CN107045334A - 充电桩管理***的测试方法及测试装置 - Google Patents
充电桩管理***的测试方法及测试装置 Download PDFInfo
- Publication number
- CN107045334A CN107045334A CN201710137992.6A CN201710137992A CN107045334A CN 107045334 A CN107045334 A CN 107045334A CN 201710137992 A CN201710137992 A CN 201710137992A CN 107045334 A CN107045334 A CN 107045334A
- Authority
- CN
- China
- Prior art keywords
- charging pile
- management system
- virtual
- charging
- pile management
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B23/00—Testing or monitoring of control systems or parts thereof
- G05B23/02—Electric testing or monitoring
- G05B23/0205—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
- G05B23/0208—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterized by the configuration of the monitoring system
- G05B23/0213—Modular or universal configuration of the monitoring system, e.g. monitoring system having modules that may be combined to build monitoring program; monitoring system that can be applied to legacy systems; adaptable monitoring system; using different communication protocols
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/20—Pc systems
- G05B2219/24—Pc safety
- G05B2219/24065—Real time diagnostics
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Automation & Control Theory (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Charge And Discharge Circuits For Batteries Or The Like (AREA)
Abstract
Description
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710137992.6A CN107045334B (zh) | 2017-03-09 | 2017-03-09 | 充电桩管理***的测试方法及测试装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710137992.6A CN107045334B (zh) | 2017-03-09 | 2017-03-09 | 充电桩管理***的测试方法及测试装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107045334A true CN107045334A (zh) | 2017-08-15 |
CN107045334B CN107045334B (zh) | 2020-03-27 |
Family
ID=59544182
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710137992.6A Active CN107045334B (zh) | 2017-03-09 | 2017-03-09 | 充电桩管理***的测试方法及测试装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107045334B (zh) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108399303A (zh) * | 2018-03-08 | 2018-08-14 | 万帮充电设备有限公司 | 一种充电桩的模拟方法和装置 |
CN109164330A (zh) * | 2018-10-24 | 2019-01-08 | 特瓦特能源科技有限公司 | 充电平台测试装置和充电平台测试*** |
CN111308243A (zh) * | 2020-03-06 | 2020-06-19 | 上海电气集团股份有限公司 | 一种智能充电测试装置及测试方法 |
CN112051466A (zh) * | 2020-08-26 | 2020-12-08 | 云南昆船数码科技有限公司 | 一种基于组态充电桩模型的汽车充电管理平台测试*** |
CN113569421A (zh) * | 2021-08-04 | 2021-10-29 | 特瓦特能源科技有限公司 | 充电桩的测试方法及相关设备 |
CN113960390A (zh) * | 2021-09-08 | 2022-01-21 | 浙江吉利控股集团有限公司 | 一种充电模拟测试方法及装置 |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20130271065A1 (en) * | 2012-04-11 | 2013-10-17 | Ship And Ocean Industries R&D Center | High-voltage battery charging simulation system and operating method thereof |
US20130297245A1 (en) * | 2011-06-01 | 2013-11-07 | Zhejiang Electric Power Corporation | Full-automatic detecting system and method for transformer |
CN104601331A (zh) * | 2014-12-26 | 2015-05-06 | 深圳市科陆电子科技股份有限公司 | 充电桩监测控制***和方法 |
CN105207287A (zh) * | 2015-09-09 | 2015-12-30 | 深圳充电网科技有限公司 | 一种充电桩管理***及方法 |
CN106205311A (zh) * | 2016-08-25 | 2016-12-07 | 宁波三星智能电气有限公司 | 一种电动汽车直流充电桩仿真培训***和仿真培训方法 |
CN106297027A (zh) * | 2016-07-28 | 2017-01-04 | 珠海小可乐科技有限公司 | 充电桩数据采集方法及其*** |
CN106291198A (zh) * | 2016-08-31 | 2017-01-04 | 北京新能源汽车股份有限公司 | 一种充电桩模拟器 |
CN106324392A (zh) * | 2016-08-12 | 2017-01-11 | 深圳天邦达科技有限公司 | 上位机模拟充电桩与bms的交互方法 |
CN106340131A (zh) * | 2016-08-12 | 2017-01-18 | 上海智接电气设备有限公司 | 电动汽车智能充电管理***及其管理方法 |
CN106385447A (zh) * | 2016-09-09 | 2017-02-08 | 合普新能源科技有限公司 | 电池管理***测试用虚拟桩的数据处理方法 |
-
2017
- 2017-03-09 CN CN201710137992.6A patent/CN107045334B/zh active Active
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20130297245A1 (en) * | 2011-06-01 | 2013-11-07 | Zhejiang Electric Power Corporation | Full-automatic detecting system and method for transformer |
US20130271065A1 (en) * | 2012-04-11 | 2013-10-17 | Ship And Ocean Industries R&D Center | High-voltage battery charging simulation system and operating method thereof |
CN104601331A (zh) * | 2014-12-26 | 2015-05-06 | 深圳市科陆电子科技股份有限公司 | 充电桩监测控制***和方法 |
CN105207287A (zh) * | 2015-09-09 | 2015-12-30 | 深圳充电网科技有限公司 | 一种充电桩管理***及方法 |
CN106297027A (zh) * | 2016-07-28 | 2017-01-04 | 珠海小可乐科技有限公司 | 充电桩数据采集方法及其*** |
CN106324392A (zh) * | 2016-08-12 | 2017-01-11 | 深圳天邦达科技有限公司 | 上位机模拟充电桩与bms的交互方法 |
CN106340131A (zh) * | 2016-08-12 | 2017-01-18 | 上海智接电气设备有限公司 | 电动汽车智能充电管理***及其管理方法 |
CN106205311A (zh) * | 2016-08-25 | 2016-12-07 | 宁波三星智能电气有限公司 | 一种电动汽车直流充电桩仿真培训***和仿真培训方法 |
CN106291198A (zh) * | 2016-08-31 | 2017-01-04 | 北京新能源汽车股份有限公司 | 一种充电桩模拟器 |
CN106385447A (zh) * | 2016-09-09 | 2017-02-08 | 合普新能源科技有限公司 | 电池管理***测试用虚拟桩的数据处理方法 |
Non-Patent Citations (2)
Title |
---|
MARIO FASCHANG, MARTIN NÖHRER, JOHANNES STÖCKL,等: "Extensible Co-Simulation Framework for Electric Vehicle Charging Infrastructure Testing", 《 2014 IEEE INTERNATIONAL CONFERENCE ON SMART GRID COMMUNICATIONS (SMARTGRIDCOMM). IEEE》 * |
王旭等: "电动汽车智能充电桩的设计与研究", 《机电工程》 * |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108399303A (zh) * | 2018-03-08 | 2018-08-14 | 万帮充电设备有限公司 | 一种充电桩的模拟方法和装置 |
CN109164330A (zh) * | 2018-10-24 | 2019-01-08 | 特瓦特能源科技有限公司 | 充电平台测试装置和充电平台测试*** |
CN111308243A (zh) * | 2020-03-06 | 2020-06-19 | 上海电气集团股份有限公司 | 一种智能充电测试装置及测试方法 |
CN112051466A (zh) * | 2020-08-26 | 2020-12-08 | 云南昆船数码科技有限公司 | 一种基于组态充电桩模型的汽车充电管理平台测试*** |
CN113569421A (zh) * | 2021-08-04 | 2021-10-29 | 特瓦特能源科技有限公司 | 充电桩的测试方法及相关设备 |
CN113960390A (zh) * | 2021-09-08 | 2022-01-21 | 浙江吉利控股集团有限公司 | 一种充电模拟测试方法及装置 |
Also Published As
Publication number | Publication date |
---|---|
CN107045334B (zh) | 2020-03-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107045334A (zh) | 充电桩管理***的测试方法及测试装置 | |
CN102073319B (zh) | 一种多功能综合型电控汽车故障诊断*** | |
CN102332616B (zh) | 一种动力电池管理***的诊断控制方法 | |
CN103568863B (zh) | 电动汽车电池管理***的实时监测诊断***及诊断方法 | |
CN111129623B (zh) | 一种车载蓄电池充电防护方法及*** | |
CN104029602B (zh) | 基于td-lte网络的交流充电桩*** | |
CN105291875B (zh) | 一种电动汽车快速充电方法 | |
CN103246280B (zh) | 一种电动汽车诊断*** | |
CN103760890B (zh) | 新能源车辆车载充电机控制装置硬件在环测试设备与方法 | |
CN103560279B (zh) | 基于can总线的电池管理***诊断***的诊断维护方法 | |
CN107253445A (zh) | 一种电动汽车自助充电方法及*** | |
CN108023790A (zh) | 一种新能源汽车模拟非车载充电机设备及其应用方法 | |
CN108973734A (zh) | 一种电动汽车预约充电控制方法及*** | |
CN106506626A (zh) | 电动汽车充电桩与服务器的数据通信方法及装置 | |
CN106627192A (zh) | 一种充电***及其充电方法 | |
CN104035425A (zh) | 一种电动车及混合动力车用远程监控*** | |
CN103760895B (zh) | 新能源汽车车载充电机控制装置硬件在环测试方法 | |
CN111060829B (zh) | 一种对pack电池包进行pack检测的***及方法 | |
CN106114236A (zh) | 一种电动车用弓式充电***及其控制方法 | |
CN202815548U (zh) | 一种混合动力汽车的远程监控控制器 | |
CN107424315A (zh) | 智能地锁的控制方法及控制装置 | |
CN103552479A (zh) | 车用动力总成及其控制电路 | |
CN207124651U (zh) | 一种用于新能源汽车分时租赁的t‑box装置 | |
CN111866127A (zh) | 一种物联网嵌入式设备的信息安全管理模块 | |
CN105799533A (zh) | 一种电动汽车安全控制方法及装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
EE01 | Entry into force of recordation of patent licensing contract | ||
EE01 | Entry into force of recordation of patent licensing contract |
Application publication date: 20170815 Assignee: Hengqin Financial Investment International Finance Leasing Co.,Ltd. Assignor: ZHUHAI LCOLA TECHNOLOGY Co.,Ltd. Contract record no.: X2022980020356 Denomination of invention: Test method and device of charging pile management system Granted publication date: 20200327 License type: Exclusive License Record date: 20221108 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: Test method and device of charging pile management system Effective date of registration: 20221110 Granted publication date: 20200327 Pledgee: Hengqin Financial Investment International Finance Leasing Co.,Ltd. Pledgor: ZHUHAI LCOLA TECHNOLOGY Co.,Ltd. Registration number: Y2022980021665 |