure and attachment means, first crane span structure is identical with the second portal structure, first crane span structure includes bottom plate and is vertically arranged at the side plate of bottom plate both sides, side plate is divided into the first side plate and the second side plate, first side plate and the second side plate are on bottom board symmetry, attachment means include the first installed part and the second installed part and revolute pair, first installed part and the second installed part are symmetrical on revolute pair, the present invention is simple in construction, convenient disassembly is simple, reduces the trouble of conveyer belt.

Description

A kind of sectional cable line sink bridge frame
Technical field
The invention mainly relates to supply field of power distribution, more particularly to a kind of sectional cable line sink bridge frame.
Background technology
Cable line sink bridge frame product is early sixties, and a kind of novel cable that industrially developed country develops lays dress Put.With electrification, the change of the high speed development of automation, particularly distribution system, trench direct-burried and installation with hanger are to meet Not use requirement, and instead cable testing bridge, so as to accelerate construction progress, it is ensured that construction speed, it is ensured that matter Amount, realizes the standardization, seriation, generalization of product.
Cable line sink bridge frame species is very more, and one of which is exactly trough type bridge frame, and its structure includes bottom plate and set vertically The side plate of bottom plate both sides is placed in, cable testing bridge produces damage because of various reasons, and the bottom plate and side plate of most of trough type bridge frames are equal For integral type structure, very big waste is so resulted in, cost is substantially increased.
The content of the invention
The present invention is to solve the above problems, there is provided a kind of sectional cable line sink bridge frame.
A kind of sectional cable line sink bridge frame, including the first crane span structure, the second crane span structure and attachment means, the first crane span structure and Two portal structures are identical, and the first crane span structure includes bottom plate and is vertically arranged at the first side plate and the second side plate of bottom plate both sides, institute Stating bottom board symmetry must be provided with bottom plate breach, bottom plate breach upper side and bottom plate breach provided with two " L " type edges, bottom plate middle part The first connector is uniformly provided between side, first connector is provided with 4, and first connector is " X " type structure, First connector one end is connected with bottom plate breach upper side, and one end is connected with bottom plate breach downside, each two it is adjacent first The distance at the center of connector is d1;
First side plate and the second side plate are on bottom board symmetry, and the upper plane of the first side plate is provided with preceding installed part and rear installation Part, preceding installed part is located at upper flat front end, and rear installed part is located at upper plane rear end, and the lower plane of the first side plate is provided with preceding installed part With rear installed part, preceding installed part is located at lower plane front end, and rear installed part is located at lower plane rear end, and the first side plate is recessed provided with " Z " type Groove, the first side plate is provided with side plate breach, uniform provided with the second connection between side plate breach upper side and side plate breach downside Part, second connector is provided with 7, and second connector is on " X " type structure, second connector one end and side plate breach Side is connected, and one end is connected with side plate breach downside, and the distance at the center of the second adjacent connector of each two is d2, d1> d2;
Between first crane span structure and the second crane span structure by 4 attachment means be connected, the attachment means include first assembly and One end of second component and revolute pair, one end of first assembly and the second component is rotatably connected by revolute pair, first group The other end of part is raised provided with first, and the first projection is provided with the first installed part, and the other end of the second component is raised provided with second, The second installed part is provided with second projection;
Before the upper plane of the rear installed part of the upper plane of first side plate of the first crane span structure and the first side plate of the second crane span structure Installed part is connected by attachment means, the rear installed part of the upper plane of the first side plate of the first crane span structure and the first peace of attachment means Piece installing is connected by connector, the preceding installed part of the upper plane of the first side plate of the second crane span structure and the second installed part of attachment means It is connected by connector;
Before the lower plane of the rear installed part of the lower plane of first side plate of the first crane span structure and the first side plate of the second crane span structure Installed part is connected by attachment means, the rear installed part of the lower plane of the first side plate of the first crane span structure and the first peace of attachment means Piece installing is connected by connector, the preceding installed part of the lower plane of the first side plate of the second crane span structure and the second installed part of attachment means It is connected by connector;
Before the upper plane of the rear installed part of the upper plane of second side plate of the first crane span structure and the second side plate of the second crane span structure Installed part is connected by attachment means, the rear installed part of the upper plane of the second side plate of the first crane span structure and the first peace of attachment means Piece installing is connected by connector, the preceding installed part of the upper plane of the second side plate of the second crane span structure and the second installed part of attachment means It is connected by connector;
Before the lower plane of the rear installed part of the lower plane of second side plate of the first crane span structure and the second side plate of the second crane span structure Installed part is connected by attachment means, the rear installed part of the lower plane of the second side plate of the first crane span structure and the first peace of attachment means Piece installing is connected by connector, the preceding installed part of the lower plane of the second side plate of the second crane span structure and the second installed part of attachment means It is connected by connector, the connector is screw bolt and nut.
The present invention has the advantages that compared with prior art:
1st, the present invention is simple in construction, and convenient disassembly is simple, reduces the trouble of conveyer belt, and bottom plate and side plate are equipped with scarce Mouthful, it is adapted to the wind blown through all directions, it is small to the resistance of wind, reduce frame body and rock.
2nd, the present invention is provided with attachment means so that crane span structure direction is adjustable, and flexibility is had more in practice.
Brief description of the drawings
Fig. 1 is top view of the invention.
Fig. 2 is left view of the invention.
Fig. 3 is the left view of the bottom plate of the present invention.
Fig. 4 is the top view of the bottom plate of the present invention).
Fig. 5 is the left view of the first side plate of the present invention.
Fig. 6 is the front view of the first side plate of the present invention.
Fig. 7 is the top view of the attachment means of the present invention.
Fig. 8 is the front view of the attachment means of the present invention.
In figure:The crane span structures of 1- first, the crane span structures of 2- second, 3- attachment means, 4- bottom plates, the side plates of 5- first, the side plates of 6- second, 7- Put down on " L " type edge, 8- bottom plate breach, the connectors of 9- first, 10- bottom plate breach upper sides, 11- bottom plate breach downside, 12- Installed part after installed part before face, 13- lower planes, 14-, 15-, 16- side plate breach, 17- side plate breach upper sides, 18- side plates lack Mouth downside, the connectors of 19- second, 20- first assemblies, the components of 21- second, 22- revolute pairs, 23- first is raised, 24- first Installed part, 25- second is raised, 26- " Z " type groove, the installed parts of 27- second, 28- connectors.
Embodiment
To make the object, technical solutions and advantages of the present invention of greater clarity, with reference to embodiment, to this Invention is further described.
A kind of sectional cable line sink bridge frame as depicted, including the first crane span structure, the second crane span structure and attachment means, the One crane span structure is identical with the second portal structure, and the first crane span structure includes bottom plate and the first side plate for being vertically arranged at bottom plate both sides and the Two side plates, the bottom board symmetry must be provided with bottom plate breach provided with two " L " type edges in the middle part of bottom plate, bottom plate breach upper side with The first connector is uniformly provided between bottom plate breach downside, first connector is provided with 4, and first connector is " X " type structure, first connector one end is connected with bottom plate breach upper side, and one end is connected with bottom plate breach downside, each two The distance at the center of the first adjacent connector is d1;
First side plate and the second side plate are on bottom board symmetry, and the upper plane of the first side plate is provided with preceding installed part and rear installation Part, preceding installed part is located at upper flat front end, and rear installed part is located at upper plane rear end, and the lower plane of the first side plate is provided with preceding installed part With rear installed part, preceding installed part is located at lower plane front end, and rear installed part is located at lower plane rear end, and the first side plate is recessed provided with " Z " type Groove, the first side plate is provided with side plate breach, uniform provided with the second connection between side plate breach upper side and side plate breach downside Part, second connector is provided with 7, and second connector is on " X " type structure, second connector one end and side plate breach Side is connected, and one end is connected with side plate breach downside, and the distance at the center of the second adjacent connector of each two is d2;
Between first crane span structure and the second crane span structure by 4 attachment means be connected, the attachment means include first assembly and One end of second component and revolute pair, one end of first assembly and the second component is rotatably connected by revolute pair, first group The other end of part is raised provided with first, and the first projection is provided with the first installed part, and the other end of the second component is raised provided with second, The second installed part is provided with second projection;
Before the upper plane of the rear installed part of the upper plane of first side plate of the first crane span structure and the first side plate of the second crane span structure Installed part is connected by attachment means, the rear installed part of the upper plane of the first side plate of the first crane span structure and the first peace of attachment means Piece installing is connected by connector, the preceding installed part of the upper plane of the first side plate of the second crane span structure and the second installed part of attachment means It is connected by connector;
Before the lower plane of the rear installed part of the lower plane of first side plate of the first crane span structure and the first side plate of the second crane span structure Installed part is connected by attachment means, the rear installed part of the lower plane of the first side plate of the first crane span structure and the first peace of attachment means Piece installing is connected by connector, the preceding installed part of the lower plane of the first side plate of the second crane span structure and the second installed part of attachment means It is connected by connector;
Before the upper plane of the rear installed part of the upper plane of second side plate of the first crane span structure and the second side plate of the second crane span structure Installed part is connected by attachment means, the rear installed part of the upper plane of the second side plate of the first crane span structure and the first peace of attachment means Piece installing is connected by connector, the preceding installed part of the upper plane of the second side plate of the second crane span structure and the second installed part of attachment means It is connected by connector;
Before the lower plane of the rear installed part of the lower plane of second side plate of the first crane span structure and the second side plate of the second crane span structure Installed part is connected by attachment means, the rear installed part of the lower plane of the second side plate of the first crane span structure and the first peace of attachment means Piece installing is connected by connector, the preceding installed part of the lower plane of the second side plate of the second crane span structure and the second installed part of attachment means It is connected by connector, the connector is screw bolt and nut.
When crane span structure comes into operation, when part produces damage, dismounting can be carried out and carried out with changing, dropped significantly The low waste of material resources.

Claims (4)

1. a kind of sectional cable line sink bridge frame, it is characterised in that:Including the first crane span structure, the second crane span structure and attachment means, One crane span structure is identical with the second portal structure, and the first crane span structure includes bottom plate and the first side plate for being vertically arranged at bottom plate both sides and the Two side plates, the bottom board symmetry must be provided with bottom plate breach provided with two " L " type edges in the middle part of bottom plate, bottom plate breach upper side with The first connector is uniformly provided between bottom plate breach downside, first connector is provided with 4, and first connector is " X " type structure, first connector one end is connected with bottom plate breach upper side, and one end is connected with bottom plate breach downside;
First side plate and the second side plate are on bottom board symmetry, and the upper plane of the first side plate is provided with preceding installed part and rear installed part, preceding Installed part is located at upper flat front end, and rear installed part is located at upper plane rear end, and the lower plane of the first side plate is provided with preceding installed part with after Installed part, preceding installed part is located at lower plane front end, and rear installed part is located at lower plane rear end, and the first side plate is provided with " Z " type groove, the Side plate is provided with side plate breach, and the second connector, institute are uniformly provided between side plate breach upper side and side plate breach downside The second connector is stated provided with 7, second connector is " X " type structure, second connector one end and side plate breach upper side It is connected, one end is connected with side plate breach downside, is connected between the first crane span structure and the second crane span structure by 4 attachment means.
2. sectional cable line sink bridge frame as claimed in claim 1, it is characterised in that:The attachment means include first group One end of part and the second component and revolute pair, one end of first assembly and the second component is rotatably connected by revolute pair, the The other end of one component is raised provided with first, and the first projection is provided with the first installed part, and the other end of the second component is provided with second The second installed part is provided with projection, the second projection;
The preceding installation of the upper plane of the rear installed part of the upper plane of first side plate of the first crane span structure and the first side plate of the second crane span structure Part is connected by attachment means, the rear installed part of the upper plane of the first side plate of the first crane span structure and the first installed part of attachment means It is connected by connector, the preceding installed part of the upper plane of the first side plate of the second crane span structure and the second installed part of attachment means pass through Connector is connected;
The preceding installation of the lower plane of the rear installed part of the lower plane of first side plate of the first crane span structure and the first side plate of the second crane span structure Part is connected by attachment means, the rear installed part of the lower plane of the first side plate of the first crane span structure and the first installed part of attachment means It is connected by connector, the preceding installed part of the lower plane of the first side plate of the second crane span structure and the second installed part of attachment means pass through Connector is connected;
The preceding installation of the upper plane of the rear installed part of the upper plane of second side plate of the first crane span structure and the second side plate of the second crane span structure Part is connected by attachment means, the rear installed part of the upper plane of the second side plate of the first crane span structure and the first installed part of attachment means It is connected by connector, the preceding installed part of the upper plane of the second side plate of the second crane span structure and the second installed part of attachment means pass through Connector is connected;
The preceding installation of the lower plane of the rear installed part of the lower plane of second side plate of the first crane span structure and the second side plate of the second crane span structure Part is connected by attachment means, the rear installed part of the lower plane of the second side plate of the first crane span structure and the first installed part of attachment means It is connected by connector, the preceding installed part of the lower plane of the second side plate of the second crane span structure and the second installed part of attachment means pass through Connector is connected.
3. sectional cable line sink bridge frame as claimed in claim 2, it is characterised in that:The connector is bolt and spiral shell It is female.
4. sectional cable line sink bridge frame as claimed in claim 2, it is characterised in that:The first adjacent company of each two The distance between center of fitting is d1, and the distance between the adjacent center of the second connector of each two is d2, d1>d2.
CN201710422999.2A 2017-06-07 2017-06-07 A kind of sectional cable line sink bridge frame Active CN107046260B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710422999.2A CN107046260B (en) 2017-06-07 2017-06-07 A kind of sectional cable line sink bridge frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710422999.2A CN107046260B (en) 2017-06-07 2017-06-07 A kind of sectional cable line sink bridge frame

Publications (2)

Publication Number Publication Date
CN107046260A true CN107046260A (en) 2017-08-15
CN107046260B CN107046260B (en) 2018-10-12

Family

ID=59547307

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710422999.2A Active CN107046260B (en) 2017-06-07 2017-06-07 A kind of sectional cable line sink bridge frame

Country Status (1)

Country Link
CN (1) CN107046260B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110649536A (en) * 2018-06-27 2020-01-03 江苏中顺电气有限公司 Spliced bridge

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2739447Y (en) * 2004-07-16 2005-11-09 黄建忠 Plugging cable bridge joint
US20130315673A1 (en) * 2011-02-03 2013-11-28 François-Régis Pionetti Curvature Limiter For A Flexible Undersea Line, And Seabed-To-Surface Linking Equipment Including Same
CN105226588A (en) * 2015-09-26 2016-01-06 国网山东省电力公司枣庄供电公司 A kind of composite type multi-angle crane span structure
CN205004693U (en) * 2015-08-04 2016-01-27 浙江圣宇成套电气有限公司 No bolted connection alloy plastics crane span structure

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2739447Y (en) * 2004-07-16 2005-11-09 黄建忠 Plugging cable bridge joint
US20130315673A1 (en) * 2011-02-03 2013-11-28 François-Régis Pionetti Curvature Limiter For A Flexible Undersea Line, And Seabed-To-Surface Linking Equipment Including Same
CN205004693U (en) * 2015-08-04 2016-01-27 浙江圣宇成套电气有限公司 No bolted connection alloy plastics crane span structure
CN105226588A (en) * 2015-09-26 2016-01-06 国网山东省电力公司枣庄供电公司 A kind of composite type multi-angle crane span structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110649536A (en) * 2018-06-27 2020-01-03 江苏中顺电气有限公司 Spliced bridge

Also Published As

Publication number Publication date
CN107046260B (en) 2018-10-12

Similar Documents

Publication Publication Date Title
CN107046260A (en) A kind of sectional cable line sink bridge frame
CN208565208U (en) C-type steel connects locking device
CN202991739U (en) Installation fixing clamp for belt conveyer cover plate
CN105914650A (en) Adjusting plate self provided with backup protection device
CN207222899U (en) A kind of flat plate mold being easily installed
CN202629393U (en) Flange device convenient to dismount
CN205802365U (en) A kind of decompression receiving hopper of belt conveyor
CN206732423U (en) One kind is scalable to open a grade accurate positioning device
CN208830703U (en) A kind of adjustable circle curve template
CN209424099U (en) A kind of ore intelligence dry-dressing machine penetrates source with X-ray and fixes device
CN206364249U (en) Switch socket disjunctor mounting bracket
CN206382114U (en) A kind of fixed mechanism of disintegrator sieving net straight flange
CN204747357U (en) Bar straightener's straightening drum
CN206029652U (en) Fixed frame unit among battery package pretightening component
CN205657379U (en) From adjusting plate of taking backup protection equipment
CN202850078U (en) Fixing device of mining excavator upper circular track
CN206716745U (en) A kind of extrusion molding dies bearing
CN204311362U (en) hanger device
CN204311361U (en) A kind of hanger device
CN204311358U (en) Suspension bracket
CN207554484U (en) A kind of mutual buckle structure and quantum communications apparatus casing
CN209465591U (en) Double end machine for shrinking device for discharging
CN207497880U (en) Lift car through bracket
CN202190489U (en) Heat radiating fan mounting structure for locomotive cubicle
CN202201614U (en) Cast and moulded hanger

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190226

Address after: Xinhai Avenue, Xuyi County Industrial Development Zone, Huaian City, Jiangsu Province

Patentee after: Jiangsu Wanqi Electric Co.,Ltd.

Address before: 212213 Fengyu Industrial Zone, Yangzhong City, Zhenjiang City, Jiangsu Province

Patentee before: JIANGSU ONEQ ELECTRICAL APPLIANCE GROUP Co.,Ltd.

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: Xinhai Avenue, Xuyi County Industrial Development Zone, Huaian City, Jiangsu Province

Patentee after: Jiangsu Wanqi Electric Appliance Group (Xuyi) Co.,Ltd.

Address before: Xinhai Avenue, Xuyi County Industrial Development Zone, Huaian City, Jiangsu Province

Patentee before: Jiangsu Wanqi Electric Appliance Group Xuyi Co.,Ltd.

Address after: Xinhai Avenue, Xuyi County Industrial Development Zone, Huaian City, Jiangsu Province

Patentee after: Jiangsu Wanqi Electric Appliance Group Xuyi Co.,Ltd.

Address before: Xinhai Avenue, Xuyi County Industrial Development Zone, Huaian City, Jiangsu Province

Patentee before: Jiangsu Wanqi Electric Co.,Ltd.