CN107045544A - 一种发电集团机组公用设备信息模型数据结构的建立方法 - Google Patents
一种发电集团机组公用设备信息模型数据结构的建立方法 Download PDFInfo
- Publication number
- CN107045544A CN107045544A CN201710150801.XA CN201710150801A CN107045544A CN 107045544 A CN107045544 A CN 107045544A CN 201710150801 A CN201710150801 A CN 201710150801A CN 107045544 A CN107045544 A CN 107045544A
- Authority
- CN
- China
- Prior art keywords
- shared device
- parameter
- information model
- device information
- model
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 29
- 230000005611 electricity Effects 0.000 title claims abstract description 27
- 230000003068 static effect Effects 0.000 claims abstract description 36
- 241000196324 Embryophyta Species 0.000 claims description 48
- 230000008859 change Effects 0.000 claims description 6
- 241000208340 Araliaceae Species 0.000 claims description 4
- 235000005035 Panax pseudoginseng ssp. pseudoginseng Nutrition 0.000 claims description 4
- 235000003140 Panax quinquefolius Nutrition 0.000 claims description 4
- 235000008434 ginseng Nutrition 0.000 claims description 4
- 238000010276 construction Methods 0.000 description 3
- 238000013461 design Methods 0.000 description 3
- 230000006870 function Effects 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 238000012360 testing method Methods 0.000 description 2
- 230000009466 transformation Effects 0.000 description 2
- 230000008901 benefit Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 238000010561 standard procedure Methods 0.000 description 1
- 239000013589 supplement Substances 0.000 description 1
- 230000009897 systematic effect Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/22—Indexing; Data structures therefor; Storage structures
- G06F16/2228—Indexing structures
- G06F16/2246—Trees, e.g. B+trees
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/21—Design, administration or maintenance of databases
- G06F16/211—Schema design and management
- G06F16/212—Schema design and management with details for data modelling support
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/28—Databases characterised by their database models, e.g. relational or object models
- G06F16/282—Hierarchical databases, e.g. IMS, LDAP data stores or Lotus Notes
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Databases & Information Systems (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Data Mining & Analysis (AREA)
- General Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Health & Medical Sciences (AREA)
- Economics (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Human Resources & Organizations (AREA)
- Marketing (AREA)
- Primary Health Care (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- Software Systems (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710150801.XA CN107045544A (zh) | 2017-03-14 | 2017-03-14 | 一种发电集团机组公用设备信息模型数据结构的建立方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710150801.XA CN107045544A (zh) | 2017-03-14 | 2017-03-14 | 一种发电集团机组公用设备信息模型数据结构的建立方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107045544A true CN107045544A (zh) | 2017-08-15 |
Family
ID=59544130
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710150801.XA Pending CN107045544A (zh) | 2017-03-14 | 2017-03-14 | 一种发电集团机组公用设备信息模型数据结构的建立方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107045544A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115934829A (zh) * | 2022-11-30 | 2023-04-07 | 湖北清江水电开发有限责任公司 | 流域梯级电站监控***数据库的数据展示方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101815003A (zh) * | 2010-02-23 | 2010-08-25 | 浪潮通信信息***有限公司 | 全业务融合网络统一资源模型 |
CN102063509A (zh) * | 2011-01-12 | 2011-05-18 | 南京南瑞继保电气有限公司 | 电力信息***异构数据库多维数据集成的模型及建模方法 |
CN102243676A (zh) * | 2011-07-13 | 2011-11-16 | 国电南瑞科技股份有限公司 | 新能源综合监控***的三级建模方法 |
CN102799789A (zh) * | 2012-07-30 | 2012-11-28 | 国网电力科学研究院 | 一种水力发电厂主设备模型建立、存储和同步的方法 |
-
2017
- 2017-03-14 CN CN201710150801.XA patent/CN107045544A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101815003A (zh) * | 2010-02-23 | 2010-08-25 | 浪潮通信信息***有限公司 | 全业务融合网络统一资源模型 |
CN102063509A (zh) * | 2011-01-12 | 2011-05-18 | 南京南瑞继保电气有限公司 | 电力信息***异构数据库多维数据集成的模型及建模方法 |
CN102243676A (zh) * | 2011-07-13 | 2011-11-16 | 国电南瑞科技股份有限公司 | 新能源综合监控***的三级建模方法 |
CN102799789A (zh) * | 2012-07-30 | 2012-11-28 | 国网电力科学研究院 | 一种水力发电厂主设备模型建立、存储和同步的方法 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115934829A (zh) * | 2022-11-30 | 2023-04-07 | 湖北清江水电开发有限责任公司 | 流域梯级电站监控***数据库的数据展示方法 |
CN115934829B (zh) * | 2022-11-30 | 2024-04-19 | 湖北清江水电开发有限责任公司 | 流域梯级电站监控***数据库的数据展示方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106951694B (zh) | 一种电力***二次设备在线监测***自适应建模方法 | |
CN103064664B (zh) | 一种基于性能预估的Hadoop参数自动优化方法和*** | |
CN102411764B (zh) | 电网设备的数据管理***及管理方法 | |
EP2081123A1 (en) | System, method and product for processing utility data | |
CN105224631B (zh) | 搭建行业开放云的***及编制xbrl财务报表的方法 | |
CN102426525B (zh) | 一种多应用***的全景建模方法 | |
CN106372044A (zh) | 一种基于报表生成类型化维度xbrl报告的方法 | |
CN114860833B (zh) | 应用于数字孪生水利工程的数据中台和数据处理方法 | |
CN104750496A (zh) | 一种模型变更影响度自动检查方法 | |
CN106356850A (zh) | 安全稳定控制装置故障离线控制策略模型的生成方法 | |
CN115617776A (zh) | 一种数据管理***及方法 | |
CN102495916A (zh) | 一种基于对象匹配的多应用***全景建模方法 | |
CN104881739B (zh) | 一种基于iec61970/61968 cim标准的营配数据一致性校验方法 | |
CN109284329A (zh) | 基于kks编码规则和大数据架构的应用展示平台 | |
CN105701220B (zh) | 一种企业内部业务数据***及处理方法 | |
CN110033195A (zh) | 一种基于cim/cis的省地调电网模型拼接方法 | |
CN107045544A (zh) | 一种发电集团机组公用设备信息模型数据结构的建立方法 | |
CN108876445A (zh) | 一种基于营配网末端设备公共信息模型的数据互操作应用 | |
CN108052637B (zh) | 电网时标量测数据接入全生命周期实时图文监控方法 | |
CN106657282A (zh) | 一种换流站设备运行状态信息的集成方法及装置 | |
El Khaouat et al. | Big data based management for smart grids | |
CN100409625C (zh) | Epa协议一致性测试中可执行测试集的实现方法 | |
CN101123533A (zh) | 通信电源运维管理装置 | |
CN103092841A (zh) | 一种数据处理方法及装置 | |
CN103838845A (zh) | 一种通用导入Excel数据的实现方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Wei Wei Inventor after: Huang Daohuo Inventor after: Jiang Haiming Inventor after: Xu Weiqiang Inventor after: Zhou Ying Inventor before: Wei Wei Inventor before: Huang Daohuo Inventor before: Jiang Haiming Inventor before: Xu Weiqiang Inventor before: Zhou Ying |
|
CB03 | Change of inventor or designer information | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170815 |
|
RJ01 | Rejection of invention patent application after publication |