CN107017618A CN201710153379.3A CN201710153379A CN107017618A CN 107017618 A CN107017618 A CN 107017618A CN 201710153379 A CN201710153379 A CN 201710153379A CN 107017618 A CN107017618 A CN 107017618A
Authority
CN
China
Prior art keywords
power supply
node
distribution network
initial
initial power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710153379.3A
Other languages
Chinese (zh)
Other versions
CN107017618B (en
Inventor
盛万兴
刘科研
孟晓丽
贾东梨
何开元
胡丽娟
刁赢龙
叶学顺
董伟杰
唐建岗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
State Grid Beijing Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
State Grid Beijing Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, China Electric Power Research Institute Co Ltd CEPRI, State Grid Beijing Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201710153379.3A priority Critical patent/CN107017618B/en
Publication of CN107017618A publication Critical patent/CN107017618A/en
Application granted granted Critical
Publication of CN107017618B publication Critical patent/CN107017618B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06393Score-carding, benchmarking or key performance indicator [KPI] analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Educational Administration (AREA)
  • Health & Medical Sciences (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Marketing (AREA)
  • Development Economics (AREA)
  • Theoretical Computer Science (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Public Health (AREA)
  • Power Engineering (AREA)
  • Primary Health Care (AREA)
  • General Health & Medical Sciences (AREA)
  • Water Supply & Treatment (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The present invention relates to a kind of active power distribution network division of the power supply area method and device, methods described includes:The initial power supply zone of power distribution network is obtained using fuzzy clustering algorithm;Set up power supply area object function and its constraints;Fit subregion is merged into by initial power supply zone and with there is the initial power supply zone that is connected of switch between it, and determines using power supply area object function and its constraints the optimization of region scheme of the fit subregion;The optimization of region scheme of power supply area is determined according to the optimization of region scheme of fit subregion;The technical scheme that the present invention is provided, using the basic model of partition zone optimizing, net assessment, obtains rational network partition structure, simplifies the switching manipulation of network, improve the operational efficiency of power distribution network.

Description

A kind of active power distribution network division of the power supply area method and device
Technical field
The present invention relates to distribution network operation control field, and in particular to a kind of active power distribution network division of the power supply area method and Device.
Background technology
Power distribution network division of the power supply area is a key issue of distribution network planning, and its result directly affects distribution network operation Economy and power supply reliability.Rational power configuration and network structure can be with the power supply reliabilities of power distribution network and power supply matter Amount, reduction via net loss, for realizing that the economy and reliability of distribution network operation are significant.
For the division of the power supply area of power distribution network, what Zhang Xinchang, Zhang Xiangan were delivered《Distribution web area based on generalized node Control is divided》One text, from the angle that the centralized differential protection of power distribution network is better achieved, the method that have studied power distribution network subregion. Proposition changes into power distribution network on the network of the generalized node of cum rights, and then the angle from graph theory is abstract to power distribution network progress, according to Topological structure between each generalized node carries out subregion.
On the one hand existing division of the power supply area method mainly concentrates planning and the division of the power supply area to transformer station;It is another Aspect, existing research method has some limitations.Traditional algorithm is only applicable to small to ensure that the calculating time meets requirement The division of the power supply area problem of scale;Artificial intelligence approach makes power supply area work have new progress, but intelligent optimization algorithm It is single using there is convergence rate compared with deficiencies such as slow, the poor, Premature Convergences of optimizing ability.The addition of distributed power source to match somebody with somebody The structure of power network is more complicated, it is therefore necessary to explore it is a kind of be applied to complicated active power distribution network division of the power supply area it is quick, High efficiency method, the structure to power distribution network simplifies, and improves the economy and reliability of distribution network operation.
The content of the invention
The present invention provides a kind of active power distribution network division of the power supply area method and device, the purpose is to using partition zone optimizing, The basic model of net assessment, obtains rational network partition structure, simplifies the switching manipulation of network, improves the operation of power distribution network Efficiency.
The purpose of the present invention is realized using following technical proposals:
A kind of active power distribution network division of the power supply area method, it is theed improvement is that, including:
The initial power supply zone of power distribution network is obtained using fuzzy clustering algorithm;
Set up power supply area object function and its constraints;
The initial power supply zone being connected by initial power supply zone and with there is switch between it merges into fit subregion, and profit The optimization of region scheme of the fit subregion is determined with power supply area object function and its constraints;
The optimization of region scheme of power supply area is determined according to the optimization of region scheme of fit subregion.
It is preferred that, the utilization fuzzy clustering algorithm obtains the initial power supply zone of power distribution network, including:
Main feeder headend node in establishing power network is j, and node is i, j ∈ [1, m], and i ∈ [1, n], m is main feeder number Mesh, n is nodes;
Clusters number c=m is set, determines each node to the equivalent electrical distance of m main feeder headend node respectively;
Using m main feeder headend node as cluster centre, by minimum of each load bus according to equivalent electrical distance Value cluster, m initial power supply zones are divided into by power distribution network.
Further, when node i is load bus, power distribution network interior joint i and main feeder headend node j is determined as the following formula Between equivalent electrical distance Dij
Dij=Ploadi×Lij
In formula, PloadiFor load bus i active power, LijFor distance of the node i away from main feeder headend node j;
It is equivalent between determination power distribution network interior joint i and main feeder headend node j as the following formula when node i is DG nodes Electrical distance Dij
Dij=(- PDGi)×Lij
In above formula, PDGiFor the active power of DG node is.
Further, it is described that power distribution network is divided into after m initial power supply zones, including:It is equal by main feeder load factor The criterion that weighs adjustment node-home, is specifically included:
The Rate of average load of m initial power supply zones is obtained respectively;
In the initial power supply zone higher than the 15% of Rate of average load, by equivalent electrical distance most long node distribution extremely Less than in the initial power supply zone of Rate of average load, until the Rate of average load of m initial power supply zones is not higher than average negative The 15% of load rate.
It is preferred that, it is described to set up power supply area object function and its constraints, including:
Power supply area object function is set up as the following formula:
In above formula, f1Optimize the overall operational cost in the period, f for power distribution network2For the load unbalanced degree in the optimization period, f3 To optimize the maximum voltage deviation sum in the period,For period t electricity price,The power for being power distribution network in period t is damaged Consumption, Δ t is the time interval of each period, and T is that, by the time small hop count of optimization Time segments division, N is branch road sum, cswiTo open Close the expense of operation once, sjiIt is the switch on branch road j in period i state, sji=0 represents to disconnect, sji=1 represents closure,Branch road j apparent energy, S are flowed through for time segment tj maxFor branch road j peak power,For time segment t nodes k electricity Pressure, VNFor node rated voltage, NrFor node set, α1、α2And α3Respectively the first proportionality coefficient, the second proportionality coefficient and the 3rd Proportionality coefficient;
Power supply area bound for objective function, including:
Node voltage is constrained, and formula is:
Vmin≤Vk≤Vmax
In above formula, Vmin、VmaxRespectively node voltage bound, VkFor node k voltage;
Power-balance constraint, formula is:
In above formula, Pi、QiActive power and reactive power that respectively node i is injected, Gij、Bij、δijIt is followed successively by node i, j Between conductance, susceptance and phase difference of voltage, n be system node sum;Vi、VjRespectively node i, j voltage magnitude;
Branch power is constrained, and formula is:
In above formula, PjFor branch road j active power value,Allow maximum for branch road j active power;
Power distribution network radiation operation is constrained, and formula is:
g∈G
In above formula, g is completes the set of the network topology structure after division of the power supply area, and G is the radial topology knot of network The set of structure;
Switch motion count constraint, formula is:
In above formula, Wj maxFor the maximum actuation number of times of single switch, WmaxFor the maximum actuation number of times of all switches, M is each Subregion branch road sum, N is branch road sum.
It is preferred that, the initial power supply zone being connected by initial power supply zone and with there is switch between it is merged into Body subregion, and the optimization of region scheme of the fit subregion is determined using power supply area object function and its constraints, including:
The initial power supply zone k for having switch to be connected with initial power supply zone i is obtained, initial power supply zone i and remaining is kept On off state between power supply zone is constant, only closes whole switches between initial power supply zone i and initial power supply zone k, obtains Take initial power supply zone i and initial power supply zone k fit subregion;
The optimal solution of the power supply area object function of fit subregion is determined using ant group algorithm, and regard the optimal solution as this The prioritization scheme of fit subregion.
It is preferred that, the optimization of region scheme according to fit subregion determines the optimization of region scheme of power supply area, including:
The corresponding x groups prioritization scheme of each fit subregion is obtained, whole prioritization schemes combination is optimized into, until whole The power supply area object function of power supply area is minimum.
A kind of active power distribution network division of the power supply area device, it is theed improvement is that, described device includes:
Division module is clustered, the initial power supply zone for obtaining power distribution network using fuzzy clustering algorithm;
Module is set up, for setting up power supply area object function and its constraints;
First determining module, the initial power supply zone for being connected by initial power supply zone and with there is switch between it is closed And be fit subregion, and determine using power supply area object function and its constraints the optimization of region scheme of the fit subregion;
Second determining module, the optimization of region side for determining power supply area according to the optimization of region scheme of fit subregion Case.
It is preferred that, the cluster division module, including:
Distance determining unit, is j for the main feeder headend node in establishing power network, node is i, j ∈ [1, m], i ∈ [1, n], m is main feeder number, and n is nodes;Clusters number c=m is set, determines each node to m main feeder head end respectively The equivalent electrical distance of node;
Cluster zoning unit, for using m main feeder headend node as cluster centre, by each load bus according to etc. The minimum value cluster of electrical distance is imitated, power distribution network is divided into m initial power supply zones.
Further, the cluster division module also includes:
Acquiring unit is loaded, for being divided into power distribution network after m initial power supply zones, m is obtained respectively individual initial The Rate of average load of power supply zone;
Load Balance Unit, in the initial power supply zone higher than the 15% of Rate of average load, by it is equivalent electrically away from From most long node distribution into less than the initial power supply zone of Rate of average load, until the individual initial power supply zones of m is average negative Load rate is not higher than the 15% of Rate of average load.
Beneficial effects of the present invention:
The technical scheme that the present invention is provided, under optimization period and corresponding load level, establishes to optimize in the period Minimum, the total load unbalanced degree of total operating cost is minimum, each period maximum voltage stability index sum is minimum, network is damaged The multiple target dynamic power region division model that minimum object function is set up is consumed, is asked using coevolution ant group algorithm Solution, can improve the network structure performance of subnet and the whole network, reach reduction power distribution network operating cost, improve node voltage skew, The purposes such as overload are eliminated, the economy and reliability of distribution network operation is improved, realizes the sustainable development of power distribution network.Meanwhile, this The technical scheme that invention is provided uses for reference the thought of composition decomposition, is one by complicated active power distribution network division of the power supply area PROBLEM DECOMPOSITION The sub- optimization problem that series is connected each other, each subregion is interacted by common system model, common evolutionary, so that entirely The continuous evolution of system, is finally reached solution purpose, and solving existing algorithm, to calculate search time long, the problem of Premature Convergence.
Brief description of the drawings
Fig. 1 is a kind of flow chart of active power distribution network division of the power supply area method of the invention;
Fig. 2 is a kind of flow chart of active power distribution network division of the power supply area method in the embodiment of the present invention;
Fig. 3 is a kind of structural representation of active power distribution network division of the power supply area device of the invention.
Embodiment
The embodiment to the present invention elaborates below in conjunction with the accompanying drawings.
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is A part of embodiment of the present invention, rather than whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art The all other embodiment obtained under the premise of creative work is not made, belongs to the scope of protection of the invention.
The division of the power supply area of power distribution network is the key link for realizing Topological expansion, and its result, which is directly affected, does not send a telegram here Electric grid investment, performance driving economy and power supply reliability of Force system etc., the research in the field under the new situation are faced with more Difficult and challenge.The present invention proposes a kind of active power distribution network division of the power supply area method, using partition zone optimizing, net assessment Basic model, obtains rational network partition structure, simplifies the switching manipulation of network, improves the operational efficiency of power distribution network, such as Fig. 1 It is shown, including:
101. the initial power supply zone of power distribution network is obtained using fuzzy clustering algorithm;
102. set up power supply area object function and its constraints;
103. the initial power supply zone being connected by initial power supply zone and with there is switch between it merges into fit subregion, And the optimization of region scheme of the fit subregion is determined using power supply area object function and its constraints;
104. the optimization of region scheme of power supply area is determined according to the optimization of region scheme of fit subregion.
Specifically, the present invention can generate the initial confession tentatively optimized using the initial power supply subnet of fuzzy clustering algorithm generation Electric subregion, is conducive to improving coevolution efficiency, can more accurately reflect electric power networks load using equivalent electrical distance Electric connecting relation between node and main feeder headend node.Obtain after equivalent electrical distance, using fuzzy clustering algorithm to Power network carries out initial division of the power supply area.Using main feeder as cluster centre, on the basis of ensureing each main feeder load factor in a balanced way, A power supply area will be merged into certain main feeder electrical distance is near, electric position difference is small load bus, you can obtain Initial division of the power supply area scheme, the step 101, including:
Main feeder headend node in establishing power network is j, and node is i, j ∈ [1, m], and i ∈ [1, n], m is main feeder number Mesh, n is nodes;
Clusters number c=m is set, determines each node to the equivalent electrical distance of m main feeder headend node respectively;
Using m main feeder headend node as cluster centre, by minimum of each load bus according to equivalent electrical distance Value cluster, m initial power supply zones are divided into by power distribution network.
Wherein, when node i is load bus, as the following formula between determination power distribution network interior joint i and main feeder headend node j Equivalent electrical distance Dij
Dij=Ploadi×Lij
In formula, PloadiFor load bus i active power, LijFor distance of the node i away from main feeder headend node j;
It is equivalent between determination power distribution network interior joint i and main feeder headend node j as the following formula when node i is DG nodes Electrical distance Dij
Dij=(- PDGi)×Lij
In above formula, PDGiFor the active power of DG node is.
Also include in described be divided into power distribution network after the initial power supply zones of m:By main feeder load factor equalization criterion Node-home is adjusted, is specifically included:
The Rate of average load of m initial power supply zones is obtained respectively;
In the initial power supply zone higher than the 15% of Rate of average load, by equivalent electrical distance most long node distribution extremely Less than in the initial power supply zone of Rate of average load, until the Rate of average load of m initial power supply zones is not higher than average negative The 15% of load rate.
In the step 102, under optimization period and corresponding load level, to optimize operating cost total in the period most Total load unbalanced degree is minimum in small, the optimization period, it is minimum to optimize each period maximum voltage stability index sum in the period Multiple target dynamic power region division model is set up for object function, including:
Power supply area object function is set up as the following formula:
In above formula, f1Optimize the overall operational cost in the period, f for power distribution network2For the load unbalanced degree in the optimization period, f3 To optimize the maximum voltage deviation sum in the period,For period t electricity price,The power for being power distribution network in period t is damaged Consumption, Δ t is the time interval of each period, and T is that, by the time small hop count of optimization Time segments division, N is that branch road sum and node are total Number, cswiFor the expense of switching manipulation once, sjiIt is the switch on branch road j in period i state, sji=0 represents to disconnect, sji= 1 represents closure,Branch road j apparent energy, S are flowed through for time segment tj maxFor branch road j peak power,It is small for the time Section t nodes k voltage, VNFor node rated voltage, NrFor node set, α1、α2And α3Respectively the first proportionality coefficient, the second ratio Example coefficient and the 3rd proportionality coefficient;
Power supply area bound for objective function, including:
Node voltage is constrained, and formula is:
Vmin≤Vk≤Vmax
In above formula, Vmin、VmaxRespectively node voltage bound, VkFor node k voltage;
Power-balance constraint, formula is:
In above formula, Pi、QiActive power and reactive power that respectively node i is injected, Gij、Bij、δijIt is followed successively by node i, j Between conductance, susceptance and phase difference of voltage, n be system node sum;Vi、VjRespectively node i, j voltage magnitude;
Branch power is constrained, and formula is:
In above formula, PjFor branch road j active power value,Allow maximum for branch road j active power;
Power distribution network radiation operation is constrained, and formula is:
g∈G
In above formula, g is completes the set of the network topology structure after division of the power supply area, and G is the radial topology knot of network The set of structure;
Switch motion count constraint, formula is:
In above formula, Wj maxFor the maximum actuation number of times of single switch, WmaxFor the maximum actuation number of times of all switches, M is each Subregion branch road sum, N is branch road sum.
Set up after power supply area object function and its constraints, the step 103, including:
The initial power supply zone k for having switch to be connected with initial power supply zone i is obtained, initial power supply zone i and remaining is kept On off state between power supply zone is constant, only closes whole switches between initial power supply zone i and initial power supply zone k, obtains Take initial power supply zone i and initial power supply zone k fit subregion;
The optimal solution of the power supply area object function of fit subregion is determined using ant group algorithm, and regard the optimal solution as this The prioritization scheme of fit subregion.
At present, more ripe using the technology of ant group algorithm formulation distribution network failure recovery scheme, the present invention is effective Solve the partitioning problem again between subnet, it is to avoid infeasible solution is produced in searching process, the optimization efficiency of algorithm is reduced, by life It is combined into tree strategy with ant group algorithm, it is ensured that the path that every ant passes through all corresponds to radial network structure.Spanning tree Strategy is it is possible to prevente effectively from radial inspection and repair process to network, it is ensured that the path that per generation produces is feasible solution, is carried High convergence of algorithm speed and search efficiency.
Ant group algorithm is a kind of optimizing search method similar to Evolution of Population, and its essence is that ant can be in the path of process The pheromone concentration that upper release pheromone to retain on the shorter path in path in identification path, exchange information, same time is got over Height, ant finds shorter path further according to pheromone concentration on path, and by using such a positive feedback mechanism, ant colony can Soon to search for optimal path, the pheromone concentration in the path also can highest.
For example:The present invention determines the optimal solution of the power supply area object function of fit subregion using ant group algorithm, and should Optimal solution as the fit subregion prioritization scheme, including:
For the radiativity feature of power distribution network, when solving power distribution network partitioning problem using ant group algorithm, using generation Tree strategy makes network topology after the failure each time corresponding to " distance of swimming " that ant completes all be radial pattern, it is to avoid radial pattern Check and repair process, it is ensured that per generation is feasible solution, improve the search efficiency of algorithm, and to the routing of ant group algorithm rule and Pheromone update strategy is improved, and accelerates convergence rate.
Power distribution network is described as a non-directed graph G, the nonoriented edge e as figure is switchedi(i=1,2 ... m), the node v of figurej(j =1,2 ... n) are made up of the load of node, and power supply point is used as root node v0, the numbering of non-directed graph G interior joints is expressed as vj(j=1, 2…n).Non-directed graph G is described using the net based structures matrix A branch of a n rows n row, wherein n is the dimension of matrix, with being The number of branches of system is identical, i.e.,
Wherein, if there is switch to be connected between node i and j, aij=aji=1, and remaining element is 0.
For another example as shown in Fig. 2 by taking the network shown in Fig. 2 as an example, solid line represents the block switch of closure, dotted line is represented The interconnection switch of disconnection, then:
It is equivalent to power distribution network by taking ant k as an example according to the principle of spanning tree after the net based structures matrix for obtaining power distribution network Into non-directed graph G define three below set and two sequences:
(1) each branch road correspondence adjacent node set Anode={ bv, it is the section adjacent with the row node serial number per row element Period, wherein adjacent node matrix is by taking network shown in Fig. 2 as an example:
(2) ant k has selected node set Endnode={ bi, the node serial number being up to the present selected into is recorded, its Middle vi∈G;
(3) the optional node set Choosenode={ b of ant kw, under current state, it can be chosen in unselected node For the node set of next paths.
(4) branch road selection sequence Lij(i, j=1,2 ..., n), record have selected branch road 0.
(5) vertex ticks sequence Mi(i=1,2 ..., n), whether flag node is as the minor details of a certain bar branch road Point, is to remember 1, otherwise remembers 0.
Using the search strategy of random spanning tree, by taking power distribution network shown in Fig. 2 as an example, with reference to above three set and two sequences Row, instruct ant generation to meet the feasible solution of topological constraints, and step is as follows:
(1) initial network topology is described:All nodes and switch are numbered, the non-directed graph G after generation numbering is obtained Abranch matrixes.
(2) initialize:Set Anode, Endnode, the Choosenode and sequence M for setting algorithm to usei, ant is put In head end power supply node, then Endnode={ 1 }, Choosenode={ 2 }, MkElement is (1,0,0,0,0).
(3) Path selection:Every ant selects a node y according to certain rule from Choosenode set.
(4) record branch road selection sequence Lij:Record current procedures under branch road first and last node i be Endnode in y phases The point of association, end-node j is the point y selected from Choosenode.
(5) set and sequence amendment:(a).Endnode:Newly-increased selected node y;(b).Choosenode:New set element For the element corresponding to y rows in Anode matrixes, and delete and selected node.Network amendment to generation:To the first and last node of branch road Check and correction, has selected interstitial content plus 1, by MiIn the node correspondence position mark 1 this time chosen, by the branch road minor details of this in initial network The corresponding load of point is added in the branch road end-node.If now Choosenode=Φ and MiIn have been labeled as 1 node total number Less than number of network node, then M is now foundiIn for 0 node serial number X as selected node, and in Endnode selection and X Associated point as branch road first node.
(6) circulation step (3)-(5) just generate one untill having selected circuitry number to reach that node keeps count of, so far can Row solution.Then load is added into respective nodes, obtains a kind of feasible radial net in new network structure, i.e. above-mentioned steps Network.The route searching of current ant terminates.
Wherein, initial time in above-mentioned steps, ant k (k=1,2 ..., Nant, Nant be often for ant number) fortune Trend is determined according to the pheromone concentration on each paths during dynamic, therefore the general of optional path is determined using pheromone concentration The probability in the pheromones accumulation more more options path is also bigger on rate, a certain path.Ant k is transferred to branch road j's by branch road i Probability is:
In formula:allowkRepresent the set of ant next step optional path;τijIt is transferred to branch road j's by branch road i for ant Pheromone concentration, ηijExpression is transferred to the visibility (η in path (i, j)ij=1/zij), zijRepresent the impedance magnitude of the circuit;α It is the pheromones significance level factor and the visibility significance level factor, the pheromones that α reflection ants accumulate in motion process with β Effect played in ant moves;β represents the relative importance of visibility.
Branch road selection rule:Every ant is when selecting transfer path using roulette rule in gathering from Choosenode Then.First, comparative sequences are constructed:x1=p (1), x2=x1+ p (2) ..., xm=xm-1+ p (m), p (i) are according to formula (3- 10) obtained branch road transition probability is calculated, m is optional path number, to currently on all of its neighbor alternative path in routing footpath Transition probability carry out standardization processing, with xmOn the basis of be worth, ensure x after processing1< x2< ... < xm∈ (0,1), is finally produced Random number rand ∈ (0,1), selection rule:
In formula, Next is the branch road that this ant is chosen.
Initial time, it is believed that pheromone concentration is identical on each paths, withInitializing each routing information element, (C is One small constant).τijBranch road j pheromone concentration is transferred to by branch road i for ant, as j=i, τiiRepresentative is originated by branch road i Pheromone concentration on (branch road i must connect power supply point), i branch roads during searching route.
Needed after completing an ant colony iteration to Pheromone update on branch road.If all ants are passed through into what is left on branch road Pheromones, which have all added up, is used as correction, then pheromones can tend to be average and be absorbed in random search, be unfavorable in colony most Positive role of the excellent solution to pheromones.Therefore, by the route searching of Nant ant of a generation, comparative analysis Nant kind approach, Wherein optimal path (optimal network configuration structure) is obtained, all paths in optimal path are recorded after completing generation circulation, i.e., Pheromones on corresponding path, according to the sequencing of its travels along path, are updated by optimal distribution network structure successively, It is main to include two aspects:The volatilization of pheromones and pheromones adjustment.While ant finds path, release pheromone, road Pheromones slowly " can volatilize " over time on footpath, and following formula first halfs have imitated this process, ρ (0 < ρ < 1) it is pheromones degree of volatility, reflects the pheromone concentration retained in volatilization rear path:
τij(t+1)=(1- ρ) τij(t)+Δτij(t)
In formula:ΔτijFor in optimal path in per generation, ant is transferred to branch road j pheromone concentration increment by branch road i, Continuous accumulating information element, improves convergence of algorithm speed on preferred path, wherein:
In formula, Q is a constant, reflects pheromones enhancing degree, fbestFor all nets of Nant ant generation of a generation Object function maximum, B in network structurebestFor the set of fingers in the optimum network structure.
Complete the optimizing mode using following global optimum after an ant colony iteration:The optimal solution that each iteration is obtained Best1 is saved as, the optimal solution Best0 that itself and last time obtain is compared, wherein Best0 will be saved as compared with the superior.Each iteration Repeat, required optimal solution is obtained when meeting the condition of convergence.After Pheromone update and optimal solution preservation is completed, under Ant colony iteration, until meeting the condition of convergence, that is, obtains optimal fit partition zone optimizing scheme.
It is determined that after the optimization of region scheme of fit subregion, service area need to be determined according to the optimization of region scheme of fit subregion The optimization of region scheme in domain, therefore, the step 104, including:
The corresponding x groups prioritization scheme of each fit subregion is obtained, whole prioritization schemes combination is optimized into, until whole The power supply area object function of power supply area is minimum.
Wherein, x=3 is a kind of feasible embodiment;
For another example the present invention provides a kind of embodiment of active power distribution network division of the power supply area method, as shown in Fig. 2 being Goal of the invention is reached, the present invention generates initial power supply zone using fuzzy clustering algorithm first;Then using operable switch as State variable, the multiple target division of the power supply area model set up in subregion, is optimized using ant group algorithm;By respective interior Portion is evolved and cooperated, and each subregion is optimized, adjusted one by one, after evaluation process, completes a coevolution process;By Coevolution, constantly improves the fitness of whole system model to be optimized, specifically includes repeatedly:
Step 1:Input the essential informations such as load value, network initial fabric, each branch impedance of network, setting subnet number i =1, the whole network iterative parameter n=1;
Step 2:Initial division of the power supply area scheme is formed using fuzzy clustering algorithm, m initial subnet is obtained;
Step 3:The subnet k for having switch to be connected with subnet i is found, and optimizes the switch between i-k;
Step 4:If i<M, then make subnet i=i+1, return to step 3;Otherwise, step 5 is continued;
Step 5:Each zoarium subregion generates three kinds of optimal partition schemes, and all partition schemes are optimized into combination, The fitness value of every kind of the whole network partition scheme is calculated respectively, obtains the subregion that the optimal scheme of object function is n-th optimization As a result;
Step 6:Iterative cycles, until the (n+1)th subzone result is consistent with n-th division result, obtain final power supply Region division result.
Based on same inventive concept, the present invention also provides a kind of active power distribution network division of the power supply area device, such as Fig. 3 institutes Show, described device includes:
Division module is clustered, the initial power supply zone for obtaining power distribution network using fuzzy clustering algorithm;
Module is set up, for setting up power supply area object function and its constraints;
First determining module, the initial power supply zone for being connected by initial power supply zone and with there is switch between it is closed And be fit subregion, and determine using power supply area object function and its constraints the optimization of region scheme of the fit subregion;
Second determining module, the optimization of region side for determining power supply area according to the optimization of region scheme of fit subregion Case.
The cluster division module, including:
Distance determining unit, is j for the main feeder headend node in establishing power network, node is i, j ∈ [1, m], i ∈ [1, n], m is main feeder number, and n is nodes;Clusters number c=m is set, determines each node to m main feeder head end respectively The equivalent electrical distance of node;
Cluster zoning unit, for using m main feeder headend node as cluster centre, by each load bus according to etc. The minimum value cluster of electrical distance is imitated, power distribution network is divided into m initial power supply zones.
When node i be load bus when, as the following formula determine power distribution network interior joint i and main feeder headend node j between etc. Imitate electrical distance Dij
Dij=Ploadi×Lij
In formula, PloadiFor load bus i active power, LijFor distance of the node i away from main feeder headend node j;
It is equivalent between determination power distribution network interior joint i and main feeder headend node j as the following formula when node i is DG nodes Electrical distance Dij
Dij=(- PDGi)×Lij
In above formula, PDGiFor the active power of DG node is.
It is described that power distribution network is divided into after m initial power supply zones, it need to adjust and save by main feeder load factor equalization criterion Point ownership, therefore, the cluster division module also include:
Acquiring unit is loaded, for being divided into power distribution network after m initial power supply zones, m is obtained respectively individual initial The Rate of average load of power supply zone;
Load Balance Unit, in the initial power supply zone higher than the 15% of Rate of average load, by it is equivalent electrically away from From most long node distribution into less than the initial power supply zone of Rate of average load, until the individual initial power supply zones of m is average negative Load rate is not higher than the 15% of Rate of average load.
It is described to set up module, including:
Power supply area object function is set up as the following formula:
In above formula, f1Optimize the overall operational cost in the period, f for power distribution network2For the load unbalanced degree in the optimization period, f3 To optimize the maximum voltage deviation sum in the period,For period t electricity price,The power for being power distribution network in period t is damaged Consumption, Δ t be each period time interval, T be by optimize Time segments division time small hop count, N, K be respectively branch road sum and Node total number, cswiFor the expense of switching manipulation once, sjiIt is the switch on branch road j in period i state, sji=0 represents disconnected Open, sji=1 represents closure,Branch road j apparent energy, S are flowed through for time segment tj maxFor branch road j peak power,For Time segment t nodes k voltage, VNFor node rated voltage, NrFor node set;
Power supply area bound for objective function, including:
Node voltage is constrained, and formula is:
Vmin≤Vk≤Vmax
In above formula, Vmin、VmaxRespectively node voltage bound, VkFor node k voltage;
Power-balance constraint, formula is:
In above formula, Pi、QiActive power and reactive power that respectively node i is injected, Gij、Bij、δijIt is followed successively by node i, j Between conductance, susceptance and phase difference of voltage, n be system node sum;Vi、VjRespectively node i, j voltage magnitude;
Branch power is constrained, and formula is:
In above formula, PjFor branch road j active power value,Allow maximum for branch road j active power;
Power distribution network radiation operation is constrained, and formula is:
g∈G
In above formula, g is completes the set of the network topology structure after division of the power supply area, and G is the radial topology knot of network The set of structure;
Switch motion count constraint, formula is:
In above formula, Wj maxFor the maximum actuation number of times of single switch, WmaxFor the maximum actuation number of times of all switches, M is each Subregion branch road sum, N is branch road sum.
First determining module, including:
The initial power supply zone k for having switch to be connected with initial power supply zone i is obtained, initial power supply zone i and remaining is kept On off state between power supply zone is constant, only closes whole switches between initial power supply zone i and initial power supply zone k, obtains Take initial power supply zone i and initial power supply zone k fit subregion;
The optimal solution of the power supply area object function of fit subregion is determined using ant group algorithm, and regard the optimal solution as this The prioritization scheme of fit subregion.
Second determining module, including:
The corresponding x groups prioritization scheme of each fit subregion is obtained, whole prioritization schemes combination is optimized into, until whole The power supply area object function of power supply area is minimum.
It should be understood by those skilled in the art that, embodiments herein can be provided as method, system or computer program Product.Therefore, the application can be using the reality in terms of complete hardware embodiment, complete software embodiment or combination software and hardware Apply the form of example.Moreover, the application can be used in one or more computers for wherein including computer usable program code The computer program production that usable storage medium is implemented on (including but is not limited to magnetic disk storage, CD-ROM, optical memory etc.) The form of product.
The application is the flow with reference to method, equipment (system) and computer program product according to the embodiment of the present application Figure and/or block diagram are described.It should be understood that can be by every first-class in computer program instructions implementation process figure and/or block diagram Journey and/or the flow in square frame and flow chart and/or block diagram and/or the combination of square frame.These computer programs can be provided The processor of all-purpose computer, special-purpose computer, Embedded Processor or other programmable data processing devices is instructed to produce A raw machine so that produced by the instruction of computer or the computing device of other programmable data processing devices for real The device for the function of being specified in present one flow of flow chart or one square frame of multiple flows and/or block diagram or multiple square frames.
These computer program instructions, which may be alternatively stored in, can guide computer or other programmable data processing devices with spy Determine in the computer-readable memory that mode works so that the instruction being stored in the computer-readable memory, which is produced, to be included referring to Make the manufacture of device, the command device realize in one flow of flow chart or multiple flows and/or one square frame of block diagram or The function of being specified in multiple square frames.
These computer program instructions can be also loaded into computer or other programmable data processing devices so that in meter Series of operation steps is performed on calculation machine or other programmable devices to produce computer implemented processing, thus in computer or The instruction performed on other programmable devices is provided for realizing in one flow of flow chart or multiple flows and/or block diagram one The step of function of being specified in individual square frame or multiple square frames.
Finally it should be noted that:The above embodiments are merely illustrative of the technical scheme of the present invention and are not intended to be limiting thereof, to the greatest extent The present invention is described in detail with reference to above-described embodiment for pipe, those of ordinary skills in the art should understand that:Still The embodiment of the present invention can be modified or equivalent substitution, and without departing from any of spirit and scope of the invention Modification or equivalent substitution, it all should cover within the claims of the present invention.

Claims (10)

1. a kind of active power distribution network division of the power supply area method, it is characterised in that methods described includes:
The initial power supply zone of power distribution network is obtained using fuzzy clustering algorithm;
Set up power supply area object function and its constraints;
The initial power supply zone being connected by initial power supply zone and with there is switch between it merges into fit subregion, and utilizes confession Electric regional aim function and its constraints determine the optimization of region scheme of the fit subregion;
The optimization of region scheme of power supply area is determined according to the optimization of region scheme of fit subregion.
2. the method as described in claim 1, it is characterised in that the utilization fuzzy clustering algorithm obtains the initial power supply of power distribution network Subregion, including:
Main feeder headend node in establishing power network is j, and node is i, j ∈ [1, m], and i ∈ [1, n], m is main feeder number, and n is Nodes;
Clusters number c=m is set, determines each node to the equivalent electrical distance of m main feeder headend node respectively;
Using m main feeder headend node as cluster centre, each load bus is gathered according to the minimum value of equivalent electrical distance Class, m initial power supply zones are divided into by power distribution network.
3. method as claimed in claim 2, it is characterised in that when node i is load bus, determine as the following formula in power distribution network Equivalent electrical distance D between node i and main feeder headend node jij
Dij=Ploadi×Lij
In formula, PloadiFor load bus i active power, LijFor distance of the node i away from main feeder headend node j;
It is equivalent electric between determination power distribution network interior joint i and main feeder headend node j as the following formula when node i is DG nodes Apart from Dij
Dij=(- PDGi)×Lij
In above formula, PDGiFor the active power of DG node is.
4. method as claimed in claim 2, it is characterised in that described that power distribution network is divided into after m initial power supply zones, Including:Node-home is adjusted by main feeder load factor equalization criterion, is specifically included:
The Rate of average load of m initial power supply zones is obtained respectively;
In the initial power supply zone higher than the 15% of Rate of average load, by equivalent electrical distance most long node distribution to being less than In the initial power supply zone of Rate of average load, until the Rate of average load of m initial power supply zones is not higher than Rate of average load 15%.
5. the method as described in claim 1, it is characterised in that described to set up power supply area object function and its constraints, Including:
Power supply area object function is set up as the following formula:
In above formula, f1Optimize the overall operational cost in the period, f for power distribution network2For the load unbalanced degree in the optimization period, f3To be excellent Change the maximum voltage deviation sum in the period,For period t electricity price,For power attenuation of the power distribution network in period t, Δ t For the time interval of each period, T is that, by the time small hop count of optimization Time segments division, N is branch road sum, cswiFor switching manipulation Expense once, sjiIt is the switch on branch road j in period i state, sji=0 represents to disconnect, sji=1 represents closure,For when Between segment t flow through branch road j apparent energy, Sj maxFor branch road j peak power,For time segment t nodes k voltage, VN For node rated voltage, NrFor node set, α1、α2And α3Respectively the first proportionality coefficient, the second proportionality coefficient and the 3rd ratio Coefficient;
Power supply area bound for objective function, including:
Node voltage is constrained, and formula is:
Vmin≤Vk≤Vmax
In above formula, Vmin、VmaxRespectively node voltage bound, VkFor node k voltage;
Power-balance constraint, formula is:
In above formula, Pi、QiActive power and reactive power that respectively node i is injected, Gij、Bij、δijIt is followed successively by between node i, j Conductance, susceptance and phase difference of voltage, n be system node sum;Vi、VjRespectively node i, j voltage magnitude;
Branch power is constrained, and formula is:
Pj≤Pj max
In above formula, PjFor branch road j active power value, Pj maxAllow maximum for branch road j active power;
Power distribution network radiation operation is constrained, and formula is:
g∈G
In above formula, g is completes the set of the network topology structure after division of the power supply area, and G is the radial topological structure of network Set;
Switch motion count constraint, formula is:
In above formula, Wj maxFor the maximum actuation number of times of single switch, WmaxFor the maximum actuation number of times of all switches, M is each subregion Branch road sum, N is branch road sum.
6. the method as described in claim 1, it is characterised in that described to connect by initial power supply zone and with there is switch between it The initial power supply zone connect merges into fit subregion, and determines the zoarium point using power supply area object function and its constraints The optimization of region scheme in area, including:
The initial power supply zone k for having switch to be connected with initial power supply zone i is obtained, keeps initial power supply zone i to be powered with remaining The on off state of by stages is constant, only closes whole switches between initial power supply zone i and initial power supply zone k, obtains just Beginning power supply zone i and initial power supply zone k fit subregion;
The optimal solution of the power supply area object function of fit subregion is determined using ant group algorithm, and regard the optimal solution as the zoarium The prioritization scheme of subregion.
7. the method as described in claim 1, it is characterised in that described to be determined to power according to the optimization of region scheme of fit subregion The optimization of region scheme in region, including:
The corresponding x groups prioritization scheme of each fit subregion is obtained, whole prioritization schemes are optimized into combination, until whole power supply The power supply area object function in region is minimum.
8. a kind of active power distribution network division of the power supply area device, it is characterised in that described device includes:
Division module is clustered, the initial power supply zone for obtaining power distribution network using fuzzy clustering algorithm;
Module is set up, for setting up power supply area object function and its constraints;
First determining module, the initial power supply zone for being connected by initial power supply zone and with there is switch between it is merged into Fit subregion, and determine using power supply area object function and its constraints the optimization of region scheme of the fit subregion;
Second determining module, the optimization of region scheme for determining power supply area according to the optimization of region scheme of fit subregion.
9. device as claimed in claim 8, it is characterised in that the cluster division module, including:
Distance determining unit, is j for the main feeder headend node in establishing power network, and node is i, j ∈ [1, m], i ∈ [1, n], M is main feeder number, and n is nodes;Clusters number c=m is set, determines each node to m main feeder headend node respectively Equivalent electrical distance;
Zoning unit is clustered, for using m main feeder headend node as cluster centre, by each load bus according to equivalent electric The minimum value cluster of gas distance, m initial power supply zones are divided into by power distribution network.
10. device as claimed in claim 9, it is characterised in that the cluster division module also includes:
Acquiring unit is loaded, for being divided into power distribution network after m initial power supply zones, m initial power supplies are obtained respectively The Rate of average load of subregion;
Load Balance Unit, in the initial power supply zone higher than the 15% of Rate of average load, by equivalent electrical distance most Long node distribution is into less than the initial power supply zone of Rate of average load, until the Rate of average load of m initial power supply zones It is not higher than the 15% of Rate of average load.
CN201710153379.3A 2017-03-15 2017-03-15 Power supply area division method and device for active power distribution network Active CN107017618B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710153379.3A CN107017618B (en) 2017-03-15 2017-03-15 Power supply area division method and device for active power distribution network

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710153379.3A CN107017618B (en) 2017-03-15 2017-03-15 Power supply area division method and device for active power distribution network

Publications (2)

Publication Number Publication Date
CN107017618A true CN107017618A (en) 2017-08-04
CN107017618B CN107017618B (en) 2021-01-08

Family

ID=59440605

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710153379.3A Active CN107017618B (en) 2017-03-15 2017-03-15 Power supply area division method and device for active power distribution network

Country Status (1)

Country Link
CN (1) CN107017618B (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108281963A (en) * 2018-01-17 2018-07-13 浙江大学 It is a kind of to be suitable for the power distribution network partition method containing multiple flexible multimode switches
CN108599141A (en) * 2018-02-05 2018-09-28 西交利物浦大学 The quick dynamic self-adapting recognition methods of multiple-energy-source LAN
CN109638823A (en) * 2018-12-19 2019-04-16 国网河南省电力公司电力科学研究院 Automatic Mesh Partition Method and device for radial system state estimation
CN109886836A (en) * 2019-03-01 2019-06-14 西安交通大学 A kind of dynamic partition Prices Calculation based on partition clustering analysis
CN110445123A (en) * 2018-05-02 2019-11-12 国家电网公司 A kind of network reconfiguration control method expanding power distribution network power supply capacity
CN110490492A (en) * 2019-09-06 2019-11-22 南方电网科学研究院有限责任公司 A kind of method and apparatus dividing distributed energy cluster
CN111709638A (en) * 2020-06-12 2020-09-25 山东大学 Method and system for constructing combined cooling heating and power system based on graph theory and equivalent electric method
CN111970586A (en) * 2020-08-13 2020-11-20 电信科学技术第五研究所有限公司 Rapid optical network path routing calculation method and device under constraint condition and computer medium
CN112598149A (en) * 2020-11-03 2021-04-02 上海电力大学 Power distribution network frame construction method based on differential load matching
CN113344273A (en) * 2021-06-08 2021-09-03 中国农业大学 Building energy consumption based method and system for adjusting and optimizing peak-valley difference of regional distribution network
CN114500621A (en) * 2022-01-24 2022-05-13 山东智达自控***有限公司 Intelligent power distribution control system based on Internet of things
CN115496392A (en) * 2022-10-08 2022-12-20 广东电力交易中心有限责任公司 Multi-target power grid blocking partitioning method based on consensus clustering and product
CN116581890A (en) * 2023-06-29 2023-08-11 浙江稳山电气科技有限公司 Intelligent monitoring method and system for operation stability of power grid

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103326351A (en) * 2013-05-17 2013-09-25 国家电网公司 Distribution type parallel load flow calculation method based on hierarchical clustering automatic partition
CN104167814A (en) * 2013-07-24 2014-11-26 国家电网公司 Method for realizing distribution network reconfiguration based on multiple agents
CN104899795A (en) * 2015-05-27 2015-09-09 云南电网有限责任公司 Method for partitioning power supply areas based on distribution network GIS system
CN106329516A (en) * 2015-07-09 2017-01-11 中国电力科学研究院 Typical scene recognition based dynamic reconstruction method of power distribution network
CN106356849A (en) * 2016-10-31 2017-01-25 山东山大电力技术有限公司 Power distribution network reconstruction multi-objective optimization method containing section switch configuration

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103326351A (en) * 2013-05-17 2013-09-25 国家电网公司 Distribution type parallel load flow calculation method based on hierarchical clustering automatic partition
CN104167814A (en) * 2013-07-24 2014-11-26 国家电网公司 Method for realizing distribution network reconfiguration based on multiple agents
CN104899795A (en) * 2015-05-27 2015-09-09 云南电网有限责任公司 Method for partitioning power supply areas based on distribution network GIS system
CN106329516A (en) * 2015-07-09 2017-01-11 中国电力科学研究院 Typical scene recognition based dynamic reconstruction method of power distribution network
CN106356849A (en) * 2016-10-31 2017-01-25 山东山大电力技术有限公司 Power distribution network reconstruction multi-objective optimization method containing section switch configuration

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
J. OLAMAEI等: "A hybrid evolutionary algorithm based on ACO and SA for distribution feeder reconfiguration", 《 2010 THE 2ND INTERNATIONAL CONFERENCE ON COMPUTER AND AUTOMATION ENGINEERING (ICCAE)》 *
华鹏宇: "电网规划中空间负荷预测及变电站供电区域划分", 《中国优秀硕士学位论文全文数据库 工程科技II辑》 *
庞若飞: "基于多代理理论的配电网故障恢复策略研究", 《中国优秀硕士学位论文全文数据库 工程科技II辑》 *

Cited By (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108281963B (en) * 2018-01-17 2019-08-27 浙江大学 A kind of power distribution network partition method suitable for being switched containing multiple flexible multimodes
CN108281963A (en) * 2018-01-17 2018-07-13 浙江大学 It is a kind of to be suitable for the power distribution network partition method containing multiple flexible multimode switches
CN108599141A (en) * 2018-02-05 2018-09-28 西交利物浦大学 The quick dynamic self-adapting recognition methods of multiple-energy-source LAN
CN108599141B (en) * 2018-02-05 2021-04-27 西交利物浦大学 Rapid dynamic self-adaptive identification method for multi-energy local area network
CN110445123A (en) * 2018-05-02 2019-11-12 国家电网公司 A kind of network reconfiguration control method expanding power distribution network power supply capacity
CN110445123B (en) * 2018-05-02 2021-07-16 国家电网公司 Network reconfiguration control method for expanding power supply capacity of power distribution network
CN109638823A (en) * 2018-12-19 2019-04-16 国网河南省电力公司电力科学研究院 Automatic Mesh Partition Method and device for radial system state estimation
CN109886836B (en) * 2019-03-01 2021-01-19 西安交通大学 Dynamic partition electricity price calculation method based on partition clustering analysis
CN109886836A (en) * 2019-03-01 2019-06-14 西安交通大学 A kind of dynamic partition Prices Calculation based on partition clustering analysis
CN110490492A (en) * 2019-09-06 2019-11-22 南方电网科学研究院有限责任公司 A kind of method and apparatus dividing distributed energy cluster
CN111709638A (en) * 2020-06-12 2020-09-25 山东大学 Method and system for constructing combined cooling heating and power system based on graph theory and equivalent electric method
CN111709638B (en) * 2020-06-12 2023-08-29 山东大学 Combined cooling heating power system construction method and system based on graph theory and equivalent electric method
CN111970586A (en) * 2020-08-13 2020-11-20 电信科学技术第五研究所有限公司 Rapid optical network path routing calculation method and device under constraint condition and computer medium
CN111970586B (en) * 2020-08-13 2022-08-02 电信科学技术第五研究所有限公司 Rapid optical network path routing calculation method and device under constraint condition and computer medium
CN112598149B (en) * 2020-11-03 2023-10-31 上海电力大学 Power distribution network frame construction method based on differential load matching
CN112598149A (en) * 2020-11-03 2021-04-02 上海电力大学 Power distribution network frame construction method based on differential load matching
CN113344273A (en) * 2021-06-08 2021-09-03 中国农业大学 Building energy consumption based method and system for adjusting and optimizing peak-valley difference of regional distribution network
CN113344273B (en) * 2021-06-08 2024-04-19 中国农业大学 Regional power distribution network peak-valley difference adjustment optimization method and system based on building energy
CN114500621A (en) * 2022-01-24 2022-05-13 山东智达自控***有限公司 Intelligent power distribution control system based on Internet of things
CN114500621B (en) * 2022-01-24 2024-04-26 山东智达自控***有限公司 Intelligent power distribution control system based on Internet of things
CN115496392A (en) * 2022-10-08 2022-12-20 广东电力交易中心有限责任公司 Multi-target power grid blocking partitioning method based on consensus clustering and product
CN115496392B (en) * 2022-10-08 2023-10-10 广东电力交易中心有限责任公司 Multi-target power grid blocking partition method based on consensus clustering and product
CN116581890B (en) * 2023-06-29 2023-10-27 浙江稳山电气科技有限公司 Intelligent monitoring method and system for operation stability of power grid
CN116581890A (en) * 2023-06-29 2023-08-11 浙江稳山电气科技有限公司 Intelligent monitoring method and system for operation stability of power grid

Also Published As

Publication number Publication date
CN107017618B (en) 2021-01-08

Similar Documents

Publication Publication Date Title
CN107017618A (en) A kind of active power distribution network division of the power supply area method and device
Nguyen et al. Multi-objective electric distribution network reconfiguration solution using runner-root algorithm
CN105046022B (en) A kind of intelligent distribution network self-healing method based on improvement ant group algorithm
CN106410853B (en) The service restoration method of power distribution network containing distributed generation resource
CN106651628B (en) Regional cooling, heating and power comprehensive energy optimal allocation method and device based on graph theory
CN104732295A (en) Power load predicating model based on big data technology
CN105932690B (en) A kind of distribution running optimizatin method of comprehensive idle work optimization and network reconfiguration
CN103034912A (en) Distributed power supply site selection constant volume optimized method
CN108494678A (en) Alternate routing configuration method based on genetic algorithm and system
CN110048456A (en) A kind of source net joint planing method based on large-scale wind power access power transmission network
CN106033887A (en) Power distribution network reconstruction method based on improved PSO-DE hybrid algorithm
CN108108224A (en) Virtual machine placement method in cloud data center based on ant colony optimization algorithm
CN104134104A (en) Distribution network reconstruction optimization method based on multi-objective optimization
CN113723807B (en) Energy storage and information system double-layer collaborative planning method, device and medium
Wang et al. Ant colony optimization for multicast routing
CN106655155B (en) Power distribution network fault recovery method considering uncertainty of fault recovery time
CN110350511B (en) Power distribution network fault recovery method based on transfer power affinity
CN111416356A (en) Transmission and distribution network linkage optimization method based on alternating direction multiplier method and optimal power flow
CN108270216B (en) Multi-target-considered complex power distribution network fault recovery system and method
CN102291308B (en) A kind of implementation method of network dynamic load balancing and system
Hong et al. Genetic algorithm based network reconfiguration for loss minimization in distribution systems
CN108537369A (en) Improvement population algorithm for distribution network reconfiguration based on local search
CN109670981A (en) Active distribution network planing method based on balance of interest and planning operation alternative optimization
Fuchs et al. Improved method for integrating renewable energy sources into the power system of Northern Europe: Transmission expansion planning for wind power integration
Ahmad et al. Multi-objective quantum-inspired Artificial Immune System approach for optimal network reconfiguration in distribution system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant